TERM 1 WEEK 1 WEEK 2 WEEK 3 WEEK 4 WEEK 5 WEEK 6 WEEK 7 WEEK 8 WEEK 9 WEEK 10
CAPS TOPICS OCCUPATIONAL OCCUPATIONAL MATERIALS EQUIPMENT EQUIPMENT AND GRAPHICS AS MEANS OF GRAPHICS AS MEANS QUANTITIES QUANTITIES COMPLETION OF
HEALTH AND HEALTH AND (GENERIC) AND TOOLS TOOLS COMMUNICATION OF COMMUNICATION (SPECIFIC) (SPECIFIC) ASSIGNMENT/
SAFETY ACT 85 SAFETY ACT 85 (GENERIC) (SPECIFIC) (GENERIC) (SPECIFIC) 1ST PHASE OF
OF 1993 (OHS) OF 1993 (OHS) PAT
(GENERIC) (SPECIFIC)
TOPICS /CONCEPTS, Application of the Safety risks Preservation and Identification, Identification, proper Interpretation of advanced Pattern development: Calculate from Quantities of hot and cold water
SKILLS AND VALUES OHS Act associated with sustainability of proper use and use and care of the drawings: Parallel line method: given drawings supply, fittings, wastewater and
pertaining to deep manholes materials: care of the following: • Site plan, floor plan and the quantities of soiled water drainage pipes for
• Round shaped
general health e.g., fumes and (As dealt with in following Pumps: elevation of multi storey bricks for a a small building, volumes of
(Cylindrical pipe
and safety in the gasses. Grades 10 and 11). specialised • Centrifugal pump buildings
elbow, cylindrical pipe simple structure cylinders and cubes (Use of SI
workplace: Safeguarding of • Painting tools: Drain cleaning tools: • Basic drawing symbols and volume of units of measurements).
offset)
• Scaffolding openings. • Curing • Dumpy level • Drain cleaning relating to the built concrete for e.g.,
rods environment in Radial line method:
• Handling of The use of safety • Electroplating • Laser level a manhole,
material. Machine tools: accordance with the • Pyramid quantities of hot
harnesses when • Powder coating • Multi detector • Pipe-thread SANS for building • Square based and cold water
• Floors and working in high • Galvanising
cutting machine drawings truncated pyramid supply, fittings,
stairs with places. MATERIALS • Drain cleaning Pattern development: • Right cone wastewater and
open sides.
COMPLETION OF ASSIGNMENT
(Specific) machine (Jetting • Frustum of a right soiled water
• Builder’s hoist. Parallel line method:
Explain the following machine) cone drainage pipes for
• Ladders. • Round shaped • Frustum of a right
reactions between Testing tools: a small building,
(Cylindrical pipe elbow, cone where the top is
materials: • Water pressure School holidays
cylindrical pipe offset) not parallel to the
• Dezincification testing pump
• Electrolytic reaction • Compressed air base
(Galvanic tests apparatus • Frustum of a cone
corrosion) with the base not at
AND PAT (PHASE 1 AND PART 1 OF PHASE 2)
Introduction to PAT right angles to the axis
(Phase 1 and part 1 of (Vent pipe flashing)
Phase 2)
REQUISITE PRE- Safe practices Safe practices Preservation of Care of Drainage pipelines; Floor plans, SANS symbols Development of Formula for Formula for calculating Volume.
KNOWLEDGE associated with when working in material and precision tools. rodding eyes. GMS of fixtures in the built cylinders and cones. calculating Fittings for cold water and hot
working on site. confined spaces Chemical reactions Ability to pipes and fittings. environment. Volume. Fittings water supply. Soil and
and elevated between metals. accurately read Flooding of trenches Development of cylinders for cold water and wastewater pipes.
positions. device / sites. and cones. hot water supply.
measurements. Soil and
wastewater pipes.
RESOURCES (OTHER Documentaries; Safety harness; Examples of metals of Internet – Internet- YouTube. Drawing equipment. Drawing equipment. Brickwork setup Geyser cylinder, Dimension
THAN TEXTBOOK) TO OHS Act 85 – Respiratory mask; the processes done; YouTube Smartphones. Drawing exercises of site Models of the cone and for a manhole paper, Cube made of GMS.
ENHANCE LEARNING document; Model documentaries. Examples of reactions showing how plans and symbols. frustum of a cone. wall. Dimension
of stairs with open on pipes; tools are used; Models of the cylindrical paper.
sides; Ladder. Documentaries. practical elbow and square elbow
demonstration of made from GMS.
the tools in use.
INFORMAL Worksheets. Test. Worksheets. Worksheets- Demonstration on Demonstration on Drawing worksheet. Drawing worksheet. Graded exercises Graded exercises to calculate
ASSESSMENT: Learners to inspect Demonstration - identification and the use of the use of equipment. Evaluation exercises on Evaluation exercises on to calculate quantities. Test.
REMEDIATION ladder to ensure use of respiratory uses of powder tools. Worksheet Mini Practical test. developments. developments. quantities.
conformity to the mask and coating, etc. on care and uses.
ASSESSMENT
OHS act. General harness. Tests.
housekeeping in the
workshop.
SBA Assignment
FORMAL PAT (PHASE 1 AND PART 1 OF PHASE 2)
ASSESSMENT Learners should be taught and be able to understand and apply principles and concepts of each topic and should not be limited to specific specifications in the CAPS.
Downloaded from hlayiso.com 1
Skip to contentAnnual teaching plan %20(Afrikaans)%20June%202025%20Possible%20Answers--c0a65d19-28ca-4ac3-8c61-d4627d2a3133/v1-5f42c573694769cf80ce/card.webp)
%20(English%20and%20Afrikaans)%20June%202025%20Question%20Paper--c8edd459-5237-48e0-8588-69d7ecd7f8e5/v1-be996aaed91bf782e098/card.webp)
%20Afr--591d6ffd-20b1-4748-a1ba-b055be0a14c3/v1-4d98a131fd37e013458a/card.webp)
%20Afr--05a95faf-5891-4d88-9e5e-7d13c1d21648/v1-f5ca67113376f7457b83/card.webp)




