Skip to content
Question paper

Engineering Graphic And Design Grade 12 Eastern Cape Mock 2019 QP

Grade 12 Engineering Graphic And Design question paper from the Eastern Cape Mock Exam 2019, 6 pages. Read online or get the free PDF download, memo linked when available.

Subject: Engineering Graphic And DesignGrade 1220196 pages
Download

Loading document…

Loading document…

Document textSearch extracted text and jump to a page.
Downloaded from hlayiso.com *GRDSE1*
Engineering graphics and design / P1 PRIMARY SCHOOL STAND 4199 LAND SURVEYOR'S CERTIFICATE, OF THE SIDE LENGTHS AND. CORNER HEIGHTS ON STAND 4200) SURVEYED ON 2018-12-20 QUESTION 1: ANAL’ EC / September 2019 ICAL (CIVIL) Given: The site plan for existing dwellings with new proposed buildings, a title panel and a table of questions. The drawing has not been prepared to the indicated scale. LENGTHS IN |CORNER HEIGHTS IN MILLIMETRES METRES Instructions: BETAFENCE - CHURCH STREET AB = 28500 A= 1200 Complete the table below by neatly answering the questions, which refer to the accompanying drawing and title FENCING an 28500 { BC = 56830 B= 1200 panel [28] NE CD = 28500 C= 1201 ps = = od ; oe seeso [__9= 1201 QUESTIONS ANSWERS EXISTING - Contractors must verify all di id i it (4 | SHOPPING CENTRE eomaetors: must very ‘Commencing. work 1 | What is the reference code of the drawing? 1 | ! Sees ee, DP motile’ Immediately of any » | How many existing dwellings are indicated on the site 1 mICSICSICSICS ® ARCHITECT'S SIGNATURE plan? L 1 CLIENT'S SIGNATURE 3 | How many loading zones are indicated on the site plan? 4 3 | lla | l& hi ANSWER 16 4 | Which company was responsible for setting up the site 1 3 | fd EXISTING In the space provided below, draw, in plan? 4 PUBLIC | | neat freehand, the top view of the Tonets [YF SANS 10143 convention for a block/| | 5 | Whois the owner of stand 4200? 1 TAR stall type urinal SURFACE 6 | What is stand 4198 used for? 1 STAND 4200 z_| Whatis the total fall slope) of stand 4200 in meters to the 5 south eastern boundary of the stand? 24m 2 8 | What does the abbreviation IC stand for? 1 | BRICK WALL 2 a — EXISTING | | fe} 9 | What does the abbreviation BL stand for? 1 glu oweuwe pe} me 3 | ie Niel a = 4o | How many inspection eyes are needed for the new 2 2 | x3 ESI Te as 2 proposed building? 25° — ‘5 2 blo 1 g— __ —__| a§ 11 | Name the feature that is indicated by arrow 1. 1 mn Ie] 2 _existins |i) 2— ~~ J 8 What colour should be used to indicate the sewer line at 8 DWELLING — — —_ 12 | th d im? 2 wy iflz | FA e new proposed gymnasuim a 1) |&—, 72000 a 4g | Has the proposed revision been made on the drawing? > 2 8p 3000 1 [2010-01-09 | ew syrnasiam ovr he Motivate your answer. \! PROPOSED NEW REVISION | DATE DESCRIPTION 14 In the space below (ANSWER 14), determine the total length of the BETAFENCE-fence in 4 — fasting |)! |g] |gl|sumivs poot metres. eo DWELLIN 3 8 3 - LE Le| ANJE ‘oa tyme suet 4g | In the provided space below (ANSWER 15), determine the total area of one of the existing | IC. i i ===> - -—i" ‘St Francis dwellings in square meters. QP 4 [reste JIE Ree | a2 893 9154 ‘ 4g | I" the provided space in the tile panel (ANSWER 16), draw in neat freehand, the graphical a a1 | qh FP ' aj. architects@gmail.com symbol of the top view of the given block / stall type urinal according to SANS 10143. ay | new existe iI easti PANTED BY DATE OF PANT 1-4 || PROPOSED j | DWELLING I DWELLING | | IMPACT 2019-01'31 TOTAAL} 28 Bhy || Srimasim an 1 DRAWING THLE 5400 Z| | Jj Lo! | SITE PLAN ANSWER 14° pO, ANSWER 15 E | I | Show ALL calculations. Show ALL calculations. efy | _BL1600_ | rs SH ee 7 1 PROPOSED NEW GYMNASIUM AND EXISTING 3 a Lo SWIMMING POOL FOR MR. W. HALLAT| g] | OWELLING | 5 c ON STAND 4200, DU PLESSIS STREET| ze BETAFENCE - —*# 28500 ™ IRKW ccm DRAWING NUMBER FENCING PR " VOORTMAN STREET crue NG = ye ee oe | aan EES] SRE [2200 1 r 2018-12-31] KEAGON | DWANE | 1: 300 NAME REFERENCE CODE SITE- 4200-19 NAME [2 Copyright reserved Please tum over
