Skip to content

Engineering Graphics and Design Grade 12 P2 NSC June 2014 QP

Question paperEngineering Graphics and DesignGrade 1220148 pages

Grade 12 Engineering Graphics and Design Paper 2 question paper from the NSC June 2014, 8 pages. Read online or download the free PDF.

Free to read online, no sign-up needed

Answer online

Loading document…

Loading document…

Questions in this paper

Document textSearch extracted text and jump to a page.
Downloaded from hlayiso.com basic education Department: Basic Education REPUBLIC OF SOUTH AFRICA SENIOR CERTIFICATE EXAMINATION TECHNICAL DRAWING P2 STANDARD GRADE 2014 MARKS: 150 TIME: 3 hours SIEN KEERSY VIR AFRIKAANS This question paper consists of 4 pages and a 6-page diagram sheet. TECH DRAW/TEGTEK SGP2/V2 7112 2 7112 X@5 Copyright reserved GAUTENG Please turn over
Downloaded from hlayiso.com Technical Drawing/SG/P2 2 DBE/2014 SCE INSTRUCTIONS AND INFORMATION _ Answer ALL the questions. 2. Questions are in first-angle orthographic projection, unless stated otherwise. 3. Draw ALL answers in first-angle orthographic projection and to scale 1: 1, unless stated otherwise. 4. Show ALL necessary construction lines and projection lines. 5. An approved calculator may be used, but ALL calculations must be shown. 6. Answer the questions on the DIAGRAM SHEETS. a STAPLE the DIAGRAM SHEETS at the top left in question number sequence. ENCLOSED: Folder with FIVE diagram sheets. Canyon sored NANA Pease um oer yr sen NANA
Downloaded from hlayiso.com Technical Drawing/SG/P2 3 DBE/2014 SCE QUESTION 1 DIAGRAM SHEET 1A shows the parts of a ROD AND CONNECTOR in first-angle orthographic projection. Draw, on DIAGRAM SHEET 1B, the assembled views of the ROD AND CONNECTOR according to scale 1 : 1. Only the M8 bolt and nut and the M10 nut are NOT shown on DIAGRAM SHEET 1A. The parts are as follows: A_| FRAME x1 FRONT VIEW AND TOP VIEW B_| LEFT BEARING HALF x1 FRONT VIEW AND TOP VIEW C_| RIGHT BEARING HALF x1 FRONT VIEW AND TOP VIEW D_| WEDGE AND ROD x1 FRONT VIEW AND TOP VIEW E | SPACER x1 FRONT VIEW AND LEFT VIEW F_| WASHER x1 FRONT VIEW AND LEFT VIEW G_| M8 HEXAGONAL BOLT AND NUT _ | x1 NOT SHOWN H_| M10 HEXAGONAL NUT x1 NOT SHOWN Assemble the parts of the rod and connector as follow on DIAGRAM SHEET 1B: The left bearing half (B) slides into the frame (A) from the right-hand side. The right bearing half (C) slides into the frame (A) from the right-hand side so that it is against the left bearing half (B). The wedge and rod (D) slide into the frame (A) and keep the bearing halves in position. The M8 bolt (G) fits accurately from the top and is fastened with the M8 nut (G). The spacer (E) slides over the rod (D) and is fastened with the washer (F) and M10 nut (H). 11 Draw, in first-angle orthographic projection and according to scale 1: 1, the following views of the complete assembly on DIAGRAM SHEET 1B on the given centre lines: 1.441 A front view with hidden details 1.1.2 A sectional top view on section line A-A through the center line of the rod and connector, as shown on DIAGRAM SHEET 1B ale Show the following in the prepared spaces: 7 Title and scale 1.2.2 TEN important dimensions and the projection symbol NOTE: Attention must be given to line work, neatness and technical presentation. [75] Copyright reserved CII UOAY TO UGA nomen GAUTENG
