Downloaded from hlayiso.com
NATIONAL
SENIOR CERTIFICATE
GRADE 11
NOVEMBER 2019
CIVIL TECHNOLOGY: CIVIL SERVICES
MARKING GUIDELINE
MARKS: 200
This marking guideline consists of 13 pages, including 3 page of answer sheets.
Skip to contentAll 2019 papers 





View all

/CIV%20TECH%20GR11%20QP%20NOV2022_Civil%20Services_Afrikaans_hlayiso.com_--195d9d88-060d-4288-a6c8-5c59a0e1f4e5/v1-2f03d63ea54e6bd10d71/card.webp)
/CIV%20TECH%20GR11%20QP%20NOV2022_Civil%20Services_English_hlayiso.com_--ed0b5808-e643-408f-bef2-165736e1c4b6/v1-0797091449081c3c3dfd/card.webp)
/CIV%20TECH%20GR11%20QP%20NOV2022_Construction_English_hlayiso.com_--ef9cc9f6-54a4-49fb-a7b1-407a487eeec8/v1-ddd234b1e4aa182f38ab/card.webp)

Civil Technology Grade 11 Eastern Cape November 2019 Memo
Grade 11 Civil Technology memorandum from the Eastern Cape November 2019 (English), 13 pages. Read online or download the free PDF.
Civil Technology · Grade 11 · Eastern Cape November · 2019. Memorandum, 13 pages. Read online or download the PDF.
- Subject
- Civil Technology
- Grade
- Grade 11
- Document type
- Memorandum
- Year
- 2019
- Exam period
- Eastern Cape November
- Curriculum
- CAPS
- Pages
- 13
- File size
- 879.0 KB
Free to read online, no sign-up needed
Loading document…
Loading document…
1 of 13
This exam
Document textSearch extracted text and jump to a page.
Downloaded from hlayiso.com
2 CIVIL TECHNOLOGY: CIVIL SERVICES (EC/NOVEMBER 2019)
QUESTION 1: SAFETY AND MATERIALS (GENERIC)
1.1 Personal protective equipment (1)
1.2 Any TWO requirements of protective footgear on a building site: (2 x 1) (2)
Sturdy
Non-slip
Metal reinforcements in the toes
1.3 Safety precautions for small plant equipment:
1.3.1 To ensure that the equipment is in a good, working condition. (1)
1.3.2 Less chance of inhaling the hazardous fumes of the engines. (1)
1.3.3 Avoiding any possible injuries. (1)
1.3.4 Insufficient training could lead to injuries and damaged equipment. (1)
1.4 Safe stacking of material:
1.4.1 Ladders or any similar answer (1)
1.4.2 Any TWO factors that should not be affected:
Ventilation
Lighting
Fire-fighting equipment (2 x 1) (2)
1.4.3 3 x 500 mm (1) = 1 500 mm of 1,5 m (2) (2)
1.4.4 Can easily hook onto or bump against protruding parts and that could
cause the stack to fall over. (1)
1.5 Cement (1) and fine sand (2) (2)
1.6 Any ONE example of a fine aggregate:
Sand
Silt
Clay (1)
Copyright reserved Please turn over
Downloaded from hlayiso.com
(EC/NOVEMBER 2019) CIVIL TECHNOLOGY: CIVIL SERVICES 3
1.7 Any ONE purpose of lime:
Increase the plasticity of the mixture
Makes the mixture more workable
Deduction of cracks (1)
1.8 Any TWO board products for panelling work:
Plywood
Block board
Hardboard / Masonite (2 x 1) (2)
1.9 Any TWO uses of stainless steel:
Sinks
Wash tubs
Water taps
Water traps
Extractor fans
Any similar answers (2 x 1) (2)
1.10 Iron (1)
1.11 Two or more metals, or metals and non-metals are combined (1), to form a
new, permanent metal (2), with enhanced qualities. (3) (3)
1.12 Any TWO uses of safety glass:
Sliding doors
Exterior doors with glass panels
Shower cubicle and doors
Bath glass screens
Balustrades of staircases (2 x 1) (2)
1.13 Any ONE use of a mastic sealant:
Adheres to almost any material (wood, glass, aluminium, concrete etc.)
For filling cracks and sealing areas exposed to water
Used in construction projects (roofing and brickwork) (1)
1.14 Can be reshaped (1) when reheated (2). (2)
[30]
Copyright reserved Please turn over
Downloaded from hlayiso.com
4 CIVIL TECHNOLOGY: CIVIL SERVICES (EC/NOVEMBER 2019)
QUESTION 2: EQUIPMENT, TOOLS AND GRAPHICS (GENERIC)
2.1 Name the tools in FIGURES 2.1.1 to 2.1.4 and name ONE use of each.
2.1.1 Claw hammer
Any ONE use:
General carpentry / Driving in nails
Remove nails (2)
2.1.2 Plastering trowel
Smooth finishing for walls / plaster work (2)
2.1.3 Club hammer
Any ONE use:
Driving brick bolster / cold chisel
Where heavy hammering is needed
Driving pegs into the ground (2)
2.1.4 Angle grinder
Any ONE use:
Cutting stone / concrete / tiles / metals
Can be used as a grinder (2)
2.2 2.2.1 Bench grinder (1)
2.2.2 Portable circular saw / Radial arm saw (1)
2.3 Identify the tool in FIGURE 2.3 and name TWO uses of it.
Plate compacter
Any TWO uses:
Compacting disturbed / loose soil up to 150 mm
Tampering fillings for hardcore layer
