Downloaded from hlayiso.com
NATIONAL
SENIOR CERTIFICATE
GRADE 12
MATHEMATICAL LITERACY P2
FEBRUARY/MARCH 2013
MEMORANDUM
MARKS: 150
Symbol Explanation
M Method
M/A Method with accuracy
CA Consistent accuracy
A Accuracy
C Conversion
S Simplification
RT/RG Reading from a table/Reading from a graph
SF Correct substitution in a formula
O Opinion/Example
P Penalty, e.g. for no units, incorrect rounding off etc.
R Rounding off
This memorandum consists of 17 pages.
Copyright reserved Please turn over
Skip to contentAll 2013 papers 





View all





Mathematical Literacy Grade 12 P2 2013 Memo (Eng)
Grade 12 Mathematical Literacy Paper 2 memorandum from the NSC Supplementary 2013 (English), 17 pages. Read online or download the free PDF.
Mathematical Literacy · Grade 12 · NSC Supplementary · 2013. Memorandum, 17 pages. Read online or download the PDF.
- Subject
- Mathematical Literacy
- Grade
- Grade 12
- Document type
- Memorandum
- Year
- 2013
- Exam period
- NSC Supplementary
- Paper
- 2
- Curriculum
- CAPS
- Pages
- 17
- File size
- 665.6 KB
Free to read online, no sign-up needed
Loading document…
Loading document…
1 of 17
This exam
NSC Supplementary 2013
- Paper 1Question paperMemo
- Paper 2Question paperMemo
Questions in this paper
Document textSearch extracted text and jump to a page.
Downloaded from hlayiso.com
Mathematical Literacy/P2 2 DBE/Feb.–Mar. 2013
NSC – Memorandum
QUESTION 1 [24 MARKS]
Ques Solution Explanation AS
M 12.4.3
1M arranging in order L3
1.1.1 7 12 8 8 12 8 12 9 9 9 9 9 12
(a)
The median score = 9 A 2A correct identification
Answer only full marks
(3)
1.1.1 Range = 9 12 – 7 12 M 1M subtraction 12.4.3
(b) = 2 A 1A simplification L2
Answer only full marks
(2)
1.1.2 O 12.4.4
(a) To eliminate scores of judges who are biased. 2O opinion L4
OR OR
Eliminating the highest and lowest scores will
have the effect that the mean is calculated without
extreme values O 2O opinion
OR
Any other valid, well-thoughtout opinion
(2)
12.4.3
1.1.2 9 + 8 + 9 + 9 + 9 + 8 12 + 8 12 L4
(b) Bongani’s mean = M 1M concept of mean
7
61 A 1A correct numerator
=
7 A 1A correct denominator
= 8,714....
= 8,71 CA 1CA simplification
9 + 9 + 7 12 + 8 + 8 12 + 9 + 9 A
Graham’s mean = 1A correct numerator
7
60 A 1A concept of mean
=
7
= 8,5714...
= 8,57 CA 1CA simplification
∴ Bongani attained the higher mean score CA 1CA conclusion
(8)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Mathematical Literacy/P2 3 DBE/Feb.–Mar. 2013
NSC – Memorandum
Ques Solution Explanation AS
12.2.1
1.2.1 Total points scored L2
A 1A correct values
= (20 × g) + (10 × s) + (5 × b)M 2M adding and multiplying
OR OR
1 A 1A correct values
= (20 × g) + (10 × s) + ( × 10 × b)M 2M adding and multiplying
2
(3)
12.2.1
1.2.2 Total points scored by China 12.4.1
= 20(9) + 10(3) + 5(11) M 1M substitution L3 (4)
= 265 A 1A simplification L4 (2)
Total points scored by Australia
= 20(8) + 10(5) + 5(10)
= 260 A 1A simplification
Total points scored by South Africa
= 20(5) + 10(15) + 5(3)
= 265 A 1A simplification
