SENIOR CERTIFICATE EXAMINATIONS
CIVIL TECHNOLOGY
2018
MARKING GUIDELINES
MARKS: 200
This marking guideline consists of 17 pages.
Copyright reserved Please turn over
Skip to contentAll 2018 papers 

_hlayiso.com_--b6d609b6-89a5-4b39-a9b7-0d878af45cd4/v1-9c90f1958077961e2845/card.webp)



View all
%20(English%20and%20Afrikaans)%20June%202025%20Question%20Paper--c8edd459-5237-48e0-8588-69d7ecd7f8e5/v1-be996aaed91bf782e098/card.webp)
%20Afr--591d6ffd-20b1-4748-a1ba-b055be0a14c3/v1-4d98a131fd37e013458a/card.webp)
%20Afr--05a95faf-5891-4d88-9e5e-7d13c1d21648/v1-f5ca67113376f7457b83/card.webp)


Civil Technology Grade 12 NSC June 2018 Memo (English)
Grade 12 Civil Technology memorandum from the NSC June Exam 2018 (English), 17 pages. Read online or download the free PDF.
Civil Technology · Grade 12 · NSC June Exam · 2018. Memorandum, 17 pages. Read online or download the PDF.
- Subject
- Civil Technology
- Grade
- Grade 12
- Document type
- Memorandum
- Year
- 2018
- Exam period
- NSC June Exam
- Curriculum
- CAPS
- Pages
- 17
- File size
- 404.1 KB
Free to read online, no sign-up needed
Loading document…
Loading document…
1 of 17
This exam
NSC June Exam 2018
Document textSearch extracted text and jump to a page.
Downloaded from hlayiso.com
Civil Technology 2 DBE/2018
SCE – Marking Guidelines
QUESTION 1: CONSTRUCTION, SAFETY AND MATERIAL
1.1 1.1.1 A hard hat will:
• protect the worker from any head injury.
• protect the worker from falling objects from above.
ANY ONE OF THE ABOVE OR ANY OTHER ACCEPTABLE
ANSWER (1)
1.1.2 The worker can wear a dust mask/respiratory mask/gas mask/
protective overall. (1)
1.1.3 If the worker does not use the safety equipment:
• His/Her eyes can be damaged by the dust
• Debris can get into his/her eyes
• Any part of his/her body can be injured if he/she is not wearing
a protective overall.
• Hearing can be damaged if ear protection is not used
• Dust can be inhaled
ANY ONE OF THE ABOVE OR ANY OTHER ACCEPTABLE
ANSWER (1)
1.2 1.2.1 Ear muffs (1)
1.2.2 In a working area where machine and equipment makes loud
noises/sounds.
ANY OTHER ACCEPTABLE ANSWER (1)
1.3 1.3.1 SA or Howe roof truss (1)
1.3.2 A – King post
B – Queen post
C – Rafter (3)
1.3.3 The slope/gradient of a roof truss used for a thatch roof must
be 45˚ and the roof truss in FIGURE 1.3 has a slope of 30°.
ANY ONE OF THE ABOVE (1)
1.3.4 • Concrete tiles
• Clay tiles
• Slate tiles
ANY ONE OR OTHER ACCEPTABLE ANSWER (1)
1.4 DPC is used between the concrete floor and the wall between
courses of brickwork.
DPM is used under a concrete floor to cover the whole area of a
room or a building or as roof underlay. (2)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology 3 DBE/2018
SCE – Marking Guidelines
1.5
110 55
75
STANDARD QUEEN
BRICK CLOSER
ASSESSMENT CRITERIA MARK CANDIDATE'S
MARK
Correctness of elevations 2
Labelling of views 1
Correct dimension lines and 1
Width of queen closer 1
TOTAL: 5 (5)
1.6 Galvanising is more expensive than painting but lasts longer than painting
OR
Painting is cheaper than galvanising and gives a wide variety of colours and
surface finishing's.
ANY ONE OF THE ABOVE (1)
1.7 • Varnish
• Oil
• Wax
• Coal tar creosote
• Paint
• Poisonous chemical salts (water and soluble salts)
• Organic compounds
ANY ONE OF THE ABOVE (1)
1.8
ASSESSMENT CRITERIA MARK CANDIDATE'S
MARK
Tongue(can be in the middle) 1
Groove(can be in the middle) 1
Board 1
TOTAL: 3 (3)
1.9 Cement binds the ingredients of concrete together. (1)
1.10 • Mass concrete – is a volume of concrete that do not have any
reinforcing
• Reinforced concrete – is concrete that is reinforced with steel rods to
strengthen the structure (2)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology 4 DBE/2018
SCE – Marking Guidelines
1.11 • Compacting by hand (rodding and spading)
• Compacting through vibration (Mechanical vibrator)
ANY ONE OF THE ABOVE (1)
1.12 • A slump test is used to test workability/consistency of concrete.
• A cube test is used to test compressive/crushing strength of concrete. (2)
1.13 • Cover strip/H-strip/Decorative grid strips
• Jointing /ceiling tape/Gauze
• Jointing compound (rhinolyte)
ANY ONE OF THE ABOVE
