GRADE 12 |
a CIVIL TECHNOLOGY: CONSTRUCTION iH |
Ww PA
uw 7
: NOVEMBER 2023 "
CPPeTrerrrrrrrrrrrrirrrrrrrrrerrerrrerrrr eer
MARKS: 200
TIME: 3 hours
This question paper consists of 14 pages and 7 answer sheets.
Copyright reserved Please turn over
Skip to contentAll 2023 papers %20Afr_hlayiso.com_--b820ac91-947c-4aed-821f-256aa13aabe1/v1-3be01795eace6f81b174/card.webp)
%20Afr_hlayiso.com_--f6f7ac38-fb55-4d61-bc66-5441e4cbcee0/v1-b3313a875de5f3475dc0/card.webp)
%20Eng_hlayiso.com_--fdfc3cf4-1a3a-4817-a3e9-a2c7f9fe5c2e/v1-c9563485d35727af6c76/card.webp)
%20Eng_hlayiso.com_--fd47df8e-afbf-4ba2-8858-18deaf33c455/v1-d7b3c4a38228f498c17f/card.webp)
%20%20MG%20Afr_hlayiso.com_--42b5315c-825c-40e3-b394-85e0253fc0fb/v1-6058b260e68654519cc3/card.webp)

View all%20(Afrikaans)%20June%202025%20Possible%20Answers--c0a65d19-28ca-4ac3-8c61-d4627d2a3133/v1-5f42c573694769cf80ce/card.webp)
%20MG%20Eng--0e265899-dc44-4809-aabf-8f374f1af392/v1-73a07814cfc9334618a1/card.webp)




Civil Technology Grade 12 NSC November 2023 QP (Eng)
Grade 12 Civil Technology question paper from the NSC November Exam 2023 (English), 23 pages. Read online or download the free PDF.
Civil Technology · Grade 12 · NSC November Exam · 2023. Question paper, 23 pages. Read online or download the PDF.
- Subject
- Civil Technology
- Grade
- Grade 12
- Document type
- Question paper
- Year
- 2023
- Exam period
- NSC November Exam
- Curriculum
- CAPS
- Pages
- 23
- File size
- 949.9 KB
Free to read online, no sign-up needed
Loading document…
Loading document…
1 of 23
This exam
Document textSearch extracted text and jump to a page.
Downloaded from hlayiso.com
Civil Technology: Construction 2 DBE/November 2023
NSC
REQUIREMENTS:
1. Drawing instruments
2. A non-programmable calculator
3. ANSWER BOOK
INSTRUCTIONS AND INFORMATION
1. This question paper consists of SIX questions.
Answer ALL the questions.
Read ALL the questions carefully.
k 2 N
Answer each question as a whole. Do NOT separate subsections of
questions.
a
Number the answers correctly according to the numbering system used in this
question paper.
Start the answer to EACH question on a NEW page.
Do NOT write in the margins of the ANSWER BOOK.
You may use sketches to illustrate your answers.
o 2 N
Write ALL calculations and answers in the ANSWER BOOK or on the
attached ANSWER SHEETS.
10. Use the mark allocation as a guide to the length of your answers.
11. Make drawings and sketches in pencil, fully dimensioned and neatly finished
off with descriptive titles and notes to conform to the SANS/SABS Code of
Practice for Building Drawings.
12. For the purpose of this question paper, the size of a brick should be taken as
220 mm x 110 mm x 75 mm.
13. Use your own discretion where dimensions and/or details have been omitted.
14. Answer QUESTIONS 2, 3.5, 3.6, 4.7, 5.8, 6.3 and 6.5 on the attached
ANSWER SHEETS using drawing instruments, where necessary.
15. Write your CENTRE NUMBER and EXAMINATION NUMBER on every
ANSWER SHEET and hand them in with your ANSWER BOOK, whether you
have used them or not.
16. Drawings in the question paper are NOT to scale due to electronic transfer.
17. Google Images was used as the source of all photographs and pictures.
18. Write neatly and legibly.
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Construction 3 DBE/November 2023
NSC
QUESTION 1: OHSA, MATERIALS, TOOLS, EQUIPMENT AND JOINING
(GENERIC)
Start this question on a NEW page.
1.1 Various options are provided as possible answers to the following questions.
Choose the answer and write only the letter (A-D) next to the question
numbers (1.1.1 to 1.1.12) in the ANSWER BOOK, e.g. 1.1.13 D.