Although South Africa and China had an equal
number of points, China performed the best
because they had more gold medals. O 2O conclusion
OR (6)
Any other well-thoughtout opinion
[24]
Copyright reserved Please turn over
Downloaded from hlayiso.com
Mathematical Literacy/P2 4 DBE/Feb.–Mar. 2013
NSC – Memorandum
QUESTION 2 [30 MARKS]
Ques Solution Explanation AS
12.1.1
2.1.1 800 km = 500 miles A 1A equating distances L3
500× 2 798
2 798 km = miles C 1C correct conversion
800
= 1 748,75 miles CA 1CA simplification
OR OR
l = the length of South African coastline
2 798 l 1M concept
= M
800 500
500× 2 798 1M manipulation
l= M
800
l = 1 748,75 miles CA 1CA simplification
OR
OR
800 km = 500 miles
500
So 1 km = milesM 1M concept
800
500
∴ 2 798 km = × 2 798 miles C 1C conversion
800
= 1 748,75 miles CA 1CA simplification
Answer only full marks
(3)
A M 12.3.1
2.1.2 Western Cape, Eastern Cape, Kwazulu Natal, 1A naming the coastal L4
Northern Cape provinces
2M correct order
(3)
12.3.3
2.1.3 223 mm on the map represents 2 798 km C 1C correct conversion values L3
223 mm on the map represents 2 798 000 000 mm C 1C conversion
2 798 000 000 000
1 mm on the map represents
223
= 12 547 085,2 mm S 1S simplification
Scale is 1: 12 500 000 R 1R rounding
Answer only full marks
(4)
A A 12.2.1(2)
2.2.1 Crew = (3 × 10) + 14 + (2 × 22) 1A ski-boat crew 12.1.1(1)
1A medium freezer crew L3
= 88 CA 1CA simplification
(3)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Mathematical Literacy/P2 5 DBE/Feb.–Mar. 2013
NSC – Memorandum
Ques Solution Explanation AS
Number of extra crew members = 102 – 88 M 1M difference 12.1.1
2.2.2 1CA simplification (1)
= 14 CA 12.2.1
J (3)
He should buy one Small freezer boat as he can operate it 2J correct boat L3 (1)
with a maximum of 14 crew members. (4) L4 (3)
12.2.1
2.3.1 time in minutes
Temperature in °C = 18 – 14,5 × L2 (2)
60 L3 (3)
120 SF 1SF substituting
D = 18 – 14,5 ×
60
= 18 – 29
= – 11 CA 1CA value of D
time in minutes
Temperature in °C = 18 – 14,5 ×
60
E SF 1SF substituting
0 = 18 – 14,5 ×
60
E
14,5 × = 18
60
0,24166... × E = 18 OR 18× 60
E= M
14,5 1M making E the subject
18 M
E=
0,24166... E = 74,482...
1CA value of E
CA
E = 74,482... E ≈ 74,48 minutes
Answer only full marks
E ≈ 74,48 minutes CA (5)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Mathematical Literacy/P2 6 DBE/Feb.–Mar. 2013
NSC – Memorandum
Ques Solution Explanation AS
12.2.2
2.3.2 TEMPERATURE AND TIME GRAPH L3(4)
L4(1)
30
20 A
1A plotting (0;20)
10
1A plotting (240;–40)
Temperature in °C
0 1A plotting (360;−40)
60 120 180 240 300 360
-10 1A joining points with a
straight line
-20 A
1A horizontal line
-30
-40 A A
A
-50 (5)
Time in minutes
12.2.3
2.3.3 Cooling rate = 14,5 °C per hour L4
= 14,5 °C per 60 minutes C 1C converting to minutes
= 2,4166... °C per 10 minutes M 1M dividing by 6
≈ 2,42 °C per 10 minutes
CA
YES the claim is valid. 1CA conclusion
OR
14,5 o C
Cooling rate = ×10 min M 1M finding the rate
60 min
CA
= 2,41666 °C per 10 minutes 1CA simplification
YES the claim is valid. CA 1CA conclusion
