Skip to content

Engineering Graphics and Design Grade 12 P1 2023 QP (Eng)

Question paperEngineering Graphics and DesignGrade 1220236 pages

Grade 12 Engineering Graphics and Design Paper 1 question paper from the NSC November Exam 2023 (English), 6 pages. Read online or download the free PDF.

Free to read online, no sign-up needed

Answer online

Loading document…

Loading document…

Questions in this paper

Document textSearch extracted text and jump to a page.
. e ok Cg ss basic education INSTRUCTIONS AND INFORMATION This question paper consists of FOUR questions. Answer ALL the questions. ALL drawings are in first-angle orthographic projection, unless otherwise stated. Department: Basic Education NATIONAL SENIOR CERTIFICATE MARKS: 100 TIME: 3 hours This question paper consists of 6 pages. | | | | Barcode label | | | Copyright reserved REPUBLIC OF SOUTH AFRICA PONS ALL drawings must be prepared using pencil and instruments, unless otherwise stated. ALL answers must be drawn accurately and neatly. ALL the questions must be answered on the QUESTION PAPER, as instructed. ALL the pages, irrespective of whether the question was attempted or not, must be re-stapled in numerical sequence in the TOP LEFT-HAND CORNER ONLY. 8. Time management is essential in order to complete all the questions. 9. Print your examination number in the block provided on every page. 10. Non Any details or dimensions not given must be assumed in good proportion. FOR OFFICIAL USE ONLY QUESTION | MARKS OBTAINED |} SIGN | MODERATED | 3] SIGN | REMARKING | 4] SIGN 1 2 Ss 4 TOTAL 2|0|0 2|0/0 2|0/0 FINAL CONVERTED MARK CHECKED BY 100 COMPLETE THE FOLLOWING: CENTRE NUMBER | CENTRE NUMBER EXAMINATION NUMBER EXAMINATION NUMBER DO NOT FOLD THIS QUESTION PAPER IN HALF. Please tum over
Engineering Graphics and Design/P1 Downloaded from hlayiso.com DBE/November 2023 > SYMBOL LEGEND: NOTE QUESTION 1: ANALYTICAL (CIVIL) gs LAND SURVEYOR'S CERTIFICATE OF THE: Contractors must verify all dimensions and ‘s CORNER HEIGHTS AND BOUNDARY 1. PALM TREE levels on site before commencing work. a LENGTHS OF LOT 22 Architects to be notified immediately of any | Given: 2 EVERGREEN discrepancies The site plan of an existing service station with a proposed new fast-food outlet and a covered walkway, a title panel CORNER HEIGHTS BOUNDARY TREE and a table of questions. The drawing is not presented to the indicated scale. INMETRES | LENGTHS Iv ancuneers stTune 3. PARKING FOR ° CLIENTS SIGNATURE Instructions: A 350 AB | 40000 PEOPLE WITH fos Complete the table below by neatly answering the questions, which refer to the accompanying drawing, title panel and B 351 Bo 78000 DISABILITIES ~ ANSWER 21 civil content. [30] In the space below, draw, in neat c 349 cp | 23340 freehand, the SANS 10143 graphical symbol for: QUESTIONS ANSWERS o 349 OE 7500 (a) SHOWER (elevation and plan) E 349 EA 44560 (b) SOCKET OUTLET 1 | Whatis the e-mail address of the architectural firm? 1 (a) SHOWER (elevation and plan) | | 2 | What scale is indicated for the site plan? 1 3 | When was the first revision made to the drawing? 1 a 4_ | Into which street does the service station exit? 1 5 | Whatis the height of the highest corner of LOT 22 in metres? 