Skip to content
Question paper

Engineering Graphic And Design Grade 11 P1 2022 QP (Eng)

Grade 11 Engineering Graphic And Design Paper 1 question paper from the Exemplar November Exam 2022 (English), 6 pages. Read online or get the free PDF download, memo linked when available.

Subject: Engineering Graphic And DesignGrade 1120226 pages
Download

Loading document…

Loading document…

Document textSearch extracted text and jump to a page.
Province of the Shee EASTERN CAPE ad S @, EDUCATION NATIONAL SENIOR CERTIFICATE ENGINEERING GRAPHICS AND DESIGN P 1 NOVEMBER 2022 MARKS: 200 TIME: 3 hours This question paper consists of 6 pages. Copyright reserved INSTRUCTIONS AND INFORMATION QRONS soene The paper consists of FOUR questions. Answer ALL the questions All drawings must be drawn to scale 1 : 1, unless otherwise stated The questions must be answered on the answer sheets provided All the answers sheets must be re-stapled in numerical sequence and handed in irrespective of whether the question was attempted or not Careful time management is essential in order to complete all the questions. Print your name in the block provided on every ANSWER SHEET. All answers must be drawn accurately and neatly. Any details or dimensions not given must be estimated in good proportion ALL drawings are in first angle orthographic projection, unless stated otherwise FOR OFFICIAL USE ONLY MODERATED MARK WwW) NM) => 4 TOTAL 2/|0/0 2/0|0 FINAL CONVERTED CHECKED BY MARK 100 COMPLETE THE FOLLOWING: NAME NAME EXAMINATION CENTRE EXAMINATION CENTRE Please turn over 1
Engineering graphichs and design / P1 NCS EC / November 2022 NOTE: Contractors must verify all dimensions and levels on the site before commencing work. Architects to be notified immediately of any ELEVATION 2 1500 8000 3870 ft ttt — 3 B 5 BEDROOM 1 KITCHEN CARPET - g BATHROOM fe g| S| TILE ES x LOUNGE BEDROOM 2 woop 4240 VIEW 1 NORTH EAST ELEVATION QUESTION 1A: ANALYTICAL (CIVIL) Given: A incomplete floor plan and two elevations of a new dwelling. A title panel and a table of questions. The drawing has not been prepared according to the indicated scale. Instructions: Complete the table below by neatly answering the questions, which refer to the accompanying drawing and title discrepancies. panel. [33] ARCHITECTS SIGNATURE seers QUESTIONS ANSWERS 1 | Whois the client? 1 2 | What is the reference code of the drawing? 1 ANSWER 16 3 | How many signatures are reqiured on the drawing? 1 4 | On what date was the house plan printed? 1 5 | Line A indicates the FFL. What line type should be used for 1 this? 6 | What does the abbreviation BIC stand for? 1 7 | What item is indicated by B? 1 8 | How many exterior doors open to the outside of the house? 2 9 | What does the line indicated by arrow G, illustrate? 2 In what colour would new masonary be presented on a 3 2021-02-28 | ADD HATCHING 10 drawing? ' 2 2021-02-28 | ret acuaoom | 44 | In what colour would new glass be presented on a drawing? 1 1 2021-02-26 |SHOW THE SCALE 42 | What SI unit are used for the dimensions on the given A REVISION | DATE | DESCRIPTION drawing? 13 | What would view 1 be called? 1 GLENDA ARCHITECTS 16 Wainwright Street 14 | What would elevation 2 be called? 2 QUEENSTOWN 5319 Have all the proposed revision been made on the drawing? TEL; 083 050 9882 15 | Motivate your answer. 