Skip to content

Engineering Graphics and Design Grade 11 P1 2018 Memo

MemorandumEngineering Graphics and DesignGrade 1120187 pages

Grade 11 Engineering Graphics and Design Paper 1 memorandum from the Eastern Cape November 2018, 7 pages. Read online or download the free PDF.

Free to read online, no sign-up needed

Loading document…

Loading document…

Document textSearch extracted text and jump to a page.
Downloaded from hlayiso.com ISEBE LEMFUNDO LEMPUMA KOLONI EASTERN CAPE EDUCATION DEPARTMENT OOS-KAAP ONDERWYSDEPARTEMENT NATIONAL SENIOR CERTIFICATE NASIONALE SENIOR SERTIFIKAAT GRADE 11 GRAAD 11 ENGINEERING GRAPHICS AND DESIGN P1 INGENIEURSGRAFIKA EN -ONTWERP V1 NOVEMBER 2018 MEMORANDUM MARKS / PUNTE: 200 TIME / TYD: 3 hours / uur This memorandum consists of 7 pages. Hierdie memorandum bestaan uit 7 bladsye. Copyright reserved / Kopiereg voorbehou
Downloaded from hlayiso.com Engineering graphichs and design/P1 NCS EC / November 2018 ANSWERS ANTWOORD 1 XOLELWA ARCHITECTS 1 1 XOLELWA ARGITEKTE 1 2 CHANEL 1 2 CHANEL 1 3 MRS. H. LORDAN 1 3 MEV. H. LORDAN 1 4 ONE ( 1 OF 4) 1 4 EEN ( 1 VAN 4) 1 5 RODDING EYE 1 5 STEEKOOG 1 6 MAN HOLE 1 6 MANGAT 1 7 RAMP 1 7 OPRIT 1 MUUR IS NIE TOT TEEN PLAFON 8 WALL IS NOT CEILING HEIGHT 2 8 2 NIE 9 RED 1 9 ROOI 1 10 GREY 2 10 GRYS 2 11 SOUTH 2 11 SUID 2 NO NEE 12 2 12 2 WALLS NOT HATCHED MURE IS NIE GEARSEER NIE. 13 900 1 13 900 1 TOTAL 23 TOTAAL 23 QUESTION / VRAAG 1B: ANTWOORD / QUESTION 14 Toon alle berekeninge / Show all calculations VCC = 6V calculation: add 1 1 1 optel berekening correct values 2x (13.875 + 11.375) korrekte waardes correct answer = 50,5 m 1 korrekte antwoord 9 + correct unit korrekte eenheid (13.875 + 11.375 + 10.425 + 3.45 + 3.8 + 7.575 = 50,5 m) [3] + ANTWOORD / QUESTION 15 Toon alle berekeninge /Show all calculations calculation (X) berekening (X) + 1 1 1 correct values 6 x 3.8 korrekte waardes correct answer korrekte antwoord correct unit and 1 9 korrekte eenheid en conversion to m = 22,8 m² omskakeling na m FIRE ALARM BRANDALARM [7] [3] 2 Copyright reserved Please turn over
Engineering graphichs and design/P1 NCS EC / November 2018 3 9 3 = 4 5 9 9 = 15 3 3 5 5 = 3 12 9 9 9 = 9 9 9 9 9 9 5 9 9 9 ASSESSERINGSKRITERIA 9 3 3 9 5 9 9 KONSTRUKSIE + 9 9 9 1 PLASING 4 H9 H 9 9 2 BO-AANSIG 6 9 9 9 9 3 D/S VOORAANSIG 19 9 9 9 9 9 4 ARSERING 2 3 5 3 5 LINKERAANSIG 15 3 5 TOTAAL 46 X Y 2 A 2 ASSESSMENT CRITERIA CONSTRUCTIONS + 9 1 PLACING 4 2 2 2 2 TOP VIEW 6 3 2 3 SEC. FRONT VIEW 19 2 Downloaded from hlayiso.com H 4 HATCHING 2 2 5 5 LEFT VIEW 15 2 TOTAAL 46 2 2 = 5 9 2 1 Correct placing of cutting plane 9 = = 1 Korrekte plasing van snyvlak A 3 Copyright reserved Please turn over
