INSTRUCTIONS AND INFORMATION
1. The question paper consists of FOUR questions.
2. Answer ALL the questions.
3. All drawings must be drawn to scale 1 : 1, unless otherwise stated.
4. The questions must be answered on the answer sheets provided.
5. All the answers sheets must be re-stapled in numerical sequence and
handed in irrespective of whether the question was attempted or not.
6. Careful time management is essential in order to complete all the questions.
7. Print your name in the block provided on every ANSWER SHEET.
ISEBE LEMFUNDO LEMPUMA KOLONI 8. All answers must be drawn accurately and neatly.
EASTERN CAPE EDUCATION DEPARTMENT 9. Any details or dimensions not given must be estimated in good proportion.
OOS-KAAP ONDERWYSDEPARTEMENT 10. ALL drawings are in first angle orthographic projection, unless stated
otherwise.
FOR OFFICIAL USE ONLY
NATIONAL
MODERATED
MARK
SENIOR CERTIFICATE 1
2
3
4
GRADE 12 TOTAL
2 0 0
FINAL CONVERTED CHECKED BY
MARK
ENGINEERING GRAPHICS AND DESIGN P1
100
SEPTEMBER 2016
COMPLETE THE FOLLOWING:
PREPARATORY EXAMINATION
NAME
NAME
MARKS: 200 EXAMINATION CENTRE
TIME: 3 hours
EXAMINATION CENTRE
This question paper consists of 6 pages.
Copyright reserved
*GRDSE* Please turn over 1
Skip to contentAll 2016 papers 





