Downloaded from hlayiso.com
INSTRUCTIONS AND INFORMATION
1. This question paper consists of FOUR questions.
2. Answer ALL the questions.
3. ALL drawings are in first-angle orthographic projection, unless otherwise stated.
4. ALL drawings must be completed using instruments, unless otherwise stated.
5. ALL answers must be drawn accurately and neatly.
6. ALL the questions must be answered on the QUESTION PAPER as instructed.
7. ALL the pages must be re-stapled in numerical sequence, irrespective of
whether the question was attempted.
8. Time management is essential in order to complete all the questions.
9. Print your examination number in the block provided on every page.
10. Any details or dimensions not given must be assumed in good proportion.
NATIONAL
SENIOR CERTIFICATE
FOR OFFICIAL USE ONLY
QUESTION MARKS OBTAINED ½ SIGN MODERATED ½ SIGN
1
GRADE 12
2
3
ENGINEERING GRAPHICS AND DESIGN P1
4
TOTAL
FEBRUARY/MARCH 2015
2 0 0 2 0 0
MARKS: 100 FINAL CONVERTED MARK CHECKED BY
TIME: 3 hours _______
100
COMPLETE THE FOLLOWING:
CENTRE NUMBER
This question paper consists of 6 pages.
CENTRE NUMBER
EXAMINATION NUMBER
EXAMINATION NUMBER
*BASIC-EDUCATION*
Copyright reserved Please turn over
Skip to contentAll 2015 papers 