1 LOT 24 6 | Whatis the finish on all the existing driveways? 1 4,8 m HIGH BOUNDARY FENCE Ay 7 |How many existing underground fuel tanks are shown? 4 (bl) SOCKET OUTLET ve 8 | On what feature in the road is the zebra crossing? 4 ) 3000 BL | 2 9. | Whatis the fall of the existing sewer line? 1 zou § EXISTING UNDERGROUND ¥ 40 | What is the height of the electronic display board in millimetres? 1 z a FA r FUEL TANKS es gouty oem EXISTING © «s ~ SRST 11 | What does the abbreviation @ at 1 stand for? 1 a 2 é Ay REO PETROL PUMP 3 G 2 | 04/02/2023 | concrete APRON | 12 | Name the feature at 2 1 62 7 a BOs + (ipsphoor a + | so1012023 | NEWENTRANCE | 13 | What does the feature at 3 indicate? 1 |! | & ADDED z 2 14 | To what must the new sewerage line be connected? 1 sg REVISION DATE DESCRIPTION bor 20) | Zl L 45 | What is the thickness of the concrete apron in metres? 1 EXISTING al PETROL PUMP 2 AE ARCHITECTS. 46 | In what colour must new walkways be indicated on site plans? 1 wg EXISTING 17 ALPINE ROAD 7 > g22 | | BULOING | & [ALPINE ROAI sceancannacon | 17_| Which elevation of the new fast-food outlet faces 7th Avenue’ 2 BES het | EXBSTING 4091 31208 2486, 4g. | fwall S-S on the new fast-food outlet is 4,8 m from boundary line A x20 ' Ggz PETROL PUMP 1 AB, how far is it from building line T-T in millimetres? age | Bes PRINTED BY: DATE OF PRINT wes ty: aug 150 CONGRETE PRINTFRIEND 19 |In the space below (ANSWER 19), determine the perimeter of LOT 22 in metres. 3 | 2g of APRON PRINTERS 05/02/2023 2.3 + ros SaAWNO TE 20 |In the space below (ANSWER 20), determine the total area of the existing building in square metres. | 3 we 588 | SITE PLAN 2 | If the space in the fitle panel (ANSWER 21), draw, in neat freehand, the SANS 10143 graphical A 582 / [ ¢7}_ prick Pavitic LAID on symbol for: (a) SHOWER (elevation and plan) and (b) SOCKET OUTLET are} t 4 ALL EXISTINGIDRIVEWAYS, PRONECT: 8 i PROPOSED NEW FAST-FOOD OUTLET TOTAL | 30 L "AND COVERED WALKWAY FOR - LAHRIE AND ASSOCIATES, ANSWER 19 ANSWER 20 LOT 22, 7th AVENUE, KLOOF Show ALL calculations. 6200 Show ALL calculations. clive (Do NOT round off the answer.) 4 4 (Do NOT round off the answer.) 6meEXIT PROJECT NUMBER: DRAWING NUMBER: D 72846-23 LA - 787976 pt 800 = ELECTRONIC DATE: DRAWN: CHECKED: | SCALE: iy = DISPLAY BOARD 2eiot2023/s motaLa | Bux | 1: 450 QUALITY STREET 6m WIDE | == 7500 (W) x 100 (0) x 2500 (H) aR Ee 3 ZESHA GROSSING ON terested 2 g a,omWIDE SPEED HUMP exstins | 218 g & SITE PLAN EXAMINATION NUMBER ‘SCALE 1: 450 -—10000__} EXAMINATION NUMBER [2 Copyright reserved Please tum over
sna Downloaded from hlayiso.com — oe QUESTION 2: SOLID GEOMETRY ‘3s Given: © The front view and top view of a right regular pentagonal pyramid with one base edge in contact with a base edge of a right regular hexagonal prism. The prism is centrally pierced by a right square prismatic hole. Cutting plane P-P, that cuts both solids Instructions: Draw, to scale 1 : 1, the following views of both solids: 2.1 The given front view 2.2 A sectional top view 2.3 A sectional left view Planning is essential Show ALL hidden detail Show ALL construction. [38] x Y ASSESSMENT CRITERIA 1 |sectionaL Top view | 154] 2 |rront view a} 3 |SecTIONAL LEFT VIEW | 14 PENALTIES () TOTAL| 38 EXAMINATION NUMBER EXAMINATION NUMBER [3 Copyright reserved Please tum over
