Skip to content

Engineering Graphics and Design Grade 11 P1 2015 QP (Eng)

Question paperEngineering Graphics and DesignGrade 1120156 pages

Grade 11 Engineering Graphics and Design Paper 1 question paper from the Eastern Cape November 2015 (English), 6 pages. Read online or download the free PDF.

Free to read online, no sign-up needed

Loading document…

Loading document…

Document textSearch extracted text and jump to a page.
Downloaded from hlayiso.com INSTRUCTIONS AND INFORMATION 1. The question paper consists of FOUR questions. 2. Answer ALL the questions. 3. All drawings must be drawn to scale 1 : 1, unless stated otherwise. 4. The questions must be answered on the answer sheets provided. 5. All the answer sheets must be re-stapled in numerical sequence and handed in irrespective of whether the question was answered or not. 6. Careful time management is essential in order to complete all the questions. ISEBE LEMFUNDO LEMPUMA KOLONI 7. Print your name in the block provided on every answer sheet. EASTERN CAPE EDUCATION DEPARTMENT 8. All answers must be drawn accurately and neatly. OOS-KAAP ONDERWYSDEPARTEMENT 9. Any details or dimensions not given must be assumed in good proportion. FOR OFFICIAL USE ONLY NATIONAL MODERATED MARK SENIOR CERTIFICATE 1 2 3 4 TOTAL GRADE 11 2 0 0 ENGINEERING GRAPHICS AND DESIGN P1 NOVEMBER 2015 COMPLETE THE FOLLOWING: NAME NAME MARKS: 200 EXAMINATION CENTRE TIME: 3 hours *IGRDSE* EXAMINATION CENTRE This question paper consists of 6 pages. Copyright reserved Please turn over 1
Engineering Graphics and Design/P1 EC DoE/NOVEMBER 2015 > e ie & QUESTION 1: CIVIL ANALYTICAL Given: L © A floor plan of a house 1) A table with questions referring to the drawing. Instructions: Answer the questions by neatly printing the answers in the space provided on the table. [30] f f 1 i E 1 C AIA QUESTIONS ANSWERS els | DINING ROOM | 4, | Identify TWO deliberate design errors in 2 the bathroom. 2 | Identify ONE deliberate drawing error in 1 LOUNGE 4 bedroom 2. > ‘ Identify ONE deliberate drawing error in iz KITCHEN 3 | the Ktehen ° 1 | What drawing feature has been omitted 4 from all the walls on the floorplan? 7] r] r 5. | What does BIC stand for? 1 6 |Name the drawing feature at 1 1 ! 7. | What do the lines at 2 indicate? 1 3 BIC 8 bA 8 | Identify the drawing error at 3. 1 fe In the space provided at 4, on the plan, BIC 9 | draw neatly in freehand, the graphical 4 symbol for a double kitchen sink. 0 In the space provided at 5, on the plan, cg) BEDROOM 2 10 | draw neatly in freehand, the graphical 3 c BEDROOM 1 symbol for a shower. f=} "1 What view of the house will be seen in 4 g the direction of the arrow at 6? 12 | What is the scale of the drawing? 1 (| BATHROOM 4g | Whats the thickness of the load 1 L bearing walls in mm? . oo 44 | Determine the floor area of bedroom 2 3 in m? : 1 —__—_—__t 45 | Determine the perimeter of the house in 3 meters. 220 110 3 Measure the length of a bedroom 4g | Window on the drawing and detemine 3 4200 2904 its length in meters according to a scale 12000 of 1: 50. 17 | What does the symbol at 7 indicate? 1 49 | Neatly print the name of the view in the 1 a space provided above the scale. SCALE 1: 50 30 NAME NAME =) Copyright reserved Please tum over
