# Mathematical Literacy Grade 12 P2 NSC November 2017 Memo

> Grade 12 Mathematical Literacy Paper 2 memorandum from the NSC November Exam 2017 (English), 17 pages. Read online or download the free PDF.

- Page: https://www.hlayiso.com/library/mathematical-literacy-p2-nov-2017-memo-eng/d20649df-4031-4497-a4c6-c1e90161c120
- Updated: 2026-09-27
- Subject: Mathematical Literacy
- Grade: Grade 12
- Document type: Memorandum
- Year: 2017
- Exam period: NSC November Exam
- Paper: 2
- Curriculum: CAPS
- Pages: 17

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 12](https://www.hlayiso.com/library/grade-12) › [Mathematical Literacy](https://www.hlayiso.com/library/grade-12/mathematical-literacy) › [Mathematical Literacy Grade 12 P2 NSC November 2017 Memo](https://www.hlayiso.com/library/mathematical-literacy-p2-nov-2017-memo-eng/d20649df-4031-4497-a4c6-c1e90161c120)

## About this document

Mathematical Literacy · Grade 12 · NSC November Exam · 2017. Memorandum, 17 pages. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

Downloaded from hlayiso.com

                                         NATIONAL
                                    SENIOR CERTIFICATE

                                                GRADE 12

                              MATHEMATICAL LITERACY P2

                                          NOVEMBER 2017

                                    MARKING GUIDELINES

MARKS: 150

                     Symbol     Explanation
                       M        Method
                      MA        Method with accuracy
                       CA       Consistent accuracy
                        A       Accuracy
                        C       Conversion
                        S       Simplification
                       RT       Reading from a table/ a graph / document/diagram
                       SF       Correct substitution in a formula
                       O        Opinion/Explanation
                        P       Penalty, e.g. for no units, incorrect rounding off, etc.
                        R       Rounding off
                      NPR       No penalty for rounding
                       AO       Answer only
                      MCA       Method with constant accuracy

                              This marking guideline consist of 17 pages.

Copyright reserved                                                                         Please turn over

### Page 2

Downloaded from hlayiso.com
        Mathematical Literacy/P2                       2                            DBE/November 2017
                                             NSC – Marking Guidelines

QUESTION 1 [40 MARKS]
Ques Solution                                                             Explanation                      T&L
                                                                                                           F
1.1.1   Decrease amount in thousands         Decrease amount                                               L2
        = R32 187 × 4,402% M                = R32 187 000 × 4,402%       1M % calculation
        ≈ R1 416,87 CA                      = R1 416 871,74              1CA decreased amount
        Communication Cost in thousands      ≈ R1 417 000
        = R32 187 – R1 416,87M              Comm. Cost                   1M subtracting
        = R30 770,13                         = R32 187 000 – R1 417 000
        = R30 770 R                         = R30 770 000                1R rounding

                                        OR                                           OR
        Communication Cost in thousands                                   1M subtracting
                 M
        = 32 187 – (4,402% × 32 187) M                                   1M % calculation
        = 32 187 – 1 416,87 = 30 770 CA R                               1CA decreased amount
                                                                          1R rounding
                                      OR                                             OR
                                    M
        100% – 4,402% = 95,598 %                       M                 1M subtracting
        Communication Cost in thousand = R32 187 × 95,598%                1M % calculation
                                       = R30 770,12826 CA                1CA cost
                                       ≈ R30 770 R                       1R rounding
                                        OR                                           OR
        Communication Cost in thousands
                                                                          1M subtracting
                     M                                                   1M adding all other values
        = R2 163 571 – R(67 257 + 640 601 + 69 866 +    M
           953 592 + 135 768 + 34 087 + 55 267 + 176 363)
                                                                          1CA total for other values
        = R2 163 571 – R2 132 801 CA
                                                                          1CA cost
        = R30 770 CA
                                                                          AO
                                                                                                  (4)
                                                                                                           F
1.1.2   Profits could decrease.          O                              2O explanation                   L4
        OR
        Imported stock will cost more. O
                                                                                                   (2)
                                                                                                           F
1.1.3                                   342 534         RT
        For 2015: Percentage profit =            × 100%                   1RT correct values               L4
                                       2 250 041        SF               1SF substitution
                                    = 15,22345593%                        1A percentage for 2015
                                                       A
                                        360 651
        For 2016: Percentage profit =            × 100%
                                       2 403 509
                                    = 15,00518617 % A                    1A percentage for 2016
        The profit decreased O                                           1O comparison
        OR
        The profit nearly stayed the same.
        OR

        Copyright reserved                                                              Please turn over

### Page 3

Downloaded from hlayiso.com
      Mathematical Literacy/P2                       3                         DBE/November 2017
                                           NSC – Marking Guidelines

