Engineering Graphic And Design Grade 11 P1 2020 Memo (Eng)

Grade 11 Engineering Graphic And Design Paper 1 memorandum from the National Exemplar November Exam 2020 (English), 10 pages. Read online or get the free PDF download, question paper linked when available.

Subject: Engineering Graphic And DesignGrade 11202010 pages
Download

Loading document…

Loading document…

Document textSearch extracted text and jump to a page.
ISEBE LEMFUNDO LEMPUMA KOLONI EASTERN CAPE EDUCATION DEPARTMENT OOS-KAAP ONDERWYSDEPARTEMENT NATIONAL SENIOR CERTIFICATE +IGRDSEM* ENGINEERING GRAPHICS AND DESIGN P11 > NOVEMBER 2020 MARKS: 200 TIME: 3 hours This question paper consists of 6 pages. Copyright reserved INSTRUCTIONS AND INFORMATION The paper consists of FOUR questions. Answer ALL the questions. All drawings must be drawn to scale 1 : 1, unless otherwise stated The questions must be answered on the answer sheets provided All the answers sheets must be re-stapled in numerical sequence and handed in irrespective of whether the question was attempted or not. Careful time management is essential in order to complete all the questions. Print your name in the block provided on every ANSWER SHEET. All answers must be drawn accurately and neatly. Any details or dimensions not given must be estimated in good proportion 0. ALL drawings are in first angle orthographic projection, unless stated otherwise. QkRONS soene FOR OFFICIAL USE ONLY MODERATED. MARK WwW) Nh} = TOTAL 2/0|0 2/0/0 FINAL CONVERTED CHECKED BY MARK 100 COMPLETE THE FOLLOWING: NAME NAME EXAMINATION CENTRE EXAMINATION CENTRE Please turn over 1
Engineering graphics and design / P1 NSC EC / November 2020 INCOMPLETE FLOOR PLAN y 5.500 y BEDROOM CARPET 17,48 m? N N N c g warns00h l g PASSAGE TILES | TILES 7,03 m? ——C 2,48 m? i A— LOUNGE / DINING ROOM Cezzzer woop [v4 17,59 m* il fo FS) Ly im a? VW KITCHEN B 1 | TILES i i 5,95 m? “ II 2 S| |8 in a 7] es elle QUESTION 1A: ANALYTICAL (CIVIL) Given: The incomplete floor plan of a house. A title panel and a table of questions. The drawing has not been prepared to an indicated scale. Instructions: NOTE: Complete the table below by neatly answering the questions, which refer to the accompanying drawing and title Contractors must verify all dimensions panel [23] and levels on site before commencing work. Architects to be notified immediately of any discrepancies QUESTIONS ANSWERS 1 | What is the name of the architectural firm responsible for ARONITEGTS SIGNATURE 1 drawing the house plans? CHENTS SIGNATURE 2 | What is the project number for this drawing? 1 3 |2020-08-27 |cowpuete THe wows 3 | Who was the person responsible for checking the 1 correctness of the drawing? 2 |2020.03-27 | ns s sear THE poo’ 4 | Whois the person responsible for drawing the floor plan? A 5 | When was the drawing printed? REVISION DATE DESCRIPTION 4 BOTHA ARCHITECTS 6 | Who is the owner of the house? 