NATIONAL
SENIOR CERTIFICATE
GRADE 11
NOVEMBER 2018
CIVIL TECHNOLOGY: WOODWORKING
MARKS: 200
TIME: 3 hours
*ICvlte3*
This question paper consists of 19 pages, including 5 pages of answer sheets.
Skip to contentAll 2018 papers 





View all

/CIV%20TECH%20GR11%20MEMO%20NOV2022_Civil%20Services_Afrikaans_hlayiso.com_--85a9ce14-da0c-4943-8570-643c7a62e6a8/v1-16d2544947d7d7544935/card.webp)
/CIV%20TECH%20GR11%20MEMO%20NOV2022_Construction_Afrikaans_hlayiso.com_--6d31745c-a94c-4612-8aef-4e9b624a57b0/v1-b3dbeb7485c9d23d03e8/card.webp)


Civil Technology Grade 11 Eastern Cape November 2018 QP
Grade 11 Civil Technology question paper from the Eastern Cape November 2018 (English), 24 pages. Read online or download the free PDF.
Civil Technology · Grade 11 · Eastern Cape November · 2018. Question paper, 24 pages. Read online or download the PDF.
- Subject
- Civil Technology
- Grade
- Grade 11
- Document type
- Question paper
- Year
- 2018
- Exam period
- Eastern Cape November
- Curriculum
- CAPS
- Pages
- 24
- File size
- 1.0 MB
Free to read online, no sign-up needed
Loading document…
Loading document…
1 of 24
This exam
Eastern Cape November 2018
- Other filesQuestion paper · EngQuestion paper · Eng (2)Question paper · Eng (3)Question paper · Eng (4)Question paper · Eng (5)Question paper · Eng (6)Question paper · AfrQuestion paper · Afr (2)Question paper · Afr (3)Question paperQuestion paper (2)Question paper (3)Memo · EngMemo · Eng (2)Memo · Eng (3)Memo · AfrMemoMemo (2)
Document textSearch extracted text and jump to a page.
Downloaded from hlayiso.com
2 CIVIL TECHNOLOGY: WOODWORKING (EC/NOVEMBER 2018)
REQUIREMENTS:
1. ANSWER BOOK
2. Drawing instruments
3. A non-programmable pocket calculator
INSTRUCTIONS AND INFORMATION
1. This question paper consists of SIX QUESTIONS: TWO questions are
generic and FOUR questions are subject specific.
2. Answer ALL the questions.
3. Answer each question as a whole. Do NOT separate subsections of
questions.
4. Start the answer to EACH question on a NEW page.
5. Do NOT write in the margins of the ANSWER BOOK.
6. You may use sketches to illustrate your answers.
7. Write ALL calculations and answers in the ANSWER BOOK or on the
attached ANSWER SHEETS.
8. Use the mark allocation as a guide to the length of your answers.
9. Make drawings and sketches in pencil, fully-dimensioned and neatly
finished off with descriptive titles and notes to conform to the SANS/SABS
Code of Practice for Building Drawings.
10. For the purpose of this question paper, the size of a brick should be taken
as 220 mm x 110 mm x 75 mm.
11. Use your own discretion where dimensions and/or details have been
omitted.
12. Answer QUESTIONS 2.6, 3.1, 4.5, 5.4 and 6.6 on the attached ANSWER
SHEETS using drawing instruments where necessary.
13. Write your NAME on every ANSWER SHEET and hand them in with your
ANSWER BOOK, whether you have answered the question or not.
14. Due to electronic transfer, drawings in the question paper are NOT to
scale.
Copyright reserved Please turn over
Downloaded from hlayiso.com
(EC/NOVEMBER 2018) CIVIL TECHNOLOGY: WOODWORKING 3
QUESTION 1: SAFETY AND MATERIAL (GENERIC)
1.1 Answer the following questions with regard to the safety equipment in
FIGURE 1.1.
FIGURE 1.1
1.1.1 What is the safety equipment in FIGURE 1.1 called? (1)
1.1.2 On which type of site is this type of safety equipment compulsory? (1)
1.2 Describe the safety measure which is applicable to each of the following
factors:
1.2.1 Loose clothing (1)
1.2.2 Type of shoes in a workshop (1)
1.2.3 Carrying of sharp objects (1)
1.2.4 Dangerous moving parts of power tools (1)
1.2.5 Number of operators who operate a machine (1)
1.3 Who is responsible for the safety of visitors on a construction site? (1)
1.4 Name any FOUR safety measures which are applicable to the storage of
flammable liquids. (4 x 1) (4)
1.5 Unreinforced concrete, reinforced concrete and precast concrete are used
on construction sites.
Identify the type of concrete which will be used for the following work:
1.5.1 Suspended concrete floors (1)