Ques Solution                                                         Explanation                      T&L
     NOTE: Calculated profit for 2015 is R343 002 thousand
                          343 002                                     1RT correct values
     Percentage profit =           × 100% RT                         1SF substitution
                         2 250 041          SF
                       ≈ 15,24%           A                          1A percentage for 2015
     For 2016:
                          360 651
     Percentage profit =           × 100%
                         2 403 509                                    1A percentage for 2016
                       = 15,00518617 %     A
      The profit decreased       O                                   1O comparison
                                                                      NPR
                                                                                               (5)
                     A                       MCA                                                     F
1.2   Income tax = R147 996 + 39% × R(663 000 – 550 100)              1A correct bracket               L3
                = R147 996 + 39% × R112 900                           1MCA amount above
                = R147 996 + R44 031    S                            1S simplification
                = R192 027 CA                                        1CA tax before rebate
      Total Income Tax (after rebates)                   M
       = R192 027 – R13 500 – R7 407   OR = R192 027 – R20907         1M subtracting both
                                                                      rebates
      = R171 120      CA                                             1CA tax after rebate
                                                                                               (6)
                                                                                                       D
1.3   Increase number of donors for 2017                                                               L3
      = 110 000 × 9,6%
      = 10 560     M                                                 1M calculating 9,6%
      Number of donors 2017
                                                                      1CA calculating total
      = 110 000 + 10 560
                                                                      donors for 2017
      = 120 560 CA

      Increase number of donors for 2018
      = 120 560 × 9,6%
                                                                      1M calculating 9,6 % of
      = 11 573,76 M
                                                                      2017 donors
      Number of donors 2018
      = 120 560 + 11 573,76
      = 132 133,76
                                                                      1CA calculating donors
      ≈ 132 134 CA
                                                                      for 2018
                                      OR                                         OR

      Number of donors for 2017                                       1M multiplying correct
      =110 000 + (110 000 × 9,6%)     M                              values
      = 120 560 CA                                                   1CA calculating donors
                                                                      for 2017
      Number of donors for 2018                                       1M multiplying correct %
      =120 560 + (120 560 × 9,6%) M                                  to 2017 number
      = 132 133,76                                                    1CA calculating number
      ≈ 132 134 CA                                                   for 2018
                                  OR

      Copyright reserved                                                            Please turn over

### Page 4

Downloaded from hlayiso.com
        Mathematical Literacy/P2                      4                              DBE/November 2017
                                            NSC – Marking Guidelines

Ques Solution                                                          Explanation                           T&L
                                    OR                                               OR

        Number of donors for 2017                                      1M multiplying and adding
        = 110 000 ×109,6% M                                           percentages
        = 120 560 CA                                                  1CA calculating total number
                                                                       for 2017
        Number of donors for 2018
        = 120 560 × 109,6% M                                          1M multiplying and adding
        = 132 133,76                                                   correct % to 2017 number
        ≈ 132 134 CA                                                  1CA calculating number for
                                                                       2018

                                    OR                                               OR

        Number of donors for 2018                                      1M adding percentages
                 M M         M                                      1M multiplying correct
        = 110 000 × 109,6% × 109,6%                                    numbers
        = 132 133,76                                                   1M multiplying 109,6% twice
        ≈ 132 134 CA                                                  1CA calculating number for
                                                                       2018
                                                                       NPR
                                                                       AO
                                                                                                  (4)
                                                                                                             D
1.4.1   Makes provision for other people who are not Asian, Black,                                           L4
                                                                       2O explanation
        Coloured or White.                   O
        OR
        Some donors don't indicate race.                O
        OR
        The percentage of the races do not add up to 100%. O
        OR
        The other is ‘mixed’ race. O
        OR
                                            O
        They are from other countries.                                                               (2)
                     O                                          O                                          D
1.4.2   As the years increase the percentage black donors increase.    2O increasing trend                   L4
                                                                                                     (2)
                                                                                                             D
1.4.3   The number of donors are different every year. O             2O explanation                        L4
        OR
        The graph represents percentages. O
        OR
        The percentages are rounded values.          O
        OR                                                    O
        The graph shows that the bars’ heights are not the same.
                                                                                                     (2)

        Copyright reserved                                                                Please turn over

### Page 5

Downloaded from hlayiso.com
        Mathematical Literacy/P2                               5                            DBE/November 2017
                                                     NSC – Marking Guidelines

Ques Solution                                                                   Explanation                          T&L
                                                                                                                     D
1.4.4    The 2015 donors × 101,02% = 490914                                                                          L2
(a)                          490 914                                            1MA dividing by 101,02%
         Number of donors =           A                    OR
                            101,02%
                         = 485 957,236…                                         1A number of donors
                         ≈ 485 957      A                                      NPR
                                                                                                             (2)
                                                                                CA from Q1.4.4 (a)                   D
1.4.4    % white = 100% – (8% + 38% + 5% + 2%) MA                              1MA subtracting from 100%            L3
(b)              = 47% CA                                                      1CA percentage