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology 5 DBE/2018
SCE – Marking Guidelines
QUESTION 2: ADVANCED CONSTRUCTION AND EQUIPMENT
2.1 2.1.1 • A – Steel capping
• C – Steel tip (2)
2.1.2 Undisturbed earth (1)
2.1.3 A drop hammer (1)
2.1.4 Pre-cast concrete piles can be used when:
• The soil is not stable/soft
• Water content of soil is high
• There's a highwater table
• Subsoil is subject to movement
• Filling materials are not sufficiently compacted
ANY TWO OF THE ABOVE OR ANY OTHER ACCEPTABLE
ANSWER (2)
2.2 • Bring the water level in the one side of the transparent pipe in line with the
first level.
• Take the other end of the pipe to the other position where the level must
be transferred, maintaining the first level and make a mark next to the
water level at this point. (2)
2.3 • Tape measure
• Chalk line
• Builders line
• Builders square
• Straight edge
• Spirit level
ANY THREE OF THE ABOVE OR ANY OTHER ACCEPTABLE ANSWER (3)
2.4 2.4.1 Angle grinder (1)
2.4.2 Grinding/cutting disc (1)
2.4.3 • The safety guard protects the worker against sparks or debris
from discs and materials.
• The safety guard protects the body parts of the worker against
the rotating blade.
ANY ONE OF THE ABOVE (1)
2.5 2.5.1 • Centre/Turning piece/Profile (1)
2.5.2 • Key brick (1)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology 6 DBE/2018
SCE – Marking Guidelines
2.6 A – Compression force
B – Tensile force (2)
2.7
√
√
NGL NGL
ASSESSMENT CRITERIA MARK CANDIDATE'S
MARK
6 Courses of bricks above the two existing 2
courses
Mortar between brickwork 1
Symbol for concrete in the cavity between
the walls 1
The symbol for concrete in the foundation 1
The symbol for back filling on one side only 1
The damp proof between the walls and the 2
cavity
The weep hole 1
One wall tie 1
TOTAL: 10 (10)
2.8 Dry wall (1)
2.9 Disadvantages of drywalls:
• They are less soundproof than brickwork.
• They are less fireproof that brickwork.
• Drywalls must be joined together or attached to existing walls, to ensure
sturdiness.
• Drywalls cannot carry heavy loads.
ANY ONE OF THE ABOVE (1)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology 7 DBE/2018
SCE – Marking Guidelines
2.10 2.10.1 A - Anchor bar
B - Shear bar (2)
2.10.2 Structural failure will occur
(1)
2.10.3 • To keep the main or anchor bars together.
• Helps to resist shear stress
ANY ONE OF THE ABOVE (1)
2.11 A - Threaded rods and nuts
B – Laggings
C – Lining
D – Collar
E - Vertical clamps (5)
2.12 C, B, A (1)
[40]
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology 8 DBE/2018
SCE – Marking Guidelines
QUESTION 3: CIVIL SERVICES
3.1 3.1.1 E (1)
3.1.2 G (1)
3.1.3 D (1)
3.1.4 F (1)
3.1.5 C (1)
3.1.6 B (1)
3.2 A water trap is installed:
• under sinks
• baths
• toilets
• at a gully
• at a shower
ANY ONE OF THE ABOVE (1)
3.3 P trap or S trap or Bottle trap (1)
3.4 3.4.1
(2)
3.4.2
(2)
3.4.3
(2)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology 9 DBE/2018
SCE – Marking Guidelines
3.5
OUTLET
INLET
OPENING
ASSESSMENT CRITERIA MARK CANDIDATE'S
MARK
External walls with plaster and holes 3
Inner wall with hole and plaster 2
Inlet pipe with T-junction 2
Outlet pipe with T-junction 2
Liquid level 1
Concrete cover with manholes 1
TOTAL: 11
(11)
3.6 • Boreholes
• Wells
• Rain water
• Snow
• Rivers
• Desalination
ANY ONE OF THE ABOVE OR ANY OTHER ACCEPTABLE ANSWER (1)
3.7 Storm water systems are used to carry storm water to rivers or low-lying
dams.
OR ANY OTHER ACCEPTABLE ANSWER (1)
3.8 • Solar energy
• Nuclear power
• Hydro electricity
• Wind
• Natural gas
• Generator
• Inverter
ANY ONE OF THE ABOVE (1)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology 10 DBE/2018
SCE – Marking Guidelines
3.9 • Solar geysers are environmentally friendly.
• Solar geysers can be used in areas where no electricity is available.
• Hot water is available at a very low cost once the installation cost has
been covered.
ANY ONE OF THE ABOVE OR ANY OTHER ACCEPTABLE ANSWER (1)
3.10 • Using solar power as an alternative source of power.
• Using appliances only when necessary.
• Using of low energy or LED light bulbs.
• Switch of lights in rooms that are not in use.
• Shower for shorter periods to prevent over use of geyser.