(3)
[30]
Copyright reserved Please turn over
Downloaded from hlayiso.com
Mathematical Literacy/P2 7 DBE/Feb.–Mar. 2013
NSC – Memorandum
QUESTION 3 [31 MARKS]
Ques Solution Explanation AS
98 − 26 M OR 26 + x + x = 98 M 12.4.4(1)
3.1.1 x = 2x = 72 1M finding the total 12.2.1(3)
2
x = 36 CA L3
= 36 M 1CA value of x
OR
y = 16 + 8 + 1
3
(36) 1
3
×36 = 12 CA 1CA calculating 13
= 36 y = 16 + 8 + 12 1CA value y
= 36 CA Answer only full marks
(4)
12.4.4
3.1.2 Ms Nana could have calculated her scores incorrectlyO L4
O
OR
One of the learners was absent and did not complete and 2O reason
submit the questionaire. O O
OR
Any other valid reason (2)
12.2.1
3.2.1 Cost (in rand) = m × (375 + 150) A 2 A equation L4
(2)
OR
Cost (in rand) = m × (525) A
12.2.1
3.2.2 There are seven learners under 18 years old.A 1A counting L4
This would mean that 4 family rooms can be booked.
1CA total number of
Four family rooms could accommodate 16 people in total.CA people in the family
rooms.
The teacher can book one twin room since the teacher will 1CA recognising 1 twin
not share a room.CA room for the teacher
Minimum number of rooms needed is 4 family rooms and 1 1CA minimum number
twin room. CA of rooms.
(4)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Mathematical Literacy/P2 8 DBE/Feb.–Mar. 2013
NSC – Memorandum
Ques Solution Explanation AS
3.2.3 Cost per night for one twin room = 1 × (R375 + R150) M 1M concept 12.1.1(5)
= R525 A 1A cost of one twin room 12.2.1(4)
per night L3(2)
Cost per night for four family rooms = 4 × R679 M 1M concept L4(7)
= R2 716 A 1A cost of four family
rooms per night
Cost per night for accomodation = R525 + R2 716
= R3 241 CA 1CA accommodation cost
per night
Total cost for two nights = R3 241 × 2
= R6 482 CA 1CA cost per two nights
M R6 482 1M dividing
Cost per person = ≈ R405,13 CA 1CA simplification
16
Mrs Suzman estimation is INCORRECT. C 1C conclusion
OR OR
Total cost for two nights CA CA A M 2M formula
= 2 × [ 4 × R679 + 1 × (R375 + R150)] 2A use of correct values
= R6 482 1CA for two nights
1CA simplification
M
1M dividing
≈ R405,13 CA
R6 482
Cost per person = 1CA simplification
16
1C conclusion
Mrs Suzman’s estimation is INCORRECT. C
(9)
12.3.4
3.3.1 B2 A 2A grid reference L2
(2)
12.3.4
3.3.2 North West A 2A direction L3
(2)
12.3.3
3.3.3 Hamilton Street A 2A answer L2
(2)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Mathematical Literacy/P2 9 DBE/Feb.–Mar. 2013
NSC – Memorandum
Ques Solution Explanation AS
12.3.3
3.3.4 From the Hotel, turn left into Proes St. A 1A correct direction from the L3
At the intersection of Proes and Beatrix St, turn right into hotel
Beatrix St. A 1A Beatrix St
Continue on Beatrix St, which later becomes Voortrekkers
St
A 1A Voortrekkers and Jacob St.
Travel until the intersection of Voortrekkers and Jacobs St.
Turn right into Jacobs Street and right into Tenth Ave. A 1A Jacobs St and Tenth Av.
OR OR
WITH THE NEW STREET NAMES:
From the Hotel, turn left into Johannes Ramohoase St.A 1A correct direction from the