1.5.2 Lintels above door openings (1)
1.5.3 Foundations for single-storey buildings (1)
Copyright reserved Please turn over
Downloaded from hlayiso.com
4 CIVIL TECHNOLOGY: WOODWORKING (EC/NOVEMBER 2018)
1.6 Name ONE use of screed. (1)
1.7 Name TWO reasons why lime can be added to a mortar mix. (2 x 1) (2)
1.8 Briefly motivate why pine wood is used for carpentry work on a
construction site. (2)
1.9 Indicate whether the following statements are TRUE or FALSE. Write only
the word ‘true’ or ‘false’ next to the number in the ANSWER BOOK.
1.9.1 Board products are cheaper than solid wood products. (1)
1.9.2 Stock bricks are manufactured from cement. (1)
1.9.3 Face bricks must be plastered. (1)
1.9.4 Cement blocks are cast with hollow cores to make them lighter. (1)
1.10 Briefly motivate why sinks are manufactured from stainless steel. (2)
1.11 Briefly describe what an alloy is. (3)
1.12 Name ONE use of thermosetting plastic. (1 x 1) (1)
[30]
Copyright reserved Please turn over
Downloaded from hlayiso.com
(EC/NOVEMBER 2018) CIVIL TECHNOLOGY: WOODWORKING 5
QUESTION 2: EQUIPMENT, TOOLS AND GRAPHICS (GENERIC)
2.1 Answer the following questions with regard to the hand tool in FIGURE 2.1.
2.1.A
FIGURE 2.1
2.1.1 What is this tool called? (1)
2.1.2 Describe the purpose of part 2.1.A. (2)
2.1.3 Briefly motivate why part 2.1.A must be replaced regularly. (2)
2.2 Identify the tool in FIGURE 2.2 and name THREE measures that should be
taken to care for it.
(4)
FIGURE 2.2
2.3 Identify the tool in FIGURE 2.3 and name THREE measures that should be
taken to care for it.
(4)
FIGURE 2.3
2.4 Name TWO measures for caring for a concrete mixer. (2 x 1) (2)
Copyright reserved Please turn over
Downloaded from hlayiso.com
6 CIVIL TECHNOLOGY: WOODWORKING (EC/NOVEMBER 2018)
2.5 Answer the following questions with regard to the plan elevation in
FIGURE 2.5.
PROTEA STREET
2.5.B
2.5.A
2.5.C
PLOT 124 PLOT 126 PLOT 128
PLOT 135 PLOT 137
FIGURE 2.5
2.5.1 What is the plan elevation called? (1)
2.5.2 What is die plot number of the plot on the west side of plot 126? (1)
2.5.3 What are the lines at 2.5.A called? (1)
2.5.4 Identify the symbols at 2.5.B and 2.5.C. (2)
Copyright reserved Please turn over
Downloaded from hlayiso.com
(EC/NOVEMBER 2018) CIVIL TECHNOLOGY: WOODWORKING 7
2.6 FIGURE 2.6, on ANSWER SHEET A, shows an incomplete section view of
a single brick wall. Complete the section view to scale 1 : 20 and show the
following parts with symbols and labels:
2.6.1 A strip foundation of 700 x 250 mm with the invert level of 400 mm (3)
2.6.2 A single brick wall with a height of 2 700 mm from the floor level
and 10 mm plaster work on the outside and inside (5)
2.6.3 The hardcore filling of 250 mm (1)
2.6.4 The dampproof course (2)
2.6.5 The blinding layer of 50 mm (1)
2.6.6 The concrete floor slab of 90 mm (1)
2.6.7 A door opening with a height of 2 100 mm (1)
2.6.8 A concrete lintel with a thickness of 70 mm above the door
opening (2)
2.6.9 A wall plate of 114 x 38 mm (2)
2.6.10 Show any TWO labels. (2 x 1) (2)
[40]
Copyright reserved Please turn over
Downloaded from hlayiso.com
8 CIVIL TECHNOLOGY: WOODWORKING (EC/NOVEMBER 2018)
QUESTION 3: QUANTITIES, JOINING AND GRAPHICS (GENERIC)
3.1 FIGURE 3.1 shows the foundation wall of a building. The width of the wall
is 220 mm and the height 450 mm.
9 000
6 000
FIGURE 3.1
Use the quantity list on ANSWER SHEET B and calculate the following:
3.1.1 Determine the centre line of the foundation wall. (6)
3.1.2 Determine the quantity of bricks needed to build the foundation
wall. Make provision for 5% brick breakages. (9)
3.2 Fully describe the purpose of the description column on the dimension
paper for quantities. (3)
3.3 Describe, in point form, the application process of contact glue. (3)
3.4 Which joining glue/material consists of resin and a hardener? (1)
3.5 Name TWO properties of mastic sealant. (2 x 1) (2)
3.6 Make neat sketches to illustrate the following symbols on a floor plan:
3.6.1 Gully (2)
3.6.2 Check valve (2)
3.6.3 Dressed wood (2)
[30]
Copyright reserved Please turn over
