Skip to content

Engineering Graphics and Design Grade 12 P1 2017 QP (Eng)

Question paperEngineering Graphics and DesignGrade 1220176 pages

Grade 12 Engineering Graphics and Design Paper 1 question paper from the NSC November Exam 2017 (English), 6 pages. Read online or download the free PDF.

Free to read online, no sign-up needed

Answer online

Loading document…

Loading document…

Questions in this paper

Document textSearch extracted text and jump to a page.
basic education Department « y) Basic Education "4 REPUBLIC OF SOUTH AFRICA NATIONAL SENIOR CERTIFICATE . i ENGINEERING GRAPHICS AND DESIGN P14 \ i] iit i NOVEMBER 2017 j Y MARKS: 200 TIME: 3 hours This question paper consists of 6 pages. INSTRUCTIONS AND INFORMATION This question paper consists of FOUR questions. Answer ALL the questions. ALL drawings are in first-angle orthographic projection, unless otherwise stated. ALL drawings must be completed using pencil and instruments, unless otherwise stated. ALL answers must be drawn accurately and neatly. ALL the questions must be answered on the QUESTION PAPER, as instructed. ALL the pages, irrespective of whether the question was attempted or not, must be re-stapled in numerical sequence in the TOP LEFT-HAND CORNER ONLY. 8. Proper planning is essential in order to complete all the questions. 9. Print your examination number in the block provided on every page. 10. Any details or dimensions not given must be assumed in good proportion. ROENS NOn FOR OFFICIAL USE ONLY QUESTION |] MARKS OBTAINED | 3 | SIGN MODERATED 3] SIGN RE-MARKING 2 | SIGN 1 2 3 4 TOTAL 2/0/0 2/;0/0 2/0/0 FINAL CONVERTED MARK CHECKED BY 100 COMPLETE THE FOLLOWING: CENTRE NUMBER CENTRE NUMBER EXAMINATION NUMBER EXAMINATION NUMBER Copyright reserved Please tum over
Engineering Graphics and Design/P1 SYMBOL LEGEND: CORNERHEIGHTS AND BOUNDARY | {DP mi iGH LANE POSTS SPACED MAXIMUM 50 m cic A 137,38 AB 143,56 2. EXISTING PALM TREES: B 134,67 BC 223,91 c 7335 cp | 143,89 | 3: NEW DECIDUOUS TREES D 136 DA 223,87 > PAVEMENT 2000 KVA ELECTRICAL SUBSTATION No. 8789 WILDEBEEST DRIVE 3m MOTOR VEHICLE ENTRANCE iN EXISTING 2 x 70 CUBIC LITRE UNDERGROUND FUEL STORAGE TANKS = STAND 7391 A - - e000 BL - “ee vu COoREFUELLING PONT” 88 7 52 [} a &s—t- 30000 aan C x 4 3 ae) EXISTING GUARD * (alt HOUSE STAND a a j 7392 | A yy um J “he 9g g | Fe ci g 4 w a; 3 é ba 3 & é 3 g i ) 5 g a, 8 5 4 5 a 3 NEW STAFF PARKING ' fF U_J ‘| yD PROPOSED NEW LOGISTICS bec B CENTRE ' gs g wo a ¢ BS 1 EEE 38 Gs NewPusLicParKiInc \ 39! ROPOSED NEW ie (25 GUARD HOUSE =e \ oS t ‘ALL NEW DRIVEWAYS AND. PARKING AREAS LAID ON WELL- COMPACTED HARDCORE WITH | ‘A.50 mm ASPHALT FINISH MUNICIPAL SEWER» CONNECTION / GENERAL NOTES: STAND 7383 on 1,2m DEEP SITE PLAN SCALE 1 : 1500 a & 3mHIGH SECURITY 50-YEAR FLOOD LINE ORANGE RIVER Downloaded from hlayiso.com NOTE: Contractors. must verify all dimensions and levels on site before commencing work. Architects to be notified immediately of any discrepancies. ARCHITECT'S SIGNATURE DBE/November 2017 QUESTION 1: ANALYTICAL (CIVIL) Given: The site plan of an existing warehouse with a proposed new logistics centre and guard house, a title panel and a table of questions. The drawing has not been prepared to the indicated scale CLIENT'S SIGNATURE Instructions: Complete the table below by neatly answering the questions which refer to the accompanying drawing and title panel [30] ANSWER 20 In the space below, draw, in neat QUESTIONS ANSWERS freehand, the front view and top view > of the SANS 10143 graphical symbol! |_1_| Who checked the drawing 1 for a WASHTUB. 2 | Whats the number of the stand? 1 3. | What is the number of the electrical substation? 1 4 | How far is the refuelling point from the fuel tanks in metres? 1 5 | How deep is the municipal sewerage connection? 4 6 | How many gullies are shown? 1 7 | What does the abbreviation IE stand for? 1 8 | How many palm trees are shown? 1 g. | What is the maximum permitted distance between the lamp posts 4 in metres? 40 | What is the combined capacity of the underground fuel tanks in y cubic litres? 11 | Besides the trees, what other natural feature is indicated? 1 12 | What does the line at 1 indicate? 1 13 | What does the line at 2 indicate? 1 14 | Name the feature at 3. 1 2 _| 2017-01-09 Security lighting 4g | in what colour must a new sewerage line be indicated on a q 2 1 2017-01-07 | New staff parking Grainage plan’ Which elevation of the proposed new logistics centre faces the REVISION | DATE DESCRIPTION 16 | new staff parking? A ; What is the distance between the boundary line and the building 3D STUDIO 17 | line on the north eastern side of the stand in metres? z ARCHITECTS 1024 FOREST DRIV! 48 | In the space below (ANSWER 18), determine the perimeter of the stand in metres. 3 ISIPINGO 4g | In the space below (ANSWER 19), determine the total area of the proposed new logistics centre in 3 ®@ 031 555 2792 square metres. PRNTED BY DATE OF PRINT 99 | In the space in the title pane! (ANSWER 20), draw, in neat freehand, the front view and top view of the | FAST PRINT 2017-01-28, SANS 10143 graphical symbol for a WASHTUB. DRAWING THEE TOTAL | 30 SITE PLAN PROJECT ANSWER 18 21000 ANSWER 19 PROPOSED NEW LOGISTICS CENTRE AND GUARD HOUSE FOR RAGE INDUSTRIES ON PLOT 7392, RIVER HORSE INDUSTRIAL PARK, 28 WILDEBEEST DRIVE, ISIPINGO. PROJECT NUNBER DRAWING NUMBER SSA/FS/-2015 LF 5-10-8PKIN DATE DRAWN _[GHEGKED | SCALE 2017-01-05] NM LUKE 1: 1500 REFERENCE CODE ViVv1-2017 Copyright reserved Show ALL calculations. 27000 -—_il PROPOSED NEW LOGISTICS CENTRE 67500 28500 34500 Show ALL calculations. EXAMINATION NUMBER EXAMINATION NUMBER [2 Please tum over
Engineering Graphics and Design/P1 > % o8 DBE/November 2017 Downloaded from hlayiso.com Copyright reserved QUESTION 2: SOLID GEOMETRY Given: * The front view and the top view of a right regular hexagonal prism with a right regular hexagonal pyramidal hole * Cutting plane A-A Instructions: Draw, to scale 1 : 1, the following views of the solid 2.1. The given front view 2.2 Asectional top view 2.3 Asectional left view 2.4 The true shape of the cut surface © Show ALL hidden detail * Show ALL construction [35] 64 ASSESSMENT CRITERIA 1 | FRONT VIEW 4 2 | SECTIONAL TOP VIEW NM 3 | SECTIONAL LEFT VIEW 10% 4 | TRUE SHAPE 6 5 | HATCHING 5 PENALTIES (-) TOTAL} 35 EXAMINATION NUMBER: EXAMINATION NUMBER [3 Please tum over