1.1.1 Electroplating is the process of ...
A applying a plastic coating on metal using electrolysis.
B_ coating a metal with another metal using electrolysis.
C_ applying paint to a metal by means of magnetism.
D applying liquid zinc to a metal using pressure.
1.1.2 The process of keeping freshly cast concrete damp will ...
A provide concrete with more volume.
B_ make concrete more watertight.
C_ increase the risk of cracking concrete.
D lead to poor bonding of concrete.
1.1.3 Why would you coat a metal with a layer of paint?
A Toresist extreme temperatures
B_ To prevent corrosion
C To prevent warping
D Only AandB
1.1.4 The minimum size of a wooden scaffold plank:
A 300 mm wide x 60 mm thick
B 238 mm wide x 12 mm thick
‘C 150 mm wide x 20 mm thick
D 228 mm wide x 38 mm thick
1.1.5 When using a scaffold, it must be inspected to ensure that ...
the scaffold is not attached to the building.
the scaffold platform is supported every 4 m.
the scaffold is free from any defects.
All the above-mentioned
o0NOD>r
1.1.6 ... Of scaffolds should be secured vertically.
Transoms
Diagonal braces
Standards
Base plates
uoNaPY
Copyright reserved Please turn over
(1)
(1)
(1)
(1)
(1)
(1)
Downloaded from hlayiso.com
Civil Technology: Construction 4
1.1.8
1.1.9
1.1.10
1.1.11
1.1.12
Copyright reserved
NSC
The guard rail on a scaffold will ensure that ...
A
B
c
D
a worker does not fall from the scaffold.
tools do not fall from the scaffold.
the scaffold is stable.
the scaffold is braced.
DBE/November 2023
Toe boards must be at least 150 mm high from the level of the ...
A
B
Cc
D
scaffold platform.
guard rail.
horizontal transoms.
base plate.
The employer must ensure that the rungs of wooden ladders are ...
A
B
Cc
D
not painted.
free from grease.
not cracked.
All the above-mentioned
The material safety data sheet for hazardous chemicals must have
the following information:
A
B
Cc
D
Quantity in the container
Cost of the chemicals
Disposal considerations
Manufacturing process
Stairways must be installed at a minimum of ... degrees from the
horizontal.
A
B
Cc
D
The purpose of the builder's hoist is to transport ...
wens ie -.
50
30
40
60
workers and materials.
materials and heavy construction machines.
equipment and heavy machines.
materials and furniture.
Please turn over
(1)
(1)
(1)
(1)
(1)
(1)
Downloaded from hlayiso.com
Civil Technology: Construction 5 DBE/November 2023
NSC
1.2 You have been tasked by a contractor to install a 20 kg gate to the pier of a
boundary wall.
1.2.1 Name the joining fixture you will use to secure the gate to the pier. (1)
1.2.2 Motivate why you will use this joining fixture. (2)
1.2.3 Explain how you will install the gate by using the joining fixture in
QUESTION 1.2.1, if the positions of the holes have been marked
on the pier. (3)
1.3 Predict what will happen if a laser level is stored in extremely cold areas. (1)
1.4 How will you ensure the accuracy of a dumpy level? (1)
[20]
QUESTION 2: GRAPHICS AS MEANS OF COMMUNICATION (GENERIC)
Start this question on a NEW page.
FIGURE A and FIGURE B on the next page show drawings that appear on a building
plan. Analyse the drawings and complete the table on ANSWER SHEET 2.
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Construction 6
NSC
DBE/November 2023
3.000
J
2955
2 955
FFL
600} ()
FIGURE A
NOTES:
Contractors must verify all
dimensions and levels on site
before commencing work.
Architects to be notified
of any discrepancies immediately.
Emergency escape staircase to be
made of mild steel.
Roof: Lean-to roof with parapet
walls
Finishing of walls: Plaster and paint
No. 3 indicates the balusters to be
made of aluminium.
Dimensions of balusters:
@ 50 mm x 1 200 mm
Architect's signature .................