View all





Engineering Graphics and Design Grade 12 P1 2016 QP (Eng)
Grade 12 Engineering Graphics and Design Paper 1 question paper from the Eastern Cape Mock Exam 2016 (English), 6 pages. Read online or download the free PDF.
Engineering Graphic And Design · Grade 12 · Eastern Cape Mock Exam · 2016. Question paper, 6 pages. Read online or download the PDF.
- Subject
- Engineering Graphics and Design
- Grade
- Grade 12
- Document type
- Question paper
- Year
- 2016
- Exam period
- Eastern Cape Mock Exam
- Paper
- 1
- Curriculum
- CAPS
- Pages
- 6
- File size
- 1.5 MB
Free to read online, no sign-up needed
Loading document…
Loading document…
1 of 6
This exam
Eastern Cape Mock Exam 2016
Questions in this paper
Document textSearch extracted text and jump to a page.
Engineering graphichs and design / P1 Downloaded from hlayiso.com NOTE:
NCS EC DBE/September 2016
Contractors must verify all dimensions and QUESTION 1: ANALYTICAL (CIVIL)
ST
AP levels on site before commencing work.
Architects to be notified immediately of any Given:
LE
discrepancies.
LAND SURVEYOR'S CERTIFICATE OF THE The site plan for an existing house with a proposed new room, a title panel and a table of questions. The drawing has
SIDE LENGTHS AND CORNER HEIGHTS not been prepared to the indicated scale.
ON ERF 132. ARCHITECT'S SIGNATURE ...........................
SURVEYED ON 2016-08-05
CLIENT'S SIGNATURE ................................... Instructions:
LENGTHS IN CORNER HEIGHTS Complete the table below by neatly answering the questions, which refer to the accompanying drawing and title
MILLIMETERS IN METERS panel. [29]
ANSWER 19
QUESTIONS ANSWERS
AB = 38500 A = 1372
In the space provided below, draw, in
BC = 25000 B = 1372,5 neat freehand, the top view of the
SANS 10143 convention for a What is the drawing number?
CD = 38500 C = 1371,25 1 1
GREASE TRAP.
DA = 25000 D = 1372,1 2 Who prepared the drawing? 1
3 Which company printed the site plan? 1
4 How many revisions were done to the site plan? 1
5 How many people must sign the drawing? 1
ERF 131
72
6000
What feature is partially visible on the erf to the south east of
13
A D 6 2
ERF 132?
B 2000 BL ANSWER 20
In the space provided below, draw, in 7 What is the length of boundary line DA in meters? 1
EXISTING
EXISTING neat freehand, the front view and top
DRIVEWAY RE
7800 GARAGE RE IE view of the SANS 10143 convention 8 What does the abbreviation IC stand for? 1
for a WALLMOUNTED URINAL.
9 What does the abbreviation RE stand for? 1
PROPOSED 5000 10 What does the abbreviation MH stand for? 1
KIPLING DRIVE C
3000 NEW ROOM IE
11 How many inspection eyes are indicated on the drawing? 1
15 m WIDE
3000 7000
12 What feature is indicated by arrow A? 1
RE
13 What feature is indicated by arrow B? 1
3000 BL
ERF 132 IE ERF 133
IE 14 What colour is used on the siteplan for all proposed work? 1
IC
15 What colour is used in elevations for new concrete? 1
EXISTING
RESIDENCE The feature indicated by arrow C is a drainage pipe. Draw
16 the correct line type for a drainage pipe in the block to the 1
3000 BL right.
IC 17 In the space provided below, determine the perimeter of erf 132 in meters. 3
In the space provided below, determine the total area of the existing garage and proposed new
18 room in square meters. 3
1500 BL
B C
A 2016-08-12
CORRECT GREASE In the space provided in the title panel, draw, in neat freehand, the top view of the SABS 10143
13 TRAP SYMBOL 19 3
72 convention for a GREASE TRAP.
REVISION DATE DESCRIPTION In the space provided in the title panel, draw, in neat freehand, the front view and top view of the
A
20 4
PRINTED BY DATE OF PRINT SABS 10143 convention for a WALL MOUNTED URINAL.
PRINT ALL CC 2016-08-15 TOTAL 30
MH MH
DRAWING TITLE
SITE PLAN ANSWER 17 ANSWER 18
Show ALL calculations. Show ALL calculations.
PROJECT
PROPOSED NEW ROOM FOR
MR A. RHADEBE ON ERF 132
13 KIPLING DRIVE, ABERDEEN.
PROJECT NUMBER DRAWING NUMBER
ECDBE1-2016 10810
NAME
DATE DRAWN CHECKED SCALE