Downloaded from hlayiso.com Engineering graphichs and design/P1 NCS EC / November 2018 1 PP PP 1 1 1 1 1 1 1 HL HL LVP RVP 1 1 GL SP 3 3 2 2 3 2 2 2 2 2 2 2 2 3 3 3 [14 2 = 7] 2 3 3 3 [9] 2 [8] 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 3 2 2 2 2 2 2 [4.5] [2.5] 3 3 2 3 3 SP ASSESSMENT CRITERIA ASSESSERINGSKRITERIA 1 1 CONSTRUCTION + VPs 5 1 KONSTRUKSIE & VPte 5 2 2 FIXTURES 24 2 TOEBEHORE 24 3 3 WALLS 7 3 MURE 7 TOTAL 36 TOTAL 36 4 Copyright reserved Please turn over
Engineering graphichs and design/P1 NCS EC / November 2018 ASSESSMENT CRITERIA FLOOR PLAN 1 + 2 2 1 DOORS WINDOWS 15 2 2 2 2 2 2 2 2 2 2 2 2 2 FIXTURES 13 2 3 3 HATCHING 3 4 KOMBUIS 4 4 EETKAMER BADKAMER HOUT 4 TEËLS 4 TEËLS 4 4 4 LABELS 6 BATHROOM 2 KITCHEN DININGROOM 2 TILES TILES 2 SUBTOTAL 37 WOOD 2 2 2 2 2 2 2 ASSESSERINGSKRITERIA VLOERPLAN 2 & 2 1 DEURE VENSTERS 15 2 TOEBEHORE 13 BEDROOM CARPET 3 ARSERING 3 SLAAPKAMER 4 MAT 4 4 BYSKRIFTE 6 STOEP 4 FAMILIEKAMER 4 TEËLS 4 TEËLS 4 Arsering: Alles gearseer 9 SUB TOTAAL 37 PORCH FAMILY ROOM Korrekte tipe 9 TILES Met instrumente 9 TILES Downloaded from hlayiso.com 6 X VENSTERS Hathing: All hatched 9 6 X WINDOWS Correct type 9 Instruments used 9 1 1 1 1 1 3 X DOORS 3 X DEURE 1 VLOERPLAN SKAAL 1 : 50 FLOOR PLAN SCALE 1 : 50 5 Copyright reserved Please turn over
Engineering graphichs and design/P1 NCS EC / November 2018 1 2 2 2 2 2 2 1 2 2 2 2 2 2 2 2 1 1 2 2 2 2 1 2 2 2 2 2 2 2 2 9 FFL 1 1 1 1 1 1 1 1 NGL 1 WES ELEVASIE WEST ELEVATION 9 SCALE 1 : 50 SKAAL 1 : 50 9 ASSESSMENT CRITERIA ASSESSERINGSKRITERIA WEST ELEVATION WES ELEVASIE 1 1 WALLS + STEPS + FFL 7 1 MURE + TRAP + VVV 7 Downloaded from hlayiso.com 2 2 WINDOWS 13 2 VENSTERS 13 9 3 LABELS 3 3 BYSKRIFTE 3 SUBTOTAL 23 SUBTOTAL 23 6 Copyright reserved Please turn over
Downloaded from hlayiso.com Engineering graphichs and design/P1 NCS EC / November 2018 1 3 9 3 9 9 3 2 2 1 1 9 999 ASSESSMENT CRITERIA 9 9 DETAILED SECTION DPC 9 3 1 1 FOUNDATIONS + WALLS + SLAB 8 9 FFL 9 2 2 WINDOW + SILL + LINTEL 10 9 DPC 1 1 1 3 1 1 3 3 3 HATCHING 6 3 1 1 3 9 4 LABELS 4 9 NGL 1 28 1 3 SUBTOTAL 3 3 1 ASSESSERINGSKRITERIA 1 3 1 1 DEURSNEE AANSIG BEGINPUNT VIR GEDETAILEERDE SNIT 1 FONDASIE + MURE + VLOER 8 STARTING POINT FOR DETAILED SECTION 2 VENSTER + -BANK + LATEI 10 GEDETAILEERDE SNIT A-A SKAAL 1 : 20 3 ARSERING 6 DETAILED SECTION A-A SCALE 1 : 20 4 BYSKRIFTE 4 SUBTOTAAL 28 7 Copyright reserved

Study this subject

More from Grade 11 Engineering Graphics and Design

View all