Downloaded from hlayiso.com
SENIOR CERTIFICATE/SENIOR SERTIFIKAAT
NATIONAL SENIOR CERTIFICATE/
NASIONALE SENIOR SERTIFIKAAT
GRADE/GRAAD 12
MATHEMATICAL LITERACY P2/
WISKUNDIGE GELETTERDHEID V2
NOVEMBER 2020
MARKING GUIDELINES/NASIENRIGLYNE
MARKS/PUNTE: 150
Symbol/Kode Explanation/Verduideliking
M Method/Metode
MA Method with accuracy/Metode met akkuraatheid
CA Consistent accuracy/Volgehoueakkuraatheid
A Accuracy/Akkuraatheid
C Conversion/Herleiding
S Simplification/Vereenvoudiging
RT Reading from a table/a graph/document/diagram/Lees vanaftabel/grafiek/diagram
SF Correct substitution in a formula/Korrektevervanging in formule
O Opinion/Explanation/Opinie/Verduideliking
P Penalty, e.g. for no units, incorrect rounding off, etc./Penalisasie, bv.
virgeeneenhede/verkeerdeafronding, ens.
R Rounding off/Afronding
NPR No penalty for rounding/Geenpenalisasievirafrondingnie
AO Answer only/Slegsantwoord
MCA Method with consistent accuracy/Metode met volgehoueakkuraatheid
These marking guidelines consist of 22 pages.
Hierdienasienriglynebestaanuit 22 bladsye.
Copyright reserved/Kopieregvoorbehou Please turn over/Blaai om asseblief
Skip to contentAll 2020 papers 





View all





Mathematical Literacy Grade 12 P2 NSC November 2020 Memo
Grade 12 Mathematical Literacy Paper 2 memorandum from the NSC November Exam 2020, 22 pages. Read online or download the free PDF.
Mathematical Literacy · Grade 12 · NSC November Exam · 2020. Memorandum, 22 pages. Read online or download the PDF.
- Subject
- Mathematical Literacy
- Grade
- Grade 12
- Document type
- Memorandum
- Year
- 2020
- Exam period
- NSC November Exam
- Paper
- 2
- Curriculum
- CAPS
- Pages
- 22
- File size
- 678.9 KB
Free to read online, no sign-up needed
Loading document…
Loading document…
1 of 22
This exam
Questions in this paper
Document textSearch extracted text and jump to a page.
Downloaded from hlayiso.com
Mathematical Literacy/P2/WiskundigeGeletterdheid/V2 2 DBE/November 2020
NSC/NSS – Marking Guidelines/Nasienriglyne
NOTE:
• If a candidate answers a question TWICE, mark only the FIRST attempt.
• If a candidate has crossed out (cancelled) an attempt to a question and NOT redone the solution,
mark the crossed out (cancelled) version.
• Consistent accuracy (CA) applies in ALL aspects of the marking guidelines provided at least one of the
values is correct; however it stops at the second calculation error.
• If the candidate presents any extra solution when reading from a graph, table, layout plan and map,
then penalise for every extra item presented.
LET WEL:
• As 'n kandidaat 'n vraag TWEE KEER beantwoord, sien slegs die EERSTE poging na.
• As 'n kandidaat'n antwoord van 'n vraagdoodtrek (kanselleer) ennieoordoennie, sien die doodgetrekte
(gekanselleerde) pogingna.
• Volgehoueakkuraatheid (CA) word in ALLE aspekte van die nasienriglynetoegepas op voorwaarde dat
ten minste een van die waardes korrek is, dithou op by die tweedeberekeningsfout.
• Wanneer 'n kandidaat aflesings vanaf 'n grafiek, tabel, uitlegplan en kaart geneem en ekstra antwoorde
gee, penaliseer vir elke ekstra item.
QUESTION/VRAAG1 [39 MARKS/PUNTE]
Q/V Solution/Oplossing Explanation/Verduideliking T&L
D
1.1.1 Slovakia/Slowakye (diff. 2015 -16): L2
RT
163 740 – 161 906 MA 1 RT correct values
1MA method of subtraction
= 1 834 CA 1CA answer
(3)
1.1.2 D
Range = highest – lowest 1M Range concept L2
M
Omvang = hoogste – kleinste
RT 1RT highest value
2 947 664 = 2 970 436 – N
N = 22 772 CA 1CA simplification
AO
(3)
1.1.3 O O D
Number of learners enrolled decreased from 2014/2015/2016 L4
O O
OR The number of learners decreased every year 1O decrease
1O time
Getal ingeskrewe leerders in Griekeland neem vanaf
2014/2015/2016 af
OF Die getal leerder neem jaarliks af
(2)
Copyright reserved/Kopieregvoorbehou Please turn over/Blaai om asseblief
Downloaded from hlayiso.com
Mathematical Literacy/P2/WiskundigeGeletterdheid/V2 3 DBE/November 2020
NSC/NSS – Marking Guidelines/Nasienriglyne
Q/V Solution/Oplossing Explanation/Verduideliking T&L
D
1.1.4 % increase(Turkey)/% verhoging (Turkye) L3
MA 1M using correct formula
1 221165 1 064 190 M 1MA subtractingcorrect
= 100%
1 064 190 values
156 975
= 100%
1 064 190
CA 1CAsimplification
= 14,75 %
% increase(United Kingdom) /% verhoging
(VerenigdeKoninkryk)
1MA subtractingcorrect
2 248 162 1 596 803
= 100% MA values
1 596 803
1CAsimplificationas a
= 40,79 % CA percentage
1CA county
United Kingdom has the biggest percentage CA
increase/Verenigde Koninkryk het die grootste persentasie
verhoging.