Client's signature «0.2.0.2... cee
000 3340,
110
220 |
‘|
=
BATHROOM
N
KITCHEN
Ww1
W141
2x40
OFFICE
BOARDROOM
3
w1
x
1 500 | 1 500
} 3 300 1 500 |
FIGURE B
®
DRAWING OF
INTERNAL
STAIRCASES
DATE:
REVISION
1 18/04/2023
PRINTED BY:
FOX PRINTERS
DATE OF PRINT:
19/04/2023
DRAWING TITLE:
187 FLOOR AND SOUTH ELEVATION
PROJECT:
PROPOSED DWELLING OF MR NTOMBI
ON PLOT 42, ISIDINGO STREET, ALBANY
PROJECT NO.: DRAWING NO.:
GR 266-424 336P5
CHECKED:
J BOK
DATE: DRAWN:
12/04/2023 NP KOK
ELEVATION AND
FLOOR PLAN SCALE 1: 100
REFERENCE CODE
QP 8 - 2023
WINDOW SCHEDULE
Q
ye) 8
1200
7 * 600,
x —2400__) “w2
wi
[40]
Copyright reserved
Please turn over
Downloaded from hlayiso.com
Civil Technology: Construction 7 DBE/November 2023
NSC
QUESTION 3: ROOFS, STAIRCASES AND JOINING (SPECIFIC)
Start this question on a NEW page.
3.1 Cast-in anchors are used to join steel sections to concrete. Draw in your
ANSWER BOOK neat two-dimensional drawings of the following cast-in
anchors showing the sectional views through the concrete:
3.1.1 The L-bolt cast-in anchor (4)
3.1.2 A welded headed stud cast-in anchor (4)
3.2 FIGURE 3.2 below shows a staircase with some incorrect labels.
BALUSTER
V4 A - GOING/TREAD
|
Is > B-—RUN
“|
C C -NOSING
FIGURE 3.2
3.2.1 Give the correct labels for A to C. (3)
3.2.2 Explain the term stairwell of a staircase. (1)
3.3 Explain why roof trusses are spaced closer together for concrete roof tiles and
further apart for corrugated iron sheets. (2)
3.4 Differentiate between a couple roof and a close-coupled roof with reference to
the maximum span of the roofs. (2)
3.5 Use ANSWER SHEET 3.5 and draw to scale 1 : 5 the ridge construction of a
couple roof truss.
Use the following specifications:
e 114x 38mm timber
e 228 x 38 mm timber (6)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Construction 8 DBE/November 2023
NSC
3.6 Use ANSWER SHEET 3.6 and draw to scale 1 : 50 a roof truss for a lean-to
roof. The external lines of the brick walls are shown on the ANSWER SHEET.
Use the following specifications:
e The parapet wall on the left extends 300 mm above the top of the roof
truss.
e The overhang is 250 mm.
The roof truss is constructed of 114 x 38 mm timber. (8)
[30]
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Construction 9 DBE/November 2023
NSC
QUESTION 4: EXCAVATIONS, FORMWORK, TOOLS, EQUIPMENT AND
MATERIALS (SPECIFIC)
Start this question on a NEW page.
4.1 Change the underlined word(s) in the following to make the statements
TRUE. Write only the appropriate word(s) next to the question numbers
(4.1.1 to 4.1.5) in the ANSWER BOOK.
4.1.1 When operating a power float, do not place your arms near the
moving parts.
4.1.2 Operate the plate compactor with care and check the base plate for
proper response before use.
4.1.3 All construction machines must be stored in a safe, elevated place.
4.1.4 When compacting fresh concrete, a power trowel float is used.
4.1.5 Construction equipment is normally driven by wind motors.
4.2 FIGURE 4.2 below shows the shuttering that is used in excavations.
A
B =
c =
“> BE
FIGURE 4.2
4.2.1 Recommend in which situations this shuttering will be used.
4.2.2 Identify A, B and C.
4.2.3 Name the member that is used to keep part C in place.
Copyright reserved Please turn over
(1)
(1)
(1)
(1)
(1)
(1)
(3)
(1)
Downloaded from hlayiso.com
Civil Technology: Construction 10 DBE/November 2023
NSC
4.2.4 Predict TWO consequences if part C is not properly secured. (2)
4.2.5 Name ONE characteristic that the timber, used for this type of
shuttering, must adhere to. (1)