         Number of white donors = 485 957 × 47% MCA                            1MCA % calculation
                                = 228 399,79…
                                ≈ 228 400 CA                                   1CA rounded number
                                                                                AO
                                                                                                             (4)
                                                                                                                     P
1.5.1    P (Blood Type O )                                                                                           L2
                RT
         = (39 + 6)%                                                            1RT correct two values

                                                                                1A calculating probability
         = 45% OR 9 OR 0,45A                                                                                (2)
                  20

                                                                                                                     P
             +                                                                  2A correct blood type                L2
1.5.2    AB         A
                                                                                                             (2)
                                                                                                                     P
1.5.3      O                                                                                                        L4
         No, it is NOT most likely.                                             1O verification

         Can only receive blood from own blood group.               O         2O explanation

                                                OR
                                                                                            OR
             -
         P (O receiving blood from any donor)
              A
         = 1                                                                    1A numerator
            8 A                                                                1A denominator
                                  O
         ∴ It is NOT most likely.
                                                                                1O verification
                                                                                                            (3)
                                                                                                           [40]

        Copyright reserved                                                                        Please turn over

### Page 6

Downloaded from hlayiso.com
        Mathematical Literacy/P2                               6                              DBE/November 2017
                                                     NSC – Marking Guidelines

QUESTION 2 [37 MARKS]
Ques Solution                                                                   Explanation                       T&L
                                                   O                                                            F
2.1.1      Inland prices have higher costs for transport / storage.             2O reason                         L4
           OR                                                       O
           Coastal storages are close by and transport fees are lower.
           OR
           Fuel is imported via harbours.     O
           OR
           Most refineries are along the coast. O
                                                                                                            (2)
                                                                                                                  F
2.1.2           R2,67 A                                                        1M multiplying                    L2
           S =         × R616,00 M                   OR
               R12,32                                                           1A correct ratio
             = R133,50    CA                                                   1CA storage cost
                                             OR
                                 R616,00M                                      1M dividing
           Number of litres =                       OR
                                 R12,32
                              = 50 A                                           1A litres
                                                     OR
           S = 50ℓ × R2,67/ℓ
             = R133,50 CA                                                      1CA storage cost

                                             OR                                               OR
                                   R77 × R5,26                                  1A basic fuel price
           Basic fuel price =                     = R263    A
                                     R1,54
                                    M                                          1M subtracting all from total
                                                          CA                   1CA storage cost
           S = R616 – R142,50 – R77,00 – R263,00 = R133,50
                                                                                AO
                                                                                                          (3)
                                                   M                                                             F
2.1.3      Number of litres consumed = 1 250 km × 7,3 ℓ ÷ 100 km                1M working with                   L4
                                      = 91,25 ℓ A                              consumption rate
           Inland cost = 91,25 ℓ × R12,32/ ℓ                                    1A number of litres
                       = R1 124,20 CA                                          1CA inland cost
           Coastal cost = 91,25 ℓ × R11,94/ ℓ
                        = R1 089,525
                                                                                1CA coastal cost
                        ≈ R1 089,53 CA

           Statement is NOT valid.           O                                 1O verification

                                     OR                                                    OR
                                     M                                         1M working with
           Litres consumed = 1 250 km ÷ 100 km × 7,3 = 91,25
                                                             A                 consumption rate
                                                                                1A number of litres
           Difference in fuel price = R12,32 – R11,94 = R0,38 M
                                                                                1M difference
           Difference in cost = R0,38/ ℓ × 91,25 ℓ
                              ≈ R34,68      A                                  1A cost
           Statement is NOT valid.    O
                                                                                1O verification
                                        OR

        Copyright reserved                                                                         Please turn over

### Page 7

Downloaded from hlayiso.com
        Mathematical Literacy/P2                         7                      DBE/November 2017
                                               NSC – Marking Guidelines