OR/OF OR/OF
MA
Turkey: (1 221 165 ÷ 1 064 190) ×100% 1MA subtracting correct
= 114,75% values
% increase (Turkey) = 114,75% –100% M 1M using correct formula
= 14,75% CA
1CA simplification
MA
(United Kingdom): (2 248 162 ÷ 1 596 803) ×100% 1MA subtracting correct
= 140,79% values
% increase United Kingdom = 140,79% - 100%
= 40,79% CA 1CAsimplification as a
United Kingdom has the biggest percentage increase percentage
CA
/VerenigdeKoninkryk het die grootstepersentasieverhoging. 1CA county
NPR
(6)
P
1.1.5 Probability (decline 2015-2016) /Waarskynlikheid L3
3 A 1A numerator
=
11 A 1Adenominator
≈ 0,27 CA 1CA as decimal
NPR
(3)
Copyright reserved/Kopieregvoorbehou Please turn over/Blaai om asseblief
Downloaded from hlayiso.com
Mathematical Literacy/P2/WiskundigeGeletterdheid/V2 4 DBE/November 2020
NSC/NSS – Marking Guidelines/Nasienriglyne
Q/V Solution/Oplossing Explanation/Verduideliking T&L
D
1.1.6 Denmark cost/Denemark koste L4
= €520,83 × 284 655 RT 1RT correct values
= €148 256 863,70 A 1A cost
Slovenia cost /Slovenië koste
RT 1RT correct values
= €350 × 85 407 = €29 892 450 A 1A cost
€148 256 863,70 : €29 892 450 1CA simplified ratioin
4,959… : 1 CA correct order
O
The statement is NOT VALID/Bewering is NIE GELDIG 1O verification
NIE
OR/OF OR/OF
Accept per year or per month /Aanvaar per jaar of per
maand
2016 Denmark : 2016 Slovenia 1RT Denmark values
RT RT 1RT Slovenia values
284 655 × 520,83 × 12 : 85 407 × 350 × 12 1A cost
A A
1 779 082 364 : 358 709 400 1A cost
1CA simplified ratio in
4,959… : 1 CA correct order
O
The statement is NOT VALID/Bewering is NIE GELDIG
NIE 1O verification
OR/OF OR/OF
Denmark: € 520,83 × 12= € 6249.96 per year /per jaar
1RT correct values
€ 6 249,96 × 284 655 RT
= € 1 779 082 364 1A cost
A
Slovenia : € 350 × 12 = € 4 200 per year /per jaar
€ 4 200 × 85 407 1RT correct values
RT
= € 358 709 400 A 1A cost
Denmark: Slovenia
€ 1 779 082 364 : € 358709 400
(€ 1 779 082 364 ÷ € 358 709 400) : (€ 358 709 400 ÷
€ 358 709 400) CA 1CA simplified ratioin
= 4,9596 : 1 correct order
The statement is NOT VALID O 1O verification
NPR
(6)
Copyright reserved/Kopieregvoorbehou Please turn over/Blaai om asseblief
Downloaded from hlayiso.com
Mathematical Literacy/P2/WiskundigeGeletterdheid/V2 5 DBE/November 2020
NSC/NSS – Marking Guidelines/Nasienriglyne
Q/V Solution/Oplossing Explanation/Verduideliking T&L
F
1.2.1 Profit/Wins = R30 × 120% = R36 MA 1MA calculating profit L3
R 36
Profit per marble / Wins per albaster= R 0,36 CA 1CA profit per marble
100
R 30 A
Cost price per marble/Kosprys per albaster = R 0,30 1A price per marble
100
Selling price/Verkoopprys
MCA 1MCA simplification
= R0,36 + R0,30 = R0,66 per marble/albaster
OR/OF OR/OF
R30 per 100 marbles/albastersis 100%
MA 1MA calculating profit
Profit on 100 marbles to yield 120% per pack
Wins op 100 albasters om 120% per pakte gee
R30 120%
=
100%
= R36 per pack
Price of selling 1 marble is/Verkoopprys per albaster is:
R30 R36 MCA 1MCA cost plus profit
100 M 1M dividing by 100
= R0,66 CA 1CA simplification
OR/OF OR/OF
MA
Selling price/verkoopprys = R30 × 220% = R66 MCA 1MA calculating % increase
Price per marble/Prys per albaster 1MCA selling price
R 66
= R 0,66 M CA 1M dividing by 100
100
1CA simplification
OR/OF
OR/OF
MA 1MA dividing by 100
Price per marble/Prys per albaster = = R0,30
M 1M calculating % increase
Selling price/verkoopprys = 0,3 2,2 MCA
1MCA selling price
= R0,66 CA 1CA simplification
OR/OF OR/OF
MA
Selling price /verkoopprys = 30 2,2 = R66 MCA 1MA calculating % increase
1MCA selling price
M
Price per marble/Prys per albaster = 1M dividing by 100
= R0,66 CA 1CA simplification
NPR
(4)
Copyright reserved/Kopieregvoorbehou Please turn over/Blaai om asseblief
Downloaded from hlayiso.com
Mathematical Literacy/P2/WiskundigeGeletterdheid/V2 6 DBE/November 2020
NSC/NSS – Marking Guidelines/Nasienriglyne