2016-08-10 FREDDIE KRUGER 1 : 300
REFERENCE CODE
QU1-2016 NAME 2
Copyright reserved Please turn over
Engineering graphichs and design / P1 Downloaded from hlayiso.com
NCS EC DBE/September 2016
b QUESTION 2: INTERPENETRATION AND
ST
AP
LE
DEVELOPMENT
Given:
The incomplete front view and the top view of a hexagonal
main pipe and equilateral triangular branch pipe. The
auxiliary view of the branch pipe with center point Q.
The center point P for the top view of the hexagon and the
ground line XY. A right angle labeled B as the start for the
development.
Instructions:
Draw, to scale 1 : 1, the following views of the two
interpentraint pipes:
2.1 The top view
2.2 The complete front view clearly showing the
interpenetration between the two parts
2.3 Develop the surface of the branch pipe and make AB
the seam.
Show ALL hidden detail and fold lines.
AB is the seam of the branch pipe. [32]
25
90
X Y 28 30°
X Y
P
Q
7
30 a b
P 50
ASSESSMENT CRITERIA
CONSTRUCTION +
1 CENTRE LINES + 8
TOP VIEW
2 FRONT VIEW 12
3 DEVELOPMENT 12
PENALTIES (-)
TOTAL 32
NAME
NAME 3
Copyright reserved Please turn over
Engineering graphichs and design / P1 Downloaded from hlayiso.com
NCS DoE EC/September 2016
QUESTION 3: PERSPECTIVE
ST
AP
Given:
LE
Two views of a monument and the information
needed to draw a two-point perspective
drawing
PP − Picture plane
HL − Horizon line
GL − Ground line
SP − Station point
Instructions:
Complete the perspective drawing.
· Align the drawing sheet with the ground line
(GL).
· Determine and label the vanishing points.
· Show ALL necessary construction.
· Show the wall thickness at the openings.
· NO hidden detail is required. [40]
PP
HL HL
ASSESSMENT CRITERIA
CONSTRUCTION +
1 7
VPs
GL
2 STAIRS + BASE 12
3 WALLS + HEXAGON 14
4 SEMI-CIRCLE 7
SP TOTAL 40
NAME
NAME 4
Copyright reserved Please turn over
Engineering graphichs and design / P1 Downloaded from hlayiso.com NCS
QUESTION 4: CIVIL DRAWING
EC DBE/September 2016
FLOOR FINISHES
ROOF 2 1 BEDROOM: CARPET Given:
ST
200 x 20 mm BARGE
DOOR AND WINDOW SCHEDULE
AP
· The incomplete south east elevation of a bachelors flat,
ROOF 1 2 BATHROOM: TILE
LE
BOARD WITH 75 mm
WEATHER BOARD 3 OPEN PLAN AREA: TILE
4 PASSAGE: TILE 1000 showing the walls, the window, the door opening, the roof and
TO FIT 50
notes
· The incomplete floor plan showing the walls, position of the
doors, windows, fixtures and electrical layout
RWDP
100 x 150 mm GUTTER 2 2 A B
· Roof notes with schematic diagrams of two roof trusses
800
200 x 20 mm FACIA BOARD 1
DOOR OPENING
WINDOW OPENING
4 · The incomplete foundation and wall detail
RWDP
WINDOW (W1) · Room designations and floor finish
· A door and window schedule
RWDP
2100
3 600
· A table of sanitary fixtures
FLOOR LEVEL
GULLEY
GROUND LINE WINDOW NOTES · A table of roof components
A
600 A = OPENING SIDE · A table of electrical symbols
INCOMPLETE SOUTH EAST ELEVATION
B = FIXED PANE
FRAMES 40 mm
· A table of rainwater items
FEATURES
ROOM DESIGNATIONS
WINDOW (W2)
· The floor plan of the proposed bachelors flat, drawn to scale
D1 DOOR DOOR FRAME AND 1 : 50 on page 6
ROOF LINE W1 WINDOW 1500 DOOR (D1)
W2 WINDOW
W3 W2 W1 Instructions:
RWDP
W3 WINDOW NOTE: 175 x 20 mm
SH 4 WB FIBRE CEMENT Answer this question on page 6.
4 WC W2
4
FIXTURES
100
A B A 1000 SILL UNDER ALL 4.1 Using the given incomplete floor plan, draw, in first-angle
6 WC TOILET
1 D1 D1
WB WASH BASIN
WINDOWS orthographic projection and to scale 1 : 50, the following
1 1
D1 W2 SH SHOWER views of the new bachelors flat:
S SINK WINDOW (W3) 4.1.1 THE COMPLETE FLOOR PLAN
Add the following features to the drawing:
RWDP
D1
2
ELECTRICAL FITTINGS
1. LIGHT SWITCH - SINGLE-POLE
· ALL doors and windows
2. LIGHT SWITCH - DOUBLE-POLE RAINWATER ROOF COMPONENTS · ALL fixtures as indicated by abbreviations
6
3 6 3. FLUORESCENT LIGHT 2 x 40 W ITEMS · ALL electrical fittings as indicated by numbers
5 4. CEILING LIGHT 200 x 20 mm FASCIA BOARD · ALL hatching detail
5. WALL MOUNTED LIGHT