Engineering Graphics and Design/P1 Loe “e SL- aK EC DoE/NOVEMBER 2 015 QUESTION 2: SECTIONING OF SOLIDS. Given: © The front view and top view of a right regular hexagonal pyramid cut by an inclined plane VT. * A starting point A, for drawing the top view. Instructions: * Draw the given front view. * Draw the sectional top view without hidden detail. * Draw the sectional right view without hidden detail. * Project the true shape of the cut surface. Show all constructions [34] ASSESSMENT CRITERIA 1 Front view 7 2 Sectional top view 7 3 Sectional right view | 10 4 True shape 6 5 Constructions 4 TOTAL 34 NAME NAME wy Copyright reserved Please tum over
Engineering Graphics and Design/P1 N oy . © EC DoE/NOVEMBER 2015 QUESTION 3: PERSPECTIVE Given: A plan and elevations of a braai area, as well as the Picture Plane (PP), Horizon Line (HL), Ground Line (GL) and Station Point (SP) Instructions: * Determine the vanishing points and label them. * Draw the two point perspective view of the braai area. Note: No hidden detail must be shown. Show all construction lines. [38] PP HL T T | | / \ GL NAME ASSESSMENT CRITERIA 1 Vanishing points 4 2 Constructions 4 3 Floor and seat 16 x > 8 4 Braai and chimney 14 x} 7 5 Sides 30 x4 15 TOTAL 38 NAME T/ Copyright reserved Please tum over
Engineering Graphics and Design/P1 “ e DOOR AND WINDOW SCHEDULE WINDOWS 2400 1200 al \. Ya wl TN / 5 L \ = / \, wi w2 NOTE 220 X 110 BRICKS ON EDGE SILL BELOW WINDOWS LINTEL PRECAST CONCRETE LINTEL: 110 x 75 mm DOORS L TOFIT L TOFIT GARAGE DOOR (D2) HOLLOW CORE DOOR (D1) DIMENSIONS OF SANITARY FIXTURES. 310 ITs crit 700 700 {300 wi N __ CEILING HEIGHT _ _ _ _ _ _ _ _ _ Tt [~ WINDOW HEIGHT WINDOW WINDOW 2 ra | b, WINDOW SILL u 220 0 2 . tt oe wi tu L] : A\ w2 we: B A — BATHROOM KITCHEN TILES TILES 1 D1 7 Dt GARAGE D1 LIVING ROOM BEDROOM [rassace See ore D1 D1 a CL _____| wW1 EC DoE/NOVEMBER 2015 QUESTION 4: CIVIL DRAWING Given: * A schematic floor plan and a schematic sectional elevation of the outline of the primeter of a house, and the grahical symbols of all the fixtures in the bathroom. * A door and window schedule * An answer sheet on page 6 showing an incomplete floor plan. Instructions: Use answer sheet 4 and the information on page 5 to draw to a scale of 1: 50, the following views: ¢ The completed floor plan * The sectional elevation on cutting plane A-A, to the given specifications below: SPECIFICATIONS: THE FLOOR PLAN Add the following features to the floor plan: ©The missing walls and hatching detail *The missing doors and windows with detail ©The cutting plane. Label the cutting plane A-A. * Label all the rooms and its floor finishes. THE SECTIONAL ELEVATION Add the following features to the sectional elevation: * The complete foundation, walls, screed and floor slab detail * The lintels above the window * The complete window detail * ALL necessary hatching *All sanitary fixtures as graphical symbols *Label the DPC * Label the NGL * Label the sectional elevation: SECTIONAL ELEVATION A-A NOTE: * ALL substructure hatching may be done in freehand. * ALL drawing must comply with the guidelines contained in the SABS 0143. [98] TERMINOLOGY Schematic diagram: A diagram that shows the main features or relationships but not the details. NAME. NAME,
Engineering Graphics and Design/P1 EC DoE/NOVEMBER 2015 FLOOR PLAN 1. HATCHING 13 2 DOORS AND WINDOWS 24 3 ROOMS AND FLOOR FINISH] 6 4 CUTTING PLANE 2 SUBTOTAL 45 SECTIONAL ELEVATION ‘1 FOUNDATION AND WALLS | 24 2 WINDOWS AND LINTELS 12 3 HATCHING 12x } 6 4 SANITARY FIXTURES. 6 5 LABELS 5 SUBTOTAL 53 TOTAL 98 NAME, NAME, 6 ) Copyright reserved Please tum over

Study this subject

More from Grade 11 Engineering Graphics and Design

View all