Q/V Solution/Oplossing Explanation/Verduideliking T&L
1.2.2 M
6,4 C 1C conversion L4
Radius container/houer =
2
MCA 1MCA finding the radius
= 3,2 cm
Volume of a cylinder/ Volume van 'n silinder
= π × radius2 height
SF
1SF both radius and height
= 3,142 × (3,2 cm)2 × 30cm
= 965,2224 cm3 CA 1CA simplification
Volume of 2 bags of marbles/volume van 2sakkealbasters
= 2 × 2 cm3× 100 MA 1MA Vol. of total marbles
= 400 cm3 CA
1CA simplification
Vol. Water to fill container/Vol.water om houertevul
= 965,2224 cm3 – 400 cm3 MCA 1MCA subtraction
= 565,2224 cm3 CA 1CA simplification
1
ℓ = 500 cm3
2
Statement is valid/Bewering is geldig O 1O conclusion
OR/OF OR/OF
C MCA
Radius of container/houer = = 3,2 cm 1C conversion
1MCA finding the radius
Volume of a cylinder/ Volume van 'n silinder SF
= radius2 height= 3,142 3,2 cm 3,2 cm 30 cm
= 965,2224 cm3OR/OF0,9652224 litres CA 1SF both radius and height
1CA simplification
Volume of 2 bags of marbles/volume van 2 sakke albasters
= 2 2 cm3 100 MA
= 400 cm3OR/OF 0,4 litres CA
1MA Vol. of total marbles
1CA simplification
Vol. Water to fill container/Vol.water om houertevul 1MCA subtraction of
= 965,2224 cm3 – 400 cm3 MCA volumes
= 565,2224 cm3 CA
1CA simplification
OR /OF
= 0,9652224 ℓ – 0,4 ℓ = 0,5652224 ℓ
More than 0,5 ℓ VALID / meer as 0,5ℓ GELDIG O 1O conclusion
Copyright reserved/Kopieregvoorbehou Please turn over/Blaai om asseblief
Downloaded from hlayiso.com
Mathematical Literacy/P2/WiskundigeGeletterdheid/V2 7 DBE/November 2020
NSC/NSS – Marking Guidelines/Nasienriglyne
Q/V Solution/Oplossing Explanation/Verduideliking T&L
OR/OF OR/OF
C
Radius of container/houer = = 3,2 cm MCA 1C conversion
1MCA finding the radius
Volume of a cylinder/ Volume van 'n silinder
= radius2 height
SF 1SF both radius and height
= 3,142 3,2 cm 3,2 cm 30 cm
CA 1CA simplification
= 965,2224 cm3OR/ OF0,9652224 litres
Volume of 2 bags of marbles/volume van 2 sakke albasters =
MA 1MA Vol. of total marbles
2 2 cm3 100 CA
3 1CA simplification
= 400 cm OR/OF0,4 litres
MCA CA 1MCA addition
400 cm + 500 cm = 900 cm3
3 3
1CA simplification
This is less than 965,2224 cm3 of the cylinder , VALID O
Minder as965,2224 cm3van die silinder, GELDIG 1O conclusion
(9)
1.2.3 M
Outer diameter/Buitemiddellyn L2
= 64 mm + 2×0,5 mm = 65 mm MA 1MAincreased diameter
Circumference = × diameter /Omtrek = × middellyn
SF 1SF substitution
= 3,142 ×(6,5) cm
1CA simplification
= 20,423 cm CA
OR/OF
OR/OF
Radius = 32 mm + 0,5 mm = 32,5 mm MA 1MA increased radius
= 3,25 cm
Circumference/omtrek= 2 × π × radius
SF 1SF substitution
= 2 × 3,142 × 3,25 cm
CA
= 20,423 cm 1CA simplification
NPR
(3)
[39]
Copyright reserved/Kopieregvoorbehou Please turn over/Blaai om asseblief
Downloaded from hlayiso.com
Mathematical Literacy/P2/WiskundigeGeletterdheid/V2 8 DBE/November 2020
NSC/NSS – Marking Guidelines/Nasienriglyne
QUESTION/VRAAG2 [38 MARKS/PUNTE]
Q/V Solution/Oplossing Explanation/Verduideliking T&L
A A F
2.1.1 Total/Totaal = 2 × (79 × R244,35) 1A number of personnel L2
1A tariff
= R38 607,30 CA 1CA simplification
OR/OF OR/OF
Amount claimed per person/Bedrag geeis per persoon:
CM/HM = 79 × R244,35 = R19 303,65 A 1A CM amount
IM = 79 × R244,35 = R19 303,65 A 1A IM amount
Total/Totaal = R19 303,65 + R19 303,65
= R38 607,30 CA 1CA simplification
(3)
M
A (Hours worked by SM)/A(Ure gewerk deur SM) L2
2.1.2
R13 763,75 MA 1MA numerator and
= denominator
R211,75/h
= 65 hours/ure CA 1CA simplification (2)
M
2.1.3 Number of marking hours/Getalnasienure L3
(a) 2 808 28 SF 1SF correct numerator
=
23 60 SF 1SF correct denominator
= 56,97391303 hours/ure≈ 57 hours /ure CA
1CA simplification/hours
1st day (Monday/Maandag): 14:00 to 20:00 = 5 hours/ureA 1A hours of 1st day
Tuesday to Saturday/Dinsdag tot Saterdag: 50 hours/ure
Sunday/Sondag = 2 hours/ure A 1A hours of complete days
Total/Totaal 5 + 50 + 2 = 57 hrs./ure to last day
CA
Finish at 10:00 on Sunday.
