Skip to content

Engineering Graphics and Design Grade 12 P1 2019 QP (Eng)

Question paperEngineering Graphics and DesignGrade 1220196 pages

Grade 12 Engineering Graphics and Design Paper 1 question paper from the NSC November Exam 2019 (English), 6 pages. Read online or download the free PDF.

Free to read online, no sign-up needed

Answer online

Loading document…

Loading document…

Questions in this paper

Document textSearch extracted text and jump to a page.
basic education Department « y) Basic Education "4 REPUBLIC OF SOUTH AFRICA NATIONAL SENIOR CERTIFICATE i ENGINEERING GRAPHICS AND DESIGN P1 i] i NOVEMBER 2019 MARKS: 100 TIME: 3 hours Copyright reserved This question paper consists of 6 pages. FOR OFFICIAL USE ONLY QUESTION |] MARKS OBTAINED | 3 | SIGN MODERATED 2] sicn RE-MARKING 3] sion 1 2 3 . } 4 i i TOTAL ! y 2[o]0 2|0]0 2[o]o FINAL CONVERTED MARK CHECKED BY 100 a 5 INSTRUCTIONS AND INFORMATION This question paper consists of FOUR questions. Answer ALL the questions. ALL drawings are in first-angle orthographic projection, unless otherwise stated. ALL drawings must be prepared using pencil and instruments, unless otherwise stated. ALL answers must be drawn accurately and neatly. ALL the questions must be answered on the QUESTION PAPER, as instructed. ALL the pages, irrespective of whether the question was attempted or not, must be re-stapled in numerical sequence in the TOP LEFT-HAND CORNER ONLY. 8. Time management is essential in order to complete all the questions. 9. Print your examination number in the block provided on every page. 10. Any details or dimensions not given must be assumed in good proportion. BOND Non COMPLETE THE FOLLOWING: CENTRE NUMBER CENTRE NUMBER EXAMINATION NUMBER | | | Barcode label | | | | EXAMINATION NUMBER Please tum over
Engineering Graphics and Design/P1 DBE/November 2019 Downloaded from hlayiso.com Copyright reserved LAND SURVEYOR'S CERTIFICATE OF ] SYMBOL LEGEND: NOTE: QUESTION 1; ANALYTICAL (CIVIL) THE CORNER HEIGHTS AND Contractors must verify all dimensions and BOUNDARY LENGTHS OF STAND 2045,| 1. DECIDUOUS TREES @ levels on site before commencing work.| Given; SURVEYED ON 2018-09-17 aeeecatciee, be notified immediately of any | The site plan of an existing housing development with a proposed new club facility, a title panel and a table of questions. BOUNDARY 2, SHRUBBERY ep The drawing has not been prepared to the indicated scale. CORNER HEIGHTS | BOVNDARY IN METRES 4. GRAVEL PATHWAY METRES ; Instructions: A = 8760 AB = 16,06 3. FRENCH DRAIN -£_]_| ARCHITECTS SIGNATURE Complete the table below by neatly answering the questions, which refer to the accompanying drawing, title panel and = so Tre CLIENTS SIGNATURE civil content. 130] © = 8760 © = 28.6 QUESTIONS ANSWERS D = 876.3 DE = 26.41 ANSWER 20 4 | Who prepared the drawing? 1 : : In the space below, draw, in neat E = 8763 EF = 1807 : f freehand, the front view and top view | 2 | What is the drawing number? 1 F = 8764 GS = 53,16 of the SANS 10143 graphical symbol | 3 | What company printed the drawing? 