Skip to content

Engineering Graphics and Design Grade 11 P1 2017 Memo

MemorandumEngineering Graphics and DesignGrade 1120179 pages

Grade 11 Engineering Graphics and Design Paper 1 memorandum from the Eastern Cape November 2017, 9 pages. Read online or download the free PDF.

Free to read online, no sign-up needed

Loading document…

Loading document…

Document textSearch extracted text and jump to a page.
Downloaded from hlayiso.com Engineering graphichs and design/P1 NCS EC DBE/November 2017 ISEBE LEMFUNDO LEMPUMA KOLONI EASTERN CAPE EDUCATION DEPARTMENT OOS-KAAP ONDERWYSDEPARTEMENT NATIONALSENIOR CERTIFICATE NASIONALE SENIOR SERTIFIKAAT GRADE 11 GRAAD 11 ENGINEERING GRAPHICS AND DESIGN P1 INGENIEURSGRAFIKA EN -ONTWERP V1 NOVEMBER 2017 MEMORANDUM MARKS / PUNTE: 200 TIME / TYD: 3 hours / uur This memorandum consists of 9 pages. Hierdie memorandum bestaan uit 9 bladsye. Copyright reserved / Kopiereg voorbehou 1
Downloaded from hlayiso.com Ingenieursgrafika en -ontwerp/V1 NSS EC DBENovember 2017 QUESTION / VRAAG 1A: ANALYTICAL (CIVIL) / ANALITIES (SIVIEL) ANSWERS ANTWOORDE 1 FYI1-2017 1 1 FYI1-2017 1 2 DLABA 1 2 DLABA 1 3 1 : 300 1 3 1 : 300 1 4 4 1 4 4 1 5 TILE 1 5 TEËL 1 6 SLOPE 1:10 1 6 SKUINSTE 1:10 1 7 WC 1 7 TOILET 1 8 BATH 1 8 BAD 1 9 BIC 1 9 IGK 1 10 TWO WAY SWITCH 1 10 TWEE RIGTING SKAKELAAR 1 11 FLUORECENT LIGHT FIXTURE 2 X 40 W 1 11 FLUORESERENDE LIG 2 X 40 W 1 12 SOUTH ELEVATION 1 12 SUID-AANSIG 1 13 FLOOR PLAN 1 13 VLOERPLAN 1 14 1 14 1 15 3 15 3 16 4 16 4 17 6 17 6 TOTAL 27 TOTAAL 27 VRAAG / QUESTION 1B: ANSWER / ANSWER / ANTWOORD 17 ELEKTRONIKA / ELECTRONICS ANTWOORD 15 PERIMETER / OMTREK = 2L+2B ü1 FREEHAND / VRYHAND Œ = 16,4 + 4,8 + 6,2 + ü1 4,1 + 7,3 + 3, 7 ü1 6V ü1 Œ Œ + 1,31 + 4,21 + 1,7 + 3,5 Œ Œ = 53,22 m Œ ü1 Œ ü1 ü1 Œ ANSWER / ANTWOORD 16 Œ Œ AREA / OPPERVLAK =LxB ü1 Œ = (7,3 x 2,7)-2(1,1 x 1,5) ü1 Œ = 16,41 m² ü1 ü1 ü1 Œ Œ Œ Œ Œ ü1 ü1 Œ 2 Copyright reserved Please turn over
Downloaded from hlayiso.com Engineering graphichs and design/P1 NCS EC DBE/November 2017  Ž   Ž Ž  F ü3  Ž Ž     Ž E    Œ Œ Œ ü4 Œ Œ Œ E Œ ü4 ü4 Œ Œ F ASSESSMENT CRITERIA ASSESERINGSKRITERIA 1 FRONT VIEW 3 1 VOORAANSIG 3 2 LEFT VIEW 4 2 LINKERAANSIG 4 3 TOP VIEW 4 21 3 BOAANSIG 4 21 4 TRUE LENGHTS 6 4 WARE LENGTES 6 SUBTOTAL 17 21 SUBTOTAAL 17 21 3 Copyright reserved Please turn over
Downloaded from hlayiso.com Engineering graphichs and design/P1 NCS EC DBE/November 2017 ASSESSMENT CRITERIA 5 DEVELOPMENT 20 21 SUBTOTAL 17 21  E TOTAL 38 ü5   ü5  F  ü5 ü5 ü5 ü5 ü5   ü5      ü5   ü5 ü5    ü5 4 Copyright reserved Please turn over
