GRAAD 12
SENIOR CERTIFICATE/
NATIONAL SENIOR CERTIFICATE
GRADE 12
CIVIL TECHNOLOGY: CIVIL SERVICES
NOVEMBER 2020
MARKING GUIDELINES
MARKS: 200
These marking guidelines consist of 19 pages.
Copyright reserved Please turn over
Skip to contentAll 2020 papers %20Memo%20Eng_hlayiso.com_--f06cef7f-235e-45f7-9f9b-f8e6a2b0c0ca/v1-45ae92f9d9d194afe959/card.webp)
%20Memo%20Afr_hlayiso.com_--8cffc125-69c0-44e9-b0eb-88ae7e930363/v1-fca2156d2557644edb35/card.webp)
%20Afr_hlayiso.com_--b796705a-6588-4c35-a6ed-9d9659bce995/v1-978b69e54ed8b19a2f08/card.webp)
%20Eng_hlayiso.com_--f45b898c-a9ab-4069-ae4b-2b730f88cf1b/v1-5a72c6e9110b3de20e2e/card.webp)
%20Eng_hlayiso.com_--6e24138d-3f1b-42f9-8076-7ae0b7db457a/v1-e0a7b2645cde7f912d21/card.webp)
%20Eng_hlayiso.com_--8ecb8551-97e5-4a57-8187-0130f8d158da/v1-b424a911dcff7aea0ac5/card.webp)
View all%20(English%20and%20Afrikaans)%20June%202025%20Question%20Paper--c8edd459-5237-48e0-8588-69d7ecd7f8e5/v1-be996aaed91bf782e098/card.webp)
%20Afr--591d6ffd-20b1-4748-a1ba-b055be0a14c3/v1-4d98a131fd37e013458a/card.webp)
%20Afr--05a95faf-5891-4d88-9e5e-7d13c1d21648/v1-f5ca67113376f7457b83/card.webp)


%20Afr--eefaae29-fe93-4b75-8223-87bf4f3fc14c/v1-3553acfa446acbaa2a45/card.webp)
Civil Technology Grade 12 NSC November 2020 Memo (English)
Grade 12 Civil Technology memorandum from the NSC November Exam 2020 (English), 19 pages. Read online or download the free PDF.
Civil Technology · Grade 12 · NSC November Exam · 2020. Memorandum, 19 pages. Read online or download the PDF.
- Subject
- Civil Technology
- Grade
- Grade 12
- Document type
- Memorandum
- Year
- 2020
- Exam period
- NSC November Exam
- Curriculum
- CAPS
- Pages
- 19
- File size
- 405.9 KB
Free to read online, no sign-up needed
Loading document…
Loading document…
1 of 19
This exam
Document textSearch extracted text and jump to a page.
Downloaded from hlayiso.com
Civil Technology: Civil Services 2 DBE/November 2020
SC/NSC – Marking Guidelines
INSTRUCTIONS FOR THE MARKERS
1. Markers should:
Familiarise themselves with the question and answer before evaluating the
responses of candidates.
Always interpret the responses of the candidates within the context of the
question.
Consider any relevant and acceptable answer during pre-marking but
should strictly adhere to the answers after finalisation of the marking
guideline.
There are two approaches to answering questions, these are (1) to describe
and (2) to explain.
If a candidate is required to explain e.g., a process in 4 steps, only the first 4
responses should be considered.
If, however a candidate is required to e.g., explain or describe how to
transfer heights from one point to another using a transparent pipe level we
need to consider that candidates may write a long description not
necessarily well organised as an intellectual response may do. In this case
the marker needs to evaluate the complete statement to judge if the
candidate explained the required outcome satisfactorily and allocate marks
on merit. The marker should apply his/her professional judgement with
these types of questions.
Mark what the candidate wrote and do not award marks for answers that the
marker thinks the candidate meant with what was written.
Indicate the tick or cross right at the position where the mark needs to be
awarded or where the candidate made the error.
Accept the letter corresponding with the correct answer as well as the
answer written in full in multiple-choice questions.
Accept incorrect spelling in one-word answers unless the spelling changes
the meaning of the answer.
2. For calculations:
A mark is only awarded if the correct unit is written next to the answer.
If TWO marks are awarded ONE mark is awarded for the answer and ONE
mark for the correct unit.