4.3 FIGURE 4.3 below shows a machine used on a construction site.
FIGURE 4.3
4.3.1 What is the purpose of the machine in FIGURE 4.3? (1)
4.3.2 Give TWO important reasons for storing this machine with the
opening facing downwards. (2)
44 Name the machine that will be most suitable for the following situations:
4.4.1 Compacting thick layers of backfilling (1)
4.4.2 Compacting thin layers of soil in final preparation for paving (1)
4.4.3 Finishing off a large concrete floor (1)
45 Fibreglass lining is used in formwork.
4.5.1 Describe the finish that you will get when using fibreglass lining. (1)
4.5.2 Explain ONE advantage of using fibreglass lining when it comes to
the striking of formwork. (1)
46 State TWO defects that can occur when shuttering seams and joints are not
watertight. ; (2)
47 FIGURE 4.7 on ANSWER SHEET 4.7 shows an incomplete drawing of a
vertical section of the formwork for a straight flight of concrete stairs with a
landing. Use ANSWER SHEET 4.7 and complete the drawing of the
formwork. Print any TWO labels. (17)
[40]
Copyright reserved Please turn over
Civil Technology: Construction 11 DBE/November 2023
Downloaded from hlayiso.com
NSC
QUESTION 5: PLASTER AND SCREED, BRICKWORK AND GRAPHICS AS
MEANS OF COMMUNICATION (SPECIFIC)
Start this question on a NEW page.
5.1
5.2
5.3
5.4
5.5
5.6
Copyright reserved
FIGURE 5.1 below shows a worker plastering a wall.
FIGURE 5.1
5.1.1 Name the tool used in FIGURE 5.1.
5.1.2 What is a clear indication that the plaster is being levelled or
scraped?
5.1.3 How many wheelbarrows of sand will you use with ONE bag of
cement when plastering dams and pools?
Explain the function of water in a screed mixture.
You are tasked to apply a monolithic screed to a freshly cast concrete floor.
5.3.1 Recommend when you can start applying the monolithic screed to
the freshly cast concrete.
5.3.2 Explain how the freshly cast concrete can be prepared to receive
the monolithic screed.
Explain the term beam filling.
Describe the height of beam filling.
Differentiate, by means of TWO sketches, between a flat arch and a
semicircular arch. Print the correct title under EACH drawing.
Please turn over
(1)
(1)
(1)
(2)
(1)
(2)
(2)
(1)
(4)
Downloaded from hlayiso.com
Civil Technology: Construction 12 DBE/November 2023
NSC
5.7 Explain the difference between a gauged arch and a rough arch in terms of
the following:
5.7.1 The shape of the bricks (2)
5.7.2 The shape of the mortar joints (2)
5.8 Use ANSWER SHEET 5.8 and draw to scale 1 : 10 a detailed sectional view
of the foot of a roof to show an open eaves.
Use the following specifications:
e The roof overhang is 300 mm.
e The roof is finished off with a 228 x 28 mm fascia board.
¢ Corrugated iron sheeting is used as roof covering.
e The pitch of the roof is 30°.
e The roof truss is constructed of 114 x 38 mm timber. a
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Construction 13 DBE/November 2023
NSC
QUESTION 6: REINFORCEMENT IN CONCRETE, FOUNDATIONS, CONCRETE
FLOORS AND QUANTITIES (SPECIFIC)
Start this question on a NEW page.
6.1 Choose a description from COLUMN B that matches the item in COLUMN A.
Write only the letter (A-H) next to the question numbers (6.1.1 to 6.1.5) in the
ANSWER BOOK, e.g. 6.1.6 J.
COLUMN A COLUMN B
6.1.1 Drop hammer A __ the casing is not removed
6.1.2 Auger B abeam can carry heavier loads
6.1.3 Precast piles C __ forces pile foundation into the
ground
6.1.4 Driven in-situ piles
D does not require fresh concrete
6.1.5 Steel-tube caisson piles
E _ has an enlarged concrete base
F used to prepare holes for
short-bored piles
G _ used to join main bars
H used to dig long trenches for
foundations
(5x1) (5)
6.2 FIGURE 6.2 below shows joining methods of steel bars used in reinforced
concrete.
FIGURE 6.2
6.2.1 Identify joining methods A and B above. (2)
6.2.2 Identify the type of bars used in FIGURE 6.2. (1)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Construction 14 DBE/November 2023
NSC
6.2.3 Name TWO types of spacers that are used when reinforcing a
concrete floor.
6.2.4 Explain TWO purposes of using spacers in reinforcing.
6.2.5 Name ONE type of steel that is recommended for use in
reinforcement.