%20Afr--eefaae29-fe93-4b75-8223-87bf4f3fc14c/v1-3553acfa446acbaa2a45/card.webp)
%20MG%20Eng--898ff365-3aa8-49fc-aa7a-8c58c79bf409/v1-0ee308106aa8bb2a75dc/card.webp)
%20MG%20Afr--1af3bcd6-f360-4582-929e-be82586adfa1/v1-f9bfd9fe3f83289b1669/card.webp)

View all



%20Eng_hlayiso.com_--e6743728-8140-42ae-838d-282654a975a5/v1-dce3e047e0d7ad60a32b/card.webp)
%20Afr_hlayiso.com_--b820ac91-947c-4aed-821f-256aa13aabe1/v1-3be01795eace6f81b174/card.webp)
Gr 12 Civil Ser ATP 2023 24
Grade 12 Civil Technology annual teaching plan, 4 pages. Read online or get the free PDF download.
Civil Technology · Grade 12. Annual teaching plan, 4 pages. Read online or download the PDF.
- Subject
- Civil Technology
- Grade
- Grade 12
- Document type
- Annual teaching plan
- Curriculum
- CAPS
- Pages
- 4
- File size
- 227.8 KB
Loading document…
Loading document…
1 of 4
Document textSearch extracted text and jump to a page.
2023/24 ANNUAL TEACHING PLANS: CIVIL TECHNOLOGY (CIVIL SERVICES): GRADE 12
2023/24 ANNUAL TEACHING PLANS: CIVIL TECHNOLOGY (CIVIL SERVICES): GRADE 12 (TERM 2)
TERM 2 WEEK 1 WEEK 2 WEEK 3 WEEK 4 WEEK 5 WEEK 6 WEEK 7 WEEK 8 WEEK 9 WEEK 10
CAPS TOPICS JOINING JOINING CONSTRUCTION CONSTRUCTION CONSTRUCTION COLD WATER COLD WATER SUPPLY
(Generic) (Specific) ASSOCIATED WITH ASSOCIATED WITH ASSOCIATED WITH SUPPLY (SPECIFIC)
CIVIL SERVICES CIVIL SERVICES CIVIL SERVICES (SPECIFIC) MID-YEAR EXAMINATION
(SPECIFIC) (SPECIFIC) (SPECIFIC)
TOPICS /CONCEPTS, Identify and explain the uses of: Regulations regarding Brickwork: Brickwork: Setting out: Valves: Joints and fittings for:
SKILLS AND VALUES • Bolts and nuts the use of lead-free Drawings of front Explain, draw and • Set out trenches Explain working • uPVC pipes (Soil and
• Rawl bolts solder for water views, sectional demonstrate how to build Support excavations in principles, uses and wastewater)
installation. views and a brick manhole to accordance with installation of: • Steel pipes (including flanges)
• Plastic plugs
Explanation and consecutive layers benching height Occupational Health and • Water meter
• Rawl plugs Water saving devices:
application of the as seen from above. Explain, draw and Safety regulations • Stop cock • Taps
following fixing demonstrate how to build Back fill and compact
JOINING • Full way valve • Showers
agents: a concrete ring manhole trenches
(Specific) to benching height • Pillar tap • Toilets
• Chemical anchors
Joining of pipes Setting out: • Bib cock, ball Explain and apply repairs and
• Sleeve anchors
Explain and apply the various • Set out levels valve and non- alterations to existing copper pipe
• Spring toggle fixing
methods of cutting, joining and return valve work and
Sheet metal using basic
securing pipe connections for galvanized mild steel (GMS) pipe
Drawing and levelling devices.
joining of: work
application of stages
• Copper pipes of obtaining:
• Galvanised pipes • Grooved seamed
• uPVC pipes (waste and soil pipes) joint
Label and explain the different • Overlap joints
parts of the joints from sectional • Pop rivet joints
School Holidays
drawings.
• Solder joints
Soft solder:
Calculating sheet
• Explanation and application of the metal allowance for
process and use of apparatus joints taking into
• Types of solder account preparation
• Properties of solder and where used. The
• Soldering irons student should be able
• Tinning a soldering iron
to mark out and cut
sheet metal.
• Flux (types and purpose).
REQUISITE PRE- Types of pipes – GMS, Copper, uPVC. Joining of pipes and Explain regulations governing drainage. Identify and explain abbreviations Installation and types of pipes and valves used for cold
KNOWLEDGE methods. and symbols used in drainage systems. Pipe arrangements. Basic site water supply.
equipment; Bricklaying tools; Setting-out Tools; Brickwork; Setting out square Joints and fittings.
angles. Concrete. Laying pipes.
RESOURCES (OTHER Samples of joining fixtures – bolts, nuts, rawlbolt, etc. Pipe Drawing equipment Fittings and valves for cold water supply.