Where the candidate made a principle error e.g. added instead of
multiplying, no marks will be awarded for the steps. If the answer is correct
according to what the candidate did, the mark for the answer can be
awarded for the application of skills.
Where an incorrect answer could be carried over to the next step, the first
answer will be deemed incorrect. However, should the incorrect answer be
carried over correctly, the marker has to recalculate the values, using the
incorrect answer from the first calculation. If correctly used, the candidate
should receive the full marks for subsequent calculations.
Markers should consider when and where a candidate has rounded off in a
calculation, as well as the subsequent effect it has on the final answer
obtained. The calculation should therefore be awarded marks on merit.
Alternative methods of calculations must be considered, provided that the
correct answer is obtained.
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Civil Services 3 DBE/November 2020
SC/NSC – Marking Guidelines
3. When marking drawings:
The member for which the mark should be awarded should be drawn
correctly in the correct position to receive a mark.
A member incorrectly drawn but wrongfully repeated in another position will
be awarded the mark for the repeated incorrect member provided that the
marking guideline provide for TWO or more marks for that member (positive
marking).
Marks can only be awarded for a label if the label is correctly indicating the
correct member.
Scale drawings should always be marked using an appropriate mask.
When a candidate drew the wrong drawing e.g.:
A horizontal section instead of a vertical section, no marks will be allocated
to the drawing as the candidate did not respond to the expected outcome.
An orthographic view instead of sectional view, no marks will be allocated to
the drawing as the candidate did not respond to the expected outcome.
An orthographic view instead of an isometric view, no marks will be
allocated to the drawing as the candidate did not respond to the expected
outcome.
If the incorrect drawing was drawn, the candidate can be awarded for only
what was asked but mark/s for the correctness of the drawing will not be
awarded e.g., if a King Post roof truss was asked in the question, and
candidate drew SA-Howe Truss
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Civil Services 4 DBE/November 2020
SC/NSC – Marking Guidelines
QUESTION 1: OHSA, SAFETY, MATERIALS, TOOLS, EQUIPMENT AND JOINING
(GENERIC)
1.1 1.1.1 E (1)
1.1.2 C (1)
1.1.3 D (1)
1.1.4 H (1)
1.1.5 B (1)
1.1.6 F (1)
1.1.7 A/I (1)
1.1.8 G/K (1)
1.2 Galvanising:
Adds strength to the original, uncoated metal.
Make it last longer/Preservation/Durable.
Decorative/Enhance appearance.
Makes metal thicker than the uncoated metal.
Nails and screws prevent staining.
Prevent the material from rusting/corroding.
ANY ONE OF THE ABOVE (1)
1.3 Material safety data sheet.
Sufficient information regarding the protection of health and safety.
ANY ONE OF THE ABOVE (1)
1.4 Materials can be moved manually/by means of a wheelbarrow/trolley.
Materials can be moved by means of machinery/builders hoist/truck/
crane/tractor/conveyor/fork lift. (2)
1.5 Water-based paint:
Dry quickly.
Allows marks/smudges to be easily cleaned with water.
Give an elastic flexible finish.
Durable
Gives a decorative finish.
Enhances the appearance.
Resistant to cracking.
Cost effective/Cheaper
Easy to apply.
ANY TWO OF THE ABOVE (2)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Civil Services 5 DBE/November 2020
SC/NSC – Marking Guidelines
1.6 1.6.1 Multi detector (1)
1.6.2 Care of the multi detector:
Place the multi-detector in its holder directly after use.
Do not bump the instrument against objects or drop it.
Protect the multi-detector against moisture and direct sunlight.
If the measuring tool is not used for a long period, remove the
battery.
Wipe away dirt or spots with a dry, soft cloth.
Switch off the device before storing.
ANY TWO OF THE ABOVE (2)
1.7 Drill a hole in the wall.
Insert the plastic plug into the hole.
Align the hole in the bracket with the hole in the wall and fasten the
screw. (3)
[20]
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Civil Services 6 DBE/November 2020
SC/NSC – Marking Guidelines
QUESTION 2: GRAPHICS AS MEANS OF COMMUNICATION (GENERIC)
NO. QUESTION ANSWER MARKS
Identify the elevation in FIGURE
1 South Elevation 1
A.