6.3 ANSWER SHEET 6.3 shows TWO ribs of a rib and block floor. Use ANSWER
SHEET 6.3 and draw, in good proportion, a sectional view through the partial
rib and block floor up to the finished floor level. Draw ALL omitted detail and
add the symbol for concrete. Print any TWO labels.
6.4 By means of TWO sketches, differentiate between tensile force and
compression force. Print the correct title under EACH drawing.
6.5 FIGURE 6.5 below shows the floor plan of a small classroom.
oO)
a
ww)
9 250
FIGURE 6.5
Use the following specifications:
e = The hardcore filling is 170 mm thick.
e The width of the external walls is 220 mm.
Use the dimension paper on ANSWER SHEET 6.5 and calculate the
following. Round off your answer to TWO decimals.
6.5.1 Volume of hardcore filling for the building
6.5.2 The amount of damp-proof membrane (DPM) needed for the
building
NOTE: Marks will be awarded for the correct use of dimension paper.
TOTAL:
Copyright reserved
(2)
(2)
(1)
(11)
(4)
(8)
(3)
(1)
[40]
200
Downloaded from hlayiso.com
Civil Technology: Construction
[ CENTRE NUMBER: LT TT J
DBE/November 2023
[EXAMINATIONNUMBER: | | | |_|
ANSWER SHEET 2
NO. QUESTIONS ANSWERS MARKS
1 Give ONE reason why FIGURE B 1
represents the first floor plan.
2 Name the Si unit that is used to 1
indicate dimensions on building plans.
3 | Identify number 1. 1
4 _| Identify the number indicating the 1
emergency exit.
5 | What is the purpose of number 3? 1
6 | Identify number 4. 1
7 ‘| Identify number 5. 4
8 | Identify number 6. 1
9 | Identify number 7. 1
Deduce from the window schedule the
10 | dimensions of the window that is 2
installed at number 8.
11 | Who is the owner of the new dwelling? 1
42 | Name the elevation where the sink is 1
located.
13. | Identify the safety error in FIGURE A. 1
Deduce from the building plan why it
14 | was not approved after the first 1
submission.
Copyright reserved
Downloaded from hlayiso.com
Civil Technology: Construction
NSC
| CENTRE NUMBER: [ | J] J
DBE/November 2023
[EXAMINATIONNUMBER: | [| | |
Name the material that must be used
15 for the balusters.
16 Deduce from the notes column the
type of roof illustrated in FIGURE A.
17 How many signatures must be
indicated on this building plan?
What are the dimensions for the
18 | balusters as indicated by the
architect?
Name the material that must be used
19 | for the final finishing of the outside
wall.
20 Describe the end shape of the
balusters.
How many hinged openings are
21 | indicated on Window 1 in the window
schedule?
20 Draw the symbol for finished wood for
the boardroom table.
23 Draw the electrical symbol for a
three-pole one-way switch.
24 How many fluorescent tubes are
indicated in the office?
Copyright reserved
Downloaded from hlayiso.com
Civil Technology: Construction DBE/November 2023
NSC
[| CENTRE NUMBER: LTT [TT 7 7]
[EXAMINATIONNUMBER: | | | | | | | [| | | [| [| | |
Calculate the total height of the wall on
the left side of the building from the 4
finished floor level. Give your answer
in metre.
25
Calculate the area of the exterior wall
on the ground floor, that will consist of
bricks, from the finished floor level to 8
the top of the floor slab in the south
elevation in FIGURE A. Show ALL
calculations.
