NATIONAL SENIOR CERTIFICATE EXAMINATION
NOVEMBER 2016
CIVIL TECHNOLOGY
MARKING GUIDELINES
Time: 3 hours 200 marks
These marking guidelines are prepared for use by examiners and sub-examiners,
all of whom are required to attend a standardisation meeting to ensure that the
guidelines are consistently interpreted and applied in the marking of candidates'
scripts.
The IEB will not enter into any discussions or correspondence about any marking
guidelines. It is acknowledged that there may be different views about some
matters of emphasis or detail in the guidelines. It is also recognised that,
without the benefit of attendance at a standardisation meeting, there may be
different interpretations of the application of the marking guidelines.
IEB Copyright © 2016 PLEASE TURN OVER
Skip to contentQuestion paper 




Civil Technology Grade 12 IEB 2016 Question Paper
IEB Grade 12 Civil Technology question paper from the 2016, 7 pages. Read online or get the free PDF download, memo linked when available.
Publisher: IEB
Civil Technology · Grade 12 · 2016. Question paper, 7 pages. Read online or download the PDF.
- Subject
- Civil Technology
- Grade
- Grade 12
- Document type
- Question paper
- Year
- 2016
- Publisher
- IEB
- Curriculum
- IEB
- Pages
- 7
- File size
- 420.2 KB
Loading document…
Loading document…
1 of 7
Document textSearch extracted text and jump to a page.
Downloaded from hlayiso.com
NATIONAL SENIOR CERTIFICATE: CIVIL TECHNOLOGY – MARKING GUIDELINES Page 2 of 7
QUESTION 1 CONSTRUCTION, SAFETY AND MATERIAL
1.1 1.1.1 – E
1.1.2 – G
1.1.3 – I
1.1.4 – B
1.1.5 – C
1.2 Trench safety
Check daily especially after rain
Must be cordoned off
Access and exit must be accessible
Must be shored so that cave-in does not occur
No vehicles or heavy machinery close to trench
Warning lights placed for public safety
Any FOUR or other applicable answer
1.3 1.3.1
Any 3 labels and 1 for correctness of drawing
1.3.2 Draw a neat drawing to indicate at wall end the difference between a
GABLE roof and a HIPPED roof.
2 Correct drawing 2 Correct drawing
IEB Copyright © 2016 PLEASE TURN OVER
Downloaded from hlayiso.com
NATIONAL SENIOR CERTIFICATE: CIVIL TECHNOLOGY – MARKING GUIDELINES Page 3 of 7
1.4 Site safety
Site should be neat and tidy
Provisions for toilet facilities
No unauthorized entrance onto site
Site must be fenced off
Warning signs in applicable places
First Aid must be available
Workers must wear appropriate safety clothing
Any TWO or other applicable answer
1.5 1.5.1 Tapered cone, spirit level, measuring tape, tamping rod
Any ONE correct
1.5.2 Used to test correct mix between ingredients
Used to test correct consistency
Used to test correct water volume
Any ONE correct
1.5.3 Compression test
To test compression strength of concrete
1.6 1. I-beam
2. Channel iron
3. H-bar/two-sided channel
1.7 1. Head plate
2. Stud
3. Panel board, Gypsum board, cladding, plywood, chipboard (any one)
4. Sole plate
QUESTION 2 ADVANCED CONSTRUCTION AND EQUIPMENT
2.1 Check that blades are sharp
Keep away from moisture, rust
Cover cutting edges
Put away in safe place and clean after use
Place in tool-box
Check the power cord is not frayed or damaged
Any THREE or other applicable answer
2.2 2.2.1 Independent scaffold
Pipe scaffold
Any ONE correct
2.2.2 Bracing and used to keep scaffold secure
IEB Copyright © 2016 PLEASE TURN OVER
Downloaded from hlayiso.com
NATIONAL SENIOR CERTIFICATE: CIVIL TECHNOLOGY – MARKING GUIDELINES Page 4 of 7
2.2.3 Ensure it is on level ground
Working platform can carry load
Kick board in place
Guard rail in place
Qualified person erected scaffold
No paint or rust visible
Ensure tied onto structure
Only workers allowed on scaffold
Any TWO or other applicable answer
2.2.4 A – Guard rail
B – Platform
C – Kick board
D – Vertical standard
2.3 2.3.1 Factors
Span
Weight of floor
Load on floor
Daily use for suspended floor
Time available for construction
Reinforcing method for floor
Any THREE factors or any other applicable answer
2.3.2 Method – Precast concrete slab OR slab on corrugated iron OR reinforced
slab