Engineering Graphics and Design/P1 Downloaded from hlayiso.com — QUESTION 3: PERSPECTIVE Given: Three views of a covered drive-through ticket booth and the information needed to draw a two-point perspective drawing PP - Picture plane HL - Horizon line GL ~ Ground line SP ~ Station point Instructions: Complete the perspective drawing * Align the drawing sheet with the ground line (GL). * Determine and label the vanishing points. * Show ALL construction. * Show depth at the window. * Show ALL interior detail as seen through the window. * NO hidden detail is required. [40] ASSESSMENT CRITERIA 4 | CONSTRUCTION 6 2 | FLOOR 11 3 | wats 83 4 | ROOF 43 5 | wINDows + ARC 10 PENALTIES () TOTAL | 40 PP IB ~~ HL. 7 _| HE i \ \ ' \ po Lo r 1 1 ' ' ' i \ ' | | |e i i \ ' | | \ ' ' ro ' ' \ \ \ | | | ' ' ' | | H 4 GL EXAMINATION NUMBER EXAMINATION NUMBER: [4 Copyright reserved Please tum over
Engineering Graphics and Design/P1 Downloaded from hlayiso.com DBE/November 2023 300 x 75 mm BARGE BOARD 10 mm CEILING BOARD ON 40 x 40 mm BRANDERING STRIPS @ 450 mm clc INCOMPLETE FOUNDATION AND EXTERNAL WALL DETAIL ee RO cm RIDGE CAP 10 x 100 mm GUTTER ON 200 x 20 mm FASCIA BOARD FLOOR FINISHES s 80 mm RWDP THAT STOPS 50 mm 1. OPEN AREA: TILE ‘ABOVE GROUND LEVEL 2, BATHROOM — TILE 8 WINDOW OPENING 3. BEDROOM: CARPET g . SLIDING DOOR OPENING 4, OFFICE: LAMINATE [ |— 150 x 300 mm FRONT STEPS WITH SIDE WALLS, }--—-—-+--—- — FINISHED FLOOR LEVEL \ GROUND LEVEL INCOMPLETE NORTH-EAST ELEVATION ROOM DESIGNATIONS Pw wo — FEATURES DOOR AND WINDOW SCHEDULE H D1 SLIDING DOOR i D2 DOOR ye TO FIT 4 Tort t 50 a H wW1 WINDOW 600 "f “500, J w2 WINDOW oa S 5 i Wc TOILET al ol i WB WASH BASIN 3 8 5 8 x ' ELECTRICAL FITTINGS L 1. ONE-WAY SWITCH - SINGLE-POLE | || B WINDOW (W1) 2. TWO-WAY SWITCH 3. FLUORESCENT LIGHT 4 x 40 W 800 4, CEILING LIGHT aS ur A 5. SWITCHED SOCKET OUTLET F DOOR (02) x &) INCOMPLETE FLOOR PLAN 6, DISTRIBUTION BOARD SLIDING DOOR (01) 2 e A 600 NOTE : ® “00, % THE ARROW SHOWS THE LIGHT eee NANG IDE x CONNECTION TO THE SWITCH. - x ss + B= FIXED PANEL wanDOW 2) A g 8 * ALL FRAMES = 50 mm THICK g 2 8 + 200 x 20 mm FIBRE CEMENT SILL UNDER ALL WINDOWS X + = GROUND LEVEL tr Fe =“ ROOF COMPONENTS ELECTRICAL SYMBOLS. FRONT STEP AND SIDE WALL DETAIL = . — 200 x 20 mm FASCIA BOARD A 1 200 gad 109 150 x 100 mm GUTTER / LE e in 75 x 50 mm PURLINS Ss ‘| F~1009 oa \ & - 300 x 75 mm BARGE BOARD L- | + CT od 200 xX bowl ‘ps0eG, al 4200_ | ROOF GAP AND RIDGE CAP KX Iieow INCOMPLETE SCHEMATIC DIAGRAM OF | F]—200 x 80 mm — ROOF TRUSS AT CUTTING PLANE A-A LINTELS ABOVE ROOF NOTES: \ [2} ALL DOOR FIXTURES 20° ROOF PITCH ‘AND WINDOW 1500 OPENINGS # 4 450 y 500 114 x 40 mm ROOF TRUSSES ON 2 4700 * st 3 4100 __y g 114 x 40 mm WALL PLATES sg x A 3 as A a 400 mm ROOF OVERHANG TO END OF a 3 J 500 3 be ROOF TRUSS aor 40 mm CORRUGATED ROOF SHEET ON * sy 75 x 50 mm PURLINS @ 1000 mm cle ss—a g 2© ale 300 x 75 mm BARGE BOARD ON GABLE ENDS AND aN son XM 200 x 20 mm FASCIA BOARD WITH 450 x 100 mm GUTTERS ON ALL SIDES BATH SINK TOILET WASH BASIN (8) (s) (we) (WB) QUESTION 4: CIVIL DRAWING Given: * The incomplete north-east elevation of a new house, showing the