Skip to content

Engineering Graphics and Design Grade 12 P1 2016 QP (Eng)

Question paperEngineering Graphics and DesignGrade 1220166 pages

Grade 12 Engineering Graphics and Design Paper 1 question paper from the NSC Supplementary Exam 2016 (English), 6 pages. Read online or download the free PDF.

Free to read online, no sign-up needed

Answer online

Loading document…

Loading document…

Questions in this paper

Document textSearch extracted text and jump to a page.
basic education Department « y) Basic Education "4 REPUBLIC OF SOUTH AFRICA NATIONAL SENIOR CERTIFICATE if ENGINEERING GRAPHICS AND DESIGN P4 \ it FEBRUARY/MARCH 2016 } MARKS: 100 TIME: 3 hours This question paper consists of 6 pages. INSTRUCTIONS AND INFORMATION This question paper consists of FOUR questions. Answer ALL the questions. ALL drawings are in first-angle orthographic projection, unless otherwise stated. ALL drawings must be completed using instruments, unless otherwise stated. ALL answers must be drawn accurately and neatly. ALL the questions must be answered on the QUESTION PAPER as instructed. ALL the pages, irrespective of whether the question was attempted or not, must be re-stapled in numerical sequence in the TOP LEFT-HAND CORNER ONLY. 8. Proper planning is essential in order to complete all the questions. 9. Print your examination number in the block provided on every page. 10. Any details or dimensions not given must be assumed in good proportion. NOORoOn> FOR OFFICIAL USE ONLY QUESTION |] MARKS OBTAINED | } | SIGN MODERATED 3] SIGN RE-MARKING 3] SIGN 1 2 3 4 TOTAL 2/;0/0 2/;0/0 2/0/0 FINAL CONVERTED MARK CHECKED BY 100 COMPLETE THE FOLLOWING: CENTRE NUMBER CENTRE NUMBER EXAMINATION NUMBER EXAMINATION NUMBER Copyright reserved Please tum over
Engineering Graphics and Design/P1 Downloaded from hlayiso.com MUNICIPAL SEWERAGE LINE 2,5m DEEP SITE PLAN SCALE 1 : 500 MH z pae IE LINE LAID AT 1: 40 iS 9S Z Ft--- 18 Fe) i i a SE § PROPOSED NEW | RE | REMOVE EXISTING | ae 3 WORKSHOP | | OUTBUILDING 4 ga PROPOSED FuTURE BR} g| | | = ROOF TOENGINEER'S | &| | j 27540 | ‘SPECIFICATIONS | (2) 47 entrance | ie Nor 9450 , 10695 ls sTAND | STAND 3 2076 (9 9566 16 _ wW | 1 aye Zz < SyE= Zl IE] a | 5 ge x ol lzZ3 ; © | 2 g/lgo i & eS E allo | = ae | “l2i3 i @ %& existincsHop} aja | = -—— ANDTOLETS | EI H [ne 2 | | ee | cS H ° L——< Ic = 28 RE TINE, ' | ey eso 2 25 sé | 88 xo 7 — |e aS RE VERTICAL T-SECTION-—~.__| wz Z STEEL SUPPORT POINTS ~~ nl 2 EXISTING CAR FOR FUTURE ROOF 1 ~ = 2 WASH BAYS eg ; 2a $ 1800 BL T = = 5 i005 a 7 1 [271.7] fy \2773)| stanp —— VENTILATION 9565 NEW UNDERGROUND FUEL STORAGE TANKS TO ENGINEER'S ‘SPECIFICATIONS NOTE: Contractors must verify all dimensions and levels on site before commencing work. Architects to be notified immediately of any discrepancies. ARCHITECTS SIGNATURE CLIENTS SIGNATURE. DBE/Feb.-Mar, 2016 QUESTION 1: ANALYTICAL (CIVIL) Given: The site plan of an existing service station with a proposed new workshop, underground fuel storage tanks and future roof, a title panel and a table of questions. The drawing has not been prepared to the indicated scale. Instructions: Complete the table below by neatly answering the questions, which refer to the accompanying drawing and title panel. [30] ANSWER 20 QUESTIONS ANSWERS In the space below, draw, in neat m . 