Downloaded from hlayiso.com INSTRUCTIONS AND INFORMATION 1. The question paper consists of FOUR questions. 2. Answer ALL the questions. 3. All drawings must be drawn to scale 1:1, unless stated otherwise. 4. The questions must be answered on the answer sheets provided. 5. All the answer sheets must be re-stapled in numerical sequence and handed in irrespective of whether the question was answered or not. 6. Careful time management is essential in order to complete all the questions. ISEBE LEMFUNDO LEMPUMA KOLONI 7. Print your name in the block provided on every answer sheet. EASTERN CAPE EDUCATION DEPARTMENT 8. All answers must be drawn accurately and neatly. OOS-KAAP ONDERWYSDEPARTEMENT 9. Any details or dimensions not given must be assumed in good proportion. FOR OFFICIAL USE ONLY NATIONAL MODERATED MARK SENIOR CERTIFICATE 1 2 3 4 TOTAL GRADE 11 2 0 0 ENGINEERING GRAPHICS AND DESIGN P1 NOVEMBER 2014 COMPLETE THE FOLLOWING: NAME NAME MARKS: 200 EXAMINATION CENTRE TIME: 3 hours This question paper consists of 6 pages. EXAMINATION CENTRE *IGRDDM1* Copyright reserved Please turn over 1
Engineering Graphics and Design/P1 N tSO-EOMm EC DoE/NOVEMBER 2014 > cg QUESTION 4: ANALYTICAL (CIVIL) 4 Given: The working drawings of a proposed new dwelling with relevant information and a table of questions. Instructions: Complete the table below by neatly printing the answers to the questions which all refer to the accompanying drawings and title block. [30] 19. In the space provided below, QUESTIONS ANSWERS ; draw, in neat freehand, the front | ] what is the project number? 1 3 view and top view of item number 6, according to SABS How many revisions have been made to the 7 conventions. (6) 2 | drawing? 1 i = = = = = _— 3 | What changes were made to the drawing 1 NGL on the 03-07-2014? VIEW A 4 | In which town is this dwelling situated? 1 5 | Whats the drawing number? 1 > 6 | Name the feature at 1 1 7 |Name the feature at 2 1 - - - - - 8 | Name the feature at 3. 1 \ 9 | In which direction is the arrow at 4 pointing? 1 — —— [T 10 | What does the abbreviation NGL stand for? 1 (FA ie) How many external doors are there in the Oo 3 15-08-2014 | SHOWER "1 dwelling? 1 Oo 2 fos.orzora [NEW 0,4 | 12 | What will view A be called? 1 | TvROOM \ O KITCHEN What would the view on cutting plane A-A TILES TILES 1 20-09-2013 |DRIVEWAY | 13 | 6 called? 1 i A ie) 5 revision | ate | ocscxnion | 14 | What is the floor finish in the passage? 1 | l= ° How many hinged openings are there on = = | - _ - _ 5 15 1 3 the bedroom window? , : SApRINT 27-07-2014. 16 | What is the abbreviation for the fixture at 5? 1 BEDROOM PASSAGE BEDROOM DRAWING TITLE CARPET TILES CARPET PROPOSED NEW DWELLING FOR | 7, | Determine the perimeter of the dwelling in 4 | J TAYLOR ON ERF No 705 AT metres. Show all calculations. a 10 PARK STREET BATHROOM CRADOCK TILES i <| 3 4g | Determine the area of the bathroom in 4 N Q © s PROJECT NUMBER: metres. Show all calculations. Z| PP 140 ? — aw; —| SeawnenreeR | CHEOKEDSY | in the space provided, draw a neat — = 7 7 7 03-05-2013 | 4g | freehand sketch of the front view and top - - 6 _ _ _ /_ / _ Sr view of item number 6, according to SABS / / NYOUNG symbols. a 6 5 4 (2 f 09-01-2014 2 SOnE 30 2700 an 1-100 a 12000 PLOT AND PLAN NAME ARCHITECTS 29 CHURCH STREET CRADOCK 5880 TEL: 048 001 0101 NAME = / Copyright reserved Please tum over
Engineering Graphics and Design/P1 _ B START DEVELOPMENT HERE AUXILIARY VIEW EC DoE/NOVEMBER 2 014 QUESTION 2: INTERPENETRATION AND DEVELOPMENT Given: The incomplete front view and incomplete top view of a regular hollow triangular prism penetrating a regular hollow hexagonal prism, in first angle orthographic projection An auxiliary view of the triangular prism Instructions: * Complete the right view of the two prisms. Complete the top view of the two prisms. * Complete the front view, clearly showing the curve of interpenetration formed between the two prisms. * Develop the sides of the triangular prism in the position shown on the answer sheet. Note: Start the development on seam AB. The axis of both prisms lie in the same vertical plane. Show all constructions and projections. 135] ASSESSMENT CRITERIA 1 Completed right view 9 2 Completed top view 3 Curve of interpenetration 6 4 Development 12 5 Constructions 6 TOTAL 37 NAME NAME. Copyright reserved Please tum over