3000 100
150 300 4.1.2 THE SOUTH EAST ELEVATION
6. SWITCHED SOCKET OUTLET ROOF CAP
S
7 7. DISTRIBUTION BOARD 300 100 Show the following features on the drawing:
W3
D1
20°
· The outside walls, window and door detail
NOTE: 75 x 50 mm PURLINS
· The roof detail, including the fascia board, gutter, rain-
THE ARROWS ON THE FLOOR
25 mm SCREED water down pipe, gully and barge board
INCOMPLETE FLOOR PLAN PLAN SHOW THE LIGHT
· The finished floor level
CONNECTION TO THE SWITCH. ELECTRICAL SYMBOLS
ROOF NOTES: 100
200
ROOF PITCH 20° WITH 200 x 20 mm FACIA BOARD ON SIDES GROUND 4.2 In the space provide on page 6, draw, to scale 1 : 20, a
LEVEL 700 Ø75 DETAILED SECTION according to cutting plane A-A of the
200 x 20 mm BARGE BOARDS AND 75 mm WEATHER BOARD ON
EAVES 500
RWDP area in the ellipse shown on the floor plan.
· Show the following features on the drawing:
75
· The complete foundation, external wall with window and
ROOF COVER 15 mm FIBRE CEMENT SHEET ON 75 x 50 mm 400
200 150
PURLINS @ 920 mm c/c
INCOMPLETE NON LOAD
internal wall with door detail
· The roof detail, including the fascia board and gutter
400 W n x 40 W
114 x 38 mm ROOF TRUSS ON 114 x 38 mm WALL PLATES BEARING WALL AND
100 x 200 mm FOUNDATION DETAILS 400 · ALL features to the right of the section
· ALL hatching detail. ONLY the substructure hatching
9 mm CEILING BOARD ON 38 x 38 mm BRANDERING STRIPS @ LINTEL
3000 GULLEY (G)
440 mm c/c ABOVE DOOR
AND WINDOW may be drawn in neat freehand
100 x 150 mm GUTTER ON ALL SIDES OPENINGS · Start at the given starting point
c/c
SANITARY FIXTURES
8 40 Label the following:
8 40
c/c
25 mm SCREED
500
400
· The south east elevation including the scale
c/c · The room designations and floor finishes
20°
8 40 400
· Using the correct abbreviations, label the following features in
100
GROUND 2100
LEVEL
850 200
750 the correct view: ground level; finished floor level and damp
SCHEMATIC DIAGRAM OF ROOF 1 TRUSS 800 400 500 350 proof course
600 FLOOR LEVEL
c/c
300
9 20
1200 NOTE:
600
SINK (S) ALL drawings must comply with the guidelines and graphical
c/c
400
symbols contained in the SANS 10143. [98]
600 200 850
9 20
20°
INCOMPLETE FOUNDATION
AND WALL DETAIL 850
WASH BASIN TOILET
SHOWER
SCHEMATIC DIAGRAM OF ROOF 2 TRUSS (WB) (WC)
(SH)
5
Copyright reserved Please turn over
Engineering graphichs and design / P1 Downloaded from hlayiso.com
NCS
PENALTIES
EC DBE/September 2016
ST
AP
LE 1 INCORRECT OVERALL SCALE
2 INCORRECT POSITIONING OF VIEWS
3 NON-ALIGNMENT OF VIEWS
TOTAL PENALTIES (-)
GL
ASSESSMENT CRITERIA
FLOOR PLAN
ROOF LINE
DOORS +
1 WINDOWS 17
2 ELECTRICAL 9
RWDP
3 FIXTURES 7
4 HATCHING 4
5 LABELS 5
SUBTOTAL 42
SOUTH EAST ELEVATION
1 ROOF 6 21
WALLS + RWDP +
2 FFL + GULLEY 4
3 DOOR + WINDOW 4
4 LABELS 1 21
RWDP SUBTOTAL 16
DETAILED SECTION
1 ROOF DETAIL 13
8
FOUNDATIONS +
2 WALLS + SLAB
DOOR + GULLEY
8
RWDP + GUTTER +
3 SILL + WINDOW +
WC
4 HATCHING 9
5 LABELS 2
SUBTOTAL 40
TOTAL 98
PENALTIES (-)
FINAL TOTAL
FLOOR PLAN SECTION A-A NAME
STARTING POINT FOR DETAILED
SCALE 1 : 50 SECTION SCALE 1 : 20
NAME 6
Copyright reserved
Study this subject
Recommended for this subject

Question paper
Engineering Graphics and Design Grade 12 P1 2016 QP (Afr)

Question paper
Engineering Graphics and Design Grade 12 P1 2013 QP

Memorandum
Engineering Graphics and Design Grade 12 P2 2016 Memo (Afr)

Memorandum
Engineering Graphics and Design Grade 12 P1 2016 Memo (Eng)

Memorandum
Engineering Graphics and Design Grade 12 P1 2025 Memo

Memorandum
Engineering Graphics and Design Grade 12 P1 2023 Memo (Afr)
More from Grade 12 Engineering Graphics and Design

Memorandum
Engineering Graphics and Design Grade 12 P2 2025 Memo (Eng)

Memorandum
Engineering Graphics and Design Grade 12 P2 2025 Memo

Memorandum
Engineering Graphics and Design Grade 12 P2 2024 Memo (Eng)

Question paper
Engineering Graphics and Design Grade 12 P2 2023 QP

Question paper
Engineering Graphics and Design Grade 12 P2 2023 QP (Afr)

Question paper