1 7 > for a SINGLE WALL-MOUNTED G = 876.4 GA = 47.69 4 | On what date was the last revision made? 1 URINAL. What must the contractors do before commencing with any AMUSEMENT PARK 5 | work? 1 A 6 | What is the finish on the pathway? 1 EW ONEERS PERIME NER SCCURITY 7 |How wide is the new entrance to STAND 2045 in metres? 1 b SPECIFICATION FENCE TO ENGINEER'S 8 | What is the STAND number of the amusement park? 1 / SPECIFICATION © g | What colour is used to represent new sewer lines on a 1 ® 4 23 drainage plan? b oe LN x 10 | What does the abbreviation BIC stand for? 1 | @ 11 | What does the broken line at 1 indicate? 1 STAND |_| z 2046 [SI Fa What does the symbol at 2 indicate? ei oO 12 yt 1 aN 2 4g | Whatis the abbreviation of the component that you will find at 1 w | L 28 = ADD SWING the junction at 3? 53 x 3 | 2018-12-20 /ARO SY (Nos gl Sano taron 14 [Name the feature at 4 1 2045, COMPACTED 2 2018-11-18 | ADD SEWER LINES | 2 HARDCORE e 15 | What are the final TWO components of the sewerage system? 2 i | 1 | 2018-11-17 [REMOVE | - EXISTING 'g| DECIDUOUS TREE | 46 | Which elevation of the clubhouse faces Comic street? 1 AGE OUTBUILDING) [P| REVISION | DATE DESCRIPTION ‘ts ee & i | CREATIVE 17 | What features make up the new club facility? 3 f New ! ARCHITECTS bh & GATES TIT BEREA ROAD 31 398 0762 4g | In the space below (ANSWER 18), determine the total length of the perimeter of STAND 2048 in 3 S PAVEMENT 3500 FH KRYPTON (PTY)LTD | 2018-12-28, 19 | In the space below (ANSWER 19), determine the total area of the new club facility in square metres. | 3 2 @ DRAWING TIT: 99 | In the space in the title panel (ANSWER 20), draw, in neat freehand, the front view and top view of 4 Fy COMIC STREET SITE PLAN the SANS 10143 graphical symbol for a SINGLE WALL-MOUNTED URINAL. NEW 6000 VEHICLE ENTRANCE — gaouecT TOTAL | 30 PROPOSED CLUBHOUSE, BECK AND POOL ANSWER 18. 8300 ANSWER 19 FOR LOIS CHALET ON STAND 2045, Seo cte SraeeT DUREAN oon Show ALL calculations. 00 | Show ALL calculations. SITE PLAN PROJECT NUMBER: DRAWING NUMBER: 8 a 3 SCALE 1: 500 FLY-2018 1818 Fy 3> | | 2018-11-18] CLARK KENT 1:500 gs a Fra 3 REFERENCE CODE 8 ® SMAN-2018 EXAMINATION NUMBER: A000], 5000 EXAMINATION NUMBER [2 Please tum over
Engineering Graphics and Design/P1 Downloaded from hlayiso.com QUESTION 2: INTERPENETRATION AND DEVELOPMENT Copyright reserved DBE/November 2019 Given: © The top view and incomplete front view of a right regular hexagonal prism that has been shaped to fit over an equilateral triangular prism. The axes of both solids lie in a common vertical plane. © An auxiliary view of the triangular prism Instructions: Draw, to scale 1 : 1, the following views of the TWO solids: 24 22 23 24 * Planning is essential. * Show ALL hidden detail. © Show ALL construction. [37] The given top view The right view The complete front view, clearly showing the curve of interpenetration The development of the surface of the hexagonal prism. Make edge 'A’ the seam 80 ee EDGE 'A' IS THE SEAM ASSESSMENT CRITERIA 1 |TOP VIEW 7} 2 |RIGHT VIEW 5 FRONT VIEW 13 DEVELOPMENT 13 PENALTIES (-) TOTAL| 37 EXAMINATION NUMBER, EXAMINATION NUMBER [3 Please tum over