At the intersection of Johannes Ramohoase St. and Steve hotel
Biko St, turn right into Steve Biko St.A A 1A Steve Biko St
Travel until the intersection of Steve Biko St. and Jacob St. 1A Steve Biko St and Jacob St.
Turn right into Jacobs Street and right into Tenth Ave. A 1A Jacobs St and Tenth Av.
(4)
[31]
Copyright reserved Please turn over
Downloaded from hlayiso.com
Mathematical Literacy/P2 10 DBE/Feb.–Mar. 2013
NSC – Memorandum
QUESTION 4 [29 MARKS]
Ques Solution Explanation AS
12.3.1
4.1.1 Breadth of tent increased by 15% L3 (4)
= 1,8 m + (0,15 × 1,8 m) OR 1,8 m × 1,15 M 1M increased % L4 (4)
= 2,07 m A 1A increased breadth
Length of tent icreased by 15%
= 2,4 m + 0,15 2,4 m M OR 2,4 m × 1,15
= 2,76 m A 1A increased length
Area needed for one tent = 2,76 m 2,07 m M 1M substitution
= 5,7132 m2 CA 1CA simplification
A
Area needed for 36 tents = 36 5,7132 m2 1A for the 36
1M multiplication
= 205,6752 m2
≈ 205,68 m2 CA 1CA simplification
OR
Breadth 1
Length 2
Length 1
Breadth 2
Breadth of tent increased by 15%
= 1,8 m + (0,15 × 1,8 m) OR 1,8 m × 1,15 M 1M increased %
= 2,07 m A 1A increased breadth
Length of tent icreased by 15%
= 2,4 m + 0,15 2,4 m OR 2,4 m × 1,15
= 2,76 m A 1A increased length
Area of camp site
M CA 1M substitution
CA
= [(6 × 2,76 m) + (4 × 2,07 m)] + [(4 × 2,76) 2CA use of correct values
× (3 × 2,07 m)]
= 137,1168 m2 + 68,5584 m2 CA 1CA simplification
= 205,6752 m2 1CA solution
≈ 205,68 m2 CA
Copyright reserved Please turn over
Downloaded from hlayiso.com
Mathematical Literacy/P2 11 DBE/Feb.–Mar. 2013
NSC – Memorandum
Ques Solution Explanation AS
OR
Breadth 1
Length 2
Length 1
Breadth 2
OR
Breadth of tent increased by 15%
= 1,8 m + (0,15 × 1,8 m) OR 1,8 m × 1,15M 1M increased %
= 2,07 m A 1A increased breadth
Length of tent icreased by 15%
= 2,4 m + 0,15 2,4 m OR 2,4 m × 1,15
1A increased length
= 2,76 m A
Breadth 1 = 4 × 2,07 m = 8,28 m
1CA breadths
Breadth 2 = 3 × 2,07 m = 6,21 m CA
Length 1 = 6 × 2,76 m = 16,56 m CA
2CA lengths
Length 2 = 4 × 2,76 m = 11,04 m CA
Area of camp site
= (16,56 m × 8,28 m) + (11,04 m 6,21 m) S
1S substitution
= 137,1168 m2 + 68,5584 m2
= 205,6752 m2
= 205, 68 m2 CA 1CA simplification
(8)
12.4.5
O
4.1.2 The probability of it raining is very high. L4
OR
There is an 80% chance that it will rain. O 2O Opinion
OR
There is a 20% chance that it will not rain. O
(2)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Mathematical Literacy/P2 12 DBE/Feb.–Mar. 2013
NSC – Memorandum
Ques Solution Explanation AS
12.1.1
4.2 Time spent on group activities on Day 1, 2, 3 and 4 (6)
= 2 hours + 2 hours 15 min + 2 hours + 2 hours 12.3.2
= 8 hours 15 min M 1M adding time (2)
L4
Total time for first four days = 4 × (8 hours 15 min)
= 33 hours A 1A total time for four
days
Time spent on group activities on Day 5
= 2 hours + 2 hours 15 min + 2 hours
= 6 hours 15 min A 1A time for day 5
Total time spent on group activities
= 33 hours + 6 hours 15 min
= 39 hours 15 min
= 39,25 hours CA 1CA total workshop
time
Total time spent at the camp from 07:00 on Day 1 to 15:30 on