Compacting soil for paving bricks (3 x 1) (3)
2.4 Wipe clean after use
Do not allow mortar / concrete / screed to dry on it
Store in a dry place (Any 2 x 1) (2)
2.5 Similar answer:
The jaws of the universal pliers cannot open big enough (1)
2.6 2.6.1 Section view (1)
2.6.2 2.6.A – Purline
2.6.B – Beam filling
2.6.C – Rafter
2.6.D – Window sill
2.6.E – Foundation
2.6.F – Wall plate
2.6.G – Wall tie
2.6.H – Lintel
2.6.I – Damp proof coarse
2.6.J – Hard core (10)
Copyright reserved Please turn over
Downloaded from hlayiso.com
(EC/NOVEMBER 2019) CIVIL TECHNOLOGY: CIVIL SERVICES 5
2.6.3 114 x 38 (2)
2.6.4 Bind 2 wall leaves (1)
2.7 Pitch of roof
Type of roof covering
Barge board
Facia board
Gutters
Downpipes (Any 4 x 1) (4)
2.8 2.8.1 Plaster
(2)
2.8.2 Undressed wood
(2)
2.8.3 Invert level
(2)
[40]
QUESTION 3: QUANTITIES, JOINING AND GRAPHIC (GENERIC)
3.1 Make neat sketches to illustrate the following symbols on a floor plan:
3.1.1 Grease trap
(2)
3.1.2 DPC (Damp-proof course)
(2)
3.1.3 Staircase
(2)
3.2 Use ANSWER SHEET 1 (12)
3.3 Basic sealant against air and leakage
Enhance materials
Used in aviation
Construction repairs (Any 3 x 1) (3)
3.4 Apply enough adhesive to both sides of the areas to be bonded
Allow to dry
After drying, hold the two pieces of material together or clamp, roll or
press them together (3)
Copyright reserved Please turn over
Downloaded from hlayiso.com
6 CIVIL TECHNOLOGY: CIVIL SERVICES (EC/NOVEMBER 2019)
3.5 Joins PVC pipes
Clear / transparent
Dries quickly (Any 1 x 1) (1)
3.6 To allow light into building
To prevent rain, wind, dust and insects from entering
Enhance the aesthetic qualities of a structure (3)
3.7 Polythene: strong and light / becomes brittle when exposed to sunlight /
can be used in underground waterproofing / can be reshaped / remoulded
after heating
Polyvinyl chloride: can be reshaped / solid material / two types available
flexible and rigid / good insulating properties / not dissolved by alcohol (2)
[30]
Copyright reserved Please turn over
Downloaded from hlayiso.com
(EC/NOVEMBER 2019) CIVIL TECHNOLOGY: CIVIL SERVICES 7
QUESTION 4: MATERIAL, EQUIPMENT AND JOINING (SPECIFIC)
4.1 Any THREE steps to prevent infections by sewerage:
Wear suitable personal protective equipment
Avoid hand-to-face contact
Cover open wounds
Wash hands
Remove protective equipment upon leaving the area
Place protective gear in a plastic bag
First-aid equipment should be available
Clean equipment thoroughly
Immunisations must be up to date (3 x 1) (3)
4.2 Any TWO safety measures which must be applied to avoid breathing in of
soldering fumes:
Extractor fan
Keeping head not directly above the work
Mask can be used (2 x 1) (2)
4.3 4.3.1 D – Unreinforced concrete
4.3.2 C – Mortar
4.3.3 B – Screed (3 x 1) (3)
4.4 Plywood (1)
4.5 Meranti is more expensive / Pine is cheaper (1)
4.6 Explain the difference in use of filler bricks and face bricks
(1) Filler bricks are used where it is not visible/is plastered
(2) Face bricks are used for facing purposes/not to be plastered/esthetical
display (2)
4.7 Copper does not rust / Keeps heat longer (1)
4.8 Zink (1)
4.9 Area of the window (1)
4.10 Any THREE properties of polypropylene which make it ideal for the use as
sewer pipes.
Flexible
Light
Strong
Resistance to chemicals
Durable (3 x 1) (3)
4.11 4.11.1 A – Cold chisel
B – Pop rivet gun (2)
Copyright reserved Please turn over
Downloaded from hlayiso.com
8 CIVIL TECHNOLOGY: CIVIL SERVICES (EC/NOVEMBER 2019)
4.11.2 Any TWO maintenance measures which must be applied to tool
4.11.A.
Sharpen regularly
Grind down mushroom heads (2 x 1) (2)
4.11.3 (1) Securing rivet pins (2) in tin sheets /sheet metal (2)
4.12 (1) Clean ends (2) Ends must be square (2)
4.13 4.13.1 False (1)
4.13.2 False (1)
4.13.3 True (1)
4.13.4 False (1)
[30]
QUESTION 5: GRAPHIC, CONSTRUCTION AND JOINING (SPECIFIC)
5.1 FIGURE 5.1 on ANSWER SHEET 2 shows the plan and elevation of a
square down pipe.
Use ANSWER SHEET 2 and develop and draw the development of the
square down pipe on scale 1 : 1. (16)
5.2 (1) Protection against drying out / keeping damp so that (2) hydration
process / hardening process can complete. (2)
5.3 Any TWO defects in concrete which is caused by inadequate curing.
Low strength
High permeability
Shrinkage
Cracks
Dusting
Crazing (2 x 1) (2)
5.4 5.4.1 Single brick wall (1)
5.4.2 Stretcher bond (1)