Downloaded from hlayiso.com
(EC/NOVEMBER 2018) CIVIL TECHNOLOGY: WOODWORKING 9
QUESTION 4: MATERIAL, TOOLS, GRAPHICS AND WINDOWS (SPECIFIC)
Start this question on a NEW page.
4.1 Name the two groups into which solid wood is divided. (2)
4.2 Choose the correct answer from those in brackets for the seasoning of timber
and write only the question number with the correct answer in your ANSWER
BOOK.
4.2.1 The compartment kiln method is (more expensive / cheaper) than
natural seasoning. (1)
4.2.2 (Any type of wood / Only hardwood) can be dried artificially. (1)
4.2.3 A progressive kiln is only recommended for wood with a
thickness of (150 mm / 50 mm). (1)
4.2.4 The moist content in wood can be reduced by up to (25% / 15%). (1)
4.3 Answer the questions on the following machine in FIGURE 4.3.
4.3.A 4.3.D
4.3.B 4.3.E
4.3.C
FIGURE 4.3
4.3.1 What is the name of the machine? (1)
4.3.2 Identify the parts 4.3.A to 4.3.E. (5)
4.4 List ONE use of each of the following portable woodworking machines:
4.4.1 Jig saw (1)
4.4.2 Orbital sander (1)
4.4.3 Router (1)
Copyright reserved Please turn over
Downloaded from hlayiso.com
10 CIVIL TECHNOLOGY: WOODWORKING (EC/NOVEMBER 2018)
4.5 FIGURE 4.5 on ANSWER SHEET C shows the incomplete view of a building.
Complete on a scale of 1:50, the SA-type roof truss with roof construction
supported on the outside walls. The roof pitch is at 30° and overhang is 300
mm. (12)
4.6 Identify the following mouldings: (3)
FIGURE 4.6.1 FIGURE 4.6.2 FIGURE 4.6.3
[30]
Copyright reserved Please turn over
Downloaded from hlayiso.com
(EC/NOVEMBER 2018) CIVIL TECHNOLOGY: WOODWORKING 11
QUESTION 5: JOINING, WINDOWS, DOORS AND WALL PANELLING
(SPECIFIC)
5.1 What is the function of a fixing lug on a metal doorframe? (1)
5.2 Name THREE methods to fix a shelf to a wall. (3 x 1) (3)
5.3 Answer the following questions on the joint construction in FIGURE 5.3.
5.3.C
5.3.A
5.3.B
FIGURE 5.3
5.3.1 What is the name of the joint? (1)
5.3.2 In what type of construction will you use this joint? (1)
5.3.3 What part is 5.3.A? (2)
5.3.4 What type of cheek is 5.3.B and 5.3.C? (2)
5.3.5 If hand tools are used to make this joint, what type of chisel will be
used to chisel the hole? (1)
5.4 FIGURE 5.4 on ANSWER SHEET D shows the incomplete horizontal view
of a stile lipped and partially rebated into the mullion of a casement with
glass.
Complete in good proportion the different parts of the stile of the adjacent
left view:
5.4.1 Ovolo moulding (2)
5.4.2 Putty for the glass (1)
5.4.3 Complete the lip of the stile (2)
5.4.4 Drip groove (2)
Copyright reserved Please turn over
Downloaded from hlayiso.com
12 CIVIL TECHNOLOGY: WOODWORKING (EC/NOVEMBER 2018)
5.5 Motivate why a minimum space of 2 mm is allowed between the edge of the
panel door and the edge of the groove. (2)
5.6 Make a neat drawing in good proportion of the back view of the framed,
ledged and braced batten door. (6)
5.7 Name FOUR advantages of plywood for wall panelling. (4)
[30]
Copyright reserved Please turn over
Downloaded from hlayiso.com
(EC/NOVEMBER 2018) CIVIL TECHNOLOGY: WOODWORKING 13
QUESTION 6: CENTRING, FORMWORK, SHORING, IRONMONGERY AND
SUSPENDED FLOORS (SPECIFIC)
6.1 Discuss FOUR requirements for the construction of centring. (4 x 1) (4)
6.2 What type of centring will you use for the construction of a flat arch? (1)
6.3 Name the different parts 6.3.A to 6.3.E of the centre in FIGURE 6.3. (5)
6.3.A
6.3.B
6.3.C
6.3.D
6.3.E
FIGURE 6.3
6.4 Name TWO advantages of board products that you can use for the sides of
formwork. (2 x 1) (2)
6.5 Describe the purpose of the following requirements for the parts of formwork:
6.5.1 The inside faces of timber should be treated with mould oil. (2)
6.5.2 The thickness of matching members of the formwork should be
uniform. (2)
6.5.3 Bolts should be greased. (2)
Copyright reserved Please turn over
Downloaded from hlayiso.com
14 CIVIL TECHNOLOGY: WOODWORKING (EC/NOVEMBER 2018)
6.6 FIGURE 6.6 on ANSWER SHEET E shows the vertical view of a wall, sole
plate and soffit shutter board for a floor slab. Complete the drawing and
