Skip to content

Engineering Graphics and Design Grade 11 P1 2019 QP (Eng)

Question paperEngineering Graphics and DesignGrade 1120196 pages

Grade 11 Engineering Graphics and Design Paper 1 question paper from the Eastern Cape November 2019 (English), 6 pages. Read online or download the free PDF.

Free to read online, no sign-up needed

Loading document…

Loading document…

Document textSearch extracted text and jump to a page.
Downloaded from hlayiso.com INSTRUCTIONS AND INFORMATION ISEBE LEMFUNDO LEMPUMA KOLONI EASTERN CAPE EDUCATION DEPARTMENT OOS-KAAP ONDERWYSDEPARTEMENT FOR OFFICIAL USE ONLY NATIONAL MODERATED MARK SENIOR CERTIFICATE 1 2 3 4 GRADE 11 TOTAL 2 0 0 2 0 0 FINAL CONVERTED CHECKED BY *IGRDSE1* MARK ENGINEERING GRAPHICS AND DESIGN 100 PAPER 1 COMPLETE THE FOLLOWING: NOVEMBER 2019 NAME NAME MARKS: 200 EXAMINATION CENTRE TIME: 3 hours This question paper consists of 6 pages. EXAMINATION CENTRE Copyright reserved Please turn over 1
Engineering graphics and design / P1 Downloaded from hlayiso.com NSC EC / November 2019 AP LE FIGURE 1: FIGURE 3: QUESTION 1A: ANALYTICAL (CIVIL) ST Given: 1 Figure 1: Incomplete wall and foundation detail. Figure 2: A view of a floorplan with measurements (not to scale). 2 Figure 3: The plan view of the SANS 10143 symbol for steps. 3 Figure 4: A symbol with a specific meaning. 4 Instructions: FIGURE 4: Complete the table below by neatly answering the questions, which refer to the accompanying figures (1 to 4) and 5 civil content. [35] 6 1 What SI-unit was used for the dimensions in figure 2? 1 ALL EXISTING MATERIALS 1 FIGURE 2: ANSWER 5: ANSWER 6: NEW WOOD 1 14500 In which colours must the following features be shown NEW DRAINAGE / SEWERAGE 1 2 on a civil drawing according to the SANS 10143? NEW MASONRY 1 NEW GLASS 1 FLOOR PLAN NEW CONCRETE 1 NTS 1 10000 1 2 1 2500 Name the parts from 1 to 6 of the incomplete wall and 3 1 3 2500 foundation detail shown in figure 1. 1 4 5 1 5000 6 1 ANSWER 9.1 ANSWER 9.2 ANSWER 9.3 4 What does the abbreviation NTS, in figure 2, stand for? 1 In the space provided (ANSWER 5) determine the total perimeter of the house, in figure 2, in meters. 5 3 Show all calculations. In the space provided (ANSWER 6) determine the total area of the house, in figure 2, in square meters. 6 4 Show all calculations. 7 What does the arrow in figure 3 mean? 1 8 Name the symbol in figure 4. 1 In the space provided (ANSWER 9.1 - 9.3), draw, in neat freehand, the front view and top view of the SANS 10143 9 graphical symbol for the following: 12 9.1 BATH; 9.2. SINGLE SINK; 9.3 TOILET TOTAL: 35 BATH SINGLE SINK TOILET FIGURE 6: ANSWER 1B: FIGURE 5: PUSH M QUESTION 1B: ELECTRONICS SWITCH "PTM" Given: MARKS Figure 5: A table with symbols of electronic components. LED Figure 6: A diagram with labels of a touch sensor. Q 1A 35 9V BATTERY Q 1B 6 Instructions: RESISTOR Draw the electronic diagram with the correct electronic TOT 41 symbols, in free hand, in the space provided NPN + under ANSWER 1B. [6] TRANSISTOR NAME ELECTRONIC COMPONENTS: SYMBOLS NAME 2 Copyright reserved Please turn over