2.4 ANSWER BOOKLET
2.5 B – Shuttering
C – Rise
D – Tread
E – Landing
G – Wedges
2.6 Strong enough to carry load
Easily nailed, screwed
Reusable
Not able to bond with concrete
Any TWO applicable or any other applicable answer
2.7 Driven pile – Driven into soil with weight, like a nail driven into wood
Precast pile – Already made up pile driven straight into the ground
Drilled pile foundation – Hole is drilled by large auger drill bit and poured afterwards
Any TWO applicable answers
2.8 12 – Number of bars
Y – High yield/ Y-bar
12 – Diameter of bar
10 – Bar number in code
300 – Spacing of bars
IEB Copyright © 2016 PLEASE TURN OVER
Downloaded from hlayiso.com
NATIONAL SENIOR CERTIFICATE: CIVIL TECHNOLOGY – MARKING GUIDELINES Page 5 of 7
2.9 Rough arch – Plastered when finished
Built with uncut bricks
Mortar wedge shaped
Any ONE answer or any other applicable answer
Gauged arch – Built with voissoirs (purpose made bricks)
Do not plaster.
Any ONE answer or any other applicable answer
2.10 2.10.1 Curing of concrete – Drying, removal of water out of mix
2.10.2 Segregation of concrete – The concrete breaks apart due to mix not done
properly
2.10.3 Beam filling – Bricks placed between trusses to close gap between wall and
roof
QUESTION 3 CIVIL SERVICES
3.1 A conservancy tank can be used in the absence of a waterborne sewerage system
and where a septic tank is not viable. Make a neat, labelled sketch of the sectional
view of a conservancy tank. Clearly showing the following:
Inlet, outlet, valve chamber, pipe diameters and floor slope, manhole cover.
Inlet chamber – 2
Conservancy tank – 1
Valve chamber – 2
Pipe ø – 1
Outlet – 1
Floor slope – 1
3.2 ANSWER BOOKLET
3.3
ADVANTAGES DISADVANTAGES
Excellent coastal areas Expensive
Readily available Joints laborious, difficult
Durable in aciduous soil
3.4 3.4.1 Trap consists of sieve that stops food going into main drain
Clean sieve and pipes can be unblocked quickly
ANY other acceptable answer
3.4.2 Used: Restaurants, large kitchen
ANY other acceptable answer
IEB Copyright © 2016 PLEASE TURN OVER
Downloaded from hlayiso.com
NATIONAL SENIOR CERTIFICATE: CIVIL TECHNOLOGY – MARKING GUIDELINES Page 6 of 7
QUESTION 4 QUANTITIES, MATERIALS AND JOINING
4.1 Fixatives
4.1.1 General use where nail can be visible
Carpentry
Crates
Any ONE or other acceptable answer
4.1.2 The large head of the clout nail holds the ceiling material better
4.1.3 Use where large nail is unsuitable
Use where nail must be hidden
Use where wood is in danger of splitting
Any ONE or other acceptable answer
4.1.4 PVC cement/glue
4.1.5 Soldering
Compression fittings
4.2 Advantages of screws
Does not damage the wood when inserting
Easy to take out and does not damage wood, when taking out
Grip is much stronger
Holds longer than nails
Any THREE or other acceptable answer
4.3 Incomplete cutting list
4.3.1 Description
4.3.2 Width
4.3.3 Thickness
4.4 ANSWER BOOKLET
IEB Copyright © 2016 PLEASE TURN OVER
Downloaded from hlayiso.com
NATIONAL SENIOR CERTIFICATE: CIVIL TECHNOLOGY – MARKING GUIDELINES Page 7 of 7
QUESTION 5 APPLIED MECHANICS
5.1 5.1.1 Rec 1 = 30 × 20 = 600 mm²
Rec 2 = 20 × 20 = 400 mm²
Rec 3 = 40 × 90 = 3 600 mm²
Total = 4 600 mm²
5.1.2 CENTROID FROM AA
4 600 × X = (600 × 15) + (400 × 40) + (3 600 × 75)
= 9 000 + 16 000 + 270 000
= 295 000/4 600
= 64,13 mm
5.2 ANSWER BOOKLET
5.3 RR × 5 = (3 × 0) + (4 × 1) + (5 × 3) + (4 × 4)
= 0 + 4 + 15 + 16
= 35/5
RR = 7 kN
RL × 5 = (4 × 1) + (5 × 2) + (4 × 4) + (3 × 5)
= 4 + 10 + 16 + 15
= 45/5
RL = 9 kN
QUESTION 6 GRAPHICS AND COMMUNICATION
6.1 ANSWER BOOKLET
6.2 ANSWER BOOKLET
Total: 200 marks
IEB Copyright © 2016
Study this subject
Revise the topics in this paper, then practise them question by question.
Recommended for this subject
More papers and memos for this grade and subject.

Question paperIEB
Civil Technology Grade 12 IEB 2016 Question Paper

Question paperIEB
Civil Technology Grade 12 IEB 2016 Question Paper (Afrikaans)

Question paperIEB
Civil Technology Grade 12 IEB 2016 Question Paper

MemorandumIEB
Civil Technology Grade 12 IEB 2016 Memo

Information sheetIEB