THAN TEXTBOOK) TO cutters, joining fittings, etc. for demonstration purposes. Equipment and materials needed for setting out. Internet- YouTube. Smartphones
ENHANCE LEARNING Shuttering boards for trenches.
INFORMAL Make use of materials and test learner’s ability to identify and Drawing equipment
ASSESSMENT: explain the use of the materials. Practical work on soldering Fittings and valves for cold water supply.
Equipment and materials needed for setting out.
REMEDIATION can be done. Internet- YouTube. Smartphones
Shuttering boards for trenches.
ASSESSMENT
SBA
Mid-year examination
FORMAL
ASSESSMENT Completion of term facets for phase 2 of PAT and assessment of facets.
Learners should be taught and be able to understand and apply principles and concepts of each topic and should not be limited to specific specifications in the CAPS.
Downloaded from hlayiso.com 2
2023/24 ANNUAL TEACHING PLANS: CIVIL TECHNOLOGY (CIVIL SERVICES): GRADE 12
2023/24 ANNUAL TEACHING PLANS: CIVIL TECHNOLOGY (CIVIL SERVICES): GRADE 12 (TERM 3)
TERM 3 WEEK 1 WEEK 2 WEEK 3 WEEK 4 WEEK 5 WEEK 6 WEEK 7 WEEK 8 WEEK 9 WEEK 10
CAPS TOPICS HOT WATER SUPPLY HOT WATER SUPPLY ROOF WORK (SPECIFIC) STORM WATER DRAINAGE DRAINAGE DRAINAGE SANITARY FITMENTS
(SPECIFIC) (SPECIFIC) (SPECIFIC) (SEWERAGE) (SEWERAGE) (SEWERAGE) (SPECIFIC)
ABOVE AND BELOW ABOVE AND BELOW ABOVE AND BELOW
GROUND (SPECIFIC) GROUND (SPECIFIC) GROUND
(SPECIFIC)
TOPICS /CONCEPTS, Abbreviations and Explain with appropriate Gutters: ROOF WORK Pipes and fittings: Drainage fixtures: Design and draw Identification and
SKILLS AND VALUES symbols: Application of sketches the working Explain and apply the (SPECIFIC) Requirements for an Identify and explain with single-line plans of explanation of working
abbreviations and principles, installation, installation of rectangular Develop and cut out GMS sheet efficient drainage sectional views the simple domestic parts, the working
symbols used in regulations, advantages and gutter with rectangular and metal for vent pipe flashing. system location, purpose, drainage lay-outs, principles and
hot water systems disadvantages of heating round down pipes to fascia Identification and use advantages including the labelling of sectional
Fabricate and fit GMS vent pipe
Explain with appropriate units: and wall (GMS and PVC) of drain and soil pipe and disadvantages of: recognised standard sketches, as well as
flashing
sketches the working • Solar heating panel (latest Fabricate stop-ends for a fittings, junctions and abbreviations, colour the installation and
STORM WATER • Inspection chamber
principles, installation, technology e.g., evacuated box gutter bends codes and the uses of the
(SPECIFIC) • Manhole following sanitary
regulations, advantages tubes and flat plate collector Flashings: Description of applicable regulations.
The regulations and methods of • Ramp fitments and their
and disadvantages of solar system) Frustum flashing for a methods of joining Inspection and testing
heating units: disposing large quantities of Explain with sectional of drains by means of connection with the
• Heat pumps ventilation pipe on a synthetic drain pipes
water from a site sketches the purpose the compressed-air discharge pipes
• High pressure geyser pitched roof. (Purpose and uPVC
Faults in water systems: to the municipal storm water and working principles tests only. Procedure, materials,
• Solar geyser (low and drawing showing part of Drainage ventilation: of: regulations, and
• Explain reasons for a very system Identify and label
high pressure) the vent pipe, flashing and Waste pipes, vent • Septic tanks methods of installing
weak or no discharge from The safe disposal of storm water sketches of the testing
roof cover) valves and anti-siphon sanitary fitments
a hot water tap in the following ways: • Vacuum tanks apparatus with a
pipes Wastewater
• Causes Roof gutters to water • French drains suitable description
Drainage fixtures: appliances:
tanks, surface channels, hard Design and draw single- of the application of