Downloaded from hlayiso.com Engineering Graphics and Design/P1 DBE/Noverber 2017 2 y QUESTION 3; PERSPECTIVE Ce 3 . Given: Three views of a serving area and the information needed to draw a two-point perspective drawing PP - Picture plane HL - Horizon line GL - Ground line SP - Station point Instructions: Complete the perspective drawing. ¢ Align the drawing sheet with the ground line (GL). © Determine and label the vanishing points. Show ALL construction. NO hidden detail is required. [40] PP \ 11 hat rit lt toot hit hit hat | THU! _| HU hit to hit ii | 7 Fo pee rit | r hat | ' iat | i hit I i hat | ' hat I i hit j i hat | ' hai I I hit I i bid ! 1 GL ASSESSMENT CRITERIA 1 | CONSTRUCTION 6 2 |WALLS AND WINDOW | 17% 3 | SERVING AREA "1 4 | SEMICIRCLE ah sP PENALTIES () EXAMINATION NUMBER TOTAL | 40 EXAMINATION NUMBER [4 Copyright reserved Please tum over
Engineering Graphics and Design/P1 ROOF B ROOF A Downloaded from hlayiso.com — 2700 2050 2375 2700 o i if INCOMPLETE WEST ELEVATION J6_ COUNTER Rp —— \ 14 ROOF NOTES: 30° ROOF PITCH PURLINS @ 1000 mm cle 200 x 9mm BARGE BOARD ON GABLE ENDS ONALL SIDES STRIPS @ 400 mm cic “| equa.| equar | equal |~ SCHEMATIC DIAGRAM OF A ROOF TRUSS FOR ROOF B 114 x 38 mm ROOF TRUSS ON 114 x 38 mm WALL PLATES: PY ry 500 mm ROOF OVERHANG TO END OF ROOF TRUSS 10 mm FIBRE CEMENT ROOF SHEETING ON 75 x 50 mm 250 x 9 mm FASCIA BOARD WITH 150 x 100 mm GUTTERS 9 mm CEILING BOARD ON 38 x 38 mm BRANDERING 100 mm THICK FLAT CONCRETE ROOF 200 x 9 mm FIBRE CEMENT BARGE BOARD. 250 x 9 mm FIBRE CEMENT FASCIA BOARD 150 x 100 mm GUTTER 70 mm RWDP DOOR OPENING BAY WINDOW OPENING FINISHED FLOOR LEVEL 900 x 300 x 200 CONCRETE STEPS GROUND LEVEL FEATURES D DOOR W1TOW3 WINDOWS FIXTURES we TOILET WB WASHBASIN SH SHOWER s SINK ELECTRICAL FITTINGS ONE-WAY SWITCH - SINGLE-POLE ONE-WAY SWITCH - DOUBLE-POLE . FLUORESCENT LIGHT 3 x 40 W WALL-MOUNTED LIGHT NoOpaena ELECTRICAL SYMBOLS naw fo) fe) fo) DOOR AND WINDOW SCHEDULE TOFIT 2050 DOOR FRAME AND DOOR (D) DOOR NOTE: TWO 75 x 100 mm LINTELS ABOVE THE DOOR 1500 @ > > o ° CEILING LIGHT => SWITCHED SOCKET OUTLET =. 3& DISTRIBUTION BOARD 8| y THE ARROW SHOWS THE LIGHT 1320 CONNECTION TO THE SWITCH. WINDOW (w3) BAY WINDOW (W1) e ala alg WINDOW NOTES: «A= OPENING SIDE « B= HINGED SIDE 1500 © C= FIXED PANEL . #150 x20 mm FIBRE CEMENT WINDOW (wa) SILL UNDER ALL WINDOWS, ROOM DESIGNATIONS FLOOR FINISHES TBATHROOM, TILE ° 2BEDROOM: — CARPET FIXTURES 8 3 LOUNGE: CARPET 8s 4 KITCHEN TILE 800 — 400 — CTE ool rt 25 mm SCREED 3 el ov iva s aaa OOR LEVEL | ete FLOOR JBL GROUND ROO ts eal 3 COMPONENTS a =e vss) LEVEL 3 6 j= 8 o 8 ‘ 2227 | ROOF cap Th i ae Cade EL /| \ 8 aap pom 600 114 x 38 mm SINK (S) WASHBASIN (WB) TOILET (WC) ES | watt PLATE 300, INCOMPLETE FOUNDATION 50 x10 f { ‘AND EXTERNAL