Describe the type of house that is Double-storey house/Building/Multi-storey
2 1
indicated in FIGURE A. building
Ridge Capping/Ridge tile/Ridge
3 Identify number 1. 1
plate/Ridge
4 Identify number 3. Fascia board 1
5 Identify number 4. Overhang/Eave/Dimension line 1
Identify the fastener indicated by
6 Holder bat/Clamp/Clip 1
number 5.
Window/Window frame/Casement/
7 Identify number 6. 1
Casement frame
Shoe/Down pipe outlet/
8 Identify number 7. 1
Spout
9 Identify number 8. Natural ground level/NGL 1
What does DPM stands for, as
10 Damp proof membrane 1
indicated in the notes?
11 Identify number 10. Built-in cupboard/BIC 1
Recommend a suitable material Fibre cement/Galvanised sheeting/Sheet
that can be used for the metal/Timber/Wood/Plastic/Fibre
12 glass/Aluminium sheeting 1
manufacturing of number 2 in
FIGURE A.
Name the TWO elevations on West elevation
13 2
which number 2 is installed. East elevation
The gutter is fixed against it.
Describe the purpose of number
14 It finishes off the roof. 1
3.
Protect roofs/rafters from rainwater.
Deduce ONE feature that has Step missing at the door
15 been omitted from the elevation in 1
FIGURE A. Sill missing at the window
Recommend any TWO sanitary Hand basin/Wash hand basin/Hand
fitments carrying waste water basin/Basin/WB/WHB/HB
16 other than a bath that can be 2
Shower/SH
installed in the room indicated by
number 11.
Copyright reserved
Downloaded from hlayiso.com
Civil Technology: Civil Services 7 DBE/November 2020
SC/NSC – Marking Guidelines
What sanitary fixture carrying soil Water closet/WC
17 water can be installed in the room 1
indicated by number 12? Bidet/BT
The two side windows are opening to the
Describe the error that appears at wrong sides/No window sill/The window
18 number 6 in the elevation in 1
drawn in FIGURE A is not the same as that
FIGURE A. in the window schedule/Window opening.
State the reference code for this
19 QP 4 - 2020 1
plan.
20 Which room will number 13 serve? Bedroom 2 1
Electrical wiring/cable/connection
21 What does the line between Wiring/Wiring from light switch to
1
numbers 13 and 14 represent? light/Shows which switch operates which
electrical fitting
15: Single tube fluorescent light/
17: Double/ tube fluorescent light.
Differentiate between number 15 15: Will use less electricity/Watt than 17/
22 in FIGURE B and number 17 in 15: Will provide less light than 17/ 2
the notes. 15: Running cost will be cheaper than 17.
15: Has one tube/1 x 40 Watt.
17: Has two tubes/2 x 40 Watt.
Explain the installation of brick
Brick force must be installed between
force from the top of the window to
23 every course above the window up to wall 1
the wall plate, as indicated by the
plate.
architect.
Face bricks
Plaster and paint/Plaster/Paint/Plaster
Recommend a possible finish for
24 finish (Smooth finish/Splatter finish/Wavy 1
the outside walls of the house.
finish/Bagging finish)
Cladding/Tiling
Deduce from FIGURE 2 which
25 elevation does NOT have East elevation 1
windows.
Deduce the thickness of the
26 220 mm 1
external wall from FIGURE 2.
Name a material that can be used
Wood/Timber/Stainless steel/Mild
27 to close the open sides of number 1
steel/Steel/Aluminium/Glass/Perspex
16.
Name the town in which the
28 Cradock 1
proposed dwelling will be build.
Calculate the area of the ℓxb ℓxb
29 bathroom. Show ALL calculations. = 2 m x 2 m OR 2 000 mm x 2 000 mm 3
Give your answer in m². = 4 m² = 4 m²
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Civil Services 8 DBE/November 2020
SC/NSC – Marking Guidelines
Calculate the total length of the 220 + 3 000 + 110
wall on the eastern side of the
building. Show ALL calculations. + 1 400 + 110 + 2 000 +220
The length must be indicated in = 7 060 mm
metres.