EindigSondag om 10:00 1CA day& time
OR/OF OR/OF
Number of marking hours/ Getal nasien ure
1SF correct numerator
SF
= 56,97391303 hours ≈ 57 hours 1SF correct denominator
= CA
1CA simplification/hours
SF
Actual marking time per day/ Werklike merkyd per dag
= 12 hrs – 2 hrs= 10 hrs
Start/Begin
Mon + Tue + Wed + Thu + Fri + Sat + Sun
A 1A hours of 1st day
= 5h + 10h + 10h + 10h + 10h + 10h + 2h
= 57 hours /ure
A
Sunday/Sondag = 08:00 + 2h 1A hours of complete days
= 10:00 CA to last day
1CA day and time
Copyright reserved/Kopieregvoorbehou Please turn over/Blaai om asseblief
Downloaded from hlayiso.com
Mathematical Literacy/P2/WiskundigeGeletterdheid/V2 9 DBE/November 2020
NSC/NSS – Marking Guidelines/Nasienriglyne
Q/V Solution/Oplossing Explanation/Verduideliking T&L
OR/OF OR/OF
Number of marking hours/ Getal nasien ure 1SF correct numerator
SF 1SF correct denominator
=
SF
= 56,97391303 hours/ure ≈ 57 hours/ure CA 1CA simplification/hours
57hours: Monday/Maandag = 5hrs/uurA 1A hours of 1st day
Rest of the days/Res van die dae = 57hrs – 5 hrs
= 52 hrs/uur
Full marking days/Vol merk dae =
= 5,2 days/dae
Therefore/dus 5 days + 0,2 days
5 days Tuesday to Saturday / 5 dae is Dinsdag tot Saterdag
0,2 days/dae 10 = 2hrs for Sunday/uur vir Sondag 1A hours of complete days
A
to last day
Ends / eindig Sunday/Sondag 10:00 CA 1CA day& time
OR/OF OR/OF
Number of marking hours/ Getal nasien ure
SF
2 808 28 1SF correct numerator
= SF 1SF correct denominator
23 60
1CA simplification/hours
≈ 57 hours/uur CA
14:00 to 14:00 = 10 working hours /werks ure A 1A full day's work
Monday 14:00 to Saturday 14:00 = 50 hours
Maandag 14:00 tot Saterdag 14:00 =50 uur
Saturday 14:00 to Sunday 10:00 = 7 hours
Saterdag14:00 tot Sondag 10:00 = 7 uur A 1A hours of complete days
to last day
Finish at 10:00 on Sunday CA 1CA day and time
Eindig Sondag 10:00
(6)
[Accept Tues 10:00]
Copyright reserved/Kopieregvoorbehou Please turn over/Blaai om asseblief
Downloaded from hlayiso.com
Mathematical Literacy/P2/WiskundigeGeletterdheid/V2 10 DBE/November 2020
NSC/NSS – Marking Guidelines/Nasienriglyne
Q/V Solution/Oplossing Explanation/Verduideliking T&L
MCA M
2.1.3 57 – 52 hours/ure = 5 working hours 1MCA hrs less from marking L3
(b) earlier/werksurevroeër [ CA from 2.1.3 (a)]
A
2 hrs of Sunday and last 3 hrs of Saturday not worked 1A separation of hrs
2 uur van Sondagen die laaste 3 ure van
Saterdagniegewerk
20:00 – 16:00 = 3 hrs excluding supper/uur sonder 1CA time
aandete 1CA day
CA CA
Finish at 16:15 on Saturday./EindigSaterdag om 16:15
(Including tea break/teepouseingesluit)
OR/OF OR/OF
A MA
52 hours claimed = 5 (Monday) + 40 (Tue to Fri) + 7 1MA breaking up the time
(Sat) 1A the hours per day
52 uregeëis = 5 (Maandag) + 40(Di tot Vry) + 7(Sat)
1CA day
Finish Saturday/EindigSaterdag CA
8:00 + 7 hours + 15 min (tea 1) + 45 min (lunch) + 15 1CA time
min (tea 2) = 16:15 CA
[also accept 16:00 since they are not paid for tea time] AO
[aanvaarook 16:00 aangesienhullenievirteepousebetaal
word nie]
(4)
O M
2.1.3 Some candidates omitted some questions or sub-sections. L4
(c) Sommigekandidatelaatvrae of onderafdelingsuit.
OR/OF O
Some candidates wrote short answers (skipping other
steps or lines or sentences).
Sommigekandidateskryfverkorteantwoorde(laatstappeuit)
OR/OF 2O reason
Responses were very clear to follow. O
Antwoorde was baie maklik omtevolg
OR/OF
O
Some markers mark fast.
Sommigenasienerskonvinnig nasien.
OR/OF
O
Markers took shorter breaks
Merkers het korter pouses geneem
(2)
Copyright reserved/Kopieregvoorbehou Please turn over/Blaai om asseblief
Downloaded from hlayiso.com
Mathematical Literacy/P2/WiskundigeGeletterdheid/V2 11 DBE/November 2020
NSC/NSS – Marking Guidelines/Nasienriglyne
Q/V Solution/Oplossing Explanation/Verduideliking T&L
F
2.1.4 Transport/Vervoer = 11 542 km × R3,26 / km MA 1MA calculation L4
= R 37 626,92 CA 1CA amount
Marking/Nasien:
= 2 × 79 × R244,35 + 5 × 65 × R211,75 + 23 × 52 × R195,50
= 2 × R19 303,65 + 5 × R13 763,75 + 23 × R10 166 MCA 1MCA multiply correct
= R38 607,3 + R68 818,75 + R233 818 number of persons by
amount claimed
= R341 244,05 CA
1CA simplification
Total/Totaal = R341 244,05 + R 37 626,92
= R378 870, 97. CA 1CA total
O
R400 000 budget will be enough/begroting is genoegsaam. 1O conclusion
(6)
M
2.2.1 Diameter = 1 m + 0,8 m + 0,8 m = 2,6 m A 1A diameter L4
Area of big circle/Oppervlakte van grootsirkel
2
2,6 m
= 3,142 × SF 1SF circle formula
2
= 5,30998 m2 CA 1CA area big circle
Area of the small circle/kleinsirkel = 3,142 × (0,5 m) 2