View all





Engineering Graphics and Design Grade 12 P1 2015 QP (Eng)
Grade 12 Engineering Graphics and Design Paper 1 question paper from the NSC Supplementary Exam 2015 (English), 6 pages. Read online or download the free PDF.
Engineering Graphic And Design · Grade 12 · NSC Supplementary Exam · 2015. Question paper, 6 pages. Read online or download the PDF.
- Subject
- Engineering Graphics and Design
- Grade
- Grade 12
- Document type
- Question paper
- Year
- 2015
- Exam period
- NSC Supplementary Exam
- Paper
- 1
- Curriculum
- CAPS
- Pages
- 6
- File size
- 1.8 MB
Free to read online, no sign-up needed
Loading document…
Loading document…
1 of 6
This exam
NSC Supplementary Exam 2015
Questions in this paper
Document textSearch extracted text and jump to a page.
Engineering Graphics and Design/P1
Downloaded from hlayiso.com
6000 x 850 x 2000 DEEP.
SOAK PIT
SEPTIC 4
TANK BRICK PAVING
| EXISTING ai
‘3 ich POOL
BAN
1 REN, easine | a]
( ouTBULDING | )3 +
STAND ‘ + RE STAND iS
322°«¢8 | | 31 y
Ps '
5
| | EXISTING BRAAI
| 9g iE
id
H 2a RE
a
"
| RE
5000 BL.
_-WIRE FENGE
PAVEMENT Ww
MULLER STREET
6000
ois
8)
SITE PLAN
SCALE 1 : 300
PAVEMENT
GOTZE STREET
3520
NOTE:
Contractors must verify all dimensions and
levels on site before commencing work.
Architects to be notified immediately of any
discrepancies.
ARCHITECTS SIGNATURE
CLIENT'S SIGNATURE
DBE/Feb.-Mar. 2015
QUESTION 1: ANALYTICAL (CIVIL)
Given:
The site plan for a proposed new dwelling, a title panel and a table of questions. The drawing has not been prepared
to the indicated scale.
Instructions:
Complete the table below by neatly answering the questions, which refer to the accompanying drawing and title
panel [30]
ANSWER 20 QUESTIONS ANSWERS
In the space provided below, draw, in
neat freehand, the front view and top |_1__| Whats the reference code for the drawing? 1
view of the SANS 10143 graphical |~> | What was th d revision? 1
symbol for a DOUBLE SINK. at was the second revision
3. | What scale is indicated for the drawing? 1
4 |How many inspection chambers are there on the sewer line? 1
5 | What finish is used around the pool? 1
6 | What new development is proposed on the site? 1
7 | In what colour would new glass be presented on a drawing? 1
8 | In what colour would new concrete be presented on a drawing? 1
9 | What is the depth of the feature at 17 1
10 | Name the feature at 2. 1
11 | What does the number at 3 indicate? 1
12 | What does the line at 4 indicate? 1
13 | Name the feature at 5. 1
3 14 |Name the feature at 6. 1
15 | Which elevation of the new dwelling faces Gotze Street? 2
2 2014-12-07| Include a soak pit
46 | Whatis the distance from the swimming poo! to the south-western 2
+ | 2014-11-09) Change driveway boundary line in metres?
2
Revision| pate. | DESCRIPTION 17 | What is the length of the boundary facing stand 32 in metres? 2
4g | In the space below, determine the perimeter of the new dwelling 3
TONY KROOS & ASSOCIATES in metres.
ARCHITECTS In the space below, determine the total building area of stand 31
BAYERN DRIVE 19 |. 3
13-46 MUNICH GARDENS in square metres.
NEW GERMANY
& PINETOWN In the space provided in the title panel, draw, in neat freehand,
tonroontbundoscom 20 | the front view and top view of the SANS 10143 graphical symbol 4
PRINTED BY DATE OF PRINT for a DOUBLE SINK.
FUSSBAL PRINTERS 2015-02-12
DRAWING TITLE, TOTAL 30
SITE PLAN e000
ROK ANSWER 18 80 ANSWER 19
Show ALL calculations. 5 Show ALL calculations.
PROPOSED DWELLING FOR MR 3 g
RIBERY ON STAND 31, CNR 3 NEW DWELLING 8
MULLER STREET AND GOTZE + 4
STREET. 8
PROJECT NUMBER DRAWING NUMBER my
CHLW-2013 BM 3113 3109 | 3100,
DATE Raum [Ove] SCALE a a
2015-01-28) ARJEN ROB 1:300 EXAMINATION NOMBER:
REFERENCE CODE
EXAMINATION NUMBER [2
Copyright reserved
1vG2014 |
Please tum over