WALL x 100 mm <TERNA CUTTER SHOWER (SH) Copyright reserved QUESTION 4: CIVIL DRAWING Given: * The incomplete west elevation of a new house, showing the walls, the door and window openings, the roof and notes * The incomplete floor plan showing the walls, positions of the doors, windows, fixtures and the electrical layout * A schematic diagram of a roof truss and roof notes * Room designations and floor finishes * The incomplete foundation and external wall detail * A table of roof components * A table of electrical symbols * A door and window schedule * A table of fixtures * The incomplete floor plan of the new house, drawn to scale 1 : 50, and the incomplete foundation of the detailed section, drawn to scale 1 : 20, on page 6 Instructions: Answer this question on page 6. 4.1. Using the given incomplete floor plan, draw, in first-angle orthographic projection and to scale 1 : 50, the following views of the new house: 4.1.1 THE COMPLETE FLOOR PLAN Add the following features to the drawing: ALL doors and windows © The fixtures as indicated by the abbreviations * ALL electrical fittings as indicated by the numbers * ALL hatching detail 4.1.2 THE COMPLETE WEST ELEVATION Show the following features on the drawing: © The outside walls, door and window detail The roof detail, including the barge boards, fascia boards, gutters and rainwater down-pipe © The finished floor level 4.2. Using the incomplete foundation on page 6, draw, to scale 1: 20,a DETAILED SECTION on cutting plane A-A of the area in the ellipse shown on the incomplete floor plan. Show the following features on the drawing: © The foundation and external wall detail © The door detail * The roof detail, including the fascia board and gutter © The sink * ALL hatching detail. ONLY the substructure hatching may be drawn in neat freehand. Label the following: * The west elevation * The room designations and floor finishes * Ground level, finished floor level and damp-proof course (use the correct abbreviations and show it on ALL the relevant views) NOTE: ALL drawings must comply with the guidelines and graphical symbols as contained in the SANS 10143. [95] [5| Please tum over
Engineering Graphics and Design/P1 Down Le Oe DETAILED SECTION A-A SCALE 1: 20 DBE/November 2017 loaded from hlayiso.com ROOF LINE N \ \ COUNTER 7 I | | | | | | | | | | | FLOOR PLAN SCALE 1 : 50 Copyright reserved FOR OFFICIAL USE ONLY INCORRECT SCALE NON-ALIGNMENT OF VIEWS VIEW(S) ROTATED SECTION VIEWED INCORRECTLY INCORRECT LETTERING TOTAL MARK ALLOCATION FOR ROOF SECTION ale{clolelele|u]i|s ASSESSMENT CRITERIA FLOOR PLAN Possisie | ostainen | sion | wooesareo 4 | fnbows 13% 2 | evectRicaL % 3 | rxtures 8% 4 | HATCHING 3 5 | tapers 4 sustotaL | 38% WEST ELEVATION 1 | RooF +RwoP 12 2 | waus+ Fr. 6% 3 | finoow 8 4 | vases % SUBTOTAL 28 DETAILED SECTION 1 | ROOF DETAR 1 3 | sink 3 4 | HATCHING 4% 5 | Laseis 1 SUBTOTAL 28% TOTAL 95 PENALTIES (-) GRAND TOTAL EXAMINATION NUMBER EXAMINATION NUMBER

Study this subject

More from Grade 12 Engineering Graphics and Design

View all