PRELIMINARY EXAMINATIONS
• Prevention Identify and explain • Wash hand basin
• Removal of Air locks surfaces, manholes, onto road line plans of simple the tests • Bath
with sectional views
School holidays
kerbs, methods of domestic drainage lay- Explain how to remove • Shower
• Water hammer the location, purpose,
channelling storm water to outs, blockages from soil • Sink
advantages
catchments areas. including the recognised waste and drain pipes Soil water appliances:
and disadvantages of:
Responsibilities of municipalities standard abbreviations, A brief explanation of a • WC pans
• Gulley colour codes and the • Urinals (single stall)
with regard to storm water typical sewerage
disposal. Regulations governing • Inspection eye applicable regulations. treatment process
storm water disposal. • Rodding eye
REQUISITE PRE- Abbreviations and symbols used in a hot water system. Joints and fittings. The methods of disposing large Pipe arrangements. Valves, flushing
KNOWLEDGE High pressure geyser. Components – pressure control Gutters; identification, fall, quantities of water from a Soil fixture. Flushing devices and water traps. devices, wastewater
valve, vacuum valve, safety valve, etc. material and methods of dwelling to the municipal storm Inspection and testing of drains by means of the compressed-air tests pipes and soil water
fixing and supporting. water system. only. pipes.
RESOURCES (OTHER YouTube, wall charts, equipment - geyser, valves, pipes, YouTube, wall charts, YouTube, wall charts and Equipment to do the test as in content, YouTube, work sheets. Sanitary fitments to
THAN TEXTBOOK) TO etc. equipment for e.g., gutters, equipment for e.g., pipes -40, 50 Wall charts and equipment for e.g., pipes -40, 50 and 110 mm, brackets, demonstrate how they
ENHANCE LEARNING brackets, sheet metal, vent and 110 mm, brackets, drawing drawing equipment, holder bats, etc. function.
pipes, holder bats, equipment, holder bats, etc.
downpipes, etc.
INFORMAL Drawings and sketches can be made. Emphasis on Labelling can be done as Fabrication of vent flashing. Sketching and labelling and explanation of the working principles of the Identification of the
ASSESSMENT: sketching. Informal tests and peer marking. Open book well. Informal test – storm water. tanks. Short tests and peer marking. mechanisms and
REMEDIATION tests. Practical – installation of high pressure geyser. Practical work – fabrication demonstration of how
ASSESSMENT
of the stopped ends. they function.
SBA PRELIMINARY EXAMINATIONS
FORMAL COMPLETION OF PHASE 2 OF PAT AND PAT ASSESSMENT
ASSESSMENT Learners should be taught and be able to understand and apply principles and concepts of each topic and should not be limited to specific specifications in the CAPS.
Downloaded from hlayiso.com 3
2023/24 ANNUAL TEACHING PLANS: CIVIL TECHNOLOGY (CIVIL SERVICES): GRADE 12
2023/24 ANNUAL TEACHING PLANS: CIVIL TECHNOLOGY (CIVIL SERVICES): GRADE 12 (TERM 4)
TERM 4 WEEK 1 WEEK 2 WEEK 3 WEEK 4 WEEK 5 WEEK 6 WEEK 7 WEEK 8 WEEK 9 WEEK 10
School holiday
Revision and prepare for examination NSC examinations
Downloaded from hlayiso.com 4
Study this subject
Notes, quizzes and topic questions for Grade 12 Civil Technology.
Recommended for this subject
More papers and memos for this grade and subject.
%20(Afrikaans)%20June%202025%20Possible%20Answers--c0a65d19-28ca-4ac3-8c61-d4627d2a3133/v1-5f42c573694769cf80ce/card.webp)
Memorandum
Civil Technology Grade 12 Gauteng June 2025 Memo (Afrikaans)
%20(English%20and%20Afrikaans)%20June%202025%20Question%20Paper--c8edd459-5237-48e0-8588-69d7ecd7f8e5/v1-be996aaed91bf782e098/card.webp)
Question paper
Civil Technology Grade 12 Gauteng June 2025 Question Paper (Afr)
%20Afr--591d6ffd-20b1-4748-a1ba-b055be0a14c3/v1-4d98a131fd37e013458a/card.webp)
Question paper
Civil Technology Grade 12 NSC June 2025 Question Paper (Afr)
%20Afr--05a95faf-5891-4d88-9e5e-7d13c1d21648/v1-f5ca67113376f7457b83/card.webp)
Question paper
Civil Technology Grade 12 NSC November 2025 Question Paper