5.4.3 220 mm (1)
5.5 (1)Pipes will rattle / vibrate and (2) cause stress / leaks in pipe joints. (2)
5.6 5.6.1 Galvanised pipes (1)
5.6.2 To bind thread with teflon-tape (1)
Copyright reserved Please turn over
Downloaded from hlayiso.com
(EC/NOVEMBER 2019) CIVIL TECHNOLOGY: CIVIL SERVICES 9
5.7 (1) Spring action of wings (2) spread against the back of the board. (2)
5.8 Make a neat sketch to illustrate the shape of a grooved seamed joint in
sheet metal. (1)
[30]
QUESTION 6: COLD AND HOT WATER SUPPLY, DRAINAGE AND SANITARY
FITMENTS (SPECIFIC)
6.1 6.1.1 Soldering – Copper pipe (1)
6.1.2 Compression joint – Copper pipe (1)
6.1.3 Threaded joint – Galvanized pipe (1)
6.2 6.2.1 Complete the sketch on ANSWER SHEET 3 by drawing in the TWO
lacking parts of the valve. (2)
6.2.2 Ball valve (1)
6.2.3 (1) Is used to control the water level in (2) cisterns and supply tanks. (2)
6.3 (1) Protection against external pressure / Allow movement because
(2) it is difficult to repair below the building. (2)
6.4 6.4.1 Automatic shut-off valve
(1)
6.4.2 Non-return valve
(1)
6.4.3 Pressure-relief valve PV
(1)
6.4.4 Vacuum-relief valve
(1)
6.5 Similar answer:
(1) Water rise to the top of (2) the geyser when it is heated. (2)
6.6 Any TWO:
Thermal expansion
Excess system pressure
Low temperature relief
Too high setting on the water heater (Any 2 x 1) (2)
Copyright reserved Please turn over
Downloaded from hlayiso.com
10 CIVIL TECHNOLOGY: CIVIL SERVICES (EC/NOVEMBER 2019)
6.7 6.7.1 (1) South elevation does not get / water will not get hot (2) direct sun
light. (2)
6.7.2 Placing on north elevation. (1)
6.8 Ensure that the tank is not subjected to any pressure. (1)
6.9 6.9. A – Radiation absorbing coating
6.9. B – Fluid tube
6.9. C – Inner glass tube (3)
6.10 6.10.1 False (1)
6.10.2 True (1)
6.10.3 False (1)
6.11 Similar description.
(1) It causes greater atmospheric pressure (2) which forces out (3) the water
locked (4) in the trap. (4)
6.12 Installing a vent pipe. (1)
6.13 Vent valves of a stub-stack sanitary system are lower than the valves of a
one-pipe sanitary system. (1)
6.14 Any TWO disadvantages of a one-pipe sanitary system.
Human waste could back up through the gully.
Rapid flushing could cause the drainage of adjacent water seals.
Larger waste pipes can be required. (2 x 1) (2)
6.15 Any TWO materials water closets are manufactured from.
Glazed porcelain
Ceramic
Special clay
Plastic
Stainless steel (2 x 1) (2)
6.16 (1) The pipe is projected to the bottom of the cistern (2) and silences the
noise of the incoming water. (2)
[40]
TOTAL: 200
Copyright reserved Please turn over
Downloaded from hlayiso.com
(EC/NOVEMBER 2019) CIVIL TECHNOLOGY: CIVIL SERVICES 11
CIVIL TECHNOLOGY
ANSWER SHEET 1 CIVIL SERVICES
NAME:
3.2 Calculate the volume of concrete needed to cast the floor slab between the
external walls. (12)
A B C D
Internal measurements of long walls
= 9 000 mm – 220 mm √ – 220 mm √
= 8 560 mm √ (3)
Internal measurements of short walls
= 5 000 – 220 mm √ – 220 mm √
= 4 560 mm √ (3)
Volume of concrete needed
1/ √ 8,56 √ Length of floor slab = 8 650 mm
4,56 √ Width of floor slab = 4 560 mm
0,085 √ 3,318 m³ √√ Thickness of floor slab = 85 mm (6)
(12)
Copyright reserved Please turn over
Downloaded from hlayiso.com
12 CIVIL TECHNOLOGY: CIVIL SERVICES (EC/NOVEMBER 2019)
CIVIL TECHNOLOGY
ANSWER SHEET 2 CIVIL SERVICES
NAME:
5.1 FIGURE 5.1 on ANSWER SHEET 2 shows the plan and elevation of a
square down pipe.
Use ANSWER SHEET 2 and develop and draw the development of the
square down pipe on scale 1 : 1. (16)
PLAN VIEW
a1 b1 c1 d1 e1 f1 g1 h1 i1
A
a2
b2 c2 d2 g2 h2 i2
B a3 e2 f2
ELEVATION VIEW
Base lines: a1-i1, a2-12, a3-f2 3
Seam lines: b1-b2, i1-i2 2
Vertical construction lines: c1-c2 tot h1-h2 6
Intersection lines: c2-d2, d2-e2, e2-f2, f2-g2, g2-h2 5
TOTAL: 16
Copyright reserved Please turn over
Downloaded from hlayiso.com
(EC/NOVEMBER 2019) CIVIL TECHNOLOGY: CIVIL SERVICES 13
CIVIL TECHNOLOGY
ANSWER SHEET 3 CIVIL SERVICES
NAME:
6.2 FIGURE 6.2 op ANSWER SHEET 3 shows an incomplete sketch of a valve
for cold water supply. Answer the following questions with regard to the
valve.
6.2.1 Complete the sketch on ANSWER SHEET 3 by drawing in the TWO
lacking parts of the valve. (2)
Lacking parts. 2
TOTAL: 2
Copyright reserved Please turn over
Study this subject
Recommended for this subject