Ques        Solution                                                      Explanation               T&L
                                            OR                                   OR
            Inland
                                                                          1M working with
            Cost / 100 km = 7,3 ℓ × R12,32/ ℓ = R89,94 M
                                                                          consumption rate
            Number of 100km distances =1250 km ÷ 100 km = 12,5
                                                  A                      1A cost
            Cost = 12,5 × R89,94 = R1 124,20
            Coastal
            Cost / 100 km = 7,3 l × R11,94 = R87,16
            Number of 100 km distances = 1250 km ÷ 100 km = 12,5
                                                                          1A cost
            Cost =12,5 × R89,94 = R1 089,53 A
                                                                          1M difference
            Difference = R1 124,50 – R1 089,53 = R34,67 M
                                         O                               1O verification
            Statement is NOT valid.
                                            OR                            OR
                                                       M                 1M difference
            Difference = R12,32 – R11,94 = R0,38
            Number of 100 km distances = 1 250 km ÷ 100 km = 12,5         1M multiplying with
                       M         M                                      consumption rate
            Cost = R0,38 × 7,3 × 12,5 = R34,68     A                     1M multiply with
                                                                          12,5
            Statement is NOT valid. O                                    1A cost
                                                                          1O verification
                                                                          NPR
                                                                                           (5)
                                                     M                                             F
2.2.1                    R70,9 billion − R54 billion                      1M % increase             L2
            % increase =                             × 100% A            1A correct values
                                 R 54 billion
                       ≈ 31,296 % CA                                     1CA percentage

                                            OR                                      OR

            R70,9 billion M                                              1M % increase
                           × 100% = 131,2962%     A                      1A correct values
             R 54 billion
            % increase = 131,2962% – 100%                                 1CA percentage
                        ≈ 31,296 %     CA
                                                                                    OR
                                            OR
            Using Trial & Error:                                          1M % calculation
                             M             A                            1A increase amount
            R54 billion × 31,3% = R16,9 billion

            R16,9 billion + R54 billion = R70,9 billion
                                                                          1CA percentage
            ∴ % increase = 31,3% CA
                                                                          NPR
                                                                                              (3)

        Copyright reserved                                                           Please turn over

### Page 8

Downloaded from hlayiso.com
        Mathematical Literacy/P2                         8                              DBE/November 2017
                                               NSC – Marking Guidelines

Ques        Solution                                                              Explanation              T&L
                                                                                                           F
2.2.2       7 + 118 = 125 A                                                      1A adding ratio          L3
                                                                                  values
             7
                × Total budgeted income = R70,9 billion A                        1A using ratio values
            125

                                                       7  M
            Total budgeted income = R70,9 billion ÷                               1M dividing by ratio
                                                      125
                                    = R1 266,07 billion
                                                                                  1CA budget value
                                    ≈ R1 266 billion CA
                                           OR                                             OR
            7: 118 = R70,9 billion : x       A                                   1A using proportion
                7x = R70,9 billion ×118
                      R70,9 billion × 118      S
                  x=                                                              1S changing subject
                               7
                    ≈ R1 195,17 billion       CA                                 1CA other revenues

            Total budgeted income = R1 195,17 billion + R70,9 billion
                                  = R1 266,07 billion
                                  ≈ R1 266 billion      CA                       1CA rounded value
                                                                                  in billion
                                                                                                   (4)
                                                                                                           D
2.3.1       India       RT                                                      2RT country              L2
                                                                                                     (2)
                                                                                                           D
2.3.2       0,02 0,52 0,63 0,91 1,12 1,23 2,03 2,17 2,97 3,62 4,11                1M use formula of        L3
                                                                                  IQR
            IQR = Q 3 – Q 1 M                                                    1A lower quartile
                    A       A                                                   1A upper quartile
                = 2,97 – 0,63
                                                                                  1CA IQR
                 = 2,34      CA                                                  AO
                                                                                  [Accept 58 – 7 = 51]
                                                                                                    (4)
                                                                                                           D
                                                                 st  O
2.3.3       Countries with high rankings are developed (rich, 1 world) as well 2O valid reason             L4
            as underdeveloped/developing (poor, 3rd world).

            OR                                                  O
            Countries with low rankings are developed (rich) as well as
            underdeveloped/ developing (poor).

            OR
            Counties listed are from all over the world (different continents).
                           O
            OR                                                           O
            Rankings show the sample was chosen randomly.                                            (2)

        Copyright reserved                                                                  Please turn over

### Page 9

Downloaded from hlayiso.com
    Mathematical Literacy/P2                            9                      DBE/November 2017
                                              NSC – Marking Guidelines

Ques    Solution                                                         Explanation               T&L
                                                                         1RT reading both          F
2.3.4                                     236,51    RT                  values                    L3
        India: Mean Daily wage =                       MA
                                          93,76%                         1MA dividing by %
                                         ≈ 252,25 Rouble A              1A Indian day wage
                                          237,35
        SA: Mean Daily wage           =
                                          26,20%
                                      ≈ 905,92 Rouble A                 1A SA day wage

                                         M                              1M subtracting
        Difference = (905,92 – 252,25) Russian Rouble
                                                                         1CA difference in
                   = 653,67 Russian Rouble     CA
                                                                         Rouble
                                                                                             (6)
                                                                                                   D
2.3.5   Range = 425,52 – 21,44 A                                        1A range                  L4
              = 404,08 Russian Rouble

