Skip to content

Engineering Graphics and Design Grade 12 P1 2014 QP (Eng)

Question paperEngineering Graphics and DesignGrade 1220146 pages

Grade 12 Engineering Graphics and Design Paper 1 question paper from the NSC Supplementary 2014 (English), 6 pages. Read online or download the free PDF.

Free to read online, no sign-up needed

Answer online

Loading document…

Loading document…

NSC Supplementary 2014

Questions in this paper

Document textSearch extracted text and jump to a page.
Downloaded from hlayiso.com INSTRUCTIONS AND INFORMATION 1. This question paper consists of FOUR questions. 2. Answer ALL the questions. 3. ALL drawings are in first-angle orthographic projection, unless otherwise stated. 4. ALL drawings must be completed using instruments, unless otherwise stated. 5. ALL answers must be drawn accurately and neatly. 6. ALL the questions must be answered on the QUESTION PAPER as instructed. 7. ALL the pages must be re-stapled in numerical sequence, irrespective of whether the question was attempted. 8. Time management is essential in order to complete all the questions. 9. Print your examination number in the block provided on every page. 10. Any details or dimensions not given must be assumed in good proportion. NATIONAL SENIOR CERTIFICATE FOR OFFICIAL USE ONLY QUESTION MARKS OBTAINED ½ SIGN MODERATED ½ SIGN GRADE 12 1 2 3 ENGINEERING GRAPHICS AND DESIGN P1 4 FEBRUARY/MARCH 2014 TOTAL 2 0 0 2 0 0 MARKS: 100 FINAL CONVERTED MARK CHECKED BY TIME: 3 hours _______ 100 COMPLETE THE FOLLOWING: This question paper consists of 6 pages. CENTRE NUMBER CENTRE NUMBER EXAMINATION NUMBER EXAMINATION NUMBER *BASIC-EDUCATION* Copyright reserved Please turn over
Engineering Graphics and Design/P1 Downloaded from hlayiso.com DBE/Feb, - Mar. 2014 Cg [//SIDELENGTHS AND CORNER HEIGHTS 8 ON ERF NUMBER 1098 PIETERMARITZBURG, SURVEYED ON 01-04-2011 LENGTHS IN HEIGHTS IN METRES METRES AB = 75 A=738 BC = 34 B=776 cD =255 c=779 DE=13,5 D=77,0 EF = 49,5 E=769 FA=476 Fe724 MUNICIPAL SEWERAGE ;- CONNECTION 2250 DEEP (1) 14500 MOTOR LEMON TREE ROAD WO ENTRANCE 6000 WIDE f_ PAVEMENT —(—Q- A we N an — 7000 BL _ oo _ i [ \ / \\ EXISTING \ GARAIBE AND EXISTING 9100 DRIVEWAY PVCLAIDTO \ ERF 1097 err 1o9g AE 1=9° \ ERF 1099 \ NEW 800 HIGH BRICK RETAINING WALL nN D| 4 = = NEW POOL NEW CONCRETE PUMP: PAVING LAID ON 150 mm WELL- COMPACTED sl RIVER SAND 3 PROPOSED NEW | carve a" SWIMMING POOL 3 4 ERF 668 Rl 7100 12500 £ 19000 L__ _ __2000 Bt. - c / B ERF 667 // SITE PLAN SCALE 1 : 200 NOTE: Contractors must verify all dimensions and levels on site before commencing work. Architects to be notified immediately of any discrepancies. 20. In the space below, draw, in neat QUESTION 1: ANALYTICAL (CIVIL) Given: The site plan of an existing house with a proposed new swimming pool, a title panel and a table of questions. The drawing has not been prepared to the indicated scale. Instructions: Complete the table below by neatly answering the questions, which all refer to the accompanying drawing and title freehand, the front view and top panel Bo] view of the SANS 10143 graphical symbol (convention) for graphical sy QUESTIONS ANSWERS 1 | On what date was the plan approved? 1 2 | Who prepared the site plan? 1 3. | What scale is indicated for the drawing? 1 4 | Whatis the project number? 1 5 | What is the name of the draughting firm? 1 6 |How many stands border erf number 1098? 1 7 | What is the fall on the existing sewerage line? 1 8 | How deep is the municipal sewerage connection in metres? 