Engineering Graphics and Design/P1 DBE/November 2019 Downloaded from hlayiso.com QUESTION 3: PERSPECTIVE Given: Two views of a house with a pitched roof, the detail of the ramp and the information needed to draw a two-point perspective drawing PP - Picture plane HL - Horizon line GL - Ground line SP - Station point Instructions: Complete the perspective drawing. * Align the drawing sheet with the ground line (GL). « Determine and label the vanishing points Show ALL construction. * NO interior detail is required, * NO hidden detail is required. [39] ASSESSMENT CRITERIA 1 |coNsTRUCTION 6 2 |WALLS 13, 3 [Doors + winDows 83 @ [ROOF 43 " 5 | ARCS 7 \ / PENALTIES () DETAIL OF RAMP TOTAL | 39 PP. T ' \ ' ' \ ' i \ HL HL GL | RANE. GL GL SP EXAMINATION NUMBER EXAMINATION NUMBER [4 Copyright reserved Please tum over
Engineering Graphics and Design/P1 Downloaded from hlayiso so.comMm DBE/November 2019 SCHEMATIC DIAGRAM OF AROOF TRUSS FOR ROOF 'A’ ROOF NOTES: 30° ROOF PITCH 115 x 40 mm ROOF TRUSSES ON 115 x 40 mm WALL PLATES, 300 mm ROOF OVERHANG TO END OF ROOF TRUSS 20 mm FIBRE CEMENT ROOF SHEETING ON 75 x 50 mm PURLINS @ 900 mm cle 300 x 20 mm FASCIA BOARD WITH 150 x 150 mm GUTTERS ON ALL SIDES 300 x 30 x 5 mm BARGE BOARDS ON GABLE ENDS, 40 mm PAST THE GUTTERS 8 mm CEILING BOARD ON 40 x 40 mm BRANDERING STRIPS @ 600 mm cic NOTE: ‘THE ARROW SHOWS THE LIGHT CONNECTION TO THE SWITCH. RIDGE COVER WINDOW AND DOOR SCHEDULE 200%30x5mmBARGE BOARD | 4 |. ep —— 1500 f~—tort _y _— 3 A500 x sf 4 200/ 1 b 8 WINDOW OPENING 2 SIP Ac g SLIDING DOOR OPENING Ra WINDOW (W1) FINISHED FLOOR LEVEL ROOM DESIGNATIONS GROUND LEVEL in x FLOOR FINISHES c 300 x 150 mm STEPS FLOOR FINISHES pet 3 SLIDING DOOR (01) 2. KITCHEN: TILES 58 500% 20mm FASCIA BOARD 3 BEDROOM, CARPET A fy WITH BIOO MN RWOP THAT. 4 BATHROOM, TILES WINDOW (Ww) STOPS 50 mm OFF THE GROUND LEVEL WINDOW NOTES: + A= OPENING SIDE 8 FEATURES + B=HINGED SIDE FS Di+D2 DOORS + C=FIXED PANEL wi+W2 WINDOWS + ALL FRAMES 50 mm THICK * 180x 20 mm SILL TILE UNDER FIXTURES. ALL WINDOWS L we TOILET DOOR (02) we WASH BASIN DOOR NOTE: B BATH * ALL FRAMES 50 mm THICK s SINK ELECTRICAL FITTINGS 4. ONE-WAY SWITCH - SINGLE-POLE 2. ONE-WAY SWITCH - DOUBLE-POLE FIXTURES 3. FLUORESCENT LIGHT 3 x 40 W 5) 4, WALL-MOUNTED LIGHT —a— 4700 5. CEILING LIGHT Lis 2 JO 6. SWITCHED SOCKET OUTLET ats 8 _ 7 SOCKET OUTLET soon 2 )( gd T 8. DISTRIBUTION BOARD FLOOR 1 00 TOILET WASH BASIN BATH poy (we) (we) 8) 2o0x75mmunrers — [L 5 ABOVE ALL WINDOW heir | ELECTRICAL SYMBOLS N | AS“ 6¢ 5S 6 x 3 8 haw c) ROOF COMPONENTS 300 ZS | ROOF CAP AND RIDGE COVER EN = LJ | 190% 150mm GuTTER GROUND LEVEL gp “ <— | 300x 20mm FASCIA BOARD 3 Fl [| 300x30x5mm BARGE BOARD k 600 + INCOMPLETE FOUNDATION AND EXTERNAL WALL DETAIL QUESTION 4: CIVIL DRAWING Given: * The incomplete north elevation of a new self-contained flatlet, showing the