= 0,7855 m2 MA 1MAarea small circle
Area of the wood/Oppervlakte van hout = 2,7 m × 2,7 m
= 7,29 m2 A 1A area of the wood
Cut-off/Afgesny = 7,29 m2 – 5,30998 m2 + 0,7855 m2 MCA
1MCA subtracting total
= 1,98002 m2 + 0,7855 m2
circles from square area
≈ 2,77 m2 CA
wood
Statement is NOT valid/Bewering is NIE geldigNIE O 1CA area
OR/OF 1O conclusion
OR/OF
Cut-off wood (in m2) /Afgesnydehout (in m²)
= Area(square) – [Area (big circle) – Area(small circle)]
A 1A radius big circle
SF
= 2,7 × 2,7 – [ 3,142 (0,8 + 0,5)2 – 3,142 (0,5)2 ] 1SF circle formula
A CA MA 1CA area big circle
= 7,29 – [ 5,30998– 0,7855] 1MAarea small circle
1A area of the wood
= 7,29 – 4,52448 M 1M subtracting total circles
from square area wood
= 2,76552. CA 1CA area
O
Which is more than 2,01. Hence, the statement is not valid
Dit is meer as die 2,01, gevolglik is die beweringniegeldignie. 1O conclusion
Copyright reserved/Kopieregvoorbehou Please turn over/Blaai om asseblief
Downloaded from hlayiso.com
Mathematical Literacy/P2/WiskundigeGeletterdheid/V2 12 DBE/November 2020
NSC/NSS – Marking Guidelines/Nasienriglyne
Q/V Solution/Oplossing Explanation/Verduideliking T&L
OR/OF OR/OF
Area of semi-circle = ½ r² A 1A diameter/ radius
1SF circle formula
Outer circle/Buite sirkel = ½ × 3,142 × (1,3 m)2 SF
= 2, 65499m2 CA 1CA area big circle
Inner circle/Binne sirkel = ½ × 3,142 × (0,5 m)2
= 0,39275 m2 MA 1MA area small circle
Desk/tafel = 2,65488m2 – 0,39275m2
= 2,26224m2 CA 1CA area of the wood
Total area/Totale oppervlak = 2,26224 m2 × 2
= 4,52448 m2 MCA 1MCA total circles area
Cut-off Area/Afsny hout = 7,29 m2 – 4,452448 m2
= 2,7552 m2 CA 1CA area
Statement not valid /Bewering is nie GELDIG nie O 1O conclusion
OR/OF OR/OF
1A diameter/ radius
Area of big semi-circle /Oppervlakte van groot halfsirkel 1SF circle formula
A SF CA 1CA area big circle
= 3,142 × 1,32 ÷ 2 = 2,65499 m2
Area of small semi-circle /Oppervlakte vanklein halfsirkel
= 3,142 × 0,52 ÷ 2 = 0,3927 m2 MA 1MA area small circle
One semi-circular top/ Een halfsirkel bo-kant
= 2,65499 – 0,3927 = 2,26224 m2
Area of two semi-circular tops/Oppervlakte van 2 halfsirkels
= 2,26224 × 2 = 4,52448 m2 MCA 1MCA total circles area
Square Board/Vierkantige hout = 2,7 × 2,7 = 7,29 m2 A 1A area of the wood
Cut-off /Afsny = 7,29 m2– 4,52448 m2≈ 2,77 m2 CA 1CA area
Statement not valid/Bewering is nie GELDIG nieO
1O conclusion
(8)
Copyright reserved/Kopieregvoorbehou Please turn over/Blaai om asseblief
Downloaded from hlayiso.com
Mathematical Literacy/P2/WiskundigeGeletterdheid/V2 13 DBE/November 2020
NSC/NSS – Marking Guidelines/Nasienriglyne
Q/V Solution/Oplossing Explanation/Verduideliking T&L
SF C F
2.2.2 Volume wood/hout = 2,7 m × 2,7 m × 0,038 m 1SF volume of wood L3
= 0,27702 m3 CA 1C conversion
1CA simplification
Price of one piece of wood excl.VAT
Prys van een stuk hout BTW uitgesluit
= 0,27702 m3× R1 215= R336,58 MA 1MA calculating cost
Price including VAT/Prys BTW ingesluit = R336,58 × 1,15
= R387,07 MCA 1MCA adding 15%
12 semi-circles cut form 6 boards/12 halfrondes word uit 6
borde gesny
Cost/Koste = R387,07 × 6 A 1A 6 boards
1CA cost
= R2 322,40 CA
OR/OF OR/OF
SF C 1SF volume of wood
Volumewood/hout = 2,7 m × 2,7 m × 0,038 m
1C conversion
= 0,27702 m3 CA 1CA simplification
Volume of 6 woodenboards A
Volume vir 6 houtborde= 0,27702 m3× 6 1A 6 boards
= 1,66212 m3
Cost of 6 boards/Koste van 6 borde = 1,66212 × R1 215
= R2 019,48 MA 1MA calculating cost
Cost with VAT/Koste met BTW
MCA
= R2 019,48 + (15% ×R2 019,48) 1MCA adding 15%
= R2 322,40 CA 1CA simplification
OR/OF OR/OF
Price of wood including VAT/Prys van hout BTW ingesluit
= R1 215 × 1,15 = R1 397,25 MCA 1MCA adding 15%
SF C 1SF volume of wood
Volume wood/hout = 2,7 m × 2,7 m × 0,038 m
CA 1C conversion
= 0,27702 m3
1CA simplification
Cost/Koste = R1 397,25 × 0,27702
MA 1MA calculating cost
= R387,07
Cost for 12 semicircles/Koste vir 12halfsirkels
1A 6 boards
= R387,07 × 6 A
1CA simplification
= R2 322,40 CA
(7)
[38]
Copyright reserved/Kopieregvoorbehou Please turn over/Blaai om asseblief
Downloaded from hlayiso.com
Mathematical Literacy/P2/WiskundigeGeletterdheid/V2 14 DBE/November 2020
NSC/NSS – Marking Guidelines/Nasienriglyne
QUESTION/VRAAG3 [39 MARKS/PUNTE]
Q/V Solution/Oplossing Explanation/Verduideliking T&L
A D
3.1.1 The data is discrete./Die data is diskreet 1Adiscrete L4
O
Percentages run from 0 to 100 and depends on the total of the 2O opinion
test and the mark obtained. It is presented as whole numbers.