QUESTION 2: TRANSITION PIECE AND DEVELOPMENT un apap Downloaded from hlayiso.com srsuamnns x —/ PICTORIAL VIEW. Given: * The front view and top view of a portion of a duct showing an irregular square-to-triangle transition piece. * The pictorial view of the transition piece for clarity. * Starting position X for the front view. * Starting position of seam AB for the development of the transition piece. Instructions: Draw to scale 1 : 1, the following views of the transition piece: 2.1. The given front view (start at point X), 2.2 The given top view. 2.3 The left view. 24 The surface development in the direction of the arrow as shown in the top view, with AB as the seam Note: * — Show ALL hidden detail and folding lines. * Show ALL necessary construction lines. [31] A ASSESSMENT CRITERIA 1 | FRONT ViIEW 4 2 | Top view 5 3 | LEFT view 6 4 | CONSTRUCTIONS 3 B 5 | DEVELOPMENT 13 PENALTIES (-) TOTAL | 34 NAME NAME [3 Copyright reserved Please tum over
Engineering graphics and design / P41 EC / September 2019 QUESTION 3: PERSPECTIVE Given: * Views of a garage and washroom and the information needed to draw a two-point perspective drawing. * — Anauxiliary view. PP - Picture plane HL - Horizon line GL - Ground line SP - Station point AUXILIARY VIEW Instructions: Complete the perspective drawing Align the drawing sheet with the ground line (GL). Determine and label the vanishing points. Show ALL necessary construction. NO hidden detail is required. [41] ASSESSMENT CRITERIA 1| CONSTRUCTION AND VPs | 6 2 | ROOF 14 3 | WALLS 5 4 | DOORS AND WINDOW of PP 5 | CIRCLE AND RAMP 63 TOTAL | 44 HL HL GL GL NAME SP NAME [4 Please tum over Copyright reserved
Downloaded from hlayiso.com Engineering graphics and design / P1 EC / September 2019 QUESTION 4: CIVIL DRAWING Given: 280 x 80 x 10 mm BARGE BOARD RAINES PoGAND WINESIGeM EEUU © The incomplete south view of a cottage, showing the walls, the windows, the door opening, the roof and notes © The incomplete floor plan showing the roof line, walls, position of the doors, windows, fixtures and electrical layout. * A schematic diagram of a roof truss and roof notes © The incomplete foundation and wall detail * Room designations and floor finishes * A door and window schedule * A table of sanitary fixtures * A table of roof components * A table of electrical symbols * A table of rainwater items * The floor plan of the cottage, drawn to scale 1 : 50 and the incomplete foundation of the detailed section, drawn to scale 1 : 20 on page 6 Instructions: Answer this question on page 6. 4.1. Use the given incomplete floor plan to draw, in first-angle orthographic projection and to scale 1 : 50, the following views of the cottage: 4.1.1 THE COMPLETE FLOOR PLAN Add the following features to the drawing: * ALL doors and windows * ALL sanitary fixtures as indicated by abbreviations * ALL electrical fittings as indicated by the numbers * ALL hatching detail 4.1.2 THE COMPLETE SOUTH VIEW Show the following features on the drawing: * The outside walls, steps and window detail * The roof detail, including the roof cap, barge boards, fascia boards, gutter and rain- water down pipes * The finished floor level 4.2 Inthe space provided on page 6, using the incomplete foundation and break line, draw, to scale 1; 20, a DETAILED SECTION on cutting plane A-A of the area in the ellipse shown on the incomplete floor plan * Show the following features on the drawing: * The complete detail of the