Skip to content

Engineering Graphics and Design Grade 11 P1 2020 Memo (Eng)

MemorandumEngineering Graphics and DesignGrade 11202010 pages

Grade 11 Engineering Graphics and Design Paper 1 memorandum from the Eastern Cape November 2020 (English), 10 pages. Read online or download the free PDF.

Free to read online, no sign-up needed

Loading document…

Loading document…

Document textSearch extracted text and jump to a page.
Downloaded from hlayiso.com *IGRDSE1*
snc Downloaded from hlayiso.com es QUESTION 1A: ANALYTICAL (CIVIL) Given: INCOMPLETE FLOOR PLAN The incomplete floor plan of a house. A title panel and a table of questions. The drawing has not been prepared to an indicated scale. Instructions: Pa 5 500 y NOTE: Complete the table below by neatly answering the questions, which refer to the accompanying drawing and title 1 Contractors must verify all dimensions panel [28] and levels on site before commencing work. Architects to be notified immediately of any discrepancies QUESTIONS ANSWERS 1 | What is the name of the architectural firm responsible for ARCHITECTS SIGNATURE 1 ly drawing the house plans? CHENTS SIGNATURE 2 | What is the project number for this drawing? 1 (ZZZZZZ 3 | 2020-03-27 Jcoupuete THe winoows 3 | Who was the person responsible for checking the 1 BEDROOM correctness of the drawing? 2 {2020-03-27 fins s 17,48 m? SERTTHE Doors 4 | Whois the person responsible for drawing the floor plan? q 5 | When was the drawing printed? REVISION DATE DESCRIPTION 41 * BOTHA ARCHITECTS 6 | Who is the owner of the house? 1 11 Da Gamma street —— ? q cxmmmoobL seeaewena 7 | What feature is indicated by the symbol at A? ; 3 S| IPASSAGE TILES 6330 Tai | TILES 7,03 m ——c TEL: 072 293 0392 8 | What feature does the line, indicated by arrow B show? a = 2.48 m2 . FAX: 042 293 0392 ” [4 EMAIL: kbotha@gmail.com — A SaNIcD BY OMEGF PRAT 9 | What does the abbreviation NTS in the title panel stand A BLUEDEVILLE 2020-04-01 for? > 10 | Has revision 3 been done correctly? Explain (zzzzzz] DRAWING THLE 1 LOUNGE / DINING ROOM ‘WOOD | FLOOR PLAN 17,59 m* lI dei SRORGT 11 | What is wrong with the hatching in the floor plan? . LU VW g 7 PROPOSED NEW HOUSE FOR VW KITCHEN MRS. X. RUPPING, STAND 1442, 12 | What does the abbreviation BIC indicate? 4 B 1 | TILES THORNHILL, EASTERN CAPE. 2 iI ssi . , x i PROJECT NONBER DRAWING NUMBER 13 | Which VIEW is indicated by arrow C? 2 gl |S il DP 2020 - 04 10f4 | | DATE DRAWN | GRECKED SCALE 14 | What is the width of the doors in mm if a scale of 1 : 100 2020-03-20 LINDO | TYRON | NTS was used? 2 Y] Ail 2 REFERENGE CODE ollle DOE-2020 15 | In the space provided below, determine the perimeter of the entire house. y 16 | in the space provided below, determine the total floor area that must be filed, in square meters. | 4 TOTAL | 27 oO ANSWER 15 ANSWER 16 NAME NAME: [2 Copyright reserved Please tum over
Engineering graphics and design / P1 Downloaded from hlayiso.com — QUESTION 2: INTERPENETRATION AND DEVELOPMENT Given: The top view and incomplete front view of a right regular triangular prism that penetrates a right regular hexagonal prism The auxiliary view of the triangular prism The position of point X, the centre ofthe hexagon and starting point for the top view. A starting point AB for the development required Instructions: Draw, to a scale 1: 1 and in first angle orthographic projection, the following views of the two solids: 21 2.2 2.3 24 The given top view using point X as a starting point. The complete front view showing the curve of interpenetration. The left view The surface development of the triangular prism Use line AB as reference point. Show ALL constructions. [39] 60 20 60 ASSESSMENT CRITERIA 4 | TOP view+ 6 CONSTRUCTION FRONT VIEW + INTERPENETRATION | 9 3) Lert view 8 4) DEVELOPMENT 16 TOTAL | 39 NAME NAME. [3 Copyright reserved Please tum over