Engineering Graphics and Design/P1 Os ASSESSMENT CRITERIA 1 Vanishing points 6 2 Constructions 4 3 Steps 22 x} "1 4 Walls 20 x} 10 5 Window 10 xt 5 TOTAL 36 EC DoE/NOVEMBER 2014 QUESTION 3: PERSPECTIVE Given: A plan and elevation of an outside wedding altar, as well as the Picture Plane (PP), Horizon Line (HL), Ground Line (GL) and Station Point (SP) Instructions: * Determine the vanishing points and label them. * Draw the two point perspective view of the altar. Note: No hidden detail must be shown Show all construction lines. [36] PP HL AUXILIARY VIEW OF NICHE GL NAME. NAME wy Copyright reserved Please tum over
Engineering Graphics and Design/P1 DOOR AND WINDOW SCHEDULE PRECAST CONCRETE BEAM: 200 x 65 mm DOOR +o TOF 2100 FRAME HOLLOW CORE DOOR (D) a lh J ah WW FWY FW \/ | 0 | ‘a0 WOODEN WOODEN FRAME (W1) FRAME (W2) NOTE 140 X 50 BRICKS ON EDGE SILL BELOW WINDOWS, LINTEL DIMENSIONS OF SANITARY FIXTURES lit 1380) 510 i a 6 : 1830. + roa 2400 2160 INCOMPLETE SOUTH ELEVATION GROUND LINE ab” INCOMPLETE FLOOR PLAN FIXTURES D DOORS WI WINDOW OPENINGS W2 WINDOW OPENINGS B BATH SH SHOWER wc TOILET WB WASH BASIN al 2500 Coo 200 +h 7 GROUNDLEVEL g | | | 100 INCOMPLETE FOUNDATION ‘AND EXTERNAL WALL DETAIL 110 GROUND LEVEL INCOMPLETE FOUNDATION AND INTERNAL WALL DETAIL, com EC DoE/NOVEMBER 2014 QUESTION 4: CIVIL DRAWING Given: (on page 5) *The incomplete south elevation of a changing room for a soccer club showing the position of the walls, windows and ground line . «The incomplete floorplan showing the walls, position of the doors, windows and sanitary fixtures «The incomplete foundation and wall detail of the external and internal walls A door and window schedule A table of sanitary fixtures The incomplete floor plan of the new changing room, drawn toa scale of 1:50, on page 6 Instructions: *Use answer sheet 4 and the information on page 5 to draw the following views to a scale of 1:50 The completed floor plan The south elevation The sectional elevation on cutting plane A-A, to the given specifications below SPECIFICATIONS: THE FLOOR PLAN Add the following features to the floor plan: The missing wall sectioning The missing doors and windows with detail The sanitary fixtures as indicated with the abbreviations The cutting plane. Label the cutting plane A-A «Insert all the given bathroom fixtures as graphical symbols according to the SABS 0143 code of practice THE SOUTH ELEVATION Show the following features on the drawing: * The outside walls The window detail The finished floor level THE SECTIONAL ELEVATION - UP TO CEILING HEIGHT ONLY Add the following features to the sectional elevation: The complete foundation, wall, and floor slab detail The window, with a single lintel above the window The elevation of the bath drawn as a graphical symbol ALL necessary hatching Label the sectional elevation SECTIONAL ELEVATION A-A NOTE: Label ONLY the requested features on the respective views ALL substructure hatching may be done in freehand. *ALL drawings must comply with the guidelines contained in the SABS 0143. [97] 9) Copyright reserved Please tum over
Engineering Graphics and Design/P1 EC DoE/NOVEMBER 2014 tye FLOOR PLAN MARKS 4 HATCHING 9 2 DOORS AND WINDOWS 14 3. SANITARY FIXTURES 16 4. CUTTING PLANE 4 SUB TOTAL 43 SOUTH ELEVATION MARKS 1 EXTERIOR WALLS AND CEILING 7 2 WINDOWS 8 3 FFL 4 SUB TOTAL 16 SECTIONAL ELEVATION MARKS 1 FOUNDATION AND WALLS 15 2. WINDOW AND LINTELS 6 3 HATCHING 41 4 SANITARY FIXTURES. 4 5 LABELS 2 SUB TOTAL 38 TOTAL 97 NAME NAME Copyright reserved