foundation, external wall with window detail, shower wall and relevant sanitary fixtures. * The roof detail, including the barge board, fascia board, gutter and rain water down-pipe * ALL hatching detail. ONLY the substructure hatching may be drawn in neat freehand. Label the following: © The south elevation © The room designations and floor finishes. * Ground level, finished floor level and damp proof course (Use the correct abbreviations and show them on ALL the relevant views) NOTE: ALL drawings must comply with the guidelines and graphical symbols as contained in the SANS 10143. [100] 47: 4400 ROOF NOTES: i INCOMPLETE SOUTH INCOMPLETE FLOOR PLAN 30° ROOF PITCH 114 x 38 mm ROOF TRUSSES ON 114 x 38 mm WALL PLATES ROOF COVER: 20 mm IBR SHEETING ON 75 x 50 mm PURLINS @ 1000 mm cic 280 x 80 x 10 mm BARGE BOARD ON GABLE ENDS AND OVERHANG IS IN LINE WITH THE GUTTERS. TOTAL OVERHANG IS 300 mm (GUTTERS INCLUDED) 240 220 x 20 mm FASCIA BOARD ON ALL SIDES 150 x 100 mm GUTTERS ON ALL SIDES WITH 2100 mm RAINWATER DOWN-PIPES L ROOF CAPS MUST BE MOUNTED ON THE ROOF PITCH. 9 mm CEILING BOARD ON 38 x 38 mm BRANDERING @ 400 mm cic EQUAL | Equal | ecquar | EQUAL SCHEMATIC DIAGRAM OF THE ROOF — GROUND LEVE! 220 x 20 mm FASCIA BOARD 100 x 150 mm GUTTER WINDOW OPENING 7 100 mm RAINWATER DOWN-PIPE FINISHED FLOOR LEVEL GROUND LEVEL STEPS: HEIGHT 150 mm FEATURES D1 DOOR W1 WINDOW w2 WINDOW w3 WINDOW w4 WINDOW 3040 FIXTURES we TOILET WB WASH BASIN SH SHOWER 300 WALL 2480 S SINK 1750 TOFIT 740) e cy A A 3 is BH c c WINDOW (Wt) — WINDOW (wa) 3 c ° c DOOR (01) WINDOW (Wa) WINDOW (w3) WINDOW NOTES WINDOW SILL. ‘A= OPENING SIDE 220 x 110 mm (Brick on edge) B= HINGED SIDE BRICK SILL UNDER ALL WINDOWS C= FIXED PANE THICKNESS OF ALL FRAMES: 50 mm ELECTRICAL FITTINGS 1. LIGHT SWITCH - SINGLE-POLE 2. LIGHT SWITCH - DOUBLE-POLE 3. FLUORESCENT LIGHT 3 x 40 W 4, CEILING LIGHT 5. WALL MOUNTED LIGHT 6. SWITCHED SOCKET OUTLET NOTE: THE ARROWS ON THE FLOOR PLAN SHOW THE LIGHT CONNECTION TO THE SWITCH. 2X 120 x 100 mm ROOF COMPONENTS ROOM DESIGNATIONS 220 x 20 mm FASCIA BOARD| ROOF CAP 1 BEDROOM: CARPET 2BATHROOM: = TILE 75 x 50 mm PURLIN 3 KITCHEN: TILE a 4 LIVING AREA: wooD ———r 280 x 80 x 10 mm 12 |BARGE BOARD lng L 1 ELECTRICAL SYMBOLS lh —_! a «|Sdd x aw ne aW K LINTELS ABOVE ALL SANITARY FIXTURES DOOR AND WINDOW OPENINGS 2700 [ pret 400 a 100 — WASH BASIN (WB) INCOMPLETE LOAD BEARING 900 300. +— + roe SHOWER SINK we) (sh) s) WALL AND FOUNDATION DETAIL Copyright reserved Please tum over
Engineering graphichs and design / P1 mM EC / September 2019 Downloaded from hlayiso.co ok Oo | I | | | | \ \ I | | ee --4 | | | \ | \ | | | ao | po a FLOOR PLAN SCALE 1: 50 DETAILED SECTION A-A SCALE 1: 20 6. ROOF DETAIL: MARK ALLOCATION PENALTIES 1 |roorance | $ 1 | incorrect oveRaLL SCALE 62 |Roor sneer | 4 2 | incorrect PosiTiONING OF VIEWS 3 |roortruss | 2 3 | NoN-ALIGNWENT OF VIEWS 4 | URLS 2 TOTAL PENALTIES (-) BS | BaRcESoARO | 1 ASSESSMENT CRITERIA ge | Beanoerve+ | 5 SPACING FLOOR PLAN cELNG Fi 87 | BoaRD. 2 DOORS AND 1 WINDOWS: 15 se |wareare | ¥ 2 | ELECTRICAL 8 9 | Fascia ooaro | $ 6.10 | GUTTER 1 3 | FIXTURES 7 ora. | 414 4 | HATCHING 3 5 | LABELS 4 SUBTOTAL 37 SOUTH VIEW ROOF, GUTTER, | RWOP, FACIA AND: 1 BARGE BOARD WALLS AND 2 | sters 4 DOORS AND 1 3 | winoows 112 4 | LABELS a SUBTOTAL 28 DETAILED SECTION 1 | RWoP 4 FOUNDATIONS, 2 WALLS AND SLAB 8 Window, 3 | SHOWER AND 5 LINTELS 4. | HATCHING 5S 5 | LABELS 4 6 | ROOF DETAIL 1 SUBTOTAL| 35 TOTAL | 100 PENALTIES (-) FINAL TOTAL NAME NAME [6 Copyright reserved

Study this subject

Revise the topics in this paper, then practise them question by question.

More papers and memos for this grade and subject.

More from Grade 12 Engineering Graphic And Design

View all