Day 5
= 4 × 24 hours + 8 hours 30 min
= 104 hours 30 min
= 104,5 hours CA 1CA total camp time
Percentage time spent on group activities
39,25 1M calculating %
= × 100% M
104,5
= 37,5598...% CA 1CA simplification
≈ 38%
∴ The teacher is not correct. C 1C conclusion
(8)
12.4.5
4.3.1 BEM means brown bread with egg and mayonnaise A 2A correct L2
explanation
(2)
12.4.5
4.3.2 The following should be found on the tree diagram: L3
(a) WEN A 4A (1 for each correct
(b) WFN A outcome)
(c) HEM A
(d) HFM A
(4)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Mathematical Literacy/P2 13 DBE/Feb.–Mar. 2013
NSC – Memorandum
Ques Solution Explanation AS
12.4.5
4.3.3 1 A A 1A numerator L3
OR 0,08 A OR 8,33 %
(a) 12 A 1A denominator
(2)
12.4.5
4.3.3 8 A L3
(b) 12 A 1A numerator
2 1A denominator
= OR 0,67 OR 66,67 % CA
3 1CA simplification
OR
A 1A for 1
1 2
A–
1 =
3 3 1
CA 1A for
3
1CA simplification
Answer only full marks
(3)
[29]
Copyright reserved Please turn over
Downloaded from hlayiso.com
Mathematical Literacy/P2 14 DBE/Feb.–Mar. 2013
NSC – Memorandum
QUESTION 5 [35 MARKS]
Ques Solution Explanation AS
M 12.4.4(2)
5.1.1 R 467,43 R 94,99RT 1RT using correct values 12.1.1(2)
(a) Difference in cost per kWh = − 1M finding the rate L2 (2)
600 150
CA 1CA simplification L3 (2)
= R 0,77905 – R0,63326
= R 0,145 OR 14,5 cents 1CA difference (accept the
CA answer in rand or cents)
≈ R 0,15 OR 15 cents
Answer only full marks
(4)
12.1.1
5.1.1 FAIR UNFAIR L4
(b) The more electricity you All people who use 2R reason (fair)
use, the more you should electricity should pay the
pay. R same rate because they
are using the same
OR resource R 2R reason (unfair)
15 cents per kWh is not a
big difference. R
OR
Any suitable reason. (4)
12.1.3(4)
5.1.2 A = R467,43 – R393,67 12.4.4(2)
= R73,76 A 1A simplification
L2
R888,83 − R728,63 1M calculating %
B= × 100% M
R728,63
1A simplification
= 21,986%A
≈ 21,99 %
1M increasing by a
A 25,12%
C = R1 147,33 × 123,38% M
1A correct values used
= R1 147,33 × 1,2338
1A simplification
= R1 415,58 A
OR
OR
A
C = R1 147,33 + 23,38% of R1 147,33 M 1M increasing by
= R1 147,33 + R268,245754 25,12%
≈ R1 147,33 + R268,25
≈ R1 415,58 A 1A correct values used
OR M M OR
C = 123,38% of R1 148,33
2M concept
≈ R1 416,81 A
1A simplification
(6)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Mathematical Literacy/P2 15 DBE/Feb.–Mar. 2013
NSC – Memorandum
Ques Solution Explanation AS
12.1.1
5.1.3 Monthly increase L2 (1)
M 1M subtraction/ L3 (3)
= R888,83 – R728,63 OR 21,99% × R728,63
calculating %
= R160,20 = R160,23
Annual increase = 12 × R160,20 OR 12 × R160,23
CA
= R1 922,40 = R1 922,76 1CA annual increase
Annual increase including VAT M
= R1 922,40 × 1,14 M OR R1 922,76 × 1,14 1M including VAT
= R2 191,54 CA = R2 191,9464
≈ R2 191,95 CA 1CA simplification
OR
Monthly increase
M
= R888,83 – R728,63 OR 21,99% × R728,63 1M subtraction/
calculating %
= R160,20 = R160,23
Annual increase = 12 × R160,20 OR 12 × R160,23 1CA
CA
= R1 922,40 = R1 922,76
Annual increase including VAT M