               1 Russian Rouble = 0,016 Euro     M                      1M multiplication
        ∴ 404,08 Russian Rouble = 404,08 × 0,016 Euro
                                = 6,46528 Euro C                        1C convert to Euro
        1 South African Rand = 0,070 Euro
                  C                                                     1C convert to rand
        ∴ 6,46528 = R92,36            A                                 1A rand value
              0,07
        Learner solution is incorrect        O                          1O verification
                                    OR                                           OR
                           0,016      C
        1 Russian Rouble =       Rand                                    1C dividing by 0,07
                                 0,070
                               = R 0,2285714286    A                    1A conversion factor
        Range = 425,52 – 21,44 A                                        1A range
              = 404,08 Russian Rouble

                 = 404,08 × 0,2285714286 rand/rouble C                  1C conversion

                 = R92,36        A
                                                                         1A rand value
                                                                         1O verification
        Learner solution is incorrect O
                                       OR                                       OR
                                                                         1C conversion
                                          C              CA
        Max. value to rand: 425,52 × 0,016 ÷ 0,07 = R97,26               1CA max value
        Min. value to rand: 21,44 × 0,016 ÷ 0,07 = R4,90 CA             1CA min value
                     M                                                  1M subtracting
        Range = R97,26 – R4,90 = R92,36 CA
                                                                         1CA rand value
        Learner solution is incorrect.       O                          1O verification
                                                                         NPR
                                                                                            (6)
                                                                                           [37]

    Copyright reserved                                                              Please turn over

### Page 10

Downloaded from hlayiso.com
    Mathematical Literacy/P2                          10                               DBE/November 2017
                                            NSC – Marking Guidelines

QUESTION 3 [40 MARKS]
Ques  Solution                                                         Explanation                        T&L
           A                                                                                            MP
3.1.1    33 Kwela Street A                                            2A correct number                  L2
                                                                       1A correct street
                                                                                                    (3)
                                                                                                          M
3.1.2    Length 22 mm A            (21 mm to 23 mm)                   1A length                          L3
         Width 9 mm A              (8 mm to 10 mm)                    1A width

         Scale 25 A
                  mm = 30 m          (24 mm to 26 mm)                  1A measured scale
                       30                                              1M using the scale
         ∴ Length =        × 22 m M
                       25
                    = 26,4 m      CA                                  1CA length in m

                         30                                            1CA width in m
         Width = 9 ×        m = 10,8 m CA
                         25
                                                                                   OR
                                       OR
                   A                                                  1A measured scale
         Scale: 25 mm : 30 m       (24 mm to 26 mm)
                 25mm : 30 000 mm                                      1M unit scale
                     1 : 1 200    M                                   1A length
         Length = 22 mm       A (21 mm to 23 mm)
                                                                       1A width
         Width = 9 mm A           (8 mm to 10 mm)
         Actual length = 22 × 1 200 mm                                 1CA length in m
                         = 26 400 mm = 26,4 m CA
         Actual width = 9 × 1 200 mm                                   1CA width in m
                      = 10 800 mm = 10,8 mCA                                                       (6)

                                                                       CA from Q3.1.2                     MP
3.1.3    On the enlarged map:                                                                             L4
                                 MCA                                  1MCA measured length
         Measured length = 62 mm         (61mm to 64 mm)
                            M        CA
         Scaled length = 62 mm ÷ 5 = 12,4 mm ≠ 22 mm                   1M dividing by 5
                                                                       1CA simplification
          ∴ NOT valid          O                                      1O verification

                                       OR                                          OR

         On the enlarged map:                                          1A measured length
                                 A
         The measured width = 24 mm       (23 mm to 26 mm)
                    M                                                 1M multiplying with 5
                           CA
         widths: 9 mm × 5 = 45 mm ≠ 24 mm                              1CA simplification

         ∴ NOT valid           O                                      1O verification
                                       OR

    Copyright reserved                                                                      Please turn over

### Page 11

Downloaded from hlayiso.com
    Mathematical Literacy/P2                        11                              DBE/November 2017
                                          NSC – Marking Guidelines

Ques     Solution                                                    Explanation                         T&L
                                     OR                                            OR
         On the enlarged map:
         Measured length = 62 mmA        (61mm to 64 mm)            1A measured
         Measured width = 24 mm           (23 mm to 26 mm)
                                  62 M                    24        1M dividing
                    Scale factor =      OR        width =
                                   22                       9
                                ≈ 2,82 CA              ≈ 2,67       1CA scale factor
         ∴ Not valid                                                 1O verification
                          O                                                                       (4)
                          MA                                                                            M
3.2.1    Length = 5 240 mm – 2 × 220 mm                              1MA subtracting of thickness        L3
                = 4 800 mm CA                                       1CA internal length
         Width = 4 040 mm – 2 × 220 mm
                = 3 600 mm     CA                                   1CA internal width
                                        MCA
         Floor area = 4 800 mm × 3 600 mm                            1MCA substitution
                    = 17 280 000 mm2
                    = 17 280 000 ÷ 1 000 000 C                      1C conversion
                    = 17,28 m2 CA                                   1CA internal area in m2
                                    OR                                            OR
         Length = 5 240mm = 5,24m         C
         Width = 4 040mm = 4,04m                                     1C conversion of all values
         Wall thickness = 220mm = 0,22m
                                   MA                               1MA subtracting thickness
         Interior Length = 5,24m – 2(0,22m) = 4,8mCA                1CA length
         Interior Width = 4,04m – 2(0,22m) = 3,6m CA                1CA width