26
TOTAL: 40
Copyright reserved
Downloaded from hlayiso.com
Civil Technology: Construction DBE/November 2023
NSC
[ CENTRE NUMBER: LITT] {Td tT J
[EXAMINATIONNUMBER: | | | | | | | | | | | | J J
ANSWER SHEET 3.5
ASSESSMENT CRITERIA
NO. MARK CANDIDATE'S MARK
Nh
@/N|N|h
TOTAL:
Copyright reserved
Downloaded from hlayiso.com
£202 Jequisaon/aga
panlasal yybsAdoo
8 “IWLOL
Zz 9
L g
L v
L €
L tA —|-—
Zz I
WAV S.SLVGIGNVO | avn "ON
VIMALIND LNSINSSASSV
9°¢ L33HS MAMSNY
CL] ] [ T J | | | M3eINNN NOILVNINXa |
[| | TYSSIINN AMINA |
OSN
uOJaNISUOD :ABojOUUdEL |IAID
Downloaded from hlayiso.com
Civil Technology: Construction DBE/November 2023
NSC
| CENTRE NUMBER: LITT [TIT tT tL 4d
[EXAMINATIONNUMBER: | | | | | | | | | | [ TJ
ANSWER SHEET 4.7
Y
FIGURE 4.7
ASSESSMENT CRITERIA
NO. MARK _| CANDIDATE'S MARK
1 2
2 2
3 2
4 5
5 2
6 2
7 1
8 1
TOTAL: 17
Copyright reserved
Downloaded from hlayiso.com
Civil Technology: Construction DBE/November 2023
NSC
[ CENTRE NUMBER: a
[EXAMINATIONNUMBER: | [ [| | [| [| | | | | | | [|_|
ANSWER SHEET 5.8
SS
WALL
ASSESSMENT CRITERIA
NO. [MARK | CANDIDATE'S MARK
1 1
2 1
3 1
4 1
5 1
6 1
7 1
8 1
9 1
10 2
TOTAL:| 11
Copyright reserved
Downloaded from hlayiso.com
Civil Technology: Construction DBE/November 2023
NSC
[ CENTRE NUMBER: LTT TT TT ]
[EXAMINATIONNUMBER: | | | | | | | | | | | | | 4
ANSWER SHEET 6.3
CT RB
ASSESSMENT CRITERIA
NO. [MARK | CANDIDATE'S MARK
1 2
2 3
3 2
4 1
5 1
6 2
TOTAL: | 114
Copyright reserved
Downloaded from hlayiso.com
Civil Technology: Construction DBE/November 2023
NSC
[ CENTRE NUMBER: LITT TTT TT i
[EXAMINATIONNUMBER: | | | | | | | | | | | J] 1]
ANSWER SHEET 6.5
DIMENSION PAPER
6.5 A B Cc D
(8)
(3)
(1)
Correct use of dimension paper
Copyright reserved
Study this subject
Recommended for this subject
%20Afr_hlayiso.com_--b820ac91-947c-4aed-821f-256aa13aabe1/v1-3be01795eace6f81b174/card.webp)
Question paper
Civil Technology Grade 12 NSC November 2023 QP (Afr)
%20Afr_hlayiso.com_--f6f7ac38-fb55-4d61-bc66-5441e4cbcee0/v1-b3313a875de5f3475dc0/card.webp)
Question paper
Civil Technology Grade 12 NSC November 2023 QP (Afr)
%20Eng_hlayiso.com_--fdfc3cf4-1a3a-4817-a3e9-a2c7f9fe5c2e/v1-c9563485d35727af6c76/card.webp)
Question paper
Civil Technology Grade 12 NSC November 2023 QP (Eng)
%20Eng_hlayiso.com_--fd47df8e-afbf-4ba2-8858-18deaf33c455/v1-d7b3c4a38228f498c17f/card.webp)
Question paper
Civil Technology Grade 12 NSC November 2023 QP (Eng)
%20%20MG%20Afr_hlayiso.com_--42b5315c-825c-40e3-b394-85e0253fc0fb/v1-6058b260e68654519cc3/card.webp)
Memorandum
Civil Technology Grade 12 NSC November 2023 Memo (Afrikaans)

Question paper
Civil Technology Grade 12 Eastern Cape Mock 2023 QP (Afr)
More from Grade 12 Civil Technology
%20(Afrikaans)%20June%202025%20Possible%20Answers--c0a65d19-28ca-4ac3-8c61-d4627d2a3133/v1-5f42c573694769cf80ce/card.webp)
Memorandum
Civil Technology Grade 12 Gauteng June 2025 Memo (Afrikaans)
%20MG%20Eng--0e265899-dc44-4809-aabf-8f374f1af392/v1-73a07814cfc9334618a1/card.webp)
Memorandum
Civil Technology Grade 12 NSC November 2025 Memo (English)

Memorandum
Civil Technology Grade 12 Eastern Cape Prelim 2024 Memo

Memorandum
Civil Technology Grade 12 Eastern Cape Prelim 2024 Memo

Memorandum
Civil Technology Grade 12 Eastern Cape Prelim 2024 Memo

Memorandum