7 freehand, the front view and top view |_1_| How many signatures are required? 1 of the SANS 10143 graphical symbol | 9 | What is the architectural firm's telephone number? 4 for a SINGLE WALL-MOUNTED URINAL. 3_ | What was the second revision? 1 4 | What is the width of Welwitchia Road in millimetres? 1 5 | What type of roof cover is proposed for the future roof? 1 6 | How many trees are shown? 1 7 | How many new underground fuel storage tanks are shown? 1 8 | What does the broken line at 1 indicate? 1 9 | Name the feature at 2 1 40 | in what colour should new steel be indicated on a drawing? 1 11 | In what colour should the feature at 3 be shown? 1 12 | Name the feature at 4. 1 13 | Name the feature at 5. 1 Which side of the existing shop and toilets faces Welwitchia 14 2 3 2015-08-30 | Move vent pipes Road? 2 | 2018-08-18| Replace fuel tanks | 15 | Give a reason why graphical symbols are used in drawings. 2 1 |2018-08-06 eed 16 | What determines the size of a graphical symbol on a drawing? 1 i 2 revision | pate. | vescrierion | 17 | Whatis the height of the lowest corner of the stand in metres 2 4g | Inthe space below, determine the perimeter of the existing shop 3 DIGITAL DRAWING and toilets in metres. ARCHITECTS 4g | Inthe space below, determine the total area of the existing shop 3 17 SAFFRON DRIVE and toilets in square metres. GLENASHLEY in the space provided in the title panel, draw, in neat freehand, 20 | the front view and top view of the SANS 10143 graphical symbol 4 for a SINGLE WALL-MOUNTED URINAL. PRINTED BY DATE OF PANT TIMELESS PRINTERS 2015-10-17, TOTAL | 30 DRAWING TILE SITE PLAN — ANSWER 18 20570 ANSWER 19 Show ALL calculations. Show ALL calculations. PROPOSED NEW WORKSHOP, UNDERGROUND FUEL STORAGE TANKS: Z| AND FUTURE ROOF FOR SA PETROLEUM 3 EXISTING SHOP S| ON STAND 9566, WELWITCHIA ROAD 5 AND TOILETS PROIEGT NUWBER ORANG NOMBER SSA/FS/-2015 TH 15-05-R4K/J L | 28050 DATE DRAWN [OREGXED | SCRE | 4 2015-09-04] Tom | HARRY | 1: 500 EXAMINATIONINUMBER REFERENCE CODE 40P1-2015 EXAMINATION NUMBER. [2 Copyright reserved Please turn over
Engineering Graphics and Design/P1 DBE/Feb.-Mar, 2016 Downloaded from hlayiso.com Copyright reserved QUESTION 2: SOLID GEOMETRY Given: The front view and an auxiliary view of a truncated right regular hexagonal pyramid with a centrally placed right square pyramidal hole. Instructions: Draw, to scale 1 : 1, the following views of the solid: 2.1. The given front view 2.2. The top view 2.3. The left view * Show ALL hidden detail * Show ALL necessary construction [40] ASSESSMENT CRITERIA 1 |FRONT AND AUX. VIEW a 2 |ToP VIEW 15 3 |LEFT VIEW 1 PENALTIES (-) TOTAL) 40 EXAMINATION NUMBER EXAMINATION NUMBER [3 Please turn over
