Downloaded from hlayiso.com
CIVIL TECHNOLOGY
GUIDELINES FOR
PRACTICAL ASSESSMENT TASKS
GRADE 12
2018
These guidelines consist of 29 pages.
Copyright reserved Please turn over
Skip to contentPractical assessment task %20Afr--05a95faf-5891-4d88-9e5e-7d13c1d21648/v1-f5ca67113376f7457b83/card.webp)



%20Afr--eefaae29-fe93-4b75-8223-87bf4f3fc14c/v1-3553acfa446acbaa2a45/card.webp)
%20MG%20Eng--898ff365-3aa8-49fc-aa7a-8c58c79bf409/v1-0ee308106aa8bb2a75dc/card.webp)






View all%20MG%20Afr--1af3bcd6-f360-4582-929e-be82586adfa1/v1-f9bfd9fe3f83289b1669/card.webp)
%20Eng_hlayiso.com_--e6743728-8140-42ae-838d-282654a975a5/v1-dce3e047e0d7ad60a32b/card.webp)
%20Afr_hlayiso.com_--b820ac91-947c-4aed-821f-256aa13aabe1/v1-3be01795eace6f81b174/card.webp)
%20Afr_hlayiso.com_--f6f7ac38-fb55-4d61-bc66-5441e4cbcee0/v1-b3313a875de5f3475dc0/card.webp)
%20%20MG%20Afr_hlayiso.com_--42b5315c-825c-40e3-b394-85e0253fc0fb/v1-6058b260e68654519cc3/card.webp)
%20MG%20Afr_hlayiso.com_--8b448e9d-ad65-4911-ae38-b9af2b632f65/v1-008a0116953928fc25f8/card.webp)
Civil Technology PAT GR 12 2018 Eng
Grade 12 Civil Technology practical assessment task from the 2018 (English), 29 pages. Read online or get the free PDF download.
Civil Technology · Grade 12 · 2018 · English. Practical assessment task, 29 pages. Read online or download the PDF.
- Subject
- Civil Technology
- Grade
- Grade 12
- Language
- English
- Document type
- Practical assessment task
- Year
- 2018
- Curriculum
- CAPS
- Pages
- 29
- File size
- 780.3 KB
Loading document…
Loading document…
1 of 29
Document textSearch extracted text and jump to a page.
Downloaded from hlayiso.com
Civil Technology 2 DBE/PAT 2018
NSC
TABLE OF CONTENTS
Page
SECTION 1 3
1. INTRODUCTION 3
SECTION 2 3
2. GUIDELINES FOR THE TEACHER 3
2.1 The structure of the PAT for Civil Technology 3
2.2 Management of the PAT 3
2.3 Administration of the PAT 4
2.4 Assessment and moderation of the PAT 4
2.5 Assessment 4
2.6 Moderation 4
SECTION 3 5
3. GUIDELINES FOR THE LEARNER 5
3.1 Construction Tasks 5
3.1.1 Instructions to the learner 5
3.1.2 Phase 1: Brickwork 6
3.1.3 Phase 2: Flower box 8
3.1.4 Assessment guidelines 9
3.1.5 Composite mark sheet 11
3.2 Civil Services Tasks 12
3.2.1 Instructions to the learner 12
3.2.2 Phase 1: Drainage Sewerage system 13
3.2.3 Phase 2: Funnel 15
3.2.4 Assessment guidelines 17
3.2.5 Composite mark sheet 19
3.3 Woodworking Tasks 20
3.3.1 Instructions to the learner 20
3.3.2 Phase 1: Roof truss 21
3.3.3 Phase 2: Coffee table 23
3.3.4 Assessment guidelines for coffee table 25
3.3.5 Composite mark sheet 26
SECTION 4 27
4.1 Absence/Non-submission of task 27
4.2 Requirements for presentation 28
4.3 Time frames 28
4.4 Declaration of authenticity 28
SECTION 5 29
5. CONCLUSION 29
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology 3 DBE/PAT 2018
NSC
SECTION 1
1. INTRODUCTION
The 16 Curriculum and Assessment Policy Statement subjects which contain a practical
component all include a practical assessment task (PAT). These subjects are:
• AGRICULTURE: Agricultural Management Practices, Agricultural Technology
• ARTS: Dance Studies, Design, Dramatic Arts, Music, Visual Arts
• SCIENCES: Computer Applications Technology, Information Technology
• SERVICES: Consumer Studies, Hospitality Studies, Tourism
• TECHNOLOGY: Civil Technology, Electrical Technology, Mechanical Technology and
Engineering Graphics and Design.