walls, the window and sliding door openings, the front steps, roof and labels * The incomplete floor plan showing the walls, front steps, positions of the doors, windows, fixtures and electrical layout * The front step and side wall detail * An incomplete schematic diagram of a roof truss at cutting plane A-A and roof notes * The incomplete foundation and external wall detail * Room designations and floor finishes * A door and window schedule * A table of roof components * A table of electrical symbols * A table of fixtures * The incomplete floor plan and ground level of the new house, drawn to scale 1 : 50, and the incomplete foundation and break lines for the detalled section, drawn to scale 1 : 20, on page 6 Instructions: Answer this question on page 6 4.1. Using the given incomplete floor plan and ground level, draw, to scale 1 : 50, the following views of the new house: 4.1.1 THE COMPLETE FLOOR PLAN ‘Add the following features to the drawing: * ALL doors and windows * ALL fixtures as indicated by abbreviations * ALL electrical fittings as indicated by the numbers * ALL hatching detail 4.1.2 THE COMPLETE NORTH-EAST ELEVATION Show the following features on the drawing: * The outside walls, window, sliding door and step detail * The roof detail including the fascia boards, barge board, gutters and rainwater down-pipe * The finished floor level Using the incomplete foundation and break lines on page 6, draw, to scale 1 : 20, a DETAILED SECTION on cutting plane A-A of the area in the ellipse shown on the incomplete floor plan. Show the following features on the drawing: * The complete foundation, external wall, slab and window detail * The roof detail including ALL rainwater items * The W2 window, roof and rainwater item detail, to the right (north-west) of cutting plane A-A * ALL hatching detail. ONLY the substructure hatching may be drawn in neat freehand. 4.2 Label the following: © The floor finishes * Ground level, finished floor level and damp-proof course (use the correct abbreviations and show them on ALL relevant views) NOTE: ALL drawings must comply with the guidelines and graphical symbols as contained in the SANS 10143. [92] [5 Copyright reserved Please tum over
Engineering Graphics and Design/P1 Downloaded from hlayiso.com DBE/November 2023 GL NORTH-EAST ELEVATION woe yl | | | | | | | | BEDROOM BATHROOM | | | | | | | wy | S| | i dl I 9 al | | | | I | OFFICE | | | | >b 7 / | | Z 4 | | I o RWDP 71 ia | ee — / ne y | | / | | | | | | | > | | oe pp Ny FLOOR PLAN SCALE 1 : 50 SECTION A-A SCALE 1 : 20 rane FOR OFFICIAL USE ONLY SECTION OF ROOF | | ncorRECT A SCALE(S) USED B NON-ALIGNMENT OF ¢ VIEW(S) ROTATED ° SECTION VIEWED E INCORRECTLY F LETTERING. G H J TOTAL TOTAL ASSESSMENT CRITERIA FLOOR PLAN posite | ostaneo | sion | monerareD 1 | fivoows | 132 2 | rwrures 8 3 |etecrrica | ot 4 | warcune 3 S | tasers 2 SUBTOTAL 36 NORTH-EAST ELEVATION 1 | woe” 83 2 | Sres” 7 3 | winoow 8 4 [vse 3 SUBTOTAL 24 DETAILED SECTION 41 |Roor vera | 433 2 |susewar] 44 3 | arcrine 54 4 | wwoons 7 5 | uses 14 SUBTOTAL 32 TOTAL 92 PENALTIES () GRAND TOTAL EXAMINATION NUMBER EXAMINATION NUMBER: [6 Copyright reserved

Study this subject

More from Grade 12 Engineering Graphics and Design

View all