Downloaded from hlayiso.com Technical Drawing/SG/P2 4 DBE/2014 SCE QUESTION 2 DIAGRAM SHEET 2 shows a front view, right view and top view of a SHAPED BLOCK in first-angle orthographic projection. Draw on DIAGRAM SHEET 2, to scale 1 : 1, an isometric drawing of the SHAPED BLOCK. Show the front view, right view and top view in the isometric drawing. NOTE: Use point A as the starting point. [30] QUESTION 3 The figure on DIAGRAM SHEET 3 shows a front view and top view of a MACHINE PART in third-angle orthographic projection. Draw on DIAGRAM SHEET 3, to scale 1: 1 and in third-angle orthographic projection, the following views of the MACHINE PART: 3.1 A left view. NO hidden detail is required. 3.2 An sectional right view on A-A [20] QUESTION 4 DIAGRAM SHEET 4 shows the front view, left view and top view of a HOUSE. The patio with paving is also shown. The top view is placed in position for the completion of a two-point perspective drawing of the house and the patio with paving. 41 Draw and label the vanishing points of the completed two point perspective drawing with the patio and paving. 4.2 Show the essential construction lines and projection lines. NOTE: NO hidden detail is required. [25] TOTAL: 150 Conyinesoves! HAL LL
Downloaded from hlayiso.com QUINN IATA ANUHNTINN)——nouse00n vedo Ost “WVLOL [sz] “JIN 6uelen puom apausepuoseg e6J0qJeA NA49 “SM L311 ‘auAjaisyaloid ua auAjaisynsjsuoy ebipou aip uoOL Zr ‘jasianejd us daojs aip yaw siny sip ueA Buluayeyjalyedsied -jundaem} =aIp §=|00}0A ud ajunduAmpsJeA aIp waoUuEeq ud Udy] I'v ‘jesioneid jaw deojs aip usa siny aip uen Huluayeyalyedsied-jundsem} u, UBA HUIIOO}OA aIp JIA See|deb aisisod ul s! Bisueeog 8iq ‘UdO}aH YOO pom Jasiane|d Jou da0}s 81q ‘SINH u, UeA Bisueeog ua Bisueeseyul| ‘BisueeJOOA 9IP U0} » TAAWVHDVIC v OVVYA [oz] v-v do Bisueesa}6e/-20usuneq u, Ze "FIN BueLen piom apaysepuoseg eboquen NAD ‘bisueeseyur7 U, Le “TSCHAGNONGIPSYW @lp ue a61suee epuabjon aip ‘alsyafoud esayeiBoyo esyeoyepiep ul ue | : | jeeys sueHion ‘ge TEAWVHDVIG do ueye, ‘aisyaloud esalyesBolo esyaoyepsep Ul TZAGYAGNONAIPSVAN u, ueA Bisueeoqg ua BisueeiooA ap uoo} € TAAWVHOVIG do unnby aiq € OVVYA [oe] “yundul6eq ap se y Jund yImiqey :SM LST ‘Bulusya} eseljewos! aip ul Bisueeoq ua Bisueeiajbe1 ‘Bisueeso0o0n aip UOOL ‘3IMMOT1E JGWHYOATD alp ueA BHulueye} esejewos! u, ‘| : | jeeys sueH|OA ‘Z TAAWVHDVIG do ueye, ‘aisyaloid asayesBoyo asyaoye}si9e Ul 4|MMOT1d ACWHYOAAD 4, ueA Bisueeog ue Bisueesa}6ai ‘Hisueesoon 9IP U0O} Z TAAWVHOVIG @ OVVYA Ass ¢L02/4da v ZVvos/eueya, asajubaL