2 FAX: 045 050 9882 EWALL:qve@gmaiicon | |. | In the space provided in the title panel, draw, in neat freehand, the front view and top view of the A PRNTEDEY DATE OF PRINT SABS 10143 graphical symbol (convention) for a BATH. DINDELA PRINTERS. 2021-04-12, DRAWING THLE 17 | In the space provided below, (answer 17) determine the perimeter of the house, in meter. 4 FLOOR PLAN WITH ELEVATIONS, In the space provided below, (answer 18) determine the total tile area of the bathroom floor in PROIEGT 18) square meter 5 PROPOSED NEW DWELLING FOR : MR. P. CEKISO ON STAND 13, ANSWER 17 ANSWER 18 UITENHAGE, EASTERN CAPE. TOTAL | 33 PROJECT NUMBER: ‘DRAWING NUMBER: EGD 2021-01 P2021 DATE: DRAWN: [CHEGKED: SCALE: 2021-01-17] HLASO | DLABA | 1; 100 REFERENCE CODE! PAGE NUMBER: DOE-2021EC 10F 4 NAME NAME [2 Copyright reserved Please tum over
Engineering graphichs and design / P1 EC / November 2022 QUESTION 2: INTERPENETRATION AND DEVELOPMENT Given: * A top view and incomplete front view of a pentagonal pipe penetrating a square pipe. * Starting point X, the centre of the main pipe (vertical pipe) in the top view. B An auxiliary view of the pentagonal pipe. Seam AB, the starting point for the development Instructions: Draw to scale 1:1, the following views of the interpenetrating pipes: 2.1 The given top view 2.2 The complete front view clearly showing the curve of aL 35 interpenetration. - - 2.3 The left view. 2.4 The development of the branch pipe (pentagonal pipe) with AB as the seam. Show ALL hidden detail and folding lines. FE Show ALL necessary construction lines. [40] 30 q |_30 | q ASSESSMENT CRITERIA 4 TOP VIEW + 8 CONSTRUCTION 2 | FRONT VIEW 9 3 | Lert view 9 5 | DEVELOPMENT 14 PENALTIES (-) xb TOTAAL | 40 NAME NAME [3 Copyright reserved Please tum over
Engineering graphichs and design / P41 NCS EC / November 2022 QUESTION 3: PERSPECTIVE GL Given: ASSESSMENT CRITERIA Three views of a HOUSE and the information needed to draw a two-point perspective drawing. CONSTRUCTION AND VPs | 7 PP - Picture plane HL - Horizon line ROOF 4 GL - Ground line SP - Station point WALLS 18 Instructions: wiNDows 7 Complete the perspective drawing PENALTIES (-) * Align the drawing sheet with the ground line (GL). © Determine and label the vanishing points. * Show ALL necessary construction TOTAL] 36 * NO hidden detail is required * W= Window [36] PP HL t | LJ w3 L. | w2 DOOR | wt wal | L. | L4 | | FFL 1 et NAME [4 Copyright reserved Please tum over
Engineering graphichs and design / P1 NCS EC / November 2022 QUESTION 4: CIVIL DRAWING Given: © The incomplete EAST ELEVATION of a proposed new one bedroom dwelling, showing the walls, step, windows, door openings and notes. © The incomplete floor plan showing the walls, position of the doors, windows and sanitary fixtures © The incomplete foundation and wall detail * Room designations and floor finishes * A door and window schedule. * A table of sanitary fixtures. © The floor plan of the new dwelling, drawn to scale 1 : 50 and the starting point P for the sectional view to scale 1 : 20 (on page 6). 3000 Instructions: ‘Answer this question on page 6. 4.1. Using the given incomplete floor plan draw in first-angle orthographic projection and to scale 1 : 50, the following views of the new dwelling: 4.1.1 THE COMPLETE FLOOR PLAN Add the following features to the drawing: ALL doors and windows. * ALL sanitary fixtures as indicated by the abbreviations. * ALL hatching detail. 