• Boil only the required quantity of water for a purpose.
• Use a geyser timer
• Use of gas
ANY ONE OF THE ABOVE OR ANY OTHER ACCEPTABLE ANSWER (1)
[30]
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology 11 DBE/2018
SCE – Marking Guidelines
QUESTION 4: QUANTITIES, MATERIALS AND JOINING
4.1 4.1.1 B (1)
4.1.2 C (1)
4.1.3 D (1)
4.1.4 A (1)
4.1.5 C (1)
4.2 4.2.1 2 030/2 030 mm (1)
4.2.2 1 (1)
4.2.3 44/44 mm (1)
4.2.4 813/813 mm (1)
4.2.5 200/200 mm (1)
4.2.6 32/32 mm (1)
4.2.7 220/220 mm (1)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology 12 DBE/2018
SCE – Marking Guidelines
A B C D
Centre line: Superstructure
2/ 7 000 mm = 14 000 mm
2/ 4 200 mm = 8 400 mm
TOTAL: = 22 400 mm
Minus 4/ 220 = 880 mm
= 21 520 mm (4)
1/ 21,52 Area of walls for superstructure
2,6 55,95 m² (3)
1/ 2.1 Area of side door
0,9 1,89 m² (3)
1/ 2,4 Area of garage door
2,1 5,04 m² (3)
1/ 1,5 Area of window
0,45 0,68 m² (3)
Total area of wall after deductions
= 55,95 m²- 1,89 m² - 5,04 m² – 0,68 m²
= 48,34 m² (2)
(18)
[30]
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology 13 DBE/2018
SCE – Marking Guidelines
QUESTION 5: APPLIED MECHANICS
5.1
(A1 x d) + (A2 x d)
Total area
= (3 600 mm² x 30 mm) + (900 mm² x 70 mm)
4 500 mm²
= 108 000 mm³ + 63 000 mm³
4 500 mm²
= 171 000 mm³
4 500 mm²
= 38 mm
OR
Part Area X AX
1 60 mm x 60 mm = 3 600 mm² 30 mm 108 000 mm³
2 15 x 60 = 900 mm² 70 mm 63 000 mm³
∑ 4 500 mm² 171 000 mm³
X=
∑ Ax
∑A
= 171 000 mm³
4 500 mm²
= 38 mm (9)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology 14 DBE/2018
SCE – Marking Guidelines
5.2 80 N
A
E
B
40 N
D
60° 30°
10 m C
DIAGRAM A: SPACE DIAGRAM (1)
a
e
b
c (6)
d
NOT ACCORDING TO SCALE
USE A MASK TO MARK THIS QUESTION
MEMBER NATURE
AE Tie
BD Tie
CD Strut
DE Strut
Tolerance of 1 N to either side. (3)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology 15 DBE/2018
SCE – Marking Guidelines
5.3 5.3.1 16 N (1)
5.3.2 4m (1)
5.3.3 6m (1)
5.3.4
8N 4 N/m 4N
B C D E
A 2m 4m 2m
RL =15 N RR = 13 N
SPACE DIAGRAM
15 N
7N
0N 0N
-9N
- 13 N (8)
Correct shape
SHEAR FORCE DIAGRAM
USE A MASK TO MARK THIS QUESTION
ASSESSMENT CRITERIA MARKS CANDIDATE'S MARK
Correct shape of shear force diagram 1
Value of shear forces correctly measured
5
and indicated
Horizontal lines indicated 2
TOTAL 8
If the drawing is not drawn to the correct scale, penalise the candidate with 1 mark.
[30]
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology 16 DBE/2018
SCE – Marking Guidelines
QUESTION 6: GRAPHICS AND COMMUNICATION
CENTRE NUMBER:
EXAMINATION NUMBER:
ANSWER SHEET 6.1
NO. QUESTIONS ANSWERS MARKS
1 Identify the type of eave construction
Open eave 1
used in the drawing.
State the minimum pitch (slope) of
2
number 1, if galvanised roof sheeting 5° - 10° 1
is used.
3 Tie-beam
Identify number 2. 1
4 State the standard dimension of 38 mm x 38 mm
1
number 3.
To cover the opening between
5 State the purpose of number 4. the wall and the ceiling. 1
6 Name the timber that is shown on top
Wall plate 1
of the external wall marked number 5.
7
Draw the drawing symbol for
2
number 6 in the next column.
To prevent dust, insects,
8
Explain the purpose of number 7. rodents, wind and birds to enter 1
the building
PVC, aluminium, galvanised
9 Name ONE material that can be used
sheet metal. 1
for number 8.
Fascia board
10 Identify number 9. 1
Down pipe
11
Identify number 10. 1
12 Draw a neat freehand line diagram of
a Fink or W roof truss in the next
3
column.
TOTAL: 15
Copyright reserved Please turn over
Civil Technology
Downloaded from hlayiso.com 17 DBE/2018
SCE – Marking Guideliness
CENTRE NUMBER:
ASSESSMENT CANDIDATES
MARKS
EXAMINATION NUMBER: CRITERIA MARK
External walls 2
ANSWER SHEET 6.2 NGL (correctly
1
drawn)
FFL (correctly
1
drawn)
Window 1
Window sill 1
Door opening 1
Step 1
Fascia board 1
Rain-water down
1
pipe
30° Roof (correctly
drawn)
2
Gutter 1
Ridge capping 1
Determining roof
4
height
Any FOUR labels 4
Application of scale
One or two incorrect
=3
Three or four
incorrect = 2
More than five
incorrect = 1
No measurement
correct = 0 3
TOTAL 25
6 550
Application of scale
NOT TO SCALE: USE A MASK TO MARK THIS QUESTION
Any four labels
Copyright reserved
Study this subject
Recommended for this subject