Downloaded from hlayiso.com joygesse wo erg UU ION I AI A noyeqi00n Baverdoy [sz] ‘puom eabeb BulBosieA asaiuhe} ua playjeu ‘yiamuA| uee joow Bepuey 74M L371 jooquiseisyaloid aip ua shulmfuysyeew eyuBuejeq NAIL Zab Jeeys Ua [ait ol isalseds aplaJaquoOA dIP Ul BPUSHIOA IP UOOL zh Gl TEAWVHD VIC do u00}86 soos ‘iapulquen ua Bueys aip UA UA|Ja]UaS BIP JNep y-y yeIAAUS do Hisueeog-seusineg U, TLL apeysepuoseg efjioquen jouw Hisueesoo, u, (aba rauAyejues emebab alp do Gi TAAWVHDVIC do Buljjaysowes abipajjon aip uen a}6isuee apuebjon alp ‘L 2 £ jeeys suabjon ua aisyaloid asaijesBoyo asyaoyejsiee Ul ‘UdyO] kk "yeo1yseBsen (H) 1NOG-OLW a!p ua (4) sa}SseM aIp yaw plom ua (q) Buejys aip joo Aj6 (4) sapisaiseds aig ‘yoosyseHsen (5) J90W-gy sIP OW PJOM Ud UI Je OG UBA JeEEINyYe Sed (5) jnog-gW aiq ‘aisisod ul sayjjaysoe] dIP Noy ue UI (7) Weed sIP Ul jiNys (q) Hues US Bim aq “(g) ayjeyeeye Ul] 9Ip Uda} 40} Ul (VW) Wee, aIp Ul ye jUeYyJO}H01 aID UeA JINyS (D) syjeyoeyaHol aig ‘ul (y) wees alp ul ye jueyeyGer alp uer jinys (g) eyjeyieeyeyul) aq ‘GL TEAWVHDVIG do wees BOA soos JapulqidA Ud Hue}s BIP UBA B[@PJBPUO IP [91S HIN NOOL3AD SIN | +X YAOW ADILNVMS3AS -OLW | H SIN NOOLSS SIN | bX | YSAOW- NS LNOG SDILNVHSAS “8 | 5 SISNVWYSMNIT NA SISNVWHOOA | _ +X YALSVM | 4 SISNVVYSMNIT NA DISNVVYOOA | 1X YAGHAAISVdS | 3 SISNVVOd Na DISNVVHOOA | 1X ONVLS NS DIM] G SISNVVOd NA SISNVVHOOA | LX SLIVSHYSAVTYSLOAY | Oo SISNVVOd N32 DISNVVHOOA | IX S1ATSHYAVIESMNIT | SISNVVOd NA DISNVVHOOA | 1X Wvvu | Vv :BJOA soos SI ajapsepUO 91g ‘alu uoo}@6 YL TAAWVHDVIC do JIN Piom Ja0W-9 LV 81p Ue Je0W- ue ynog ebyueyses -g ep shag “| : | jeeys sueb}oA YAQNIGHSA NJ ONV.LS a!Pp ue oBisuee opjajsobwees op ‘gi TAAWVHDVIG do ‘ueyeL ‘alsyaloid asaljyesBou0 9S8}8048}S199 Ul YHAQNIGHAA NA ONVLS U, UBA BjBPJBPUO SIP UOO] VL TSAWVHYOVIC b SVWYHA ass vl0¢/4da € ZA /DS/eueye, esaiube
Downloaded fram hlayiso.com jeygesse wo fee IU IOU ITY I AT A noyeqioon Baserdoy ayjeawes6eip 4A A Jow BejswEQ ‘LINISADNI "sen apsoHjonrawiwoubeeA ul Og S4ul| STIAANVHOVIC ep WH “ATISAWVYDVIC 2!P do akin alp proomjueag *plom u00}96 a0 aBulueyeleq ATV Jeew ‘piom yiniqe6 Bew seeuayasyes epinayebpe0y u, ‘aufjaisyeloid ua auAjaisynsjsuoy e6ipou 477 uoOL “einaB suapue Asua} ‘| : | jeeys suabjon ue alsyaloid esayesBouo asyaoyelsi9a U! BPJOOMJUe ATV UEeXeL “pjewan sigpue Asus} ‘alsyalosd esalyesHoHO asye0ye}siee U! SI BLA 81 “@EJA Bp Ty ploomjueeg Z 9 ONILOMINI NA S3ISMNULSNI dss bloc/aga Z ZA/DS/aueye| asajuba
Downloaded from hlayiso.com fermosse we ene INVA AA AE noyaqioon Basaidoy vii SOX SLbL mL ebb @nzd0S NALOIVMVYG H93L ‘jeawes6eip-Aspejq 9 u, ua aAspelq fF JIN Uee}SAq Ja}SERIA SIPJOIH HSITSNA Y¥Od ACIS SSYSASRY 35S ann € :qAL OSt -3LNNd vloc QVVYSCYVVGNVLS cA ANAMAL ASAINDAL vlLOe — NAINVSS-LVVISILYASHOINAS Vol¥dav HLNOS JO 9IN8Nd3sy uoleonpyz oiseg JUuawWpedeq UO!eINps JIseq

Study this subject

More from Grade 12 Engineering Graphics and Design

View all