INSTRUCTIONS AND INFORMATION
FOR OFFICIAL USE ONLY
MODERATED
NATIONAL MARK
SENIOR CERTIFICATE 1
2
3
4
GRADE 12 TOTAL
2 0 0 2 0 0
FINAL CONVERTED CHECKED BY
MARK
*GRDSE1*
ENGINEERING GRAPHICS AND DESIGN P1
100
SEPTEMBER 2025
COMPLETE THE FOLLOWING:
PREPARATORY EXAMINATION
NAME
NAME
MARKS: 200
EXAMINATION CENTRE
TIME: 3 hours
This question paper consists of 6 pages.
EXAMINATION CENTRE
Copyright reserved
Please turn over
Skip to contentAll 2025 papers 





View all





Engineering Graphics and Design Grade 12 P1 2025 QP (Eng)
Grade 12 Engineering Graphics and Design Paper 1 question paper from the Eastern Cape Mock Exam 2025 (English), 6 pages. Read online or download the free PDF.
Engineering Graphic And Design · Grade 12 · Eastern Cape Mock Exam · 2025 · English. Question paper, 6 pages. Read online or download the PDF.
- Subject
- Engineering Graphics and Design
- Grade
- Grade 12
- Language
- English
- Document type
- Question paper
- Year
- 2025
- Exam period
- Eastern Cape Mock Exam
- Paper
- 1
- Curriculum
- CAPS
- Pages
- 6
- File size
- 657.8 KB
Free to read online, no sign-up needed
Loading document…
Loading document…
1 of 6
This exam
Eastern Cape Mock Exam 2025
- Paper 1Question paperMemo
- Paper 2Question paper · AfrMemo · Eng
Questions in this paper
Document textSearch extracted text and jump to a page.
Engineering graphics and design/P1 NSC EC/September 2025
QUESTION 1: ANALYTICAL (CIVIL)
LAND SURVEYOR'S CERTIFICATE NOTE:
SYMBOL LEGEND Contractors must verify all dimensions Given:
OF THE BORDER LINE LENGTHS
1
2 000 mm LENGTH
AND CORNER HEIGHTS OF and levels on the site before The site plan of an existing dairy stall with alterations of a new proposed deli on stand 2389, a title block and a table of
PER CATTLE PANEL commencing work. Architects to be
STAND 2389 questions. The drawing has not been prepared to the indicated scale.
1 800 mm HIGH notified immediately of any
2 SECURITY FENCING SURVEYED ON 2025-04-15 discrepancies.
BORDERLINE Instructions:
CORNER HEIGHTS IN Complete the table below by neatly answering the questions which refer to the accompanying drawing and title block. [28]
3
PIVOT- SINGLE LENGTHS IN
TOWER METRES ARCHITECT'S SIGNATURE ...................................
MILLIMETRES
4 INDIGENOUS TREE
AB = 99 120
BC = 116 760
A = 613,5
B = 613
CLIENT'S SIGNATURE ...................................
QUESTIONS ANSWERS
CD = 92 960 C = 615 1 What is the name of the architect firm? 1
5 HEDGE SHRUB
DA = 82 810 D = 615,5 ANSWER 17
SINGLE In the space below, draw in neat
6 SILO WITH 32 TON 2 On what date was the site plan printed? 1
FEEDING CAPACITY freehand, the front view and top view
of the SANS 10143 graphical symbol
for a WATER CLOSET. 3 What was the reason for the second revision of the site plan? 1
4 How many existing cattle pens are there on stand 2389? 1
STAND 2388 B
In what colour should the existing dairy stall be presented on the
Y STR
EE T 5
siteplan?
1
EF
ETI
R 0 BL
180 6 How many cattle panels are used for cattle pen D and E? 1
EXISTING
CATTLE
STEEL PEN D
7 Name the feature at Y. 1
SECURITY
SLIDING GATE
8 Name the feature at Z. 1
Z EXISTING
CATTLE
A VIS PEN E What is the purpose of the open space, in front of the dairy stall, on
9 1