30 = 7,06 m
6
OR
220 + 3 000 + 110 + 3 510 + 220
= 7 060 mm
= 7,06 m
TOTAL: 40
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Civil Services 9 DBE/November 2020
SC/NSC – Marking Guidelines
QUESTION 3: CONSTRUCTION ASSOCIATED WITH CIVIL SERVICES, OHSA,
AND QUANTITIES (SPECIFIC)
3.1 3.1.1 Hard ground (1)
3.1.2 Moderately firm ground (1)
3.1.3 Moderately firm ground (1)
3.1.4 Loose and waterlogged ground (1)
3.1.5 OHS (1)
3.2 Methods of backfilling trenches are:
Compaction/Fill and compact
Jetting/Flowable fill (2)
3.3 3.3.1 English bond (1)
3.3.2 Queen closer/Closer (1)
3.3.3 55 mm (1)
3.4 Workers must:
wear safety goggles.
wear face shield.
wear rubber gloves/gloves.
wear gum boots.
wear overall.
wear a respirator.
ensure that all open wounds are properly covered.
ANY TWO OF THE ABOVE (2)
3.5 3.5.1 Protects (1)
3.5.2 Competent (1)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Civil Services 10 DBE/November 2020
SC/NSC – Marking Guidelines
3.6
OR
ASSESSMENT CRITERIA MARK
Manhole cover and frame 3
Pipe channel 2
Sloping concrete/mortar/haunching 2
Correctness of drawing 1
TOTAL: 8
3.7 A B C D
3.7.1 Volume of tank
22
1/ Volume = πr2h
7
Note: π = 22
0,9
7
0,9
2,8
7,13 m3
OR
Volume of tank
22
1/ Volume = πr2h
7
(0,9)2
2,8
7,13 m3
Volume of water in the tank
3.7.2 1/ 7,13 = volume of tank x 1 000
1 000
7 130 ℓ (8)
[30]
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Civil Services 11 DBE/November 2020
SC/NSC – Marking Guidelines
QUESTION 4: HOT- AND COLD-WATER SUPPLY, TOOLS, EQUIPMENT AND
MATERIALS (SPECIFIC)
4.1
OPEN NON-RETURN VALVE
CLOSED NON-RETURN VALVE
ASSESSMENT CRITERIA MARK
Open non-return valve
Correct position of ball 2
Correct position of spring 1
Closed non-return valve
Correct position of ball 2
Correct position of spring 1
TOTAL: 6 (6)
4.2 4.2.1 Water meter (1)
4.2.2 To enable local authorities to calculate the amount of water used
by a household. (1)
4.2.3 The municipality/local authority/Council (1)
4.3 Water that has been contaminated by/or carries human waste or other
pollutants.
Water from basin, bath and sink is not the desired answer but may be
accepted when candidates provided it. (2)
4.4 4.4.1 To join the water closet pan to the sewer pipe. (1)
4.4.2 To connect soil pipes at a 135°angle. (1)
4.4.3 Where soil pipes have to bend/change direction. (1)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Civil Services 12 DBE/November 2020
SC/NSC – Marking Guidelines
4.5 Compressed-air test apparatus (1)
4.6 Advantages of the red water diverter:
It uses no electricity
No on-going costs
No new wiring to new locations
No energy wastage from pumps
No heat loss in recirculating pipes
Saves water
Saves money
ANY THREE OF THE ABOVE (3)
4.7 A coupling that can be used to repair a leaking galvanised pipe is:
Johnson pipe coupling
Long screw fitting
Galvanised union
Socket/T-piece/45° bend/90°-bend
ANY ONE OF THE ABOVE (1)
4.8 4.8.1 Components that are incorrectly installed:
Pressure-reducing valve
Vacuum breaker
Space between geyser and driptray
ANY TWO OF THE ABOVE (2)
4.8.2 Recommended solutions:
Move the pressure reducing valve next to the stop cock before
the cold water draw off to other taps.
Install the two vacuum breakers in line with each other,
minimum 300 mm above the geyser.
Reduce the space between the geyser and drip tray to ensure
that the drip tray properly support the geyser. (2)
ANY TWO OF THE ABOVE
4.8.3 Thermostat (1)
4.8.4 It protects the geyser from corrosion. (1)
4.8.5 Pipe-thread cutting machine (1)
4.9 4.9.1 Evacuated tube (1)
4.9.2 A – Outer glass tube/Glass
B – Radiation absorbing coating
C – Inner glass tube
D – Fluid tube (4)
4.9.3 Water pressure testing pump (1)
4.10 Both are a form of corrosion. (1)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Civil Services 13 DBE/November 2020
SC/NSC – Marking Guidelines
4.11 4.11.1 Galvanic corrosion (1)
4.11.2 A – Copper pipe
B – Galvanised steel pipe (2)
4.12 Using a drain cleaning machine instead of drain cleaning rods:
The drain cleaning machine requires a lot less effort/force.