A practical assessment task (PAT) mark is a compulsory component of the final promotion
mark for all candidates offering subjects that have a practical component and counts 25% (100
marks) of the end-of-year examination mark. The PAT is implemented across the first three
terms of the school year. This is broken down into different phases or a series of smaller
activities that make up the PAT. The PAT allows for learners to be assessed on a regular basis
during the school year and it also allows for the assessment of skills that cannot be assessed
in a written format, e.g. test or examination. It is therefore important that schools ensure that all
learners complete the practical assessment tasks within the stipulated period to ensure that
learners are resulted at the end of the school year. The planning and execution of the PAT
differs from subject to subject.
SECTION 2
2. GUIDELINES FOR THE TEACHER
(These guidelines must be explained clearly to the learners.)
2.1 The structure of the PAT for Civil Technology
The PAT demonstrates the skills the learner has mastered. The PAT is assessed at intervals
and requires the learner to engage in multiple practical sessions. During the weekly sessions,
skills, such as simulation, experimentation, hand skills, tool skills, machine skills and workshop
practice are honed and perfected to the point where the learner may engage in the tasks set
out for that particular term. The PAT accounts for 25% of the learner's promotion mark.
2.2 Management of the PAT
The PAT should commence in term 1, as this is a lengthy and drawn out process and
CANNOT be left to the last minute. The model should be made over THREE terms. Making the
model starts in term 1 and is done with phase 1 in term 1. Phase 1 must be completed, marked
and internally moderated term 1. Phase 2 must be completed, marked and internally
moderated by 30 August 2018.
(a) All the phases of the PAT should be completed and presented for assessment by the end
of August 2018 to allow sufficient time for the external moderation.
(b) During this phase, the teacher will do any final assessments that are outstanding. All the
phases of the PAT are kept safely until the moderation process is completed (both
provincial and national moderation).
(c) The internal moderator/HOD must conduct moderation of the PAT throughout the
year.
(d) It is imperative that the criteria are adhered to from the beginning, as this will form the
basis for assessment.
(e) Teachers cannot penalise learners on points that are not included in the initial criteria.
When learners are selected during moderation (face moderation), they may be required
(f) to showcase their skills and knowledge.
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology 4 DBE/PAT 2018
NSC
All teachers must design a pacesetter to indicate the completion dates for the different stages
of the PAT. The teacher must manage this process to avoid crisis management and
unnecessary stress nearer to the completion date of the PAT. This pacesetter must also be
given to the learners.
The submission dates for the different sections of the PAT, as indicated in the pacesetter,
should be given to learners in writing.
2.3 Administration of the PAT
The PAT should be based on real-life situations and should be administered and completed
under controlled conditions.
After studying the guidelines teachers must explain the different stages of the PAT and the
criteria, as indicated in the rubrics and mark schedules, to the learners. This will ensure that
learners and teachers have a common understanding of the assessment tools and what is
expected of the learners.
Teachers are requested to make copies of SECTIONS 3 TO 5 (relevant area of
specialisation) of this document and hand it to the learners together with the assessment
criteria of the PAT not later than the first week of February 2018.
The products/models should not leave the classroom/workshop and must be kept in a
safe place at all times when learners are not working on it.
2.4 Assessment and moderation of the PAT
The PAT for Grade 12 is externally set and moderated, but internally assessed by the teacher
and moderated by the internal moderator/HOD.
2.5 Assessment
Frequent developmental feedback is needed to guide and support to the learner to ensure that
the learner is on the right track.
Both formal and informal assessment should be conducted on the different tasks that
constitute the PAT. Informal assessment can be conducted by the learner himself or herself, by
a peer group, or by the teacher. Formal assessment should always be conducted by the
teacher and the results will be recorded.
The teacher must take into account the requirements of the assessment of all the phases of
the PAT and therefore plan the assessment programme of the PAT accordingly.
2.6 Moderation
During moderation of the PAT all phases of the PAT must be presented to the internal and
external moderators.
Where required, the moderator should be able to call on the learner to explain the function and
principles of operation and also request the learner to exhibit the skills acquired through the
capability tasks for moderation purposes.
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology 5 DBE/PAT 2018
NSC
SECTION 3
3. GUIDELINES FOR THE LEARNER
3.1 Construction tasks
The practical assessment task (PAT) consists of TWO phases to be completed over three
terms.
The PAT should be done over THREE terms starting in term 1 with phase 1 and phase 2.
TIME SCHEDULE FOR THE COMPLETION OF THE PAT:
It is recommended that learners and teachers use this time schedule to finish the PAT in the
allocated time.
TIME FRAMES FOR THE COMPLETION OF THE PAT:
TERM WORK TO BE DONE
Term 1 Phase 1 and 2
Term 2 Phase 2
Term 3 Phase 2
3.1.1 Instructions to the learner
Learner's name: ____________________________________________________________
Time Allowed: 1st to 3rd term
• This practical assessment task counts 25% of your final promotion mark.