Memorandum
Civil Technology Grade 11 Eastern Cape November 2019 Memo

Memorandum
Civil Technology Grade 11 Eastern Cape November 2019 Memo

Memorandum
Civil Technology Grade 11 Eastern Cape November 2019 Memo

Memorandum
Civil Technology Grade 11 Eastern Cape November 2019 Memo

Memorandum
Civil Technology Grade 11 Eastern Cape November 2019 Memo

Question paper
Civil Technology Grade 11 Eastern Cape November 2019 QP
More from Grade 11 Civil Technology

Annual teaching plan
Gr 11 Cons ATP 2023 24

Annual teaching plan
Gr 11 Civil Ser ATP 2023 24
/CIV%20TECH%20GR11%20QP%20NOV2022_Civil%20Services_Afrikaans_hlayiso.com_--195d9d88-060d-4288-a6c8-5c59a0e1f4e5/v1-2f03d63ea54e6bd10d71/card.webp)
Question paper
Civil Technology Grade 11 2022 QP (Afr)
/CIV%20TECH%20GR11%20QP%20NOV2022_Civil%20Services_English_hlayiso.com_--ed0b5808-e643-408f-bef2-165736e1c4b6/v1-0797091449081c3c3dfd/card.webp)
Question paper
Civil Technology Grade 11 2022 QP (Eng)
/CIV%20TECH%20GR11%20QP%20NOV2022_Construction_English_hlayiso.com_--ef9cc9f6-54a4-49fb-a7b1-407a487eeec8/v1-ddd234b1e4aa182f38ab/card.webp)
Question paper
Civil Technology Grade 11 2022 QP (Eng)

Question paper