Engineering graphics and design / P1 EC / November 2020 Downloaded from hlayiso.com QUESTION 3: PERSPECTIVE Given: Two views of a HOUSE and the information needed to draw a two-point perspective drawing. PP — Picture plane HL - Horizon line GL ~ Ground line SP - Station point Instructions: Complete the perspective drawing * Align the drawing sheet with the ground line (GL). * Determine and label the vanishing points. * Show ALL necessary construction. * NO hidden detail is required. 144] CEMENT PORCH AROUND: THE HOUSE PP HL ASSESSMENT CRITERIA 4 | CONSTRUCTION + VPs 5 2 | ROOF 15 3 | WALLS 7 4 | DOOR + WINDOWS 10 r | 5 | PORCH 7 | | . TOTAL| 44 t : 1 GL ae Me NAME CEMENT PORCH AROUND SP THE HOUSE NAME [4 Copyright reserved Please tum over
Engineering graphics and design / P1 Downloaded from hlayiso.com EC / November 2020 QUESTION 4: CIVIL DRAWING Given: © The incomplete SOUTH ELEVATION of a proposed new dwelling, showing the walls, step, windows, the door openings and notes. © The incomplete floor plan showing the walls, position of the doors, windows and sanitary fixtures. © The incomplete foundation and wall detail. * Room designations and floor finishes. * A door and window schedule. * A table of sanitary fixtures. * The floor plan of the new dwelling, drawn to scale 1 : 50 and the starting point P for the sectional view to scale 1 : 20 (on page 6). Instructions: Answer this question on page 6 4.1. Using the given incomplete floor plan draw in first-angle orthographic projection and to scale 1 : 50, the following views of the new dwelling 4.1.1 THE COMPLETE FLOOR PLAN Add the following features to the drawing: * ALL doors and windows. * ALL sanitary fixtures as indicated by the abbreviations. * ALL hatching detail. 4.1.2 THE SOUTH ELEVATION Show the following features on the drawing: « The outside walls, step, doors and window detail as well as the window sill under the widows. « Draw a break line 2 700 mm above the finished floor level. © The finished floor level. 4.2 In the space provided on page 6, using the incomplete foundation and break line, draw, to scale 1 : 20, a DETAILED SECTION on cutting plane A-A of the area in the ellipse shown on the incomplete floor plan Show the following features: ¢ The complete foundation, external wall and window detail * The lintels above the window. * The window sill under the window. * The bath in position. * Indicate with dimensioning the length of the bath. * ALL hatching detail * ALL substructure hatching may be drawn neat in freehand. Label the following: « The south elevation and scale. « The room designations and floor finishes. « Using the correct abbreviations, label the following features in the correct view: natural ground level, finished floor level and damp proof course. NOTE: ALL drawings must comply with the guidelines and graphical symbols contained in the SANS 10143. [39] 