• All work you produce must be your own effort.
• Use your discretion where dimensions and/or information have been excluded.
• Where available you may use electronic equipment, e.g. cellphones, cameras, digital
cameras, etc. to document your progress.
• The product/model should not leave the classroom/workshop and must be kept in a
safe place at all times when you are not working on it.
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology 6 DBE/PAT 2018
NSC
3.1.2 Phase 1: Brickwork
Term: 1
Duration of phase 1: 2 hours per learner
Mark allocation: 20 marks
Task: Dry packing of bricks for a cavity wall
The picture below shows the corner of a cavity wall.
Instructions:
• Dry pack the bricks for a cavity wall just above floor level with a 50 mm cavity, 5 courses
high and 3 bricks long.
• Insert wall ties where required.
• Create weeping holes.
• Insert DPC in the wall to show how water will run out at the weep holes.
Tools and materials needed:
• Spirit level
• Tape measure
• Builder's square
• Chalk line/Straight edge
• Approximately 60 bricks per learner
• 3 wall ties (can be bent using binding wire) per learner
• DPC
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology 7 DBE/PAT 2018
NSC
MARKING GUIDELINE FOR PHASE 1: DRY PACKING OF BRICKS
LEARNER'S NAME: __________________________________________________
NO. ASSESSMENT CRITERIA
GOOD/ POOR/NOT
MAXIMUM MARK
AVERAGE
LEARNER
EXCELLENT ATTEMPTED MARK
3–4 2 0–1 LM
1.1 Measure and mark the outline on floor of the 4
workshop using required tools correctly
1.2 Dry packing of bricks for outer skin done correctly 4
1.3 Dry packing of bricks for inner skin done correctly 4
1.4 Wall ties placed correctly 4
1.5 DPC inserted in the correct place for weeping 4
holes
TOTAL MARK OUT OF 20
It is recommended that video clips and photos of the learner performing the task be kept
electronically at the school and on a disc (backup).
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology 8 DBE/PAT 2018
NSC
3.1.3 Phase 1: Flower box
Term: 1, 2 and 3
Duration: 20 hours
Task: Flower box
The picture below shows a pictorial view, not drawn to scale, of the formwork for a flower box.
Reinforcing mesh
Shuttering board sides
Shuttering board base
Instructions:
You are required to make a concrete flower box with the necessary formwork to the
specifications listed below.
Use the following specifications:
• Minimum outside measurements of the flower box is 500 mm square, 300 mm high and the
sides are 50 mm thick (minimum measurements).
• Use form oil as releasing agent on the inside of the formwork.
• Use screws to fix the different parts of the formwork together to facilitate easy dismantling
of the formwork.
• Provision must be made to dismantle the inner formwork from the inside so that it can be
easily removed.
• Learners have options to add additives to the concrete mixture for aesthetical purposes.
• Provision must be made for the drainage of excess water at the bottom of the flower box.
• Apply a finishing agent to the surface of the concrete.
• Learners should be innovative and creative to create patterns in the concrete on the
outside of the flower box.
Guide to completing the model:
• Make the inner and outer formwork for the flower box as shown.
• Bend the reinforcement mesh to fit in the middle of the bottom and sides of the formwork.
• Place spacers onto reinforcement to prevent the reinforcement from touching the side of
the formwork.
• Mix concrete of a proper strength using appropriate material to suit the purpose.
• Cast the bottom of the flower box first, 50 mm thick, before inserting the inner formwork
that will form the inner sides of the flower box.
• Fill the rest of the formwork with concrete, compact it and let it cure for seven days.