ITO the site plan?
RP
EXISTING TURNING AREA ARK 10 What does the abbreviation RE stand for? 1
30 FOR MILK TANKER
517
CATTLE
4 PEN A ING 3
61
STAND 2389 11 What is the total feed storage capacity of the silos on stand 2389? 1
Add a steel security
2 2025-05-12 sliding gate
Indicate the height of 12 Determine the diameter of the water reservoir, in meters. 2
800 BL
1 2025-04-22 the security fence
REVISION DATE DESCRIPTION In relation to the north point, which elevation of the existing dairy
13 2
stall faces Retief street?
MARITZ AND POTGIETER
PROPOSED ARCHITECTS Determine the shortest distance from the dairy stall to the
EXISTING 14 3
CATTLE NEW DELI 211 COMBRETUM ROAD borderline, AB, next to Retief street, in meters.
PEN B HUMEWOOD, GQEBERHA Determine, in the space provided below (ANSWER 15) the total length of the cattle panels around
082 119 2678 15 3
cattle pen A, in meters. Show all calculations.
1800 BL
EXISTING IE mp.architects@gmail.com
RE IE Determine, in the space provided below (ANSWER 16), the total area of the existing dairy stall and
DAIRY STALL PRINTED BY: DATE OF PRINT:
16 3
VIVID DESIGNS 2025-06-18 proposed new deli, on stand 2389, in square meters. Show all calculations and formula.
DRAWING TITLE: In the space at the title panel (ANSWER 17), draw in neat freehand, the top view and front view of the
SITE PLAN 17 4
PROPOSED SANS 10143 graphical symbol for a water closet.
NEW CATTLE
IEIE PROJECT: ANSWER 15 ANSWER 16
615
PEN C
W
RE
NEW DELI PROPOSAL Show ALL calculations. Show ALL calculations. TOTAL 28
ON STAND 2389 FOR
WATER 32400
MRS. D. VAN JAARSVELD
RESERVOIR R 3570 Cnr. RETIEF STREET, PATENSIE
17500
900 BL TANK
D C PROJECT NUMBER: DRAWING NUMBER:
31500
10-2025 KD-18/04-25
DATE: DRAWN: CHECKED: SCALE:
SITE PLAN 2025-03-15 GEOFFREY CLARK 1 : 700 NAME
SCALE 1 : 700 REFERENCE CODE: DRAWING NO.:
19300
SITE- 2389-25 1 of 4 NAME 2
Copyright reserved Please turn over
Engineering graphics and design/P1 NSC EC/September 2025
QUESTION 2: INTERPENETRATION AND DEVELOPMENT
Given:
x The complete top view and incomplete front view of a
pentagonal pipe S with a square branch pipe T. The axes
of both pipes lie in a common vertical plane.
Instructions:
Draw to scale 1 : 1, the following views of the two pipes:
2.1 The given top view.
2.2 The complete front view clearly showing the curve of the
interpenetration.
2.3 The left view, which ONLY shows the main pipe S, which
clearly shows the line of interpenetration between the two
pipes.
2.4 Develop the surface of branch pipe T.
x ALL hidden detail is required.
x Show ALL necessary constructions.
[35]
40
A
T S
75
30
30°
X Y
10
T 40
A
S
45°
ASSESSMENT CRITERIA
75
1 TOP VIEW 9
2 FRONT VIEW 11½
3 LEFT VIEW 7½
4 DEVELOPMENT 7
PENALTIES (-)
TOTAL 35
NAME
NAME 3
Copyright reserved Please turn over
Engineering graphics and design/P1 NSC EC/September 2025
QUESTION 3: PERSPECTIVE ASSESSMENT CRITERIA
Given:
1 CONSTRUCTION + VP's 6
x Three views of a house with a hip and valley roof design and
the information needed to draw a two-point perspective
drawing. 2 WALLS + PORCH + STEP 18
PP − Picture plane 3 ROOF 4
HL − Horizon line WINDOWS + DOOR + WALL
GL − Ground line 4 INSERT 9½
SP − Station point
5 ARCH + CONSTRUCTION 4½
Instructions:
Complete the perspective drawing. PENALTIES (-)
x Align the drawing sheet with the ground line (GL). TOTAL 42
x Determine and label the vanishing points.
x Show ALL necessary construction.
x NO hidden detail is required. [42]
WINDOW
DOOR
WALL INSERT
PP
WALL
INSERT
HL HL
DOOR WINDOW
FFL FFL
GL
NAME
SP
NAME 4
Copyright reserved Please turn over
Engineering graphics and design/P1 NSC EC/September 2025
RIDGE COVER QUESTION 4: CIVIL DRAWING
CONCRETE SLAB Ø100 mm RWDP THAT
DOOR AND WINDOW SCHEDULE STOPS 100 mm ABOVE THE Given:
FASCIA BOARD FINISHED FLOOR LEVEL x The incomplete south elevation of a new house, showing the
TO FIT
600 20° GUTTER walls, windows and door openings, the steps and patios with
pillars, the roof and notes.
1200
x The incomplete floor plan showing the walls, steps, patios with
400 600 pillars, position of the doors, windows, fixtures and the
A
electrical layout.
3050
A
2100
WINDOW 2180 x A schematic diagram of a single roof truss and roof notes.
950 A (W2)
B x The incomplete foundation and external wall with dimensions.
x A door and window schedule.
WINDOW
x A table of electrical symbols.
WINDOW NOTES 150 x A table of roof components.
(W1)
A = OPENING SIDE INCOMPLETE SOUTH ELEVATION FINISHED FLOOR LEVEL
B = FIXED PANEL
GROUND LEVEL x Floor finishes.
DOOR (D1) THICKNESS OF ALL RWDP x A table of sanitary fixtures.
1870 W1
FRAMES: 50 mm W2 x The incomplete floor plan, of a new house, drawn to scale
WC 1 : 50, and the incomplete foundation and break lines for the
WINDOW SILL:
750 180 x 20 mm
3 detailed section, drawn to scale 1 : 20, on page 6.
D1 B
A A 5
1700
FIBRE CEMENT 2
5 D1
B WINDOW SILL UNDER 1
B B S 1 Instructions:
ALL WINDOWS WB
D1 Answer this question on page 6.
W1 4.1 Use the given incomplete floor plan, to draw, in first-angle
WINDOW DOOR FRAME PROFIL: 3
11 (W3)
4 FLOOR FINISHES orthographic projection to scale 1 : 50, the following views of
50 50 the new house:
11 1. KITCHEN: TILES
80 A D1 2. BEDROOM: CARPET 4.1.1 THE COMPLETE FLOOR PLAN
5
1 2 3. BATHROOM: TILES Add the following features to the drawing:
1
80
6 D1 4. LIVING ROOM: WOOD x ALL doors and windows
RWDP x ALL sanitary fixtures as indicated by the abbreviations
FEATURES x ALL electrical fittings as indicated by the numbers
ROOF COMPONENTS D1 DOORS
W3 x ALL hatching detail
W1 + W2 + W3 WINDOWS
300 A 4.1.2 THE COMPLETE SOUTH ELEVATION
RIDGE COVER
FIXTURES FLOORPLAN Show the following features on the drawing:
S SINK SCALE 1 : 50 x The outside walls, door, step, patios with pillars and the
200 x 20 mm
B BATH detailed windows.
FASCIA BOARD
WC TOILET
WB WASH BASIN
x The roof detail, including the fascia boards, ridge covers
150 x 100 GUTTER 250 1 X 250 x 100 mm LINTEL and gutters.
ELECTRICAL FITTINGS CONCRETE SLAB ABOVE ALL DOOR AND x The finished floor level.
ELECTRICAL SYMBOLS 1. ONE-WAY SWITCH - SINGLE-POLE WINDOW OPENINGS ROOF NOTES: 4.2 Using the given foundation and break line on page 6,
2. TWO-WAY SWITCH - SINGLE-POLE 20° ROOF PITCH draw, to scale 1 : 20 a DETAILED SECTION on cutting
3. SWITCHED SOCKET OUTLET
4. FLUORESCENT LIGHT 2 x 40 W 150 plane A-A of the area in the ellipse shown on the
114 x 38 mm ROOF TRUSSES ON
5. CEILING LIGHT
114 x 38 mm WALL PLATES
incomplete floor plan.
