Skip to content

Engineering Graphics and Design Grade 12 P1 2014 QP (Eng)

Question paperEngineering Graphics and DesignGrade 1220146 pages

Grade 12 Engineering Graphics and Design Paper 1 question paper from the NSC November Exam 2014 (English), 6 pages. Read online or download the free PDF.

Free to read online, no sign-up needed

Answer online

Loading document…

Loading document…

Questions in this paper

Document textSearch extracted text and jump to a page.
Downloaded from hlayiso.com INSTRUCTIONS AND INFORMATION 1. This question paper consists of FOUR questions. 2. Answer ALL the questions. 3. ALL drawings are in first-angle orthographic projection, unless otherwise stated. 4. ALL drawings must be completed using instruments, unless otherwise stated. 5. ALL answers must be drawn accurately and neatly. 6. ALL the questions must be answered on the QUESTION PAPER as instructed. 7. ALL the pages must be re-stapled in numerical sequence, irrespective of whether the question was attempted. 8. Time management is essential in order to complete all the questions. 9. Print your examination number in the block provided on every page. 10. Any details or dimensions not given must be assumed in good proportion. NATIONAL SENIOR CERTIFICATE FOR OFFICIAL USE ONLY QUESTION MARKS OBTAINED ½ SIGN MODERATED ½ SIGN 1 GRADE 12 2 3 4 ENGINEERING GRAPHICS AND DESIGN P1 TOTAL NOVEMBER 2014 2 0 0 2 0 0 FINAL CONVERTED MARK CHECKED BY MARKS: 100 _______ TIME: 3 hours 100 COMPLETE THE FOLLOWING: CENTRE NUMBER This question paper consists of 6 pages. CENTRE NUMBER EXAMINATION NUMBER EXAMINATION NUMBER *BASIC-EDUCATION* Copyright reserved Please turn over
Engineering Graphics and Design/P1 Downloaded fr. NEW VEHICLE ENTRANCE AND EXIT WITH CONTROL POINT MUNICIPAL WATER | CONNECTION AND MAIN MUNICIPAL SEWER CONNECTION RIDGE ROAD ~\ METER ? 417357 ) 7 PAVEMENT it 4000 BL _ _ _ _ Z a say [LL] saxon 10700 aA in NEW SEWER LINE: i 5 - e58 g Zz 8h z= @ | % « xa |t ca 4 ®, NEWPARKIN iio ES le sige ZZ MH g |z a4 & ’ & |g a a 3 72000 en “1 < IEE 5 REET pawns tan | g leon ew | iS3| lcompacten| MHA [oo tL jaro cone B wy a se || | i ig ESE H EXISTING o2| || Fs Zu IE HOTEL Ze 1 | 6° oe Bo | z 8 fe ge| g| RE o | 8 7 oe \ \ 10631 zaoo__|, ELECTRICAL H CONNECTION | B iH MH ° EXISTING ° > 2 PARKING 1 = 4 3 2s 2 = = & bs ' 4000 BL 41735 S7 EXISTING 4 m VEHICLE ENTRANCE WITH CONTROL POINT EXISTING RETAINING WALL TO ENGINEER'S ‘SPECIFICATION SITE PLAN SCALE 1 : 500 NORTH WAY NOTE Contractors must verify all dimensions and levels on site before commencing work. Architects to be notified immediately of any discrepancies. ARCHITECT'S SIGNATURE CLIENTS SIGNATURE DBE/November 2014 m_hlayiso.com QUESTION 1: ANALYTICAL (CIVIL) Given: A site plan of a hotel with a proposed new conference centre, a title panel and a table of questions. The drawing has not been prepared to the indicated scale. Instructions: Complete the table below by neatly answering the questions, which refer to the accompanying drawing and title panel [30] ANSWER 20 QUESTIONS ANSWERS In the space provided below, draw, in neat freehand, the front view and top | 1 | On what date was the site plan printed? 1 view of the SANS 10143 graphical What must the contractors do on site before commencing with symbol for a SINGLE URINAL. 2 | any work? 1 3. | What scale is indicated for the drawing? 1 4. | What was the first revision? 1 5 | What is the surface finish of the new road? 1 6 | What new development is proposed for the hotel? 1 7 | In what colour would new timber be presented on a drawing? 1 8 | In what colour would new steel be presented on a drawing? 1 9 | What does the number at 1 indicate? 1 10 | Name the feature at 2 1 11 | What does the line at 3 indicate? 1 12 | Name the feature at 4 1 13 | Name the feature at 5. 