3.000 INCOMPLETE SOUTH ELEVATION AM wa wi Gy NWS Wer 3 8 2 sH 3 D we 1 4 —] ° w3 sD 5 in STEP INCOMPLETE FLOOR PLAN 4 2X 125 x80 mm LINTELS ABOVE ALL Z DOOR AND WINDOW OPENINGS: 3 gs Z| | oI 3g a g Z| GROUND LEVEL eI FS) 600. INCOMPLETE WALL AND FOUNDATION DETAIL DOOR AND WINDOW SCHEDULE y TO FIT y , TOFIT ) t { t { DOOR OPENING WINDOW OPENING SLIDING DOOR OPENING |_— FINISHED FLOOR LEVEL STEP GROUND LEVEL g g 200) “ N SLIDING DOOR DOOR FRAME AND (sD) DOOR (0) ROOM DESIGNATIONS FLOOR FINISHES: 1500 2000 1. BEDROOM CARPET 450 450 450 2. BATHROOM TILE A 1 7 3, KITCHEN TILE 4, LOUNGE woop 5. PORCH CEMENT c B A c B A c lA BI 3 FEATURES = D DOOR SD SLIDING DOOR 3 wi WINDOW g| c c c c c w2 WINDOW WS WINDOW WINDOW (wa) WINDOW (wa) FIXTURES We TOILET WB WASH BASIN 1.000 SH SHOWER 1 ino notes B BATH a S SINK B )PENING SIDE ol INGED SIDE Z| A IXED PANE o THICKNESS OF ALL FRAMES: 50mm c WINDOW SILL: 180 x 20 mm FIBRE WINDOW (WA) CEMENT SILL UNDER ALL WINDOWS. SANITARY FIXTURES 2.050 500 FA 200 3 | zor 850, FLOOR LevEL| 750 750. SHOWER (SH) (we) 400 WASH BASIN 1200 TOILET BATH SINK (we) (8) ‘s) Copyright reserved Please tum over
Engineering graphics and design / P1 Downloaded from hlayiso.com EC / November 2020 PENALTIES 1 | INCORRECT OVERALL SCALE 2 | INCORRECT POSITIONING OF VIEWS. 3 | NON-ALIGNMENT OF VIEWS TOTAL PENALTIES (-) ASSESSMENT CRITERIA FLOOR PLAN DOORS + WINDOWS 7 FIXTURES 9 1 2 3 | vasets 5 4 HATCHING 5 SUB TOTAL 36 SOUTH ELEVATION 4 | Wats + steps + FFL + BREAK 7 LINE DOOR + 2 WINDOWS 14 3 | casets 2 SUB TOTAL 23 DETAILED SECTION 4] Founoations= |g 3 wats+siaa | 82 3] HarcHine 6i A} sath 24 5] vimension 4 6 | tasets 13 SUB TOTAL 30 f TOTAL | 89 PENALTIES (-) —_ GRAND TOTAL FLOOR PLAN DETAILED SECTION ON A:A i NAME SCALE 1: 50 SCALE 1: 20 NAME [6 Copyright reserved
Downloaded from hlayiso.com ISEBE LEMFUNDO LEMPUMA KOLONI EASTERN CAPE EDUCATION DEPARTMENT OOS-KAAP ONDERWYSDEPARTEMENT NATIONAL SENIOR CERTIFICATE NASIONALE SENIOR SERTIFIKAAT GRADE 11 GRAAD 11 ENGINEERING GRAPHICS AND DESIGN P1 INGENIEURSGRAFIKA EN -ONTWERP V1 NOVEMBER 2020 MEMORANDUM MARKS / PUNTE: 200 TIME / TYD: 3 hours / uur This memorandum consists of 7 pages. Hierdie memorandum bestaan uit 7 bladsye. Copyright reserved / Kopiereg voorbehou Engineering graphics and design/P1 NSC EC / November 2020 PAPER 1 QUESTION 1: ANALYTICAL _ MARKING GUIDELINE. VRAESTEL 1 VRAAG 1: ANALITIES _NASIENRIGLYN ‘oon alle berekeninge / Show all calculati ANSWERS ANTWOORDE 1 | BOTHA ARCHITECTS 1 1 | BOTHA ARGITEKTE 1 2 | DP 2020 - 04 1 2 | DP 2020 - 04 1 3 | TYRON 1 3 | TYRON 1 4 |LINDO 1 4 |LINDO 1 5 | 2020-04-01 1 5 | 2020-04-01 1 6 |MRS. X. RUPPING 1 6 | MEV. X. RUPPING 1 7 | BIDET 1 7 | BIDET 1 8 | ARCH / OPENING IN THE WALL 2 8 | BOOG (OPENING) IN DIE MUUR 2 9 |NOT TO SCALE 1 9 | NIE VOLGENS SKAAL 1 40 NO. THE WINDOW MUST HAVE 2 10 NEE. DIE VENSTERS MOET 2 TWO LINES INSTEAD OF ONE TWEE LYNE HE IPV EEN " MECHANICAL HATCHING OR 2 " MEGANIESE OF VERKEERDE 2 WRONG HATCHING TYPE USED TIPE ARSERING IS GEBRUIK 12 | BUILD IN CUPBOARD 2 12 | INGEBOUDE KAS 2 13 | WEST VIEW / WEST ELEVATION 2 13 | WESAANSIG / WES ELEVASIE 2 14 |900 mm 2 14 | 900 mm 2 15 | ANSWER BELOW 4 45 | ANTWooRD ONDER 4 16 | ANSWER BELOW 4 16 | ANTWOORD ONDER 4 TOTAL | 28 TOTAL| 28 QUESTION / VRAAG 15 QUESTION / VRAAG 16 Toon alle berekeninge /Show all calculations 2(L+B) ¥ | 7.03] rekte waardes 2 (10 + 5,5) corre 248-7 te antwoord tn 2x15,5. ¥ correct unit(m) + 5 95} korrekte eenheia (m) = Simvv 15.46 mi? V/ (4) (4) Copyright reserved Please tum over