Persentasies is van 0 tot 100 en hang af van die totaal van die
toets en die punt behaal. Hier is dit aangebied as heelgetalle. (3)
D
3.1.2 Median score test 2/mediaan L2
66 67 RT M 1RT correct value
=
2 1M median concept
= 66,5 CA 1CA simplification
(3)
MA D
3.1.3 Y (% mark) 1 443 MA 1MA adding all known% L3
Mean/Gemiddeld = = 84
18 marks
1MA mean concept
Y (% mark) = 18 × 84 – 1 443 M 1M changing the subject
= 69% CA 1CA simplification
OR/OF OR/OF
18 × 84 = 1 512 MA 1MA mean concept
MA 1MA adding all known %
Y + 1443 = 1 512 marks
Y = 1 512 – 1 443 M 1M changing the subject
= 69% CA 1CA simplification
(4)
D
RT
3.1.4 2RT candidate L3
Helen : 87% – 57% = 30%
RT 1RT candidate
Kevin : 97% –67% = 30%
[Note: Afrikaans scripts the answers will be
Paul &Oscar] (3)
D
3.1.5 Q3/K3 = 71% A 1A quartile 3 L3
Q1/K1= 61% A
1A quartile Q1
IQR = Q3 – Q1/IKO = K3 – K1
= 71% – 61% MCA 1MCA IQR concept
= 10% CA 1CA simplification
(4)
Copyright reserved/Kopieregvoorbehou Please turn over/Blaai om asseblief
Downloaded from hlayiso.com
Mathematical Literacy/P2/WiskundigeGeletterdheid/V2 15 DBE/November 2020
NSC/NSS – Marking Guidelines/Nasienriglyne
Q/V Solution/Oplossing Explanation/Verduideliking T&L
CA value of Y from 3.1.3 P
3.1.6 8 A 1A numerator L3
P(non distinction/nie onderskeiding) =
18 A 1A denominator
4
= CA 1CAsimplification
9
OR/OF OR/OF
10 5 A
P(distinction/onderskeiding) = 1A numerator
18 9
MA 1MA subtracting from 1
5 4 CA
P(not distinction/nieonderskeiding) = 1 – =
9 9 1CA simplification
(3)
3.1.7 D
Mode/Modus = 73% A 2A modal value L2
(2)
MP
3.2.1 View TerraceOR/OF ViewOR/OF Terrace RT 2RT Reading from the map L2
(2)
O MP
3.2.2 Facing oncoming traffic/Sy gaanin aankomende verkeer vasry L4
OR/OF 2O reason
O (2)
One way road/Dit is 'n eenrigtingpad
MP
3.2.3 North west/Noordwes or/of NW A 2A correctdirection L2
(2)
A MP
3.2.4 21 mm = 110 yards/jaart 1A measuring scale L3
A
50 110 1A measuring distance
XY =
21 M 1M working with scale
XY = 261,904…yards/jaart CA
1CA answer
≈ 262 yards/jaart
[Bar scale accept measurements in the range 20 mm to 23 mm
NPR
For XY measurements in the range 47 mm to 53 mm] (4)
MP
3.2.5 Parking offence Parkeer boete O L4
(a) Street parking is limited to 1 Parkering is beperk tot 1 uur
hour before 5 pm voor 5nm. 2O Reason for charge
Exceededallowable duration Oorskryding van toegelate
of parking. parkering
Free parking time was over Gratis parkeering het
verstryk
(2)
Parked for more than 1 hour. Parkeer vir meer as 1 uur
Copyright reserved/Kopieregvoorbehou Please turn over/Blaai om asseblief
Downloaded from hlayiso.com
Mathematical Literacy/P2/WiskundigeGeletterdheid/V2 16 DBE/November 2020
NSC/NSS – Marking Guidelines/Nasienriglyne
Q/V Solution/Oplossing Explanation/Verduideliking T&L
F
3.2.5 M 25 1M subtracting free hour L3
From/Vanaf 12:00 - 15:25 = (3 – 1) + C
(b) 60 1C conversion minutes into
CA hours
= 2 ,4166666667 hours/uur
1CA total charged hours
£79,75 M
Rate per hour/Koers per uur=
2,4166666667 1M division by hours
= £33 CA 1CA simplification rounded
to the nearest pound
OR/OF OR/OF
From/Vanaf 12:00 - 15:25 = 3 h 25 min
Hours she was charged for /Ure waarvoor sy beboet is
M CA 1M subtracting free hour
3 h 25 min – 1 h = 2 h 25 min 1CA total charged hours
2h 25 min = 145 min C 1C conversion hours into
minutes
Rate per hour/Koers per uur = M
1M division by minutes
=
CA 1CA simplification rounded
= £33
to the nearest pound
(5)
[39]
Copyright reserved/Kopieregvoorbehou Please turn over/Blaai om asseblief
Downloaded from hlayiso.com
Mathematical Literacy/P2/WiskundigeGeletterdheid/V2 17 DBE/November 2020
NSC/NSS – Marking Guidelines/Nasienriglyne
QUESTION/VRAAG4 [34 MARKS/PUNTE]
Q/V Solution/Oplossing Explanation/Verduideliking T&L
L2
4.1.1 P(odd seat/onewe) = 2 A 1A numerator P
× 100%
288 1Atotal seats
A
= 0,69% CA 1CA simplification
(3)
RT L2
4.1.2 D10 RT 1RT row MP
1RT seat
(2)
L3
4.1.3 Person at D7: MP
A
Turn left walk towards the corridor./Draai links en loop 1A turn left and walk
na die gang.
A 1A turn right towards stage
Turn right walk towards the stage./Draai regs en loop
na die verhoog.
A 1A turn left end of corridor
At end of the corridor turn left./Aan die einde van die
gang draai links.
A
Walk towards the last seat in the front of section 1A last seat; section B
B./Loop na die laastesitplek in afdeling B.
(4)
F
4.1.4 Collection/Insameling: 1MA multiply tariff by L4
MA relevant total patrons.
