FREIGHT LOGISTICS
LEVEL 3
TOPIC 4: Procurement and Order
Processing
Downloaded from hlayiso.com
7 The procurement process
Skip to contentStudy guide
L3 Freight Logistics Topic 4 Procurement and Order Processing
Level 3 Freight Logistics study guide, 12 pages. Read online or get the free PDF download.
Subject: Freight LogisticsMultiple grades12 pages
Freight Logistics. Study guide, 12 pages. Read online or download the PDF.
- Subject
- Freight Logistics
- Grade
- Multiple grades
- Document type
- Study guide
- Curriculum
- TVET
- Pages
- 12
- File size
- 247.5 KB
Loading document…
Loading document…
1 of 12
Document textSearch extracted text and jump to a page.
7.2.4 Tender process
# Tender: Is to invite bids for a project or
accept a formal offer such as takeover bid.
# Process: A series of actions or steps taken in
order to achieve a particular end.
-By using a tender process, several suppliers
may all bid to do the same work or provide the
same goods and they all receive the same
specifications to base their bid or quote on.
Downloaded from hlayiso.com
- The Procurement Department may stipulate
Indicate that the lowest price will not
necessarily be awarded the tender. However,
the aims and scope of the tender must be well
defined.
-The aim of the tender may be to achieve one
or more of the following:
# Reduction in costs
# Increased capability
# Additional capacity
# Replacement of a failing supplier
# Innovation Downloaded from
from the supply hlayiso.com
market to give
competitive advantage to the company.
-Tenders may be awarded based on the
supplier’s:
# Commercial and technical competence
# Financial ability and standing
# Training expertise (especially when
expensive equipment is bought)
# Post-sale service contract
# Black Economic Empowerment (BEE) status
# Perception that the supplier is the best fit for
the job or provides the goods that best fit the
companies needs
Downloaded from hlayiso.com
Although differences occur, most tender
processes follow the following stages:
# Contract strategy
# Specification
# Communication
# Pre-qualification
# Invitation to tender
# Tender opening
# Tender evaluation
# Decision of the review pannel
Downloaded from hlayiso.com
- Contract Strategy
# During this stage the tender structure,
submission dates, tender requirements and
the team who will have responsibility for the
evaluation of bids will be considered
-Specification
# The specification should set out the :
° Requirements
° Criteria
°Specification
Downloaded
° Rules and guidelines from
for the hlayiso.com
goods or service
that are being tendered for
# There are two types of specification, namely
the:
° Functional specification describing the
functions that the goods and/or services are
expected to fulfil
° Technical specification
- Communication
# the tender process is intended to provide
equal opportunities to all bidders.
Downloaded
# Communication should befrom hlayiso.com
limited to written
information provided to all tenderes
-Prequalification
# It is used to limit the number of tenders for a
specific requirement
# The process ensures that only those tenders
who meet specific criteria, and the necessary
capabilities, are invited to bid
-Invitations to tender
# Invitations to tender are usually sent under
the sealed bid process.
# This means that every bid must be submitted
Downloaded
in a sealed envelope or boxfrom hlayiso.com
and will only be
opened at the due time, on the due date
Indicated in the Invitation to Tender.
# All tenders must then be submitted by that
date and time at the least.
-Tender opening
# The Tender Board may consist of any
employees elected within a company and will
usually include expert users of the goods or
services.
# All members need to be present when the
tenders are opened.
Downloaded from hlayiso.com
- Tender evaluation
# Firstly, they will ensure that all the bids
comply with the tender requirements in terms
of prequalification ( where needed),
submission adherence, forms and information
that had to be submitted.
# They also have to ensure that all parts of the
tender requirements have been addressed
adequately (appropriately).
- Decision to the review
Downloaded
# when making fromthe
a final decision, hlayiso.com
Tender
Board has to consider all the requirements
Set out in the tender documents such as:
° BEE status
° Price
° Specification
# As well as aspects such as:
° Price
° Quality
°Timing
° Cost
# Once a decision is made, it is usually final
and the Tender Board will not liaise the
Downloaded
tenderers about the outcomefrom hlayiso.com
# Please complete activity 10 on page 95
any questions or were u need clarity
please ask me via watsapp
Downloaded from hlayiso.com
Study this subject
Notes, quizzes and topic questions for this subject.
Recommended for this subject
More papers and memos for this grade and subject.