4 41 Da Gamma street —— ? TEEEREVSpay 7 | What feature is indicated by the symbol at A? q 6330 TEL: 072 293 0392 8 | What feature does the line, indicated by arrow B show? 2 FAX: 042 293 0392 EMAIL: kbotha@gmail.com — CANNED BY CO Ne 9'| What does the abbreviation NTS in the tile panel stand 1 BLUEDEVILLE 2020-04-01 for? - 10 | Has revision 3 been done correctly? Explain ORAWNGTIE 1 FLOOR PLAN oo 11 | What is wrong with the hatching in the floor plan? ; PROPOSED NEW HOUSE FOR MRS. X. RUPPING, STAND 1442, 12 | What does the abbreviation BIC indicate? THORNHILL, EASTERN CAPE. 2 PROJECT NONBER DRAWING NUMBER 13 | Which VIEW is indicated by arrow C? 2 DP 2020-04 10f4 DATE ORAM ]oneoxeo SCALE 14 | What is the width of the doors in mm if a scale of 1 : 100 2020-03-20 LINDO | TYRON | NTS was used? 2 seen OE 2020 15 | In the space provided below, determine the perimeter of the entire house. A 16 | in the space provided below, determine the total floor area that must be filed, in square meters. | 4 TOTAL | 27 ANSWER 15 ANSWER 16 NAME NAME. [2 Copyright reserved Please tum over
Engineering graphics and design / P1 NSC EC / November 2020 QUESTION 2: INTERPENETRATION AND DEVELOPMENT Given: The top view and incomplete front view of a right regular triangular prism that penetrates a right regular hexagonal prism The auxiliary view of the triangular prism The position of point X, the centre ofthe hexagon and starting point for the top view. A starting point AB for the development required. Instructions: Draw, to a scale 1: 1 and in first angle orthographic projection, the following views of the two solids: 21 2.2 2.3 24 The given top view using point X as a starting point. The complete front view showing the curve of interpenetration. The left view The surface development of the triangular prism Use line AB as reference point. Show ALL constructions. [39] 60 20 60 ASSESSMENT CRITERIA 4 | TOP views 6 CONSTRUCTION FRONT VIEW + INTERPENETRATION | 9 3) Lert view 8 4) DEVELOPMENT 16 TOTAL | 39 NAME NAME. [3 Copyright reserved Please tum over
Engineering graphics and design / P1 NSC EC / November 2020 QUESTION 3: PERSPECTIVE Given: Two views of a HOUSE and the information needed to draw a two-point perspective drawing. PP — Picture plane HL - Horizon line GL ~ Ground line SP - Station point Instructions: Complete the perspective drawing * Align the drawing sheet with the ground line (GL). * Determine and label the vanishing points. * Show ALL necessary construction. * NO hidden detail is required. 144] CEMENT PORCH AROUND: THE HOUSE PP HL ASSESSMENT CRITERIA 4 | CONSTRUCTION + VPs 5 2 | ROOF 15 3 | WALLS 7 4 | DOOR + WINDOWS 10 r | 5 | PORCH 7 | | . TOTAL | 44 t : 1 GL ae Me NAME CEMENT PORCH AROUND SP THE HOUSE NAME [4 Copyright reserved Please tum over