         Floor Area = 4,8 m × 3,6 m MCA                             1MCA substitution
                    = 17,28m2 CA                                    1CA internal area in m2
                                                                                                   (6)
                                                                     CA from Q3.2.1                      M
3.2.2    Area of Ceiling board = 2 400 mm × 900 mm          SF      1SF substitution                    L4
                               = 2 160 000 mm2 A                    1A area of board

                                      17 280 000 M                  1M dividing
         Number of boards needed =
                                       2 160 000
                                     =8                              1CA number of boards
                                              CA
         ∴ Need more than 7 O                                       1O deduction
                                     OR                                            OR
         Number needed = 4 800 mm ÷ 2 400 mm
                                             M                      1M dividing
                       = 2 for length CA                            1CA number length wise
         Number needed = 3 600 mm ÷ 900 mm
                       = 4 for width       CA                       1CA number width wise
         Total needed = 2 × 4 = 8 CA                                1CA number of boards
         ∴ Need more than 7 O
                                                                     1O deduction
                                  OR

    Copyright reserved                                                                    Please turn over

### Page 12

Downloaded from hlayiso.com
        Mathematical Literacy/P2                         12                                  DBE/November 2017
                                               NSC – Marking Guidelines

Ques        Solution                                                      Explanation                           T&L
                                        OR                                                                      M
                                                                                                                L4
                                              SF            A           1SF substitution
            Area of one ceiling board = 2,4 m × 0,9 m = 2,16 m2
                                                                          1A area of board
                                                  M       CA
            Total area coved by 7 boards = 2,16 m2 × 7 = 15,12 m2         1M multiplying
                                                                          1CA total area
            ∴ Need more than 7         O                                 1O deduction
                                                                                                         (5)
                                         CA                                                              M
                                                       SF
3.2.3       Length of cornice = 2 × (4 800 mm + 3 600 mm)                 1CA values from Q 3.2.1 or RT L2
                                                                          if reworked
                                   = 16 800 mm CA                        1SF substitution
                                                                          1CA length
                                                                                                      (3)
                                                                          CA from Q3.2.3 and Q3.2.2       F
3.2.4       16 800 ÷ 2 000 = 8,4                                                                          L4
                    CA
            Hence 9 lengths cornice needed.                               1CA number of lengths
                              A         M
            Total cost = 8 × R91,44 + 9 × R53,64                          1A using 2 correct prices
                       = R731,52 + R482,76                                1M multiplying
                       = R1 214,28 CA                                    1CA cost

            The statement is correct. O                                  1O conclusion
                                                                                                         (5)
                                                                                                                MP
3.3.1       Above ground is a higher security risk      O               2O reason                             L4

            OR
            Safety reasons           O

            OR
            Below the ground the cost will be less.    O

            OR
            Above the ground it takes up space.                 O

            OR
            Underground, the water stays cooler/fresher than in
            direct sun/ lessen evaporation.          O

            OR
            Aesthetic reasons. O

            OR
                                                                O
            Below the ground for water to easily run into it.
            OR
            Less maintenance O
                                                                                                         (2)

        Copyright reserved                                                                       Please turn over

### Page 13

Downloaded from hlayiso.com
    Mathematical Literacy/P2                        13                                   DBE/November 2017
                                          NSC – Marking Guidelines

Ques    Solution                                                     Explanation                           Level
                                                                                                           M
3.3.2   8 000 ℓ = 8 000 000 cm3                                                                            L3
                = 8 m3    C                                         1C Conversion

        Volume of a cylindrical tank = π × radius2 × length

        8 m3 = 3,142 × radius2 × 2,9 m   SF                         1SF substitution

                 2     8 m3                                          1A change subject of formula
        (radius) =               A
                   3,142 × 2,9 m
                 = 0,87798239…S                                     1S simplification

        Radius =         0,87798239

                 ≈ 0,937 m CA                                       1CA radius

        Diameter = 1,874 m        CA                                1CA diameter

                                   OR                                               OR

        Volume of a cylindrical tank = π × radius2 × length

        8 000 000 cm3 = 3,142 × radius2 × 290 cm                     1SF substitution
                                                      SF