Downloaded from hlayiso.com Ingenieursgrafika en -ontwerp/V1 NSS EC DBE/November 2017 PP ü1 Œ Œ ü1 Œ ü1 Œ ŒLVP Œ RVP ü1 ü1 HL HL GL SP            ŽŽ Ž ŽŽŽ   Ž    Ž Ž Ž Ž Ž  Ž Ž Ž Ž  ŽŽ Ž Ž Ž Ž    Ž Ž             Ž Ž ASSESSMENT CRITERIA ASSESSERINGSKRITERIA SP 1 CONSTRUCTION + VPs 8 1 KONSTRUKSIE + VPs 8 2 STEPS 9 2 TRAPPE 9 3 WALLS 13 3 MURE 13 4 OPENINGS 4 4 OPENINGE 4 5 ROOF 6 5 DAK 6 TOTAL 40 TOTAAL 40 5 Copyright reserved Please turn over
Downloaded from hlayiso.com Ingenieursgrafika en -ontwerp/V1 NSS EC DBE/November 2017 HŽ HŽ Œ Œ BEDROOM Œ CARPET  Œ ŒŒ Œ Œ HŽ HŽ  Œ Œ HŽ    HŽ HŽ     BATHROOM  Œ Œ TILE  Œ PASSAGE  ŒŒ ŒŒ TILE   Œ  Œ HŽ Œ         Œ HŽ HŽ Œ Œ Œ Œ OPEN PLAN TILE  Œ Œ Œ Œ Œ HŽ Œ Œ Œ HŽ Œ Œ Œ Œ Œ ASSESSMENT ASSESSERINGSKRITERIA CRITERIA FLOORPLAN VLOERPLAN DOORS + DEURE + VENSTERS + 1 WINDOWS + STEPS 19 1 TRAPPE 19 2 FIXTURES 11 21 2 TOEBEHORE 11 21 3 HATCHING 6 3 ARSERING 6 4 LABELS 4 4 BYSKRIFTE 4 SUBTOTAL 40 21 SUBTOTAAL 40 21 6 Copyright reserved
Downloaded from hlayiso.com Engineering graphichs and design/P1 NCS EC DBE/November 2017 Œ  Ž Ž Ž Ž Ž Œ    Œ Ž Ž Œ  Ž Œ Œ  Œ Œ Œ Œ Œ NORTH ELEVATIONü4 SCALE 1 : 50 ü4 ASSESSMENT CRITERIA ASSESSERINGSKRITERIA NORTH ELEVATION NOORDAANSIG 1 WALLS + STEPS + FFL 5 21 1 MURE + TRAPPE + VVV 5 21 2 DOOR 3 2 DEUR 3 3 WINDOW 4 3 VENSTER 4 4 LABELS 2 4 BYSKRIFTE 2 SUBTOTAL 14 21 SUBTOTAAL 14 21 7 Copyright reserved
Downloaded from hlayiso.com Engineering graphichs and design/P1 NCS EC DBE/November 2017 HŽ HŽ ŒŒ Œ Œ H HŽ Œ Ž Œ    Œ Œ Œ HŽŒ DPC Œ         HŽ     FFL DPC Œ Œ HŽ Œ Œ HŽ Œ Œ HŽ ŒŒ Œ NGL HŽ HŽ HŽ HŽ HŽ Œ HŽ Œ HŽ Œ Œ ASSESSMENT ASSESSERINGSKRITERIA CRITERIA DETAILED SECTION DEURSNEE AANSIG FOUNDATIONS + FOUNDATIONS + 1 WALLS + SLAB 12 1 WALLS + SLAB 12 2 DOOR + WINDOW 4 2 DOOR + WINDOW 4 3 HATCHING 8 3 HATCHING 8 4 LABELS 2 4 LABELS 2 5 FIXTURES 4 5 TOEBEHORE 4 SUBTOTAL 30 SUBTOTAAL 30 8 Copyright reserved
Engineering graphichs and design / P1 NCS EC DBE/November 2017 OFFICIAL USE Œ 1 INCORRECT OVERALL SCALE  Ž 2 INCORRECT POSITIONING OF VIEWS Ž Ž Ž 3 NON-ALIGNMENT OF VIEWS Ž Œ    Œ Ž Ž Œ TOTAL PENALTIES (-)  Ž Œ Œ Œ Œ Œ Downloaded from hlayiso.com Œ Œ HŽ HŽ SOUTH ELEVATIONü4 ŒŒ Œ Œ SCALE 1 : 50 ü4 H HŽ HŽ Œ Ž Œ HŽ Œ Œ  BEDROOM ASSESSMENT CRITERIA Œ CARPET    FLOOR PLAN Œ Œ ŒŒ Œ 1 DOORS + 19 WINDOWS + STEPS Œ 2 FIXTURES 11 21 Œ Œ HŽ DPC ŒŒ 3 HATCHING 6  HŽ  4 LABELS 4 SUBTOTAL 40 21 HŽ Œ   Œ HŽ  NORTH ELEVATION     HŽ HŽ 1 WALLS + STEPS 5 21   2 3    SLIDING DOOR BATHROOM  3 WINDOW 4   Œ  Œ TILE  HŽ 4 LABELS 2 Œ  PASSAGE ŒŒ  TILE   ŒŒ    SUBTOTAL 14 21 Œ  Œ DPC FFL HŽ Œ Œ Œ DETAILED SECTION HŽ HŽ  Œ Œ HŽ 1 FOUNDATIONS + 12  WALLS + SLAB +  Œ Œ HŽ ŒŒ Œ LINTELS NGL HŽ HŽ HŽ HŽ 2 DOOR + WINDOW 4 Œ HŽ HŽ 3 HATCHING 8 Œ Œ  OPEN PLAN HŽ Œ HŽ Œ 4 LABELS 2 Œ Œ Œ  Œ Œ Œ Œ TILE Œ 5 FIXTURES 4 Œ SUBTOTAL 30 TOTAL 85 PENALTIES (-) FINAL TOTAL HŽ Œ Œ Œ HŽ Œ Œ Œ Œ Œ 9 Copyright reserved

Study this subject

More from Grade 11 Engineering Graphics and Design

View all