Engineering graphics and design / P1 NSC EC / November 2020 QUESTION 4: CIVIL DRAWING Given: © The incomplete SOUTH ELEVATION of a proposed new dwelling, showing the walls, step, windows, the door openings and notes. © The incomplete floor plan showing the walls, position of the doors, windows and sanitary fixtures. © The incomplete foundation and wall detail. * Room designations and floor finishes. * A door and window schedule. * A table of sanitary fixtures. * The floor plan of the new dwelling, drawn to scale 1 : 50 and the starting point P for the sectional view to scale 1 : 20 (on page 6). Instructions: Answer this question on page 6 4.1. Using the given incomplete floor plan draw in first-angle orthographic projection and to scale 1 : 50, the following views of the new dwelling 4.1.1 THE COMPLETE FLOOR PLAN Add the following features to the drawing: * ALL doors and windows. * ALL sanitary fixtures as indicated by the abbreviations. * ALL hatching detail. 4.1.2 THE SOUTH ELEVATION Show the following features on the drawing: « The outside walls, step, doors and window detail as well as the window sill under the widows. « Draw a break line 2 700 mm above the finished floor level. © The finished floor level. 4.2 In the space provided on page 6, using the incomplete foundation and break line, draw, to scale 1 : 20, a DETAILED SECTION on cutting plane A-A of the area in the ellipse shown on the incomplete floor plan Show the following features: ¢ The complete foundation, external wall and window detail * The lintels above the window. * The window sill under the window. * The bath in position. * Indicate with dimensioning the length of the bath. * ALL hatching detail * ALL substructure hatching may be drawn neat in freehand. Label the following: « The south elevation and scale. « The room designations and floor finishes. « Using the correct abbreviations, label the following features in the correct view: natural ground level, finished floor level and damp proof course. NOTE: ALL drawings must comply with the guidelines and graphical symbols contained in the SANS 10143. [39] 3.000 INCOMPLETE SOUTH ELEVATION AM wa wi Gy NWS Wer 3 8 2 sH 3 D we 1 4 —] ° w3 sD 5 in STEP INCOMPLETE FLOOR PLAN 4 2X 125 x80 mm LINTELS ABOVE ALL Z DOOR AND WINDOW OPENINGS: 3 gs Z| | oI 3g a g Z| GROUND LEVEL eI FS) 600. INCOMPLETE WALL AND FOUNDATION DETAIL DOOR AND WINDOW SCHEDULE y TO FIT y , TOFIT ) { t { DOOR OPENING WINDOW OPENING SLIDING DOOR OPENING |_— FINISHED FLOOR LEVEL STEP GROUND LEVEL g g 200) “ N SLIDING DOOR DOOR FRAME AND (sp) DOOR (0) ROOM DESIGNATIONS FLOOR FINISHES: 1500 2.000 1. BEDROOM CARPET 450 450 450 2. BATHROOM TILE A 1 7 3, KITCHEN TILE 4, LOUNGE woop 5. PORCH CEMENT c B A c B A c lA BI 3 FEATURES 2 D DOOR SD SLIDING DOOR 3 w1 WINDOW g| c c c c c w2 WINDOW WS WINDOW WINDOW (wa) WINDOW (wa) FIXTURES We TOILET WB WASH BASIN 1.000 SH SHOWER +t winvownotes B BATH S SINK B PENING SIDE ol INGED SIDE 3 A IXED PANE o THICKNESS OF ALL FRAMES: 50 mm c WINDOW SILL: 180 x 20 mm FIBRE WINDOW (WA) CEMENT SILL UNDER ALL WINDOWS. SANITARY FIXTURES 500 FA 200 3 2.050 | zor 850. FLOOR LevEL| 400 750 750. ‘SHOWER WASH BASIN (SH) (wB) 1200 TOILET BATH ‘SINK (we) (8) ‘s) Copyright reserved Please tum over