Engineering Graphics and Design/P1 PP Downloaded from hlayiso.com DBE/Feb.-Mar, 2016 HL QUESTION 3: PERSPECTIVE Given: Three views of a double-storey dwelling and the information needed to draw a two-point perspective drawing PP - Picture plane HL - Horizon line GL - Ground line SP - Station point Instructions: Complete the perspective drawing. * Align the drawing sheet with the ground line (GL) * Determine and label the vanishing points. * Show ALL necessary construction. * NO hidden detail is required [39] ASSESSMENT CRITERIA 1 | CONSTRUCTION + VPs 5 2 |FLOOR 4 3 | GROUND FLOOR 12 4 |FIRST FLOOR 12 5 | WINDOW + DOOR 6 PENALTIES (-) TOTAL | 39 Cod DOOR K---f----4 Copyright reserved EXAMINATION NUMBER EXAMINATION NUMBER [4 Please turn over
Engineering Graphics and Design/P41 Download ed from layiso.com DBE/Feb.-Mar. 2016 QUESTION 4: CIVIL DRAWING Given: * The incomplete south-east elevation of a new garage and washroom showing the walls, the garage door opening, the door and window openings, the roof and notes * The incomplete floor plan showing the walls, position of the doors, windows, fixture and the electrical layout * The incomplete foundation and external wall detail of the garage and of the washroom * Room designations and floor finishes * Schematic diagrams of the TWO types of roof trusses and roof notes * A table of electrical symbols * A table of rainwater items * A table of the fixture * A door and window schedule * A table of roof components *The incomplete floor plan of the new garage and washroom, drawn to scale 1: 50, on page 6 Instructions: Answer this question on page 6. 4.1 Using the given incomplete floor plan, draw, in first-angle orthographic projection and to scale 1 : 50, the following views of the new garage and washroom: 4.1.1 THE COMPLETE FLOOR PLAN Add the following features to the drawing: * ALL doors and windows * The fixture as indicated by the abbreviation * ALL electrical fittings as indicated by numbers ALL hatching detail 4.1.2 THE COMPLETE SOUTH-EAST ELEVATION Show the following features on the drawing: © The outside walls, door and window detail ©The roof detail, including the fascia boards, barge boards, gutters, rainwater down-pipe and gulley © The finished floor level 4.2 In the space provided, draw, to scale 1: 20, a DETAILED SECTION on cutting plane A-A of the area in the ellipse shown on the incomplete floor plan. Show the following features on the drawing: « The complete foundation and external wall detail © The window detail, with a DOUBLE lintel © The roof detail, including the fascia board and gutter * ALL features and fixtures to the right of the section * ALL hatching detail. ONLY the substructure hatching may be drawn in neat freehand. Label the following: « The south-east elevation © The room designations and floor finishes * Using the correct abbreviations, label the following features in the correct view: ground level, finished floor level and damp-proof course NOTE: © Planning is essential. * ALL drawings must comply with the guidelines and graphical symbols as contained in the SANS 10143. [91] [5 ROOF 1 -- ROOF 2 | | ELECTRICAL DOOR AND WINDOW SCHEDULE [—— 300 x 100 mm BARGE BOARD ON ALL GABLED ENDS H | SYMBOES TOF y » TOF 5 ys0 \ 4 + tf { 150 x 100 mm GUTTER ! I co | 200 x 20 mm FASCIA BOARD Hr | = al a 2 ia 970 mm RWOP ! H = | 3 I DOOR OPENING | el 2 8 WINDOW OPENING | ! Fe = sg FINISHED FLOOR LEVEL (GARAGE) L J | N 8 150 mm HIGH STEP a I] FINISHED FLOOR LEVEL (WASHROOM) ROOM DESIGNATIONS AN a. [—- | GROUND LEVEL t LE! | GARAGE DOOR OPENING FLOOR FINISHES ?