• All concrete must be cast in a single operation to prevent a dry joint between the base and
the sides
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology 9 DBE/PAT 2018
NSC
3.1.4 Marking guidelines for assessment of the flower box
MARKING GUIDELINE FOR ASSESSMENT OF THE CONCRETE FLOWER BOX
LEARNER SURNAME:________________________ NAME: ______________
ASSESSMENT CRITERIA
GOOD/ POOR/ NOT
AVERAGE
LEARNER
EXCELLENT ATTEMPTED MARK
MARKING AN CUTTING OUT OF FORMWORK MEMBERS 8–10 4–7 0–3 LM
Marking and cutting of formwork for sides and bottom of inner box
Marking and cutting of formwork for sides and bottom of outer box
TOTAL: 20
ASSEMBLY OF FORMWORK 4–5 2–3 0–1 LM
Marking and drilling of holes for screws to assemble formwork
Joining of members for inner formwork
Joining of members for outer formwork
Testing of squareness
TOTAL: 20
REINFORCEMENT 4–5 2–3 0–1 LM
Placing of reinforcement
Correct use of spacers
TOTAL: 10
CONCRETE 4–5 2–3 0–1 LM
Correct mixing proportions and mixing procedures
Placing and compacting and curing of concrete
TOTAL: 10
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology 10 DBE/PAT 2018
NSC
ASSESSMENT CRITERIA
GOOD/ POOR/ NOT
AVERAGE
LEARNER
EXCELLENT ATTEMPTED MARK
STRIKING OF FORMWORK 4–5 2–3 0–1 LM
Dismantling of formwork members without damage to concrete
TOTAL: 5
FINISHING OF PRODUCT 4–5 2–3 0–1 LM
Finishing of external surface of the concrete
TOTAL: 5
FINAL PRODUCT 4–5 2–3 0–1 LM
The flower box has drainage, is without cracks and is of an
appropriate size
Neatness and appearance of final product
TOTAL: 10
INNOVATION AND CREATIVITY 4–5 2–3 0–1 LM
The learner adapted the original design and added features to
improve the appearance and functionality of the flower box
TOTAL: 5
GENERAL ASPECTS 4–5 2–3 0–1 LM
Safe and correct use of tools
Good housekeeping
Adherence to deadlines
TOTAL: 15
GRAND TOTAL: 100
GRAND TOTAL CONVERTED TO: 80
Copyright reserved Please turn over
Civil Technology
Downloaded from hlayiso.com 11 DBE/PAT 2018
NSC
3.1.5 COMPOSITE MARK SHEET FOR CONSTRUCTION PAT
NO. NAMES OF LEARNERS PHASE 1 PHASE 2 (MODEL) TOTAL
(P1) (P2)
FINISHING OF PRODUCT
MARKING AND CUTTING
CONVERTED TOTAL P2 GRAND TOTAL P1 + P 2
FUNCTIONALITY AND
MODERATED MARK REINFORCEMENT GENERAL ASPECTS MODERATED MARK MODERATED MARK
INNOVATION AND
TOTAL PHASE 1 TOTAL PHASE 2
ASSEMBLY OF STRIKING OF
PHASE 1 OUT OF FORMWORK CONCRETE FINISHED PRODUCT CREATIVITY
FORMWORK FORMWORK
20 20 20 20 25 10 10 5 5 5 5 15 100 100 80 100 100
1
2
3
4
5
6
7
8
9
10
TOTAL TOTAL
_________________________ __________________
Signature of (Teacher) Date
SCHOOL STAMP
________________________ __________________
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology 12 DBE/PAT 2018
NSC
3.2 Civil services tasks
The practical assessment task (PAT) consists of TWO phases to be completed over three
terms.
The PAT should be done over THREE terms starting in term ONE with phase ONE and phase
TWO.
TIME SCHEDULE FOR THE COMPLETION OF THE PAT:
It is recommended that learners and educators use this work schedule to finish the PAT in the
allocated time.
TIME FRAMES FOR THE COMPLETION OF THE PAT:
TERM WORK TO BE DONE
Term 1 Phase 1 and 2
Term 2 Phase 2
Term 3 Phase 2
3.2.1 Instructions to the learner
Learner's name: ____________________________________________________________
Time Allowed: 1st to 3rd term
• This practical assessment task counts 25% of your final promotion mark.
• All work you produce must be your own effort.
• Use your discretion where dimensions and/or information have been excluded.
• Where available you may use electronic equipment, e.g. cellphones, cameras, digital
cameras, etc. to document your progress.
• The product/model should not leave the classroom/workshop and must be kept in a
safe place at all times when you are not working on it.
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology 13 DBE/PAT 2018
NSC
3.2.2 Phase 1: Drainage (Sewerage) system
Term: 1
Duration of phase 1: 2 hours per learner
Mark allocation: 20 marks
Task: Installation of a below-ground drainage system
The diagram below shows the diagram of the layout of a drainage system.
NOTE:
• The teacher should cut the pipes to length and remove rubber seals from junctions so that it
is easy to fit and to re-use the pipes and joints many times.
• If the school does not have a trench for the drainage system, use the corner of the
workshop and dry pack the missing walls as indicted in layout.
Instructions:
• Determine the centre lines and spacing of the different parts of the sewerage layout against
the corner walls of the workshop.
• Use chalk line and a builder's square to mark the layout of the pipes and fittings on the floor.
• Place the different pipe fittings and pipes in the correct place next to the centre lines, as
indicated in the diagram.
• Join all pipes and pipe fittings according to the layout drawing.
• It is not required of learners to lay pipes according to the slopes indicated. Pipes may be
laid flat on the floor.
• Clean the work area and pack away all tools and equipment.