Engineering graphics and design / P1 NSC EC / November 2020 PENALTIES 1 | INCORRECT OVERALL SCALE 2 | INCORRECT POSITIONING OF VIEWS. 3 | NON-ALIGNMENT OF VIEWS. TOTAL PENALTIES (-) ASSESSMENT CRITERIA FLOOR PLAN 1 ivnoows | 17 2 | rixtures 9 3 | vasets 5 4 HATCHING 5 SUB TOTAL 36 SOUTH ELEVATION A 4 WALLS + STEPS +FFL+BREAK | 7 LINE DOOR + 1 2 WINDOWS 14 LABELS 2 SUB TOTAL 23 DETAILED SECTION | <A = 4] Founoations= |g 4 WALLS + SLAB 2 WINDOW + SILL 2) inne 10 Cc 3 | HatcHine 6t A} sath 24 5] mension 1 6 | tasets 13 SUBTOTAL | 30 TOTAL | 89 | PENALTIES (-) im GRAND TOTAL | FLOOR PLAN DETAILED SECTION ON A: A P NAME SCALE 1: 50 SCALE 1: 20 NAME [6 Copyright reserved
ISEBE LEMFUNDO LEMPUMA KOLONI EASTERN CAPE EDUCATION DEPARTMENT OOS-KAAP ONDERWYSDEPARTEMENT NATIONAL SENIOR CERTIFICATE NASIONALE SENIOR SERTIFIKAAT GRADE 11 GRAAD 11 ENGINEERING GRAPHICS AND DESIGN P1 INGENIEURSGRAFIKA EN -ONTWERP V1 NOVEMBER 2020 MEMORANDUM MARKS / PUNTE: 200 TIME / TYD: 3 hours / uur This memorandum consists of 7 pages. Hierdie memorandum bestaan uit 7 bladsye. Copyright reserved / Kopiereg voorbehou Engineering graphics and design/P1 NSC EC / November 2020 PAPER 1 QUESTION 1: ANALYTICAL _ MARKING GUIDELINE. VRAESTEL 1 VRAAG 1: ANALITIES _NASIENRIGLYN ‘oon alle berekeninge / Show all calculati ANSWERS ANTWOORDE 1 | BOTHA ARCHITECTS 1 1 | BOTHA ARGITEKTE 1 2 | DP 2020 - 04 1 2 | DP 2020 - 04 1 3 | TYRON 1 3 | TYRON 1 4 |LINDO 1 4 |LINDO 1 5 | 2020-04-01 1 5 | 2020-04-01 1 6 |MRS. X. RUPPING 1 6 | MEV. X. RUPPING 1 7 | BIDET 1 7 | BIDET 1 8 | ARCH / OPENING IN THE WALL 2 8 |BOOG (OPENING) IN DIE MUUR 2 9 |NOT TO SCALE 1 9 | NIE VOLGENS SKAAL 1 40 NO. THE WINDOW MUST HAVE 2 10 NEE. DIE VENSTERS MOET 2 TWO LINES INSTEAD OF ONE TWEE LYNE HE IPV EEN " MECHANICAL HATCHING OR 2 " MEGANIESE OF VERKEERDE 2 WRONG HATCHING TYPE USED TIPE ARSERING IS GEBRUIK 12 | BUILD IN CUPBOARD 2 12 | INGEBOUDE KAS 2 13 | WEST VIEW / WEST ELEVATION 2 13 | WESAANSIG / WES ELEVASIE 2 14 |900 mm 2 14 | 900 mm 2 15 | ANSWER BELOW 4 45 | ANTWooRD ONDER 4 16 | ANSWER BELOW 4 16 | ANTWOORD ONDER 4 TOTAL | 28 TOTAL| 28 QUESTION / VRAAG 15 QUESTION / VRAAG 16 Toon alle berekeninge /Show all calculations x 2(L+B) ¥ ne 7.03} rorelto wees 2 (10 + 5,5) corre 248-7 te antwoord 2x15 5. correct unit(m) 4 5 95) korrokte eonheid (m) = Simvv 15.46 mi? VW (4) [4] Copyright reserved Please tum over
Engineering graphics and design/P1 NSC EC / November 2020 Gr. 11 NOVEMBER 2020 MARKING GUIDELINE PAPER 1 - QUESTION 2: INTERPENETRATION AND DEVELOPMENT VRAESTEL 1 - VRAAG 2: INTERPENETRASIE EN ONTWIKKELING rit NOVEMBER 2020 c2) NASIENRIGLYN a 5 4 jo ia al \ ray v= 3 @ 5] Y p 98 (o) vo construction @_ | ASSESSERINGSKRITERIA 2 gon enh 1 | BOAANSIG + 6 KONSTRUKSIE Konstruksie — @ + femekiepeerg 2 | vooRAANSIG 9 3 | LINKERAANSIG 8 4|ontwikkeune | 16 TOTAAL 39 ASSESSMENT