CA
Adults/Volwassenes: 150 × $28,60 = $4 290 1CA amount
Students/Studente: 57 × $26,40 = $1 504,80 CA 1CA amount
Kids/Kinders: 33 × $17,60 = $ 580,80 CA 1CA amount
Total collection/Totaalingesamel
= $4 290 + $1 504,80 + $580,80
1MCA total collection
= $6 375,60 MCA
MCA CA 1MCA dividing by 1,10
$6 375,60
Excluding VAT/Sonder BTW = = $5 796 1CA amount excl. VAT
1,10
O 1O conclusion
Claim is CORRECT/Opmerking is KORREK
Copyright reserved/Kopieregvoorbehou Please turn over/Blaai om asseblief
Downloaded from hlayiso.com
Mathematical Literacy/P2/WiskundigeGeletterdheid/V2 18 DBE/November 2020
NSC/NSS – Marking Guidelines/Nasienriglyne
Q/V Solution/Oplossing Explanation/Verduideliking T&L
OR/OF OR/OF
Adults/volwassenes = 53 + 57 + 40 = 150
MA 1MA multiply tariff by
Cost/Koste = $28,60 × 150 = $4 290
MCA relevant total patrons.
Cost excl VAT /Koste BTW uitgesluit = $4 290 ÷ 1,10 1MCA dividing by 1,10
= $3 900 1CA amount
CA
Students/Studente = 15 + 32 + 10 = 57
Cost/Koste= $26,40 × 57 = $1 504,80
Cost excl VAT /Koste BTW uitgesluit = $1 504,80 ÷ 1,10
= $1 368 CA 1CA amount
Children = 9+15+9 = 33
Cost/Koste = $17,60 × 33 = $580,80
Cost excl VAT/Koste BTW uitgesluit = $580,80 ÷ 1,10
= $528 CA 1CA amount
Total/Totaal = $3 900 + $1 368 + $528 MCA 1MCA total collection
= $5 796 CA 1CA amount excl. VAT
The claim is correct/ Opmerking is KORREK O 1O conclusion
OR/OF OR/OF
Section A/Afdeling A: MA 1MA multiply tariff by
= 53 × 28,60 + 15 × 26,40 + 9 × 17,60 relevant total patrons.
= 1 515,80 + 396,00 + 158,40= 2 070,20 CA 1CA amount
Section B/ Afdeling B:
= 57 × 28,60 + 32 × 26,40 + 15 × 17,60
= 1 630,20 + 844,80 + 264,00= 2 739,00 CA 1CA amount
Section C/ Afdeling C:
= 40 × 28,60 + 10 × 26,40 + 9 × 17,60
= 1 144,00 + 264,00 + 158,40= 1 566,40 CA 1CA amount
Total amount of Sections = 2 070,20 + 2 739,00 + 1 566,40
MCA 1MCA total collection
= $6 375,60
MCA 1MCA dividing by 1,10
$6 375,60
Excluding VAT/Sonder BTW = = $5 796 CA
1,10 1CA amount excl. VAT
or/of
$5 796 × 1,1 = $6 375,60 which equals total collection
Claim is CORRECT/Opmerking is KORREK O 1O conclusion
Copyright reserved/Kopieregvoorbehou Please turn over/Blaai om asseblief
Downloaded from hlayiso.com
Mathematical Literacy/P2/WiskundigeGeletterdheid/V2 19 DBE/November 2020
NSC/NSS – Marking Guidelines/Nasienriglyne
Q/V Solution/Oplossing Explanation/Verduideliking T&L
OR/OF OR/OF
Adult / Volwassenes MCA 1MCA dividing by 1,10
100
Price excl. VAT/Prys sonder BTW = $28,60 × = $26
110 1MA multiply tariff by
MA relevant total patrons.
Total amount/Totale bedrag = 26 × 150 = $3 900 CA
1CA amount
Student /Studente
100
Price excl.VAT /Prys sonder BTW=$26,40 × = $24
110
Total amount/Totale bedrag = $24 × 57 = $1 368 CA 1CA amount
Children/Kinders
100
Price excl. VAT/ Prys sonder BTW = $17,60 × = $16
110
Total amount/Totale bedrag = $16 × 33 = &528 CA 1CA amount
MCA 1MCA total collection
Total collection/ Totale insameling = 3 900 + 1 368 + 528
= $5 796 1CA amount excl. VAT
CA
Claim is CORRECT/Opmerking is KORREK O 1O conclusion
(8)
L2
4.1.5 Cost in USD/Koste in VSD F
RT 1RTticket price
= $30,50 × 0,71
= 21,655 USD/VSD MCA 1MCA answer in USD
Cost in rand/Koste in rand
= $21,655 × R14,43/$
= R312,48 MCA 1MCA answer in rand
OR/OF OR/OF
Conversion factor ZAR to AUD /Herleidingsfaktor : 1A Conversion factor
R14,43 × 0,71 = R10,2453 A
RT 1RT ticket price
$30,50 × R10,2453
=R312,48 MCA 1MCA answer in rand
OR/OF OR/OF
Conversion to ZAR/ Herlei na ZAR
RT 1RT ticket price
= $30,50 × 0,71 × R14,43 MCA
1MCA Conversion
= R312,48 MCA 1MCA answer in rand
(3)
Copyright reserved/Kopieregvoorbehou Please turn over/Blaai om asseblief
Downloaded from hlayiso.com
Mathematical Literacy/P2/WiskundigeGeletterdheid/V2 20 DBE/November 2020
NSC/NSS – Marking Guidelines/Nasienriglyne
4.2.1 L2
AUSTRALIAN INFLATION RATE FOR 2017 AND 2018 D
3.5
MONTHLY INFLATION RATE (%)
3.0 A
A A
2.5 A A
2.0
1.5
1.0
0.5
0.0
Jan Feb Mar Apr May June July Aug Sep Oct Nov Dec
2017 2.5 2.74 2.38 2.2 1.87 1.63 1.73 1.94 2.23 2.04 2.2 2.11
2018 2.07 2.21 2.36 2.46 2.8 2.87 2.95 2.7 2.28 2.52 2.18 1.91
5 × A for each correct bar
(5)
A L3
4.2.2 June/Junie 1A correct month F
MCA 1MCA subtracting values
Difference/Verskil = 2,87% – 1,63% = 1,24% CA 1CA simplification
(3)
RT F
4.2.3 Inflation Nov/Inflasie Nov = AUD 156 831,36 × 2,18 % 1RT correct rate L4
= AUD3418,92
MCA 1MCA Increasing
Dec cost of car /Des koste= AUD 156 831,36 + AUD3418,92
= AUD 160 250,28 CA 1CA simplification
Inflation Dec/Inflasie Des = AUD 160 250,28 × 1,91 %
= AUD 3 060,78
Jan. cost of car/Koste in Jan.