Engineering Graphics and Design/P1
DBE/Feb.-Mar. 2015
Downloaded from hlayiso.com
QUESTION 2: TRANSITION PIECE
Given:
The front view and the top view of a square-
to-irregular four-sided transition piece.
Instructions:
Draw, to scale 1 : 1, the following views of the
transition piece:
2.1. The given top view
2.2. The given front view
2.3. The development of the transition piece
NOTE
ABis the seam. [36]
if — i
27
» Fl
A
BLA 3
&
ASSESSMENT CRITERIA
1 |FRONTAND TOP view | 14
2 | TLCONSTRUCTION 8
3 | DEVELOPMENT 17
PENALTIES (-)
TOTAL 36
EXAMINATION NUMBER
EXAMINATION NUMBER [3
Copyright reserved
Please tum over
Engineering Graphics and Design/P1
Downloaded from
DBE/Feb.-Mar. 2015
layiso.com
QUESTION 3: PERSPECTIVE
Giver
Two views of an entrance with a control point
and the information needed to draw a
two-point perspective drawing
PP - Picture plane
HL - Horizon line
GL - Ground line
SP - Station point
Instructions:
Complete the perspective drawing
* Align the drawing sheet with the ground line
(GL).
* Determine and label the vanishing points.
* Show ALL necessary construction.
* Show the wall thickness at the window and
door.
* NO internal or hidden detail is required. [40]
‘S ASSESSMENT CRITERIA
1. |CONSTRUCTION+ VPs | 7
PP
2 | ROOF 4
3 | WALLS 17
4 | QUARTER-CIRCLE 6
5 | WINDOW + DOOR 6
PENALTIES (-)
TOTAL 40
HL T
i i
i i
i i
i i
i i
i i
I I
i i
i i
i i
I I
i i
i i
i i
i i
i i
i i
i i
GL H H
Copyright reserved
EXAMINATION NUMBER
EXAMINATION NUMBER [4
Please tum over
Engineering Graphics and Design/P1
3000
20° |
Downloaded from hlayiso.com
2100.
100 x 150 GUTTER
200 x 20 FASCIA BOARD
SLIDING DOOR OPENING
VERANDAH PILLARS.
FLOOR LEVEL
GROUND LEVEL
INCOMPLETE SOUTH-WEST ELEVATION
INCOMPLETE FLOOR PLAN
ROOF NOTES:
ROOF PITCH 20° WITH 200 x 20 mm FACIA
BOARD ON ALL SIDES
ROOF COVER 15 mm FIBRE CEMENT SHEET
ON 75 x 50 mm PURLINS @ 900 mm cic.
115 x 38 mm ROOF TRUSS ON 115 x 38 mm
WALL PLATES
9 mm CEILING BOARD ON 38 x 38 mm
BRANDERING STRIPS @ 600 mm cle
100 x 150 mm GUTTER ON ALL SIDES
VERANDAH LEVEL
FEATURES
D1 SLIDING DOOR
D2 INTERNAL DOOR
Wi WINDOW
w2 WINDOW
FIXTURES
WC TOILET
WB WASH BASIN
SH SHOWER
S SINK
ELECTRICAL FITTINGS
1, LIGHT SWITCH - SINGLE-POLE
2, LIGHT SWITCH - DOUBLE-POLE
3, FLUORESCENT LIGHT 2 x 40 W
4, CEILING LIGHT
5. WALL MOUNTED LIGHT
6. SWITCHED SOCKET OUTLET
7, DISTRIBUTION BOARD.
NOTE:
‘THE ARROW SHOWS THE LIGHT
CONNECTION TO THE SWITCH.
120
50
han
TIMBER BEAM
2680
200 x 200 mm VERANDAH
PILLAR AND BEAM DETAIL
1000 /T
300) 100
|
00
EQUAL | EQUAL | EQUAL | EQUAL |~
SCHEMATIC DIAGRAM OF A ROOF TRUSS
ra
600
INCOMPLETE FOUNDATION ‘A’
‘AND VERANDAH DETAIL
FLOOR FINISHES
1 BEDROOM: CARPET
2 BATHROOM TILE
3 KITCHEN: TILE
4 LOUNGE: TILE
5 VERANDAH: GRANO
150 x 200 mm LINTEL ~h
ABOVE DOOR OPENING
25 mm SCREED
GROUND LEVEL
ROOM DESIGNATIONS
‘420 x 50 x 7250 mm
3000
900
600
INCOMPLETE FOUNDATION
AND EXTERNAL WALL DETAIL
Copyright reserved
DBE/Feb.-Mar. 2015
DOOR AND WINDOW SCHEDULE
I TO FIT 4 --TOFIT 450
OPENING FIXED
PANEL PANEL
sr
= INTERNAL DOOR
SLIDING DOOR
WITH FRAME (01) FRAME AND DOOR
(02)
1550 600
WINDOW NOTE:
ls PENING SIDE
eI | IXED PANEL
s All B lA A
WINDOW (wa) NOTE:
160 x 25 mm FIBRE
CEMENT SILL UNDER
550 550 ALL WINDOWS
WINDOW (w1)
RAINWATER ROOF COMPONENTS
ITEMS
1200 x 20 mm FASCIA BOARD|
150
aa
120 x 50 x 7250 mm
420 — TIMBER BEAM
2 f 75 x 50 mm PURLINS
g ELECTRICAL SYMBOLS.
FY
ors ||
A KIS Cd
awoP = |so
8r
og xX laxaow!
Hay k
GULLY (6)
FIXTURES,
500
I 7
a a
FLOOR LEVEL al?
©) | 3 ce 5 SINK (8)
J 9200
WASH BASIN TOILET + SHOWER.
(ws) (we) 8)
:
QUESTION 4: CIVIL DRAWING
Given:
«The incomplete south-west elevation of a new cottage,
showing the walls, the verandah pillars, the sliding door
opening, the roof and notes
© The incomplete floor plan showing the walls, position of the