The drain cleaning machine is already fully assembled.
The drain cleaning machine is self-propelled and no force is necessary
from a worker.
The drain cleaning machine works faster.
ANY TWO OF THE ABOVE (2)
4.13 Measures to consider when taking care of the bearings of a centrifugal pump:
Clean the bearing bracket if it contains any oil.
Lubricate the bearing regularly.
ANY TWO OF THE ABOVE (2)
[40]
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Civil Services 14 DBE/November 2020
SC/NSC – Marking Guidelines
QUESTION 5: GRAPHICS AS MEANS OF COMMUNICATION, ROOF WORK AND
STORM WATER (SPECIFIC)
5.1 Methods that are used to channel water away from buildings are:
Gutters on roofs collect rainwater and feed it to down pipes.
Channels or inclined surfaces can lead water away from buildings.
Manholes connected to storm-water drains will carry the water away from
inhabited areas to be safely discharged into rivers or dams.
Furrows can channel water to catchments areas.
Water tanks.
ANY TWO OF THE ABOVE (2)
5.2 The owner of the property. (1)
5.3 The purpose of a road kerb:
Storm water from roads flows along a road kerb until it reaches the storm
water drain.
Channels storm water into the storm water drain.
ANY ONE OF THE ABOVE (1)
5.4
ASSESSMENT CRITERIA MARK
125 mm x 40 mm side 1
80 mm x 40 mm side 1
125 mm x 80 mm centre 1
Seam 2
TOTAL: 5 (5)
5.5 Stop ends are used to seal the gutter off at the ends.
Prevent water flowing out at the gutter ends.
ANY ONE OF THE ABOVE (1)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Civil Services 15 DBE/November 2020
SC/NSC – Marking Guidelines
5.6 Flashing material:
Copper
Galvanised sheet metal
Lead
Bitumastic patents/Bituman
Rubber sealant
ANY ONE OF THE ABOVE (1)
5.7
4
6
4
5 5
4
5
3 3
5 5
1
1
4
6
4
2 2 2 NO ASSESSMENT CRITERIA MARK
1 Projection lines to determine
2
the apex
2 Determine true length 3
3 Top and bottom arc of pyramid 2
Development of base of
4 5
pyramid
5 Development of top of pyramid 5
6 5 mm seams 2
TOTAL: 19
(19)
[30]
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Civil Services 16 DBE/November 2020
SC/NSC – Marking Guidelines
QUESTION 6: SEWERAGE, SANITARY FITTINGS AND JOINING (SPECIFIC)
6.1 6.1.1 C (1)
6.1.2 B (1)
6.1.3 A (1)
6.1.4 C (1)
6.1.5 A (1)
6.2 6.2.1 A – Compression joint
B – O-ring compression connection (2)
6.2.2 A – Used to fix waste pipes into the outlet of the waste trap under
basins/baths/sinks/sanitary fitments.
B – Used to join drain pipes. (2)
6.3 6.3.1 A - Overflow
Allows water to flow out if the tap is not closed before the water
reaches the point of overflowing. (2)
6.3.2 22 mm/15 mm/20 mm (1)
6.3.3 P – Trap/Gully trap (1)
6.3.4 If no inspection eyes are installed:
there will be no access to the pipe
it will not be possible to clear blockages.
it will not be possible to inspect for blockages.
ANY TWO OF THE ABOVE (2)
6.3.5 Water seal/Water level/Water (1)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Civil Services 17 DBE/November 2020
SC/NSC – Marking Guidelines
6.4 Requirements for a sewerage system are:
The gradient of the pipe installations must be correct – 1:40 or 1:60.
The diameter of any drainage pipe must be big enough to carry the
sludge.
Pipes must conform to SABS standards.
Pipes must be properly sealed at the joints to prevent gases from
escaping the system.
Sharp inclines and angles should be avoided.
Sewer pipes should be at least 100 mm in diameter.