= R1 922,40 + 14% of R1 922,40 1M including VAT
= R1 922,40 + R269,136
≈ R2 191,54 CA 1CA simplification
OR
Monthly increase
= R888,83 – R728,63 M
= R160,20
M 1M subtraction
Monthly increase including VAT = 1,14 × R160,20 1M including VAT
= R182,628
= R182,63 CA
Annual increase including VAT = 12 × R182,63 1CA simplification
= R2 191,56 CA 1CA simplification
Please note the small
differences in the final
answer depending on
where the rounding off
occurred
(4)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Mathematical Literacy/P2 16 DBE/Feb.–Mar. 2013
NSC – Memorandum
Ques Solution Explanation AS
A 12.3.1
5.2.1 First two members will need an area of 2 m2 1 A recognising the 2m2 L3
(a) M
There are four other members who need 4 × 0,7 m2 1M multiplying
= 2,8 m2
2 2
Total area = 2 m + 2,8 m
= 4,8 m2 CA 1CA total
area
Length = M 1M using area formula
breadth
4,8 m 2
=
1,5 m
1CA simplification
CA 1A unit
= 3,2 m A
Answer only full marks
(6)
12.3.1(4)
5.2.1 Volume of cylinder = π × r × height
2
12.3.2(2)
(b)
150 ℓ = 3,14 × r2 × 1,2 m SF 1SF substitution L3
C
150 000 cm3 = 3,14 × r2 × 120 cm C 2C conversion
150 000
r2 = cm2 CA
3,14 × 120 1CA manipulation
= 398,089172 cm2
r = 19,9521... cm CA 1CA finding square root
1R rounding
≈ 20 cm R
(6)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Mathematical Literacy/P2 17 DBE/Feb.–Mar. 2013
NSC – Memorandum
Ques Solution Explanation AS
12.1.1
5.2.2 Cost of supplying and installing the geyser L4
= R12 490 – R4 500
= R7 990 CA 1CA simplification
M
Monthly cost of heating water = 0,45 × R888,83 1M multiplication
= R399,97 A 1A calculating the
savings
R7 990 M
Number of months = 1M dividing
R399,97
= 19,976...CA 1CA simplification
≈ 19,98
J
YES her statement is valid. 1J justification
OR
OR
Cost of supplying and installing the geyser
= R12 490 – R4 500
= R7 990 CA 1CA simplification
M
Monthly cost of heating water = 0,45 × R888,83 1M multiplication
= R399,97 A 1A calculating the
savings
Saving R399,97 per month for 2 years
Total saving = R399,97 × 24 monthsM 1M multiplying
= R9 599,28 CA 1CA simplifictaion
J
YES her statement is valid. 1J justification
(6)
[35]
TOTAL: 150
Copyright reserved
Study this subject
Recommended for this subject

Question paper
Mathematical Literacy Grade 12 P2 NSC Supplementary 2013 QP

Question paper
Mathematical Literacy Grade 12 P2 NSC Supplementary 2014 QP

Memorandum
Mathematical Literacy Grade 12 P2 2023 Memo (Afr)

Memorandum
Mathematical Literacy Grade 12 P2 2023 Memo (Eng)

Memorandum
Mathematical Literacy Grade 12 P2 2022 Memo (Eng)

Memorandum
Mathematical Literacy Grade 12 P2 Gauteng Mock 2018 Memo
More from Grade 12 Mathematical Literacy

Addendum
Mathematical Literacy Grade 12 P2 2025 Addendum (Afr)

Question paper
Mathematical Literacy Grade 12 P1 Free State Mock 2025 QP

Addendum
Mathematical Literacy Grade 12 P1 KZN Mock 2025 Addendum

Question paper
Mathematical Literacy Grade 12 P1 Limpopo Mock 2025 QP

Question paper
Mathematical Literacy Grade 12 P2 Limpopo Mock 2025 QP

Question paper