1 200 2 900 BRICK WALL/
TRENCH
VP
G
100
220
900
RE 2
RE 1
JUNCTION C
JUNCTION A JUNCTION B
SLOPE = 1:40
BRICK WALL/ 6 000
TRENCH
JUNCTION D
IE
SEWER
CONNECTION
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology 14 DBE/PAT 2018
NSC
MARKING GUIDELINE FOR PHASE 1:
INSTALLATION OF A BELOW-GROUND DRAINAGE SYSTEM
LEARNER'S NAME: ________________________________________________
NO. ASSESSMENT CRITERIA
GOOD/ POOR/NOT
AVERAGE
LEARNER
EXCELLENT ATTEMPTED MARK
4–5 2–3 0–1 LM
1.1 Determine the centre lines and spacing of the different
parts of the sewerage layout and use a chalk line to mark
it on the floor.
1.2 Place the different pipe fittings and pipes in the correct
place next to the centre lines as indicated in diagram.
Join all pipes and pipe fittings according to the layout drawing.
All openings and fittings must face upwards.
1.3 Connection of rodding eyes
1.4 Connection of vent pipe
1.5 Connection of universal gully head with grid and
connection of gully trap
1.6 Connection of inspection eye
1.7 Pipe assembly (with junctions and bends) correctly placed
and aligned.
1.8 Clean the work area and pack away all tools and
equipment.
TOTAL MARK OUT OF 40
CONVERTED MARK OUT OF 20
It is recommended that video clips and photos of the learner performing the task be kept
electronically at the school and on a disc (backup).
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology 15 DBE/PAT 2018
NSC
3.2.3 Phase 2: Funnel
Term: 1, 2 and 3
Duration: 20 hours
Task: Funnel
The picture and the different orthographic views of a funnel are shown below.
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology 16 DBE/PAT 2018
NSC
42
JOINTS, SOFT 30
SAFE EDGE SOLDERED
R 20
6
Q
80 P
6 220
O
80 FOLDED SEAM
LAPPED JOINT,
SOFT SOLDERED
ᴓ 20
R 20
R 70
24
Instructions:
You are required to make a funnel to the specifications listed in the orthographic views and
below.
Use the following specifications:
• The funnel may not be smaller than the given dimensions and must be a cylindrical cone.
• Developments with the seams of all the parts of the funnel should be drawn to scale 1:1 to
be used as templates.
• Templates should be used to mark the shapes on the sheet metal.
• Cut out the different parts from the sheet metal.
• Shape the different parts.
• The parts should be joined together by using soldering.
• All soldering joints should be cleaned.
• Apply a finishing agent to the final product.
• Learners should be innovative and creative to determine the size and an angle of the
different parts of the funnel, use other sheet metal than galvanised sheeting, make
indentations on the funnel to create a pattern and to add a device to prevent dirt from
passing through the funnel.
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology 17 DBE/PAT 2018
NSC
3.2.4 Marking guideline for the assessment of the funnel
MARKING GUIDELINES FOR THE FUNNEL
LEARNER'S SURNAME: ____________________________ NAME: ______________________
ASSESSMENT CRITERIA:
GOOD/ EXELLENT
NOT ATTEMPTED/
LEARNER MARK
AVERAGE POOR
MAKING OF TEMPLATE AND MARKING OUT OF SHEET METAL 4–5 2–3 0–1 LM
Drawing of templates
Making of template for top part of funnel
Making of template for spout of funnel
Making of template for handle of funnel
Marking of shapes on sheet metal using templates
TOTAL: 25
CUTTING OUT OF SHAPES ON SHEET METAL 4–5 2–3 0–1 LM
Cutting out of top part of funnel ( correct use of tin snip and accuracy)
Cutting out of spout (correct use of tin snip and accuracy)
Cutting out of handle (correct use of tin snip and accuracy)
TOTAL: 15
MANUFACTURING/BENDING/SHAPING 4–5 2–3 0–1 LM
Correct use of plate bending machine to bend lap joint, handle and
seams.
Correct use of roller machine/alternative method to shape the conical
parts of the funnel.
TOTAL: 10
JOINING 4–5 2–3 0–1 LM
Lap joints/seam lap joints of top and spout of funnel.
Correct soldering technique
Accuracy of alignment and placement of different parts of funnel
when joining.
TOTAL: 15
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology 18 DBE/PAT 2018
NSC
ASSESSMENT CRITERIA:
NOT ATTEMPTED/POOR
GOOD/ EXELLENT LEARNER MARK
AVERAGE
FINISHING 4–5 2–3 0–1 LM
Cleaning of joints and sanding and wiping off of final model.