6. WALL-MOUNTED LIGHT Show the following features on the drawing:
W 300 mm ROOF OVERHANG TO THE END OF THE ROOF TRUSS x The complete foundation-, concrete slab-, external wall-,
n x 40 W
NOTE: lintel and door frame detail.
THE ARROWS ON THE FLOOR PLAN SHOW ROOF COVER: 20 mm FIBRE CEMENT ROOF SHEETING x The step, with the pillar, to the west of the cutting plane
2520
THE LIGHT CONNECTION TO THE SWITCH. ON 75 x 50 mm PURLINS @ 900 mm c/c
A-A
SANITARY FIXTURES 2180 2100 200 x 20 mm FASCIA BOARD WITH 150 X 100 mm GUTTERS ON ALL x The roof detail, including the fascia board and gutter.
SIDES AND A Ø100 mm RAINWATER DOWN-PIPE x ALL hatching detail. ONLY the substructure hatching
500 may be drawn in neat freehand.
400
10 mm CEILING BOARD ON 38 x 38 mm BRANDERING @ 400 mm c/c
Label the following:
130
850
200 400 900 SCHEMATIC DIAGRAM OF x The south elevation.
750
ROOF TRUSS FOR ROOF x The floor finishes.
400 150 x Ground level and finished floor level (use the correct
FLOOR LEVEL
200 300 c/c
230 GROUND LEVEL 900 abbreviations and show it on ALL the relevant views)
400 350 c/c NOTE:
600 200 400 900
700 ALL drawings must comply with the guidelines and graphical
500
200 c/c
900 symbols as contained in the SANS 10143. [95]
600 600 20°
1700 1200
DIMENSION GUIDE: 400 c/c 400 c/c 400 c/c
WASH BASIN TOILET BATH SINK INCOMPLETE FOUNDATION AND
(WB) (WC) (B) (S) EXTERNAL WALL DETAIL
5
Copyright reserved Please turn over
Engineering graphics and design/P1 NSC EC/September 2025
ROOF DETAIL: PENALTIES
MARK ALLOCATION 1 INCORRECT SCALE
1
A ROOF ANGLE 2
2 NON-ALIGNMENT OF VIEWS
B ROOF SHEET 1
3 INCORRECT LETTERING
C ROOF TRUSS 221
OVERHANG
TOTAL PENALTIES (-)
D PURLIN +
121
SPACING
E
BRANDERING
+ SPACING
121 ASSESSMENT CRITERIA
CEILING
F
BOARD
1
2 FLOOR PLAN
DOORS +
G WALL PLATE 1
1 WINDOWS
15
H FACIA BOARD 121
2 ELECTRICAL 8
I GUTTER 1
3 FIXTURES 7
TOTAL 11
4 HATCHING 3
5 LABELS 2
NGL
SUBTOTAL 35
EAST ELEVATION
1 ROOF DETAIL 8
BATHROOM WALLS + PATIOS
2 + STEP
10 21
3 DOOR + WINDOW 8
BEDROOM
4 LABELS 1
SUBTOTAL 27 21
DETAILED SECTION
KITCHEN
1 ROOF DETAIL 11
FOUNDATIONS +
2 WALLS + FLOOR 7 21
LIVING ROOM + PILLAR
DOOR + STEPS +
3 CONCRETE SLAB
5
A 4 HATCHING 8 21
1
5 LABELS 2
SUBTOTAL 32 21
TOTAL 95
PENALTIES (-)
GRAND TOTAL
A
FLOOR PLAN
SCALE 1 : 50
NAME
DETAILED SECTION A-A
SCALE 1 : 20 NAME 6
Copyright reserved
Study this subject
Recommended for this subject

Memorandum
Engineering Graphics and Design Grade 12 P2 2025 Memo (Eng)

Memorandum
Engineering Graphics and Design Grade 12 P1 2025 Memo

Question paper
Engineering Graphics and Design Grade 12 P1 2013 QP

Memorandum
Engineering Graphics and Design Grade 12 P1 2023 Memo (Afr)

Memorandum
Engineering Graphics and Design Grade 12 P1 2022 Memo

Memorandum
Engineering Graphics and Design Grade 12 P1 2018 Memo
More from Grade 12 Engineering Graphics and Design

Memorandum
Engineering Graphics and Design Grade 12 P2 2025 Memo

Memorandum
Engineering Graphics and Design Grade 12 P2 2024 Memo (Eng)

Question paper
Engineering Graphics and Design Grade 12 P1 2023 QP (Eng)

Question paper
Engineering Graphics and Design Grade 12 P2 2023 QP (Afr)

Question paper
Engineering Graphics and Design Grade 12 P2 2023 QP (Eng)

Question paper