Engineering graphics and design / P1 Downloaded from hlayiso.com NSC EC / November 2019 AP LE QUESTION 2: TRANSITION PIECE ST Given: x The top view and front view of a square to triangle transition piece, drawn in first-angle orthographic projection. x An isometric help view of the transition piece. x Axis XY and -X1Y1.and a starting point c and c1. x Starting point ABC and the direction of development. Instructions: X 1 Draw, to scale 1 : 1, the following views of the transition piece. Start at C, C1. 2.1 The given top view. 2.2 The given front view. 2.3 The left view. 2.4 The development of the transition piece, starting and ending with seam AB. The direction of the arrow P indicates the direction of the development. Show ALL constructions. [36] 30 a d 80 c b c X Y X Y p c1d1 c1 a1b1 60° 60 60 C A ASSESSMENT CRITERIA CONSTRUCTIONS + D 1 PLACING 4 2 TOP VIEW 6 Y 1 3 FRONT VIEW 5 P 4 LEFT VIEW 4 A B P 5 DEVELOPMENT 17 TOTAL 36 C B NAME ISOMETRIC VIEW: NAME 3 Copyright reserved Please turn over
Engineering graphics and design / P1 Downloaded from hlayiso.com NSC EC / November 2019 LE AP ST QUESTION 3: PERSPECTIVE Given: Three views of a HOUSE WITH A PORCH and the information needed to draw a two-point perspective drawing. ASSESSMENT CRITERIA PP − Picture plane HL − Horizon line 1 CONSTRUCTION + VPs 6 GL − Ground line SP − Station point 2 ROOFS 7 Instructions: 3 WALLS + BRAAI + 15 CHIMNEY Complete the perspective drawing. 4 WINDOW + DOOR 8½ x Align the drawing sheet with the ground line (GL). x Determine and label the vanishing points. 5 PORCH 4½ x Show ALL necessary construction. x NO hidden detail is required. [41] TOTAL 41 PORCH PORCH PP PP HL HL PORCH PORCH GL GL NAME SP NAME 4 Copyright reserved Please turn over
Engineering graphics and design / P1 Downloaded from hlayiso.com NSC EC / November 2019 LE AP ST QUESTION 4: CIVIL DRAWING SLIDING DOOR OPENING DOOR AND WINDOW SCHEDULE Given: WINDOW OPENING SLIDINGDOOR AND -FRAME (SD) x The incomplete SOUTH ELEVATION of a proposed new GARAGE DOOR OPENING dwelling, showing the walls, step as well as window-, 1500 TO FIT 2050 2150 GARAGE FINISHED FLOOR door- and roll up garage door openings. LEVEL 400 x The incomplete floor plan showing the walls, position of GROUND LINE the doors, windows and sanitary fixtures. x The incomplete foundation and wall detail. STEP RAMP 200 x Room designations and floor finishes. FINISHED FLOOR LEVEL x A door, window and garage door schedule. 2050 INCOMPLETE SOUTH ELEVATION x A table of sanitary fixtures. x The floor plan of the new dwelling as well as a breakline and the natural ground level in the south elevation, drawn KITCHEN CABINET to scale 1:50 and the starting point and breakline for the HEIGHT: 800MM FEATURES sectional view to scale 1:20 (on page 6). SLIDINGDOOR NOTES W2 W2 W1 FRAMES 50 mm D1 DOOR WC S TO FIT 1000 Instructions: B SD SLIDING DOOR W1 WINDOW Answer this question on page 6. A D1 A W2 WINDOW WB 3 GD ROLL UP GARAGE DOOR 4.1 Using the given incomplete floor plan, draw in first-angle 4 A 800 2 orthographic projection and to scale 1 : 50, the following SH FIXTURES 350 B views of the new dwelling: 2050 BIC D1 WC TOILET WINDOW (W1) D1 D1 W1 B BATH 4.1.1 THE COMPLETE FLOOR PLAN D1 WB WASH BASIN 1500 Add the following features to the drawing: BIC SH SHOWER 650 x ALL doors and windows. S SINK 6 BIC BUILT IN CUPBOARD x ALL fixtures as indicated by the abbreviations. 