verandah pillars, doors, windows, fixtures and electrical layout
* Roof notes with a schematic diagram of a roof truss
* Room designations and floor finish
© Verandah pillar and beam detail
© The incomplete foundation 'A' and verandah detail
© The incomplete foundation and external wall detail
* A door and window schedule
* A table of rainwater items
* A table of roof components
* A table of electrical symbols
© A table of fixtures
The incomplete foundation ‘A’ and floor plan of the new
cottage, drawn to scale 1 : 50, on page 6
Instructions:
Answer this question on page 6.
4.1 Using the given incomplete floor plan, draw, in first-angle
orthographic projection and to scale 1: 50, the following
views of the new cottage:
4.1.1 THE COMPLETE FLOOR PLAN
Add the following features to the drawing:
* ALL doors and windows
* ALL fixtures as indicated by abbreviations
* ALL electrical fittings as indicated by numbers
* ALL hatching detail
4.1.2 THE SOUTH-WEST ELEVATION
Show the following features on the drawing:
* The outside walls, verandah and sliding door detail
© The roof detail, including the fascia board, gutter, rain-
water down pipe and gully
© The finished floor level
4.2. Using the given incomplete foundation ‘A’, draw, to scale
1: 20, a DETAILED SECTION on cutting plane A-A of
the area in the ellipse shown on the incomplete floor plan
Show the following features on the drawing:
* The complete foundation 'A’ and verandah detail
* The complete foundation, external wall and sliding door
detail
© The roof detail, including the fascia board and gutter
* ALL features of the verandah to the left of cutting plane
A-A, including the rainwater down pipe and gully
* ALL hatching detail. ONLY the substructure hatching
may be drawn in neat freehand
Label the following:
* The south-west elevation
* The room designations and floor finishes
Using the correct abbreviations, label the following features in
the correct view: ground level and finished floor level
NOTE:
ALL drawings must comply with the guidelines and graphical
symbols contained in the SANS 10143. [94]
Bl
Please tum over
Engineering Graphics and Design/P1
a4
DETAILED SECTION
SCALE 1 : 20
Downloaded from hlayiso.com
DBE/Feb.-Mar. 2015
PENALTIES
INCORRECT OVERALL SCALE
INCORRECT POSITIONING OF VIEWS.
NON-ALIGNMENT OF VIEWS
TOTAL PENALTIES (-)
RWDP
FLOOR PLAN
Copyright reserved
ASSESSMENT CRITERIA
FLOOR PLAN
posse | ostaneo | sian | mooerare
ee = |! WINDOWS 12
RWDP | [2 [etcermca 10
| [3 | rocrures 4
\ | 7 4
\ BIC |
\ | | 5 [eases 5
\
\ | SUBTOTAL 35
| SOUTH-WEST ELEVATION
LN | 1 | ROOF 6%
|
| [2 peresecty | 9
| 3 | poor 3
| [4 [wees 1%
| SUBTOTAL 20
| DETAILED SECTION
| [a | RooF beraL 12
| [a [roumoarons* ayy,
WALLS + S.AB
| DOOR + GULLY
| Ja |Rwor+ 9
| GurTER
| [4 |ratoHns 6%
| SUBTOTAL 39
| TOTAL 94
|
TOTAL PENALTIES (-)
FINAL TOTAL
EXAMINATION NUMBER
EXAMINATION NUMBER [6
SCALE 1:50
OMA
Study this subject
Recommended for this subject

Question paper
Engineering Graphics and Design Grade 12 P2 2015 QP (Afr)

Question paper
Engineering Graphics and Design Grade 12 P1 2015 QP (Afr)

Question paper
Engineering Graphics and Design Grade 12 P1 2015 QP (Eng)

Memorandum
Engineering Graphics and Design Grade 12 P1 2015 Memo

Memorandum
Engineering Graphics and Design Grade 12 P1 2016 Memo (Eng)

Question paper
Engineering Graphics and Design Grade 12 P2 2015 QP
More from Grade 12 Engineering Graphics and Design

Memorandum
Engineering Graphics and Design Grade 12 P1 2025 Memo

Memorandum
Engineering Graphics and Design Grade 12 P2 2025 Memo (Eng)

Memorandum
Engineering Graphics and Design Grade 12 P2 2025 Memo

Memorandum
Engineering Graphics and Design Grade 12 P2 2024 Memo (Eng)

Memorandum
Engineering Graphics and Design Grade 12 P1 2023 Memo (Afr)

Question paper