TOTAL: 5
FINAL PRODUCT 4–5 2–3 0–1 LM
Neatness and appearance of final product
Functionality of finished product(test for leaks)
TOTAL: 10
INNOVATION AND CREATIVITY 4–5 2–3 0–1 LM
The learner adapted the original design and added features to
improve the appearance and functionality of the funnel.
TOTAL: 5
GENERAL ASPECTS 4–5 2–3 0–1 LM
Safe and correct use of tools
Good housekeeping
Adherence to deadlines
TOTAL: 15
TOTAL FOR ALL SECTIONS 100
CANDIDATE'S CONVERTED TOTAL OUT OF 80 80
Copyright reserved Please turn over
Civil Technology
Downloaded from hlayiso.com 19 DBE/PAT 2018
NSC
3.2.5 Composite mark sheet civil services
NO. NAMES OF LEARNERS PHASE 1 PHASE 2 (MODEL) TOTAL
(P1) (P2)
MODERATED MARK GENERAL ASPECTS MODERATED MARK CONVERTED TOTAL MODERATED MARK
MANUFACTURING/ GRAND TOTAL: 100
CUTTING OUT OF INNOVATION AND
FINAL PRODUCT
MAKING OF
PHASE 1 TOTAL: 20 SHAPES BENDING/SHAPING JOINING FINISHING CREATIVITY TOTAL : 100 (P1 + P2)
TEMPLATES
20 20 20 25 15 10 15 5 10 5 15 100 100 80 100 100
1
2
3
4
5
6
7
8
9
10
TOTAL TOTAL
__________________________ __________________
Signature of (Teacher) Date
SCHOOL STAMP
________________________ __________________
Signature of (Moderator)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology 20 DBE/PAT 2016
NSC
3.3 Woodworking task
The practical assessment task (PAT) consists of TWO phases to be completed over three
terms.
The PAT should be done over THREE terms starting in term ONE with phase ONE and phase
TWO.
TIME SCHEDULE FOR THE COMPLETION OF THE PAT:
It is recommended that learners and educators use this work schedule to finish the PAT in the
allocated time.
TIME FRAMES FOR THE COMPLETION OF THE PAT:
TERM WORK TO BE DONE
Term 1 Phase 1 and 2
Term 2 Phase 2
Term 3 Phase 2
3.3.1 Instructions to the learner
Learner's name: ____________________________________________________________
Time Allowed: 1st to 3rd term
• This practical assessment task counts 25% of your final promotion mark.
• All work you produce must be your own effort.
• Use your discretion where dimensions and/or information have been excluded.
• Where available you may use electronic equipment, e.g. cellphones, cameras, digital
cameras, etc. to document your progress.
• The product/model should not leave the classroom/workshop and must be kept in a
safe place at all times when you are not working on it.
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology 21 DBE/PAT 2018
NSC
3.3.2 Phase 1: Construction of a South African roof truss (Howe) for a small span
Term: 1
Duration of phase 1: 6 hours per learner
Mark allocation: 20 marks
Task: Making of a South African roof truss (Howe) for a building with a small span
A line diagram of a roof truss (Howe) is given below.
Instructions:
• Draw to scale 1:10 the South African roof truss (Howe) according to the specifications
indicated below.
• Build the roof truss.
• Measure and cut the parts into the correct length and shapes according to your drawing.
• Fix the parts by means of gang nails according to the drawing.
• Label all the parts.
Use the following specifications:
• Use the line diagram above as a guide for your drawing.
• Use a sheet of A3 drawing paper to draw the roof truss to scale 1:10.
• Use SCALE 1:10 to make your model.
• Span of the roof truss is 4 000 mm.
• Eaves overhang is 400 mm.
• Pitch (angle/slope/gradient) of the roof is 30˚.
• Members are gang-nailed.
• 114 x 38 mm timber is used to make the truss.
• Use 4 mm thick pine/supawood/shuttering board for the construction of the roof truss.
• The model must stand in an upright position when finished.
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology 22 DBE/PAT 2018
NSC
MARKING GUIDELINE FOR PHASE 1:
CONSTRUCTION OF A SOUTH AFRICAN ROOF TRUSS
LEARNER'S NAME: ________________________________________________
NO. ASSESSMENT CRITERIA
POOR/NOT ATTEMPTED
GOOD/EXCELLENT LEARNER MARK
AVERAGE
4–5 2–3 0–1 LM
1.1 Drawing of roof truss Mark x 2
1.2 Marking off and cutting different truss members into length and
shape
1.3 Truss members placed in correct position and assemble with
gang nails
1.4 Finishing
1.5 Labelling
TOTAL MARK OUT OF 30
CONVERTED MARK OUT OF 20
It is recommended that video clips and photos of the learner performing the task be kept
electronically at the school and on a disc (backup).