Memorandum
Civil Technology Grade 12 Eastern Cape Prelim 2024 Memo (Afr)

Memorandum
Civil Technology Grade 12 Eastern Cape Prelim 2024 Memo (English)
Related documents

Memorandum
Civil Technology Grade 12 Eastern Cape Prelim 2024 Memo (English)

Question paper
Civil Technology Grade 12 Eastern Cape Prelim 2024 QP (Eng)
%20Afr--eefaae29-fe93-4b75-8223-87bf4f3fc14c/v1-3553acfa446acbaa2a45/card.webp)
Question paper
Civil Technology Grade 12 November 2024 NSC Question Paper
%20MG%20Eng--898ff365-3aa8-49fc-aa7a-8c58c79bf409/v1-0ee308106aa8bb2a75dc/card.webp)
Question paper
Civil Technology Grade 12 November 2024 NSC MG Question Paper
%20MG%20Afr--1af3bcd6-f360-4582-929e-be82586adfa1/v1-f9bfd9fe3f83289b1669/card.webp)
Question paper
Civil Technology Grade 12 November 2024 NSC MG Question Paper

Memorandum
Civil Technology Grade 12 Eastern Cape Mock 2023 Memo (English)
More from Grade 12 Civil Technology

Question paper
Civil Technology Grade 12 Eastern Cape Mock 2023 QP (Afr)

Question paper
Civil Technology Grade 12 Eastern Cape Mock 2023 QP (Afr)

Question paper
Civil Technology Grade 12 Eastern Cape Mock 2023 QP (Afr)

Question paper
Civil Technology Grade 12 Eastern Cape Mock 2023 QP (Eng)
%20Eng_hlayiso.com_--e6743728-8140-42ae-838d-282654a975a5/v1-dce3e047e0d7ad60a32b/card.webp)
Question paper
Civil Technology Grade 12 NSC November 2023 Question Paper
%20Afr_hlayiso.com_--b820ac91-947c-4aed-821f-256aa13aabe1/v1-3be01795eace6f81b174/card.webp)
Question paper