show all the different parts on a scale of 1 : 20. (10)
6.7 Describe what the purpose of folding wedges are in the erection process of
a floor slab. (2)
6.8 Explain the purpose of yokes in the formwork process for a square column. (2)
6.9 Indicate whether the following statements are TRUE or FALSE. Write only
the word ‘true’ or ‘false’ next to the number in the ANSWER BOOK.
6.9.1 Shoring is a permanent construction that can be used to support a
wall. (1)
6.9.2 Raking shores are used on top of foundation excavations to
support them. (1)
6.9.3 Flying shores are used to provide support between two walls next
to adjacent buildings. (1)
6.9.4 The wall plate provides a supporting surface for the shore and
bracing, and is fixed to the wall. (1)
6.10 Identify the different types of hinges in FIGURES 6.10.A to 6.10.C. (3)
FIGURE 6.10.A FIGURE 6.10.B FIGURE 6.10.C
6.11 What is the purpose of the open space underneath the suspended timber
floor? (1)
[40]
TOTAL: 200
Copyright reserved Please turn over
Downloaded from hlayiso.com
(EC/NOVEMBER 2018) CIVIL TECHNOLOGY: WOODWORKING 15
CIVIL TECHNOLOGY
ANSWER SHEET A GENERIC
NAME:
2.6 FIGURE 2.6 on ANSWER SHEET A shows an incomplete section view of a
single brick wall. Complete the section view to scale 1 : 20.
2.6.1 Strip foundation (3)
2.6.2 Single brick wall (5)
2.6.3 Hard core filling (1)
2.6.4 Damp proof course (2)
2.6.5 Blinding layer (1)
2.6.6 Concrete floor slab (1)
2.6.7 Door opening (1)
2.6.8 Concrete lintel (2)
2.6.9 Wall plate (2)
2.6.10 2 Labels (2)
TOTAL /20
NGL
Copyright reserved Please turn over
Downloaded from hlayiso.com
Downloaded from hlayiso.com
16 CIVIL TECHNOLOGY: WOODWORKING (EC/NOVEMBER 2018)
CIVIL TECHNOLOGY
ANSWER SHEET B GENERIC
NAME:
QUESTION 3.1
A B C D
3.1.1 CENTRE LINE: (6)
.......... x ................ m = ................ m
.......... x ................ m = ................ m
= ................ m
Minus: ........ x ............ m = ................. m
TOTAL CENTRE LINE = ................. m
3.1.2 QUANTITY OF BRICKS: (9)
AREA:
Total wall area
...... ......
....... ...... Thus: Total wall area = ...............
TOTAL BRICKS
....... 100 bricks/ m2 for single brick wall
........ ........... Thus: .................. bricks for total wall
5% BREAKAGE
TOTAL BRICKS:
................ + ............... = ................ total quantity bricks
Copyright reserved Please turn over
Downloaded from hlayiso.com
Downloaded from hlayiso.com
(EC/NOVEMBER 2018) CIVIL TECHNOLOGY: WOODWORKING 17
CIVIL TECHNOLOGY
ANSWER SHEET C WOODWORKING
NAME:
4.5 FIGURE 4.5 on ANSWER SHEET C shows the incomplete view of the outside
walls and one inner wall of a building. Complete by using scale 1:50, the SA-type
roof truss with a roof construction supported on the outside walls. The roof pitch
is 30° and overhang is 300 mm.
SA-type truss 1
Tie beam 1
Principal rafters 2
King post 1
Strut 2
Position of support 1
30° Pitch 1
300 mm Overhang 1
Scale 2
TOTAL 12
Copyright reserved Please turn over
Downloaded from hlayiso.com
Downloaded from hlayiso.com
18 CIVIL TECHNOLOGY: WOODWORKING (EC/NOVEMBER 2018)
CIVIL TECHNOLOGY
ANSWER SHEET D WOODWORKING
NAME:
5.4 FIGURE 5.4 on ANSWER SHEET D shows the incomplete section through the
mullion and adjacent stile of a casement with glass. The stiles are lipped and
partially rebated into the mullion. Complete in good proportion the section view
by completing the parts of the left hand stile:
Ovolo mould 2
Putty 1
Edge of stile 2
Drip groove 2
TOTAL 7
Copyright reserved Please turn over
Downloaded from hlayiso.com
Downloaded from hlayiso.com
(EC/NOVEMBER 2018) CIVIL TECHNOLOGY: WOODWORKING 19
CIVIL TECHNOLOGY
ANSWER SHEET E WOODWORKING
NAME:
6.6 FIGURE 6.6 on ANSWER SHEET E shows the vertical view of a wall, sole
plate and soffit shutter board for a floor slab.
Complete the drawing by drawing all the parts for formwork supports on a
scale of 1:20. (10)
Wedges 2
Props 2
Cross-bearers 2
Bearer 2
Scale 2
TOTAL 10
Copyright reserved Please turn over
Downloaded from hlayiso.com
Study this subject
Recommended for this subject