Memorandum
Civil Technology Grade 12 NSC June 2018 Memo (Afrikaans)

Question paper
Civil Technology Grade 12 NSC June 2018 Question Paper (Eng)
_hlayiso.com_--b6d609b6-89a5-4b39-a9b7-0d878af45cd4/v1-9c90f1958077961e2845/card.webp)
Memorandum
Civil Technology Grade 12 Eastern Cape Mock 2018 Memo (Eng)

Memorandum
Civil Technology Grade 12 Eastern Cape Mock 2018 Memo (Afr)

Memorandum
Civil Technology Grade 12 Eastern Cape Mock 2018 Memo (Eng)

Memorandum
Civil Technology Grade 12 Eastern Cape Mock 2018 Memo (Afr)
More from Grade 12 Civil Technology

Question paper
Civil Technology Grade 12 Eastern Cape Mock 2025 QP (Eng)
%20(English%20and%20Afrikaans)%20June%202025%20Question%20Paper--c8edd459-5237-48e0-8588-69d7ecd7f8e5/v1-be996aaed91bf782e098/card.webp)
Question paper
Civil Technology Grade 12 Gauteng June 2025 QP (Afr)
%20Afr--591d6ffd-20b1-4748-a1ba-b055be0a14c3/v1-4d98a131fd37e013458a/card.webp)
Question paper
Civil Technology Grade 12 NSC June 2025 Question Paper (Afr)
%20Afr--05a95faf-5891-4d88-9e5e-7d13c1d21648/v1-f5ca67113376f7457b83/card.webp)
Question paper
Civil Technology Grade 12 NSC November 2025 QP (Afr)

Question paper
Civil Technology Grade 12 Eastern Cape Prelim 2024 QP (Afr)

Question paper