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology 23 DBE/PAT 2018
NSC
3.3.3 Phase 2: Coffee Table
Term: 1, 2 and 3
Duration: 20 hours
Task: Make either coffee table A or coffee table B according to the specifications
The drawings below show the incomplete orthographic views of two examples of coffee tables,
coffee table A and B.
COFFEE TABLE A
480
SIDE VIEW
A
A
B 500
OR
B
600
TOP VIEW
The two figures above shows the side views of
COFFEE TABLE B examples of slats, bevelled and spaced a small
distance apart OR bevelled and placed against
each other as used for the table top.
480
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology 24 DBE/PAT 2018
NSC
Instructions
You are required to make either coffee table A or coffee table B according to the specifications
indicated below.
Specifications:
• The given dimensions are the minimum measurements.
• Legs 460 x 50 x 50 mm Not sure if these are standard measurements
• Long rails 70 x 20 mm
• Short rails 70 x 20 mm
• Bottom rails 50 x 20 mm
• Kicker(cleats) 50 x 20 mm
• Slats 80 x 20 mm
• Haunched mortice and tenon joints should be used between top rails and the legs.
• Twin mortice and tenon joints should be used between bottom rails and the legs.
• Any soft wood or hard wood can be used for the model.
• Learners may use their innovation and creativity to shape the legs, rails and table top of the
model or any other improvement on the table.
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology 25 DBE/PAT 2018
NSC
3.3.4 Assessment guidelines
MARKING GUIDELINES FOR THE ASSESSMENT OF THE COFFEE TABLE
NAME OF LEARNER: _______________________________________________
POOR/NOT ATTEMPTED
GOOD / EXCELLENT LEARNER MARK
AVERAGE
MARKING AND CUTTING OF DIFFERENT PARTS OF THE 4–5 2–3 0–1 LM
MODEL:
Marking and cutting out of legs
Marking and cutting out of rails
Marking and cutting out of slats and solid tops
TOTAL: 15
MANUFACTURING/ASSEMBLING 4–5 2–3 0–1 LM
Making of tenons (Mark x 2 = 10)
Making of mortises (Mark x 2 = 10)
Glue and clamp frame of table (Check for square) (Mark x 2 = 10)
Glue and clamp of table top (Check for square) (Mark x 2 = 10)
Join table top to table frame
TOTAL: 45
FINISHING OF MODEL 4–5 2–3 0–1 LM
Sanding of frame before and after gluing
Sanding of top before and after gluing
Applying finishing agents
TOTAL: 15
FINAL PRODUCT 4–5 2–3 0–1 LM
Neatness and appearance of final product
TOTAL: 5
INNOVATION AND CREATIVITY 4–5 2–3 0–1 LM
The learner adapted the original design and added features to
improve the appearance and functionality of the coffee table
TOTAL: 5
GENERAL ASPECTS 4–5 2–3 0–1 LM
Safe and correct use of tools
Good housekeeping
Adherence to deadlines
TOTAL: 15
GRAND TOTAL: 100
TOTAL CONVERTED TO: 80
Copyright reserved Please turn over
Civil Technology
Downloaded from hlayiso.com 26 DBE/PAT 2018
NSC
3.3.5 Composite mark sheet for woodworking
NO. NAMES OF LEARNERS: PHASE 1 PHASE 2 MODEL (P2) TOTAL
(P1)
MODERATED MARK MARKING & CUTTING FINISHING OF MODEL GENERAL ASPECTS MODERATED MARK CONVERTED MARK MODERATED MARK
GRAND TOTAL: 100
MANUFACTURING FINAL PRODUCT
INNOVATION/
PHASE 1 (P1 + P2)
TOTAL CREATIVITY TOTAL
20 20 20 15 45 15 5 5 15 100 100 80 100 100
1
2
3
4
5
6
7
8
9
10
TOTAL
Signature of (Teacher)________________ Date __________ Signature of (Moderator)__________________Date __________
Signature of (Principal)________________ Date__________ School stamp
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology 27 DBE/PAT 2018
NSC
SECTION 4
4.1 Absence/Non–submission of task (What are the consequences?)
The absence of a practical assessment task will be dealt with in accordance with the
regulations as stipulated in the National Policy on Protocol for Assessment Grades R–12, page
6, chapter 3, paragraphs 7 and 8.
The National Protocol for Assessment Grades R–12, chapter 3, paragraph 8, subsection (4)
clearly states that the absence of a practical assessment task mark will result in the candidate
registered for that particular subject, receiving an incomplete result.