walls, the sliding door and window openings, the roof and labels © The incomplete floor plan showing the walls, steps, position of the doors, windows, fixtures and the electrical layout * A schematic diagram of a roof truss for roof ‘A’ and roof notes * Room designations and floor finishes © The incomplete foundation and external wall detail * A window and door schedule * A table of fixtures * A table of electrical symbols * A table of roof components * The incomplete floor plan of the new self-contained fiatlet, drawn to scale 1 : 50, and the incomplete foundation and break line for the detailed section, drawn to scale 1 : 20, on page 6 Instructions: Answer this question on page 6 4.1. Using the given incomplete floor plan, draw, in first-angle orthographic projection and to scale 1 : 50, the following views of the new self-contained flatlet 4.1.1 THE COMPLETE FLOOR PLAN Add the following features to the drawing: * ALL doors and windows © The fixtures as indicated by the abbreviations * ALL electrical fittings as indicated by the numbers * ALL hatching detail 4.1.2 THE COMPLETE NORTH ELEVATION Show the following features on the drawing: © The outside walls, steps, window and door detail *The roof detail, including the barge boards, fascia board, gutter and rainwater down-pipe © The finished floor level 4.2. Using the incomplete foundation on page 6, draw, to scale 1: 20, a DETAILED SECTION on cutting plane AA of the area in the ellipse shown on the incomplete floor plan. Show the following features on the drawing: * The complete foundation and extemal wall detail * The window detail © The roof detail, including the fascia board, gutter and barge board © The bath * ALL hatching detail. ONLY the substructure hatching may be drawn in neat freehand Label the following: © The north elevation * The room designations and floor finishes * Ground level, finished floor level and damp-proof course (use the correct abbreviations and show it on ALL the relevant views) NOTE: ALL drawings must comply with the guidelines and graphical symbols as contained in the SANS 10143, [94] [5| Copyright reserved Please tum over
en Downloaded from hlayiso.com — MARK 2 pong FOR OFFICIAL USE ONLY ‘a & SECTION OF ROOF INCORRECT SCALE(S) A(2) USED B(1) NON-ALIGNMENT OF Ci) VIEWS D@ VIEW(S) ROTATED E (6) SECTION VIEWED INCORRECTLY F (2) ,._] ] INCORRECT ei) LETTERING H(1) 11) TOTAL TOTAL ASSESSMENT CRITERIA FLOOR PLAN POSSBIE | OBTAINED ] SIGN ] NoDERATED 1 | Minoows 14 2 | rocrures 7 3 | etecraion, 10 4 | narcune 3 r q Lrset Je Reorune 5 [uses 4 RNP SUBTOTAL 35 | NORTH ELEVATION | 1 |roor+rwor | 104 | 2 |wasese |g | 3 | winoow 7 | 4 | seis 13 | SUBTOTAL 25 | DETAILED SECTION | 1 [roorcem | 46 | 2 |u| 40 | winoow | 3 [eam 1 | | | 5 | ses 13 7 | SUBTOTAL 34 | _y 4 | TOTAL 94 L a tL ee | PENALTIES (-) GRAND TOTAL DETAILED SECTION A-A FLOOR PLAN SCALE 1: 20 SCALE 1:50 DAWINATION NOES AMM A EXAMINATION NUMBER [6 Copyright reserved

Study this subject

More from Grade 12 Engineering Graphics and Design

View all