All connections must be made at 45°/135°.
Sufficient volumes of water must be discharged into the system.
Pipes must be smooth on the inside and made of a strong, durable
material.
Approved tools must be used for installations.
Rodding and inspection eyes need to be installed in the system.
A manhole must be constructed where two or more pipes meet, at the
main pipeline junction, or where a distance exceeds 25 metres,
measured along the line of the drain from a rodding eye or other
permanent means of access.
There should be at least one vent pipe in the sewer system.
Trenches in close proximity to foundations should be backfilled with
concrete.
Pipes should be laid in a straight line.
ANY THREE OF THE ABOVE (3)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Civil Services 18 DBE/November 2020
SC/NSC – Marking Guidelines
6.5
IE
IE
VP
IE
G
IE
IE IE IE RE
VP G
RE
ASSESSMENT CRITERIA MARK
Branch pipes drawn
5
correctly
Vent pipes indicated
2
correctly
Gulleys indicated correctly 2
Junction of two main sewer
1
pipes
Rodding eyes 2
Inspection eyes 2
TOTAL: 14
(14)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Civil Services 19 DBE/November 2020
SC/NSC – Marking Guidelines
6.6 6.6.1
MH
(2)
6.6.2
OR
ACCEPT ANY ROTATION OF SYMBOL AS LONG AS IT IS
CORRECTLY DRAWN. (2)
6.7 6.7.1 Black (1)
6.7.2 Green (1)
6.8 The purpose of a septic tank is to collect/decompose/treat sewage. (1)
[40]
TOTAL: 200
Copyright reserved
Study this subject
Recommended for this subject
%20Memo%20Eng_hlayiso.com_--f06cef7f-235e-45f7-9f9b-f8e6a2b0c0ca/v1-45ae92f9d9d194afe959/card.webp)
Memorandum
Civil Technology Grade 12 NSC November 2020 Memo (English)
%20Memo%20Afr_hlayiso.com_--8cffc125-69c0-44e9-b0eb-88ae7e930363/v1-fca2156d2557644edb35/card.webp)
Memorandum
Civil Technology Grade 12 NSC November 2020 Memo (Afrikaans)
%20Afr_hlayiso.com_--b796705a-6588-4c35-a6ed-9d9659bce995/v1-978b69e54ed8b19a2f08/card.webp)
Question paper
Civil Technology Grade 12 NSC November 2020 QP (Afr)
%20Eng_hlayiso.com_--f45b898c-a9ab-4069-ae4b-2b730f88cf1b/v1-5a72c6e9110b3de20e2e/card.webp)
Question paper
Civil Technology Grade 12 NSC November 2020 QP (Eng)
%20Eng_hlayiso.com_--6e24138d-3f1b-42f9-8076-7ae0b7db457a/v1-e0a7b2645cde7f912d21/card.webp)
Question paper
Civil Technology Grade 12 NSC November 2020 QP (Eng)
%20Eng_hlayiso.com_--8ecb8551-97e5-4a57-8187-0130f8d158da/v1-b424a911dcff7aea0ac5/card.webp)
Question paper
Civil Technology Grade 12 NSC November 2020 QP (Eng)
More from Grade 12 Civil Technology
%20(English%20and%20Afrikaans)%20June%202025%20Question%20Paper--c8edd459-5237-48e0-8588-69d7ecd7f8e5/v1-be996aaed91bf782e098/card.webp)
Question paper
Civil Technology Grade 12 Gauteng June 2025 QP (Afr)
%20Afr--591d6ffd-20b1-4748-a1ba-b055be0a14c3/v1-4d98a131fd37e013458a/card.webp)
Question paper
Civil Technology Grade 12 NSC June 2025 Question Paper (Afr)
%20Afr--05a95faf-5891-4d88-9e5e-7d13c1d21648/v1-f5ca67113376f7457b83/card.webp)
Question paper
Civil Technology Grade 12 NSC November 2025 QP (Afr)

Question paper
Civil Technology Grade 12 Eastern Cape Prelim 2024 QP (Afr)

Question paper
Civil Technology Grade 12 Eastern Cape Prelim 2024 QP (Eng)
%20Afr--eefaae29-fe93-4b75-8223-87bf4f3fc14c/v1-3553acfa446acbaa2a45/card.webp)
Question paper