Question paper
Civil Technology Grade 11 Eastern Cape November 2018 QP

Question paper
Civil Technology Grade 11 Eastern Cape November 2018 QP

Question paper
Civil Technology Grade 11 Eastern Cape November 2018 QP

Question paper
Civil Technology Grade 11 Eastern Cape November 2018 QP

Question paper
Civil Technology Grade 11 Eastern Cape November 2018 QP

Question paper
Civil Technology Grade 11 Eastern Cape November 2018 QP
More from Grade 11 Civil Technology

Annual teaching plan
Gr 11 Cons ATP 2023 24

Annual teaching plan
Gr 11 Civil Ser ATP 2023 24
/CIV%20TECH%20GR11%20MEMO%20NOV2022_Civil%20Services_Afrikaans_hlayiso.com_--85a9ce14-da0c-4943-8570-643c7a62e6a8/v1-16d2544947d7d7544935/card.webp)
Memorandum
Civil Technology Grade 11 2022 Memo (Afr)
/CIV%20TECH%20GR11%20MEMO%20NOV2022_Construction_Afrikaans_hlayiso.com_--6d31745c-a94c-4612-8aef-4e9b624a57b0/v1-b3dbeb7485c9d23d03e8/card.webp)
Memorandum
Civil Technology Grade 11 2022 Memo (Afr)

Memorandum
Civil Technology Grade 11 2022 Memo (Eng)

Memorandum