CRITERIA 4 | TOP VIEW G CONSTRUCTION 2 | FRONT VIEW 9 3 | LEFT View 8 4 | DEVELOPMENT 16 TOTAL 39 B v v v q D vo vo v A a) 2 iv 14| Copyright reserved Please turn over Engineering graphics and design/P1 NSC EC / November 2020 PAPER 1 - QUESTION 3: PERSPECTIVE YRAESTEL 1 -VRAAG 3: PERSPEKTIEF NOVEMBER 2020 NOVEMBER 2020 MARKING GUIDELINE \ASIENRIGLYN q @ a. ml® ASSESSMENT CRITERIA ASSESSERINGSKRITERIA CONSTRUCTION + VPs 5 1 | KONSTRUKSIE & vPte | 5 ROOF 15 2 | DAK 15 WALLS 7 3) MURE 7 DOOR + WINDOWS 10 4|peuR+vensters | 10 PORCH 7 5 | STOEP 7 ToTAL| 44 TOTAAL | 44 Copyright reserved Please tun over
Jono winy aseaiq ponuosos yySucdoo, 9 e% wvLo.ans €% w1o0l ans z SLSIMSAS € z $1397 € - vw suaisnan+ 3unaa] @% vt SMOaNIM + 8000 | 7% NATHASIG + AA SNN1 yvaua + Z + addve + aun} | 4 |asa+saais+stvm | | 3ISVAa7a GINS NOLLWAS7a HLNOS VINALINMSONINASSASSV VINALIND LNSWSSaSsV 05 IWWHS: 0s 1 s1WOS SISVA313 GINS NOILVAA14 HLNOS@ Oven ~ (1 o 2) Onw Oo cc a o ap Pp —o |P D> 8 o a NATORINAISYN 0202 43aN3AON fre) aISVASTA“® OvvUA- TTSISSVEA aNTIaaiNO ONDRIvHN 0202 43GW3AON fren) NouwaaT3 :¥ NoUSand - TEadve 020Z JeqUisAON / D3 OSN Ld/ubisep pue soiydes6 Buyeeuibu3 48N0 WIN] BSEAld penieses jySUAdoD ; 0S: 1 a1voS: 0s: b IWWyS NW1d YOOT14 NV1dy3S01A HOOT ONIONS TUNSITINNS XT Q [A GINSNS9 INSW3S) @HOYNOd d30.Ls bid ° SHOOT SUSISNSAXS 4 oe TwvLolans s onrsasay | fy @1aduvo < ®woouaaa @aoom ~ s aianpsra] © @39NnN01 wane ans 4NOH 6 3u0H30301| Z MAWVHLIS SUSISNSA ad vaunaa| b NV1duaO7A Cc. VINSLINSONNASSASSV Suga e sva3L Osnu Opawvave| ge Ww.10L ans SINAWOM ==@NAHOLIM saL@ @noowHiva Ss ‘SNIHOLVH Y v = s sae] © 1 a 6 saunixid é NATOINNAISVN lb SMOQNIM 0202 HaGW3AON +suooa} b 139 NvTaUa0TA iy OvvuA- TTSISSVEA NV Id HOOT oat veh 1p ynigod s Suyosie op anrvzcino onpnavi ViNaLN9 LNAWSSassv vp S Pe SNS oO ean rer) pata rr pausieyiy ‘BUNBIH HA ba vA sony ‘Buyosiy NV1d Noord ‘¥ NoUSaND- TEsdva 0z0z eqUIeAON 7 OF OSN Ld/ubisep pue sojydei6 Buyoouy
Engineering graphics and design/P1 NSC EC / November 2020 PAPER 1 - QUESTION 4: DETAILED SECTION Grit NOVEMBER 2020 MARKING GUIDELINE VRAESTEL 1 - VRAAG 4: GEDETAILEERDE SNIT Grit ASSESSMENT CRITERIA NOVEMBER 2020 NASIENRIGLYN DETAILED SECTION 2D | rmcows ens D B J rrr 64 Q oP G | ears 24 _ 5 | omensiow 1 9 Pp 6 | uses 14 SUB TOTAL 30 3) e ASSESSERINGSKRITERIA GEDETAILEERDE SNIT 1 | rowmsse nes | gg y & SLoece | 2 |YiEwneures] 10 to) o 17008 B | assernc 63 4 | 0 24 gq Oo @ 5] aarsnerwns 1 Ca) ra) SUBTOTAAL 30 "4 co) ca] pPc® Pat b o 8 No hatching ad py Go Geen arsering e Q _NGLe & 9 (a) © a Q GEDETAILEERDE SNIT A: A DETAILED SECTION ON A:A SKAAL 1 : 20 SCALE 1: 20 Copyright reserved

Matching paper and memo

The question paper, memo or addendum that belongs with this document.

Study this subject

Revise the topics in this paper, then practise them question by question.

More papers and memos for this grade and subject.

More from Grade 11 Engineering Graphic And Design

View all