1 9 | Name the encircled feature at 1 1 ARCHITETS SIGNATURE 10 | Name the feature labelled 'G' at 2. 1 CLIENTS SIGNATURE 11 | What does the arrow in the circle at 3 indicate? 1 12 |Name the feature at 4. 1 13 |Name the feature at 5. 1 14 | Which elevation of the existing house faces the pool? 1 415. | How long is the north-eastern boundary line of erf 1098 in 2 metres? REVISION DATE DESCRIPTION 16 | What is the width and length of the swimming pool in metres? 2 PRINTED BY DATEOF PRINT PATSY PRINTERS 17-02-2014 Determine the area of the concrete paving around the swimming DRAWING THLE 17 | pool in square metres. 3 SITE PLAN Show ALL calculations. BRORECTNUNBER | GRANNY one een eyaan —_iwor2ora] 1g | Determine the perimeter of erf 1098 in metres. 3 = Show ALL calculations. REFERENCE CODE | CHECKED BY OnE DBE-2014-01 PTHAKER 05-02-2014 DRAWING NUMBER: | APPROVED BY OATE Determine the shortest distance from the swimming pool to the 13-001-siP__|_MZUNGU __ |14-02-2014] 19 | south-eastern building line in metres. 3 PROWECT Show ALL calculations. PROPOSED NEW SWIMMING POOL ra FOR AM MBUTU ON ERF NUMBER i the space provided in the tie panel, drew in neal frechand, ; 4098 AT 87 LEMON TREE ROAD, | 20 | the front view and top view of the graphical symbol 3 PIETERMARITZBURG (convention) for a SHOWER. TOTAL | 30 BUDGET DRAUGHTING 26 CHURCH STREET PIETERMARITZBURG EXAMINATION NUMBER Tel: 033 245 3434 EXAMINATION NUMBER [2 Copyright reserved Please turn over
Engineering Graphics and Design/P1 Downloaded from hlayiso.com DBE/Feb, - Mar. 2014 Copyright reserved QUESTION 2: TRANSITION PIECE Given: The front view and top view of a square-to- round transition piece Instructions: Draw, to scale 1 : 1, the following: 2.1 The given front view and top view 2.2 The development of the surface of the transition piece. Make AB the seam. Show ALL necessary construction. [35] Al LL a AB IS THE SEAM. ASSESSMENT CRITERIA 1 | GIVEN 5 2 | CONSTRUCTION 4 3 | TRUE LENGTHS 8 4 | DEVELOPMENT 18 TOTAL 35 EXAMINATION NUMBER EXAMINATION NUMBER [3 Please turn over
Engineering Graphics and Design/P1 Downloaded from hlayiso.com DBE/Feb, - Mar. 2014 PP. QUESTION 3: PERSPECTIVE Given: Two views showing the interior of a kitchen and the information needed to draw a two-point perspective drawing PP ~ Picture plane HL - Horizon line GL - Ground line SP - Station point Instructions: Complete the perspective drawing. * Align the drawing sheet with the ground line (GL). © Determine and label the vanishing points. * Show ALL necessary construction * Show the wall thickness at the window. * Show the depth of the washing machine drum. * NO hidden detail is required [39] HL GL WINDOW HL ASSESSMENT CRITERIA 1 | CONSTRUCTION + VPs 6 2 | WALLS + CUPBOARDS | 17% 3 | EXTRACTOR + CIRCLES | 15% Copyright reserved TOTAL 39 EXAMINATION NUMBER EXAMINATION NUMBER [4 Please turn over
Engineering Graphics and Design/P1 Downloaded from hlayiso.com DBE/Feb, - Mar. 2014 ROOF COMPONENTS ELECTRICAL ==] [15x 38watt pate SYMBOLS a & 75 x 50 PURLINS — KX faa 244800, | ROOF cAP WINDOW AND DOOR SCHEDULE — 500 TT 1550. 