1 3 14 | On what must the paving in the new parking lot be laid? 1 2 | 2014-07-15] IncludeaanewMH | 15 | In which road is the new exit from the hotel? 2 + [2014-07-11] ‘Change road 46 | Whats the length of the south western wall on the new > conference centre in metres? REVISION | DATE | DESCRIPTION 17 | Whats the shortest distance from the new conference centre to ; the boundary line on North Way in metres? NEW HORIZON y —Y ARCHITECTS 4g | In the space below, determine the perimeter of the new 3 7 MAIN ROAD conference centre in metres. DURBAN 49 | Inthe space below, determine the total area of the new 3 Tels 031 335 2635 conference centre in square metres. vOUNNIT PRINTERS | 2014-08-05 In the space provided in the title panel, draw, in neat freehand, SaAWNGTME 20 the front view an top view of the SANS 10143 graphical symbol 4 for a . SITE PLAN Torat | 30 PROUEGT ANSWER 18 32500 300 ANSWER 19 PROPOSED NEW CONFERENCE Show ALL calculations. Show ALL calculations. CENTRE FOR THE SA HOTEL GROUP ON STANDS 734 TO 739 2 aes AT 261 NORTH WAY, DURBAN 3 Rane PROIECT NUMBER ORAING NUMBER 04 10-B708 DATE] ORAWN [oHEGKED SCALE “13500 __27300__| 2014-05-30| SAREL | PERTO | 1: 500 EXAMINATIONINUMBER REFERENCE CODE N14-01 EXAMINATION NUMBER, [2 Copyright reserved Please turn over
Engineering Graphics and Design/P1 DBE/November 2014 Downloaded from hlayiso.com QUESTION 2: SOLID GEOMETRY Given: The front view and the top view of a right regular hexagonal prism with a right square hole and a right regular pentagonal pyramid Specifications: * One base edge of the hexagonal prism is in contact with one base edge of the pentagonal pyramid * Both solids are cut by a cutting plane VT. Instructions: Draw, to scale 1 : 1, the following views of the TWO solids: 2.1. The given front view 2.2 The sectional top view 2.3 The sectional left view. Show ALL hidden detail Show ALL necessary construction [38] Vv i i i i f i f i Hy i Wy ifs 4 iy S\\) | last |\ x Lit tty T } ASSESSMENT CRITERIA 1 |CONST.+FRONTVIEW | 7 2 | SECTIONAL TOP VIEW 12% 3.| SECTIONAL LEFTVIEW | 15 4 | HATCHING 3% PENALTIES (-) TOTAL 38 EXAMINATION NUMBER EXAMINATION NUMBER [3 Copyright reserved Please tum over
Engineering Graphics and Design/P1 Downloaded from hlayiso.com DBE/November 2014 QUESTION 3: PERSPECTIVE Given: Two views of an outside entertainment area and the information needed to draw a two-point perspective drawing PP - Picture plane HL - Horizon line GL - Ground line SP - Station point Instructions: Complete the perspective drawing * Align the drawing sheet with the ground line (GL). * Determine and label the vanishing points. * Show ALL necessary construction. * Show the wall thickness at the openings. © Show the floor tiles. # NO hidden detail is required. [39] ASSESSMENT CRITERIA 4 | CONSTRUCTION + VPs 7 2 | WALLS + TILES 15 pp 3 oPenncs+seaTnc | 10 4 | seMi-ciRCLe 7 PENALTIES (-) TOTAL 39 H I ' ' I I ' t HL “4 i ' ' < Hl iS ' S I | \ -4 po 7 I ' ' I ' f GL + 1 ! SP. EXAMINATION NUMBER EXAMINATION NUMBER [4 Copyright reserved Please tum over
Engineering Graphics and Design/P1 DBE/November 2014 nloaded from hlayiso.com FEATURES D DOOR w1 WINDOW w2 WINDOW FIXTURES S SINK B BATH BIC BUILT-IN CUPBOARD (600 mm deep) We TOILET WB WASH BASIN ELECTRICAL FIXTURES 1, CEILING LIGHT 2. WALL-MOUNTED LIGHT 3. DISTRIBUTION BOARD 4, FLUORESCENT LIGHT 2 X 40 W 5. LIGHT SWITCH - SINGLE-POLE 6. LIGHT SWITCH - TWO-POLE 7. SWITCHED SOCKET OUTLET NOTE: THE ARROWS SHOW THE LIGHT CONNECTION TO THE SWITCHES. ROOF NOTES: ROOF PITCH 20° ROOF COVER 15 mm FIBRE CEMENT SHEET ON 75 x 50 mm PURLINS 115 x 38 mm ROOF TRUSS ON 115 x 38 mm WALL PLATES 9 mm CEILING BOARD ON 38 x 38 mm BRANDERING STRIPS. 