¢ 1 GARAGE GRANO 2 WASHROOM: TLE FEATURES x DOOR FRAME —_ DOOR (01) D1 DOOR « 41000 D2 GARAGE DOOR 4 1 ep) Wi WINDOW ax 8] we winoow > ani 3 HINGED SIDE FIXTURE = OPENING SIDE WT WASHTUB fo} fe) FIXED PANEL ELECTRICAL FITTINGS S 4. ONE-WAY SWITCH - DOUBLE-POLE 3 WINDOW FRAME (W1) 2. TWO-WAY SWITCH 3, FLUORESCENT LIGHT 2.x 40 W 500 4. WALL-MOUNTED LIGHT oo pee 5. CEILING LIGHT 6. SWITCHED SOCKET OUTLET al HINGED SIDE NOTE: RAINWATER “ OPENING SIDE THE ARROW SHOWS THE LIGHT ITEMS CONNECTION TO THE SWITCH. WINDOW FRAME (W2) ge 550 1c 42 \ FI [| NOTE: Oo eK 307 | 150 x 20 mm FIBRE CEMENT SILL UNDER 022K Hl Se N i ‘ALL WINDOWS INCOMPLETE FLOOR PLAN —T EQUAL | EQUAL [ EQUAL) EQUAL] ~ 2450 2500 t t t t 1 "4 | SCHEMATIC DIAGRAM OF A 2 3 iJ TRUSS FOR ROOF '1' 2 ql 270 rr yoy 1 I s ay < we® = ok I ~ 280 ROLL-UP GARAGE DOOR (D2) x =< 3 —~| EQUAL EQUAL I @ oy 50 200 SCHEMATIC DIAGRAM OF A. ROOF COMPONENTS TRUSS FOR ROOF '2 GULLEY (6) RWDP 00 Fe Poy ROOF CAP ROOF NOTES: FIXTURE 20 mm SCREED ROOF PITCH 20° = WALL PLATE ‘ON 80 mm ¢-800_» CONCRETE SLAB 200 x 20 mm FASCIA BOARD ON ALL SIDES ‘AND 300 x 20 mm BARGE BOARD ON THE 75 x 50 mm PURLIN GABLED ENDS | ROOF COVER 15 mm FIBRE CEMENT Fel 150 x 100 mm GUTTER eS s | GROUND SHEETING ON 75 x 50 mm PURLINS SPACED 3 3] 0) LEVEL ACCORDING TO SCHEMATIC DIAGRAMS 400 8 er 300 x 100 mm FIBRE CEMENT scl ] st | | 114 x 38 mm ROOF TRUSS ON 114 x 38 mm BARGE BOARD 600 600 WALL PLATES 9 mm CEILING BOARD ON 38 x 38 mm 200 x 20 mm FASCIA BOARD INCOMPLETE FOUNDATION —_ INCOMPLETE FOUNDATION BRANDERING STRIPS @ 400 mm cic WASH TUB (WT) AND EXTERNAL WALL AND EXTERNAL WALL DETAIL OF THE GARAGE —_DETAIL OF THE WASHROOM 100 x 150 mm GUTTER ON ALL SIDES aad NNUAL Please turn over
Engineering Graphics and Design/P41 DBE/Feb.-Mar. 2016 Downloaded from hlayiso.com FOR OFFICIAL USE ONLY INCORRECT SCALE(S) NON-ALIGNMENT OF VIEWS, VIEW(S) ROTATED ‘SECTION VIEWED INCORRECTLY INCORRECT LETTERING TOTAL PENALTIES (-) MARK ALLOCATION FOR SECTION OF ROOF (4.2 No 1) Copyright reserved A ny a ‘| RWDP | | | “LS | [Af Oll I a} | | | ! | ~ | | | | wl | | 2 | | ge—}}——_________ | — S| | ! Lt | | | Rwop | | a | | | | | | | | | | | | | ; Lo CI | RWDP, | a | FLOOR PLAN DETAILED SECTION ON A-A SCALE 1 : 50 SCALE 1: 20 ale|cjofelfeje|x]ifufK«ie ASSESSMENT CRITERIA FLOOR PLAN Possiate | osTaneD | sion] wooeRATE 4 | tnbows 12 2 | evectRicat 8 3 | Foxture 2 4 | HATCHING 4 5 | Lanes 2 SUBTOTAL 28 SOUTH-EAST ELEVATION + | ROOF + RwoP 9 WALLS +FFL SRAM DOOR + 4 3 | winoow % 4 | uses 2 SUBTOTAL 25 DETAILED SECTION 1 | ROOF DETALL + for 16 2 | rouparion= WALL + SLAB + 9 Ine REA 3] wmoow-wr | 8 4 | parcHine: 4 5 | uses 1 SUBTOTAL 38 TOTAL 1 TOTAL PENALTIES (-) GRAND TOTAL EXAMINATION NUMBER EXAMINATION NUMBER [6

Study this subject

More from Grade 12 Engineering Graphics and Design

View all