Engineering graphics and design/P1 Downlo EC / November 2020 Gr. 11 NOVEMBER 2020 MARKING GUIDELINE PAPER 1 - QUESTION 2: INTERPENETRATION AND DEVELOPMENT VRAESTEL 1 - VRAAG 2: INTERPENETRASIE EN ONTWIKKELING Grit NOVEMBER 2020 NASIENRIGLYN © 2 9g \e 5 a 4 o Vv Q al 9g a v= 3 Q a Y p 98 Pp (o) v construction @ | ASSESSERINGSKRITERIA oe enn 7 | BOAANSIG + F KONSTRUKSIE Konstruksie — @ + Kersks tans [2 vooRaansic 9 3 | LINKERAANSIG 8 4|ontwikkeune | 16 TOTAAL 39 ASSESSMENT CRITERIA t|consraucrion | & 2 | FRONT VIEW 9 3 | LEFT View 8 4 | DEVELOPMENT 16 TOTAL 39 A=) 3 Copyright reserved Please turn over aded from hlayiso.com Engineering graphics and design/P1 NSC EC / November 2020 Gr. 11 NOVEMBER 2020 MARKING GUIDELINE PAPER 1 - QUESTION 3: PERSPECTIVE Grit NOVEMBER 2020 \ASIENRIGLYN Q| VRAESTEL 1 -VRAAG 3: PERSPEKTIEF ASSESSMENT CRITERIA ASSESSERINGSKRITERIA CONSTRUCTION + VPs 5 1] KONSTRUKSIE & vPte | 5 ROOF 15 2] Dak 15 WALLS 7 3 | MURE 7 DOOR = WINDOWS 10 4|peuR+vensters | 10 PORCH 7 5 | STOEP 7 TOTAL| 44 TOTAAL | 44 4 Copyright reserved Please turn over
Downloaded from hlayiso.com 40n0 winy aseoiq ponuosos yySucdoo 9 &% wvlolans x4 w10l ans z SLSIMSAS € z s738v7 € - vw suaisnan+ sansa] Z% vb SMOaNIM + 8000 | 7% NATASIG + AA SNM yvaua + Z + addve + aun} 4 |ass+saais+stvm | | 3ISVAa7a GINS NOLLWAS7a HLNOS VINALINMSONINASSASSV VINALIND LNSWSSaSsV 05 IWWHS: 0s 1 s1WOS SISVA313 GINS NOILVAA14 HLNgS@ Oven i) (1 o G Ow tc) a o q p p [ee |e p 8 o a NATORINAISYN 0202 43aN3AON fre) aISVASTA“® OvvUA- TTSISSVEA aNTIaaiNO ONDRIvHN 0202 43GW3AON fren) NouwaaT3 :¥ NoUSand - TEadve 020Z JeqUisAON / D3 OSN Ld/ubisep pue soiydes6 Buyeeuibu3 48N0 WIN] BSEAld penieses jySUAdoD ; 0S: 1 a1voS: 0s: b IWWyS NW1d YOOT14 NV1dy3S01A HOOT ONIONS TUNSITINNS XT [A GINSNS9 INSW3S) @HOYNOd d30.Ls bid ° SHOOT SUSISNSAXS 4 oe TwvLolans Ss onniasuy | 7 @1aduvo @wooudag ®aoom ° s aianpsra] © @39NnN01 wane ans 4NOH 6 suoHaa301| 7 MAWVHLIS SUSLSN3A, ad vaunaa| b NV1duaO7A Cc. VINSLINSONNASSASSV sTgaL e S133. Osnu Gyawvxave ge Ww.10L ans SINANOM =@N3HOLIM sa1Le @noowHiva Ss ‘SNIHOLVH Y v = s sae] © 1 a 6 SaUNLXtd é NATOINNAISVN lb SMOQNIM 0202 HaGW3AON +suooa| | eae) NvTaUa0TA iy OvvuA- TTSISSVEA NV1d 40014 m= S op es camenecat! ANTaqIN ONDINYI, VINaLIND LNSWSS3Ssv vy — salamat peysiey iy “Bua lv “Bunosiy: NV 1d YOOTd ‘¥ NOILSAND - Tuadvd vA PALA 02Z0Z JequieAON / O3 Taiubisep pue so|ydei6 Busou
Downloaded from hlayiso.com Engineering graphics and design/P1 EC / November 2020 PAPER 1 - QUESTION 4: DETAILED SECTION Grit NOVEMBER 2020 MARKING GUIDELINE VRAESTEL 1 - VRAAG 4: GEDETAILEERDE SNIT Grit ASSESSMENT CRITERIA NOVEMBER 2020 NASIENRIGLYN DETAILED SECTION 2D | rmcows ens D 3 | rarcrine 63 4 | oan 23 ° 5 | omensiow 1 9 Pp 6 | uses 14 SUB TOTAL 30 Dp e ASSESSERINGSKRITERIA GEDETAILEERDE SNIT 4 |rcressermnes [gg y aN Sopc@ | 2 |YSeSec-une| 10 e e 5 ; O 1700 ARSERING 62 4 | exo 24 q jo @ 5] aarsnerwns 1 ° © SUBTOTAAL 30 co) co ppc Pat ) b : @ a) No hatching a co) 2 pb G Geen arsering e ° Q__NGLe 8 fc) Qa Gg Q GEDETAILEERDE SNITA:A DETAILED SECTION ON A: A SKAAL 1 : 20 SCALE 1: 20 7 Copyright reserved

Study this subject

More from Grade 11 Engineering Graphics and Design

View all