450 x ALL hatching detail. ROOM DESIGNATIONS DOOR AND -FRAME (D1) A 1 5 100 1500 FLOOR FINISHES DOOR FRAME PROFILE B 4.1.2 THE SOUTH ELEVATION 1. BEDROOM CARPET WINDOW NOTES A Show the following features on the drawing: 2. BEDROOM CARPET 50 A = OPENING SIDE x The outside walls, step, window-, door- and roll up garage W2 GD 3. BATHROOM TILE 400 B door detail below the given breakline. B = FIXED PANEL 4. KITCHEN TILE 5. LIVING ROOM TILE FRAMES 50 mm x The finished floor level. SD WINDOW (W2) 6. GARAGE GRANO WINDOW SILL: 220 x 110 mm STEP WINDOW SILL: BRICK ON EDGE UNDER ALL 4.2 Draw in the space provided on page 6 to scale 1 : 20, a RAMP INCOMPLETE FLOORPLAN WINDOWS DETAILED SECTION according to cutting plane A-A of the 240 2550 area in the ellipse shown on the floor plan. Show the following features: 110 x The complete foundation, external wall and door detail. 2 X 120 x 100 mm LINTEL x The lintels above the door. ABOVE DOOR- AND WINDOW OPENINGS R200 ROLL UP GARAGE DOOR (GD) x The partial window in the kitchen. x A partial kitchen cabinet. x ALL hatching detail. ALL substructure hatching may be SANITARY FIXTURES drawn neat in freehand. 500 2400 400 Label the following: 400 x The south elevation and scale. 2050 200 850 850 x The room designations and floor finishes. 750 25 mm 100 x Using the correct abbreviations, label the following 25 mm 400 390 SCREED FLOOR LEVEL features in the correct view: natural ground level, finished 100 SCREED floor level and damp proof course. 100 300 400 600 200 1100 500 350 550 GROUND LEVEL 800 NOTE: 250 ALL drawings must comply with the guidelines and graphical 550 1200 200 800 1400 symbols contained in the SANS 10143. [82] 600 WASH BASIN TOILET SINK 400 SHOWER (WB) (WC) (S) BATH (B) (SH) INCOMPLETE NON LOAD NAME BEARING WALL AND INCOMPLETE LOAD BEARING STARTING POINT FOR DETAILED SECTION FOUNDATION DETAILS WALL AND FOUNDATION DETAILS NAME 5 Copyright reserved Please turn over
Engineering graphics and design / P1 Downloaded from hlayiso.com NSC EC / November 2019 PENALTIES LE AP ST 1 INCORRECT OVERALL SCALE 2 INCORRECT POSITIONING OF VIEWS 3 NON-ALIGNMENT OF VIEWS TOTAL PENALTIES (-) ASSESSMENT CRITERIA FLOOR PLAN NGL NGL 1 DOORS + WINDOWS 20 2 FIXTURES 9 3 HATCHING 3 4 LABELS 6 SUB TOTAL 38 SOUTH ELEVATION 1 WALLS + STEP + FFL 5 2 WINDOW + DOOR + GARAGE DOOR 10 3 LABELS 4 SUB TOTAL 19 DETAILED SECTION 1 FOUNDATION + WALL + FLOOR 9 2 DOOR + LINTEL + WINDOW + KITCHEN CABINET 8 3 HATCHING 5 4 LABELS 3 SUB TOTAL 25 TOTAL 82 PENALTIES (-) FINAL TOTAL STARTING POINT FOR DETAILED SECTION DETAILED SECTION ON A-A FLOORPLAN SCALE 1 : 20 SCALE 1 : 50 NAME NAME 6 Copyright reserved

Study this subject

More from Grade 11 Engineering Graphics and Design

View all