1 s [HINGED END _ L a} |] ulkceo eho WINDOW (W1) ed To FIT TOFIT tt FS 500 500 WINDOW (w2) NOTE: 190 x 20 FIBRE CEMENT SILL UNDER ALL WINDOWS, 2100 INTERNAL FRAME AND DOOR (D1) TO FIT TOFIT or yy; _TOri _ 2100 DOOR AND DOUBLE DOOR FRAME (D2) INCOMPLETE NORT! (| | __ FIXTURES: we TOILET w2 5. CEILING LIGHT NOTE: 114 x 38 mm ROOF TRUSSES ON 114 x 38 mm WALL PLATES ROOF PITCH 20° WITH 200 x 20 mm FASCIA BOARD AND 200 x 20 mm BARGE BOARDS ON THE GABLES PLASTER CEILING BOARD ON 38 x 38 mm FIXTURES 1700 400 roe QZ 4 act KP AS! 500) WASHBASIN (WB) TOILET (WC) BRANDERING @ 750 mm cle CONNECTION TO TI INCOMPLETE FLOOR PLAN FLOOR FINISH: ROOF NOTES: BEDROOMS CARPET 15 mm FIBRE CEMENT SHEETS ON 75 x 50 mm BATHROOM: TILES PURLINS @ 950 mm cle KITCHEN, TILES LIVING ROOM: TILES: —r BEDROOM KITCHEN BEDROOM LivING ROOM ROOM DESIGNATIONS SINK (S) MT BUILT-IN CUPBOARD (BIC)! | 750 fe | 750 cle | 760 ee | 750 cle | 750 cle | 760 ee | SCHEMATIC DIAGRAM OF A ROOF TRUSS FOR ROOF A Copyright reserved THE ARROW SHOWS THE LIGHT 200 x 20 FASCIA BOARD 200 x 20 BARGE BOARD OPENING FOR DOUBLE DOORS FLOOR LEVEL 2s STEP HEIGHT 150 mm. SIs GROUND LINE DOOR OPENINGS D2 DOUBLE DOOR OPENING Dt INTERIOR W1 WINDOW OPENINGS wW2 WINDOW OPENINGS s SINK B BATH WB WASHBASIN BIC BUILT-IN CUPBOARD ELECTRICAL FITTINGS: 1. DISTRIBUTION BOARD 2. SWITCH SOCKET OUTLET 3. TWO-POLE LIGHT SWITCH 4, SINGLE-POLE LIGHT SWITCH 6. 2x 40 W FLUORESCENT TUBES, at HE SWITCH = Liz INCOMPLETE FOUNDATION AND INTERNAL WALL DETAIL 600 fu 2600 GROUND LEVEL = 300 Fd INCOMPLETE FOUNDATION AND EXTERNAL WALL DETAIL QUESTION 4: CIVIL DRAWING Given: © The incomplete north elevation of a new house, showing the walls, the entrance opening, the roof and notes * The incomplete floor plan, showing the walls, position of the doors, windows, fixtures and the electrical fittings * Roof notes and a schematic diagram of a roof truss ©The floor finishes and a diagram showing the room designations © The incomplete foundation, walll detail of an internal and an external wall * A table of roof components * A table of electrical symbols * A window and door schedule * A table of fixtures © The incomplete floor plan of the new house, drawn to scale 1:50, on page 6 Instructions: * Answer this question on page 6. Using the given incomplete floor plan, draw, in first-angle orthographic projection and to scale 1 : 50, the following views of the new house: 4.1 The complete floor plan 4.2 The north elevation 4.3 A sectional elevation on cutting plane A-A *ALL drawings must comply with the guidelines and graphical symbols contained in the SANS 10143. SPECIFICATIONS: THE FLOOR PLAN Add the following features to the drawing: * ALL the doors and windows * ALL the fixtures as indicated by the abbreviations * ALL the electrical fittings as indicated by the numbers * ALL hatching detail THE NORTH ELEVATION Show the following features on the drawing: « The outside walls and the finished floor level © The double doors and step © The roof detail, including the barge boards and fascia board THE SECTIONAL ELEVATION Show the following features on the drawing: © The complete foundation, wall, slab, roof and ceiling detail « The window detail, with a double lintel © The detail of the window on the east-facing wall * ALL hatching detail Label the followin * The room designations with floor finishes © The north elevation and the sectional elevation Using the correct abbreviations, label the following features in the correct view: natural ground level, finished floor level and damp-proof course NOTE: ALL substructure hatching may be drawn in freehand. [96] [5| Please turn over
etn ous Downloaded from hlayiso.com DBE/Feb, - Mar. 2014 ASSESSMENT CRITERIA FLOOR PLAN TEs E Seas + [seas | 15 5 | HATCHING 3 SUBTOTAL 45 NORTH ELEVATION iy [SERe iB) 3 | poor 2 4 [usas th SUBTOTAL 13 SECTIONAL ELEVATION 41 | ROOF 12 3 | winpows 7 4 | HATCHING 5 5 [seis wh SUBTOTAL 38 TOTAL 96 FLOOR PLAN EXAMINATION NUMBER SCALE 1: 50 Sree 0H 0 A SvanNATONNONEER [6

Study this subject

More from Grade 12 Engineering Graphics and Design

View all