= AUD 160 250,28 + AUD 3 060,78 1CA simplification second
= AUD 163 311,06 CA month cost
Increase/Verhoging= AUD 163 311,06 – AUD 156 831,36
= AUD 6 479,70 CA
1CA increase
He is incorrect/Hy is NIE korrek NIE O
1O opinion
Copyright reserved/Kopieregvoorbehou Please turn over/Blaai om asseblief
Downloaded from hlayiso.com
Mathematical Literacy/P2/WiskundigeGeletterdheid/V2 21 DBE/November 2020
NSC/NSS – Marking Guidelines/Nasienriglyne
Q/V Solution/Oplossing Explanation/Verduideliking T&L
4.2.3 OR/OF OR/OF F
L4
Inflation Nov/Inflasie Nov = $156 831,36 × 2,18%RT 1RT correct rate
= $3418,92
MCA 1MCA Increasing
Dec. cost of car /Des koste= $ 156 831,36 + $3418,92
= $ 160 250,28 CA 1CA simplification
Inflation Dec/Inflasie Des = $ 160 250,28 × 1,91 %
= $ 3 060,78 CA 1CA simplification second
month inflation
Price increase = Inflation Nov + Inflation Dec
Prysverhoging = Inflasie Nov + Inflasie Des
= $3418,92 + $ 3 060,78
= $ 6 479,70 CA 1CA increase
O
He is incorrect/Hy is NIE korrek NIE
1O opinion
OR/OF OR/OF
December/ Desember: RT
MCA 1RT correct rate
Cost of car/Koste van motor= $156 831,36 × 102,18 % 1MCA Increasing by %
= $160 250,28 CA 1CA simplification
January/Januarie
Cost of car/Koste= $ 160 250,28 × 101,91 %
= $ 163 311,06 CA
1CA simplification
Increase/Verhoging = $ 163 311,06 – $156 831,36
= $ 6 479,70 CA
1CA increase
He is incorrect/Hy is verkeerd O
1O opinion
OR/OF
OR/OF
Price in January /Prys in Januarie
RT MCA CA 1RT correct rate
= AUD 156 831,36 1,0218 1,0191 1MCA Increasing
= AUD 163 311,0641 CA 1CA Increasing
1CA simplification
Increase/Verhoging = AUD 163 311,06 – AUD 156 831,36
= AUD 6 479,70 CA 1CA increase
Incorrect/ Nie korrek nie O 1O opinion
Copyright reserved/Kopieregvoorbehou Please turn over/Blaai om asseblief
Downloaded from hlayiso.com
Mathematical Literacy/P2/WiskundigeGeletterdheid/V2 22 DBE/November 2020
NSC/NSS – Marking Guidelines/Nasienriglyne
OR/OF OR/OF
RT
MCA
December price /Desember prys = AUD 156 831,36 1,0218 1RT correct rate
= AUD 160 250,28 CA 1MCA Increasing by %
1CA simplification
Januaryprice/Januarie prys = AUD 160 250,28 1,0191
= AUD 163 311,06 1CA simplification
CA
Adding the increase to the price in November
Tel die verhoging by die prys in November
= AUD 156 831,36 + AUD 6 500
= AUD 163 331,36 CA 1CA increase
Therefore/dusAUD 163 331,36 ≠ AUD 163 311,06 1O opinion
Incorrect / Nie korrek nie O
OR/OF OR/OF
Price end October = AUD 156 831,36 1RT correct rate
January price/Januarie prys 1M Increasing by %
RT MCA 1M Increasing by %
= AUD 156 831,36 1,0218 1,0191 M
= AUD 163 311,0641 CA 1CA simplification
Subtracting stated increase / Trek die beweerde verhoging af
AUD 163 311,0641 – AUD 6 500
= AUD 156 811,06 CA
Therefore/dusAUD 156 831,36 ≠ AUD 156 811,06
1CA comparing values
Incorrect/ Nie korrek nie O
1O opinion
(6)
[34]
TOTAL/TOTAAL:150
Copyright reserved/Kopieregvoorbehou
Study this subject
Recommended for this subject

Addendum
Mathematical Literacy Grade 12 P2 NSC November 2020 Addendum

Memorandum
Mathematical Literacy Grade 12 P1 NSC November 2020 Memo

Memorandum
Mathematical Literacy Grade 12 P2 NSC November 2017 Memo

Addendum
Mathematical Literacy Grade 12 P1 NSC November 2020 Addendum

Addendum
Mathematical Literacy Grade 12 P1 NSC November 2020 Addendum

Question paper
Mathematical Literacy Grade 12 P2 Eastern Cape Mock 2020 QP
More from Grade 12 Mathematical Literacy

Addendum
Mathematical Literacy Grade 12 P2 2025 Addendum (Afr)

Question paper
Mathematical Literacy Grade 12 P1 Free State Mock 2025 QP

Addendum
Mathematical Literacy Grade 12 P1 KZN Mock 2025 Addendum

Question paper
Mathematical Literacy Grade 12 P1 Limpopo Mock 2025 QP

Question paper
Mathematical Literacy Grade 12 P2 Limpopo Mock 2025 QP

Question paper