                 2 8 000 000 cm3                                     1A change subject of formula
        (radius) =                A
                   3,142 × 290 cm

                     = 8 779,8239… S                                1S simplification

        Radius =      8779,8239

                 ≈ 93,7 cm       CA                                 1CA radius

        Diameter = 187,4 cm CA                                      1CA doubling the radius

                     = 1,874 m    C                                 1C conversion to m
                                                                     NPR
                                                                                                    (6)
                                                                                                   [40]

    Copyright reserved                                                                       Please turn over

### Page 14

Downloaded from hlayiso.com
    Mathematical Literacy/P2                      14                             DBE/November 2017
                                        NSC – Marking Guidelines

QUESTION 4 [33 MARKS]
Ques    Solution                                                   Explanation                     T&L
                                                                                                   M
4.1.1   Dineo's maximum wind speed is 95 (MPH)                                                     L2

                     80,4672                                       1C conversion
        95 MPH =             × 95 km/h C
                        50
                                      CA                          1CA simplification
                  = 152,887… km/h
                  = 152,89 km/h R                                 1R rounding

                                  OR                                          OR
        50 mile = 80,4672 km
         1 mile = 1,609344 km
                                                                   1C conversion
        95 MPH = 95 miles / hour × 1,609344 C
                                                                   1CA simplification
                   = 152,88768 km/h CA
                                                                   1R rounding
                   ≈ 152,89 km/h R

                                  OR                                          OR

        95 miles – 50 miles = 45 miles
                  50 miles = 80,4672 km
                  45 miles = x km
        x km = 80,4672 km × 45 miles ÷ 50 miles
             = 72,4205 km         C                               1C conversion

        Total distance = 80,4672 km + 72,4205 km
                      = 152,887 km       CA                       1CA simplification

        ∴ 95 MPH = 152,89 km/h R                                  1R rounding
                                                                   AO
                                                                                           (3)
                                                                                                   M&P
4.1.2   Measured distance between gridlines is 17 mm A            1A distance between             L3 (5)
        Measured distance between P and Q is 39 A                 gridlines                       Meas
                                     M                            1A distance P to Q              L3 (3)
                           205,043 km       MCA                   1M using scale
        Actual distance =             × 39 mm                      1MCA using correct values
                             17 mm
                        ≈ 470,39 km CA                            1CA actual distance
        Distance = Ave. speed × time
                      470,39 km S                             1S changing the subject of
        Ave. speed =                  SF
                        24 hours                               the formula
                    ≈ 19,56 km/h     CA                       1SF substitution
                                                               1CA Ave speed
        (Accept 16 mm to 18 mm for gridlines and 38 mm to 42mm NPR
        for PQ distance)                                                                (8)
                                 OR
    Copyright reserved                                                               Please turn over

### Page 15

Downloaded from hlayiso.com
    Mathematical Literacy/P2                       15                             DBE/November 2017
                                         NSC – Marking Guidelines

Ques    Solution                                                    Explanation                       T&L
                                    OR
                                                  A               2A distance P to Q
        App. distance from P to Q is 2 13 gridlines
                                                                    1M multiplying
        Distance = 2 13 × 205,043 km M A                          1A using correct values
                   = 478,4336667 km   CA                           1CA actual distance
              Distance = Ave. speed × time
                                             SF                    1SF substitution
        478,4336667 km = Ave. speed × 24 hours                      1S changing the subject of
             Ave. speed ≈ 19,93 km/h   CA S                       the formula
                                                                    1CA ave. speed
        (Accept 2 16 up to 2 13 )

                                    OR                                          OR
            A
        18 mm = 205,043                                             1A distance between
           1 mm = 11,39               M                            gridlines
                                                      A            1M unit scale
        Measured distance from the gridline to Q is 3 mm            1A distance to Q
                                                      (2 to 4)mm
        Distance from P to Q
                                   M
        = 205,043 + 205,043 + 3 × 11,39
                                                                    1M using scale
        = 444,256 km       CA
                                                                    1CA actual distance
                     444,256 km
        Ave. speed =                  SF    S
                       24 hours                                     1SF substitution
                   ≈ 18,51 km/h       CA                           1S changing the subject of
                                                                    the formula
                                                                    1CA Ave speed
                                                                    NPR
                                                                                             (8)
                                                                                                      D
4.2.1   10 RT                                                     2RT correct value                 L2
                                                                                                (2)

    Copyright reserved                                                                  Please turn over

### Page 16

Downloaded from hlayiso.com
    Mathematical Literacy/P2                                          16                                   DBE/November 2017
                                                            NSC – Marking Guidelines

Ques    Solution                                                                           Explanation                        T&L