4.2 Requirements for presentation
The following should be presented by the candidate for assessment and moderation:
• A complete design portfolio
• All scale drawings
• A completed model
• The candidate's name and class must be clearly indicated on all components of the PAT
The following document should be presented by the teacher for moderation:
A composite mark sheet (one composite mark sheet comprising all candidates' names and
marks for all aspects that were assessed)
4.3 Recommended time frames for the completion of the PAT
Term 1:
• Phase 1
• Phase 2 (part 1)
Term 2:
• Phase 2 (part 2)
Term 3:
• Phase 2 (part 3)
The product/model to be manufactured in the workshop under teacher supervision.
• Declaration of authenticity
NOTE: The learners should start with the model at the beginning of term 1 and complete
it by the end of August. The teacher should properly plan and manage the
available resources so that all learners will be busy with some part of the tasks
throughout the year.
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology 28 DBE/PAT 2018
NSC
4.4 Declaration of Authenticity
NAME OF THE SCHOOL: .................................................................................
NAME OF LEARNER: .......................................................................................
NAME OF TEACHER: .....................................................................................
SCHOOL STAMP
I hereby declare that the practical assessment task submitted for assessment is my own,
original work and has not been submitted for moderation previously.
SIGNATURE OF LEARNER DATE
As far as I know, the above declaration by the candidate is true and I accept that the
work offered is his or her own.
SIGNATURE OF TEACHER DATE
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology 29 DBE/PAT 2018
NSC
SECTION 5
5. CONCLUSION
On completion of the practical assessment task learners should be able to
demonstrate their understanding of the industry, enhance their knowledge,
skills, values and reasoning abilities as well as establish connections to life
outside the classroom and address real world challenges. The PAT
furthermore develops learner's life skills and provides opportunities for
learners to engage in their own learning.
Copyright reserved
Study this subject
Notes, quizzes and topic questions for Grade 12 Civil Technology.
Recommended for this subject
More papers and memos for this grade and subject.
%20Afr--05a95faf-5891-4d88-9e5e-7d13c1d21648/v1-f5ca67113376f7457b83/card.webp)
Question paper
Civil Technology Grade 12 NSC November 2025 Question Paper

Memorandum
Civil Technology Grade 12 Eastern Cape Prelim 2024 Memo (English)

Memorandum
Civil Technology Grade 12 Eastern Cape Prelim 2024 Memo (English)

Question paper
Civil Technology Grade 12 Eastern Cape Prelim 2024 QP (Eng)
%20Afr--eefaae29-fe93-4b75-8223-87bf4f3fc14c/v1-3553acfa446acbaa2a45/card.webp)
Question paper
Civil Technology Grade 12 November 2024 NSC Question Paper
%20MG%20Eng--898ff365-3aa8-49fc-aa7a-8c58c79bf409/v1-0ee308106aa8bb2a75dc/card.webp)
Question paper
Civil Technology Grade 12 November 2024 NSC MG Question Paper
Related documents

Memorandum
Civil Technology Grade 12 Eastern Cape Mock 2023 Memo (English)

Question paper
Civil Technology Grade 12 Eastern Cape Mock 2023 QP (Eng)

Memorandum
Civil Technology Grade 12 Eastern Cape Mock 2022 Memo (English)

Memorandum
Civil Technology Grade 12 Eastern Cape Mock 2022 Memo (English)

Question paper
Civil Technology Grade 12 Eastern Cape Mock 2022 QP (Eng)

Memorandum
Civil Technology Grade 12 Eastern Cape Mock 2021 Memo (English)
More from Grade 12 Civil Technology
%20MG%20Afr--1af3bcd6-f360-4582-929e-be82586adfa1/v1-f9bfd9fe3f83289b1669/card.webp)
Question paper
Civil Technology Grade 12 November 2024 NSC MG Question Paper
%20Eng_hlayiso.com_--e6743728-8140-42ae-838d-282654a975a5/v1-dce3e047e0d7ad60a32b/card.webp)
Question paper
Civil Technology Grade 12 NSC November 2023 Question Paper
%20Afr_hlayiso.com_--b820ac91-947c-4aed-821f-256aa13aabe1/v1-3be01795eace6f81b174/card.webp)
Question paper
Civil Technology Grade 12 NSC November 2023 Question Paper
%20Afr_hlayiso.com_--f6f7ac38-fb55-4d61-bc66-5441e4cbcee0/v1-b3313a875de5f3475dc0/card.webp)
Question paper
Civil Technology Grade 12 NSC November 2023 Question Paper
%20%20MG%20Afr_hlayiso.com_--42b5315c-825c-40e3-b394-85e0253fc0fb/v1-6058b260e68654519cc3/card.webp)
Question paper
Civil Technology Grade 12 NSC November 2023 Question Paper
%20MG%20Afr_hlayiso.com_--8b448e9d-ad65-4911-ae38-b9af2b632f65/v1-008a0116953928fc25f8/card.webp)
Question paper