200 x 25 mm FASCIA BOARDS WITH 150 x 100 mm GUTTER ON BOTH ENDS. @100 mm RAIN-WATER DOWN PIPE 400 x 400 x 200 mm GULLY 11025 co 1026 co}1025 coj1025 co SCHEMATIC DIAGRAM OF A TRUSS FOR ROOF "1" 11025 ce (1026 ec|1025 co}1025 co SCHEMATIC DIAGRAM OF A TRUSS FOR ROOF '2' ROOF 1 — ROOF 2 window OPENING “ STEPS y GROUND LINE L SOT t Bes INCOMPLETE NORTH ELEVATION 7 | | | | | Pl | | | | a INCOMPLETE FLOOR PLAN TRUSS HEIGHT al = sg GROUNDLINE fe 3 I Ls 800 INCOMPLETE FOUNDATION AND EXTERNAL WALL DETAIL INCOMPLETE FOOTING LOUNGE AND INTERNAL WALL. DETAIL FLOOR FINISHES KITCHEN: TILES — LOUNGE: — CARPET BATHROOM: TILES BEDROOM: CARPET Le el ROOM DESIGNATIONS Copyright reserved DOOR AND WINDOW SCHEDULE p Tor »y 50 7 2000 , 550 550 WINDOW (W1) 1000 DOOR FRAME AND DOOR (D) WINDOW NOTE: 3 A= OPENING SIDE 8] JB Al) c J] B=HINGED side C= FIXED PANEL ELECTRICAL SYMBOLS 25 — WINDOW (Wa) NOTE: 150 x 25 mm FIBRE CEMENT SILL UNDER ALL WINDOWS x -K haw ax aow fe) S OQ, Q, 2, ROOF COMPONENTS. C=] 145 x 38 mm WALL PLATE [75 x 50 mm PURLINS| 2 FASCIA BOARD 300 £309, ROOF CAP FIXTURES ) 3704 700 350) TOILET (WC) WASHBASIN (WB) QUESTION 4: CIVIL DRAWING Given: The incomplete north elevation of a new dwelling, showing the walls, the roof and notes ©The incomplete floor plan showing the walls, position of the doors and windows, the fixtures and electrical layout ©The incomplete detail of the footing/foundation of an internal and an external wall Roof notes with schematic diagrams of the TWO types of roof trusses *A diagram showing the room designations and a list of floor finishes * A door and window schedule © A table of electrical symbols © A table of roof components © A table of fixtures «The incomplete floor plan of the new dwelling, drawn to scale 1: 50, on page 6 Instruction: * Answer this question on page 6. © Using the given incomplete floor plan, draw, in first-angle orthographic projection and to scale 1 : 50, the following views of the new dwelling: 4.1 The complete floor plan 4.2 The complete north elevation 4.3 A sectional elevation on cutting plane A-A ALL drawings must comply with the guidelines and graphical symbols contained in the SANS 10143. SPECIFICATIONS: THE FLOOR PLAN Add the following features to the drawing: * ALL the doors and windows * ALL the fixtures as indicated by abbreviations * ALL the electrical fittings as indicated by numbers ALL hatching detail THE NORTH ELEVATION Show the following features on the drawing: « The outside walls, steps and finished floor level ©The roof detail, including the fascia board, gutter, rainwater down pipe and gully © The window detail THE SECTIONAL ELEVATION Show the following features on the drawing: © The complete footing or foundation, wall, roof and ceiling detall © The window detail, with a DOUBLE lintel * ALL features to the west of the cutting plane * ALL hatching detail Label the following: © The room designations and floor finishes « The sectional elevation and the north elevation Using the correct abbreviations, label the following features in the correct view: ground level, finished floor level and damp-proof course. NOTE: ONLY the substructure hatching may be drawn in neat freehand, 193175] 5 Please tum over
° ee Downloaded from hlayiso.com i PENALTIES Le INCORRECT OVERALL SCALE s INCORRECT POSITIONING OF VIEWS NON-ALIGNMENT OF VIEWS: TOTAL ASSESSMENT CRITERIA FLOOR PLAN posite | osraned | sion | mooeRaTe 6 A 4 | ves 4 ROOF LINE TT ttall lawop a “1 2 | ELECTRICAL 9 | | 4 | roures 4 | | 5 | wsroune 4 | SUBTOTAL 32 | | NORTH ELEVATION | I 1 | was 5 | % | ROOF + FACIA | | 2 | Boxro « 7 GUTTER + RWOP 1 r ET Py 7 3 | winnow 5% a a 4 | 4 | Laseis: 1% ! | | SUBTOTAL 19 | | | ae | | SECTIONAL ELEVATION | 4 | Boxro + 15 | | GUTTER + RNP | | 2 | Srounoaron | 18 | ee | 4 | LaseLs DA | Al SUBTOTAL 42 | PENALTIES (-) if DP | TOTAL 93 {2F'*---------------- SARTO G SCALE 1 : 50 EXAMINATION NUMBER [6 Copyright reserved