4.1.2 THE EAST ELEVATION Show the following features on the drawing: © The outside walls, step, doors and window detail, window sills, and the garage ramp. * Draw a break line 3000 mm above the ground level. © The finished floor level. 4.2 In the space provided on page 6, using the incomplete foundation and break line, draw, to scale 1: 20, a DETAILED SECTION on cutting plane A-A of the area in the ellipse shown on the incomplete floor plan. Show the following features: * The complete foundation, external wall and window detail. The lintels above the window. The window sill under the window. Show a part of the garage door opening ALL hatching detail ALL substructure hatching may be drawn neat in freehand Label the following: * The east elevation and scale. * Detailed section A : A and scale. * The room designations and floor finishes. * Using the correct abbreviations, label the following features in the correct view: natural ground level, finished floor level and damp proof course. NOTE: * ALL drawings must comply with the guidelines and graphical symbols contained in the SANS 10143. [91] 2100 250 GARAGE DOOR OPENING [ DOOR OPENING DOOR AND WINDOW SCHEDULE | WINDOW OPENINGS y 2600 TOFIT i i # 4 # a g x ba FINISHED FLOOR LEVEL |. _ GROUND LEVEL af ° ol INCOMPLETE EAST ELEVATION 400) S 2 a al -— W3 el ‘ GARAGE DOOR w3 DOOR FRAME AND (GD) DOOR (D) ROOM DESIGNATIONS AND FLOOR FINISHES 1. BEDROOM CARPET 2.BATHROOM — TILE x 2.000 x 3. KITCHEN] TILE 450 450 450 4, LOUNGE woop 1 x 5. GARAGE CEMENT FEATURES D DOOR al ° wi wWkbow & || ¢ & |B A) cA B w2 WINDOW 7 ~ W3 WINDOW STEP FIXTURES t Re WC TOILET INCOMPLETE FLOOR PLAN We Wash BASIN WINDOW (W2) ‘WINDOW (W1) 240, ee y—1000_y WINDOW NOTES B PENING SIDE n INGED SIDE 2 A C= FIXED PANE 2X 120 x 80 mm LINTELS 8 THICKNESS OF ALL FRAMES: 50 mm. ABOVE ALL DOOR AND c WINDOW SILL: 180 x 20 mm FIBRE I s00 nt NBOuE 4 CEMENT SILL UNDER ALL WINDOWS THE FINISHED FLOOR 100 WINDOW (WS) LEVEL 1 4 Ss | SANITARY FIXTURES q GROUND LEVEL. S r=) 8 Fe 500 “ gs At 500 “Sp 8) a ‘4-800 400) S| 2009) ol \ |_| Fa pry INCOMPLETE FOUNDATION AND iN} 2 3 7] ° 100 EXTERNAL WALL DETAIL OF THE al FLOOR LEVEL HOUSE (sa ; RE J Oe : > it ale — GROUND LEVEL 8 ae 200) O zg [ea 3 “ zg ‘900 of Ll ‘SHOWER WASH BASIN TOILET SINK (SH) (we) (we) () INCOMPLETE FOUNDATION AND NAME EXTERNAL WALL DETAIL OF THE j|ARAGE SARAGE NAME [5 Copyright reserved Please tum over
Engineering graphichs and design / P1 NCS EC / November 2022 |__] PENALTIES 4 | INCORRECT OVERALL SCALE 2 | INCORRECT POSITIONING OF VIEWS: 3 | NON-ALIGNMENT OF VIEWS: TOTAL PENALTIES (-) FLOOR PLAN SCALE 10 ASSESSMENT CRITERIA FLOOR PLAN DOORS AND 4 1 | winoows 403 2 | FIXTURES 84 3 | LABELS 5 4 | HATCHING 5 SUB-TOTAL 39 EAST ELEVATION WALLS, STEPS, 1 | FFLAND BREAK 64 LINE DOOR AND 1 2 | winoows Wa 3 | LABELS 2 SUB-TOTAL 23 DETAILED SECTION FOUNDATIONS, 1 | WALLS AND 8 FLOOR WINDOW, SILL, 2 | LINTEL AND 13 GARAGE DOOR 3. | HATCHING 53 4 | LABeLs 23 SUB-TOTAL 29 TOTAL 1 PENALTIES (-) GRAND TOTAL NAME NAME [6 Copyright reserved

Matching paper and memo

The question paper, memo or addendum that belongs with this document.

Study this subject

Revise the topics in this paper, then practise them question by question.

More papers and memos for this grade and subject.

More from Grade 11 Engineering Graphic And Design

View all
Engineering Graphic And Design Grade 11 P1 2022 QP (Eng) | Hlayiso