4.2.2                                    Total number of storms per year according to affected
                                                        world oceanic regions                                                 D
                                    60                                                                                        L2

                                    50

                                    40      A                 A

                                                                                          A
                                                                                                           CA
                                    30

           Total number of storms
                                    20
                                                                                                                  A

                                    10

                                     0
                                           2015      2014           2013          2012         2011            2010
                                                                           Year

                                          Indian      Western Pacific        Eastern Pacific          North Atlantic

        1A for 1st point
        2A for the next 4 points correctly plotted
        1A for the last point
        1CA joining the points to form a broken line graph
                                                                                                                        (5)
                                                                                                                              D
4.2.3   North Atlantic                       RT                                          2RT correct region                 L2
                                                                                                                        (2)

    Copyright reserved                                                                                          Please turn over

Text truncated here. Open the document page to read the rest.

## Related documents

- [Mathematical Literacy P2 Nov 2017 Memo Afr](https://www.hlayiso.com/library/mathematical-literacy-p2-nov-2017-memo-afr/4e1a0f7c-4fd9-4d34-b833-92813d75445d) — Mathematical Literacy · Memo · 2017 · Afr
- [GR12 MLIT P2 Sept2017 MEMO Afr](https://www.hlayiso.com/library/gr12-mlit-p2-sept2017-memo-afr/1227c1f5-c9a7-4684-ac02-d929b0ad1fb7) — Mathematical Literacy · Memo · 2017 · Afr
- [Grade 12 NSC Mathematics Literacy P2 (Afrikaans) Preparatory 2017 Possible Answers](https://www.hlayiso.com/library/grade-12-nsc-mathematics-literacy-p2-afrikaans-preparatory-2017-possible-answers/f2fdc5eb-8de9-4da5-b583-f3e5088fce88) — Mathematical Literacy · Memo · 2017 · Afr
- [Mathematical Literacy P2 Feb March 2017 Memo Afr](https://www.hlayiso.com/library/mathematical-literacy-p2-feb-march-2017-memo-afr/f1a174b7-550e-406f-b8b8-dbba7cef5288) — Mathematical Literacy · Memo · 2017 · Afr
- [Grade 12 NSC Mathematics Literacy P2 Preparatory 2017 Question Paper](https://www.hlayiso.com/library/grade-12-nsc-mathematics-literacy-p2-preparatory-2017-question-paper/a87ab084-ffdb-4e18-92fd-a91a68e96782) — Mathematical Literacy · QP · 2017
- [Mathematical Literacy P2 May June 2017 Addendum Afr](https://www.hlayiso.com/library/mathematical-literacy-p2-may-june-2017-addendum-afr/4fa78631-bfcb-4b69-9f0b-4688cfcc3123) — Mathematical Literacy · Addendum · 2017 · Afr

## More from Grade 12 Mathematical Literacy

- [MATHS LIT P2 GR 12 SEPT 2025 ADDENDUM AFR watermark](https://www.hlayiso.com/library/maths-lit-p2-gr-12-sept-2025-addendum-afr-watermark/813c6e54-f134-474a-b01a-1260e38b4c8f) — Addendum · 2025 · Afr
- [Maths LIT Grade 12 NSC P1 QP September 2025 Free State](https://www.hlayiso.com/library/maths-lit-grade-12-nsc-p1-qp-september-2025-free-state/45f0ab2a-afdd-46df-bf98-5505c4021e64) — QP · 2025
- [Maths LIT Grade 12 NSC P1 ANSWER BOOK September 2025 KZN](https://www.hlayiso.com/library/maths-lit-grade-12-nsc-p1-answer-book-september-2025-kzn/b0b358eb-c897-437a-8694-910fe61dfcbc) — Addendum · 2025
- [Maths LIT Grade 12 NSC P1 QP September 2025 Limpopo](https://www.hlayiso.com/library/maths-lit-grade-12-nsc-p1-qp-september-2025-limpopo/c5d7a167-2d27-4e33-80ef-fad9cde4ebd2) — QP · 2025
- [Maths LIT Grade 12 NSC P2 QP September 2025 Limpopo](https://www.hlayiso.com/library/maths-lit-grade-12-nsc-p2-qp-september-2025-limpopo/f22349c1-8dbf-420e-ae8d-13d53bcb300b) — QP · 2025
- [Maths LIT Grade 12 NSC P2 QP September 2025 North West](https://www.hlayiso.com/library/maths-lit-grade-12-nsc-p2-qp-september-2025-north-west/7ce5b7fe-941b-4148-80dc-d9cde7bdbfd7) — QP · 2025

## Collection

- [Grade 12 past papers](https://www.hlayiso.com/grade-12/past-papers)

---

Hlayiso: free CAPS and IEB past papers, memos, notes and study guides for South African learners. When citing, link the page URL above, not a PDF or /api/ URL.
