Downloaded from hlayiso.com
NATIONAL
SENIOR CERTIFICATE
GRADE 12
SEPTEMBER 2021
CIVIL TECHNOLOGY: CIVIL SERVICES
MARKING GUIDELINE
MARK
200
S:
This marking guideline consists of 15 pages, including 3 answer sheets.
Skip to contentAll 2021 papers 





View all
%20Afr--05a95faf-5891-4d88-9e5e-7d13c1d21648/v1-f5ca67113376f7457b83/card.webp)

%20Afr--eefaae29-fe93-4b75-8223-87bf4f3fc14c/v1-3553acfa446acbaa2a45/card.webp)
%20Afr--307147a5-3280-4a11-a82e-cf3e33388eb0/v1-e53e38093df191bfe243/card.webp)
%20Eng_hlayiso.com_--e6743728-8140-42ae-838d-282654a975a5/v1-dce3e047e0d7ad60a32b/card.webp)
Civil Technology Grade 12 Eastern Cape Mock 2021 Memo (Eng)
Grade 12 Civil Technology memorandum from the Eastern Cape Mock Exam 2021 (English), 15 pages. Read online or download the free PDF.
Civil Technology · Grade 12 · Eastern Cape Mock Exam · 2021 · English. Memorandum, 15 pages. Read online or download the PDF.
- Subject
- Civil Technology
- Grade
- Grade 12
- Language
- English
- Document type
- Memorandum
- Year
- 2021
- Exam period
- Eastern Cape Mock Exam
- Curriculum
- CAPS
- Pages
- 15
- File size
- 502.5 KB
Free to read online, no sign-up needed
Loading document…
Loading document…
1 of 15
This exam
Document textSearch extracted text and jump to a page.
Downloaded from hlayiso.com
2 CIVIL TECHNOLOGY: CIVIL SERVICES (EC/SEPTEMBER 2021)
INSTRUCTIONS FOR THE MARKERS
1. Markers should:
Familiarise themselves with the question and answer before evaluating the
responses of candidates.
Always interpret the responses of the candidates within the context of the
question.
Consider any relevant and acceptable answer during pre-marking but should
strictly adhere to the answers after finalisation of the marking guideline.
There are two approaches to answering questions, these are (1) to describe
and (2) to explain.
If a candidate is required to explain e.g., a process in 4 steps, only the first 4
responses should be considered.
If, however a candidate is required to e.g., explain or describe how to transfer
heights from one point to another using a transparent pipe level we need to
consider that candidates may write a long description not necessarily well
organised as an intellectual response may do. In this case the marker needs
to evaluate the complete statement to judge if the candidate explained the
required outcome satisfactorily and allocate marks on merit. The marker
should apply his/her professional judgement with these types of questions.
Mark what the candidate wrote and do not award marks for answers that the
marker thinks the candidate meant with what was written.
Indicate the tick or cross right at the position where the mark needs to be
awarded or where the candidate made the error.
Accept the letter corresponding with the correct answer as well as the answer
written in full in multiple-choice questions.
Accept incorrect spelling in one-word answers unless the spelling changes
the meaning of the answer.
2. For calculations:
A mark is only awarded if the correct unit is written next to the answer.
If TWO marks are awarded ONE mark is awarded for the answer and ONE
mark for the correct unit.
Where the candidate made a principle error e.g. added instead of multiplying,
no marks will be awarded for the steps. If the answer is correct according to
what the candidate did, the mark for the answer can be awarded for the
application of skills.
Where an incorrect answer could be carried over to the next step, the first
answer will be deemed incorrect. However, should the incorrect answer be
carried over correctly, the marker has to recalculate the values, using the
incorrect answer from the first calculation. If correctly used, the candidate
should receive the full marks for subsequent calculations.
Markers should consider when and where a candidate has rounded off in a
calculation, as well as the subsequent effect it has on the final answer
obtained. The calculation should therefore be awarded marks on merit.
Alternative methods of calculations must be considered, provided that the
correct answer is obtained.
Copyright reserved Please turn over
Downloaded from hlayiso.com
(EC/SEPTEMBER 2021) CIVIL TECHNOLOGY: CIVIL SERVICES 3
3. When marking drawings:
The member for which the mark should be awarded should be drawn correctly
in the correct position to receive a mark.
A member incorrectly drawn but wrongfully repeated in another position will
be awarded the mark for the repeated incorrect member provided that the
marking guideline provide for TWO or more marks for that member (positive
marking).
Marks can only be awarded for a label if the label is correctly indicating the
correct member.
Scale drawings should always be marked using an appropriate mask.
When a candidate drew the wrong drawing e.g.:
A horizontal section instead of a vertical section, no marks will be allocated to
the drawing as the candidate did not respond to the expected outcome.
An orthographic view instead of sectional view, no marks will be allocated to
the drawing as the candidate did not respond to the expected outcome.
An orthographic view instead of an isometric view, no marks will be allocated
to the drawing as the candidate did not respond to the expected outcome.
If the incorrect drawing was drawn, the candidate can be awarded for only
what was asked but mark/s for the correctness of the drawing will not be
awarded e.g., if a King Post roof truss was asked in the question, and
candidate drew SA-Howe Truss.
Copyright reserved Please turn over
Downloaded from hlayiso.com
4 CIVIL TECHNOLOGY: CIVIL SERVICES (EC/SEPTEMBER 2021)
QUESTION 1: SAFETY AND MATERIALS (GENERIC)
1.1 Answer the following question regarding scaffolding.
1.1.1 A – Guardrail (1)
B – Planks / Working platform (1)
C – Kickboard / Toe-board (1)
D – Brace (1) (4)
1.1.2 228 mm (1) x 38 mm (1) (2)
1.1.3 Provides stability to the scaffolding. (1)
1.1.4 Minimum = 900 mm (1) and maximum = 1 000 mm (1) (2)
1.2 1.2.1 Placing of building rubble:
May not obstruct access or exits
Safe place
Regularly removed. (Any 1 x 1) (1)
1.2.2 When materials are transported to higher surfaces:
Workers must maintain a safe distance
Overhead protection (Any 1 x 1) (1)
1.3 Any THREE:
Non-skid devices on the bottom
Hooks at the upper ends
Lashed, secure or fastened
Held by someone (Any 3 x 1) (3)
1.4 Rungs (1)
1.5 The coating of a metal by electrolysis (1) with a thin layer of another
metal. (1) (2)
1.6 To improve the metal’s corrosion resistance. (1)
1.7 Any TWO:
Adds strength to the metal
Galvanised metals are thicker
Galvanised nails and screws prevents staining (Any 2 x 1) (2)
[20]
Copyright reserved Please turn over
Downloaded from hlayiso.com
(EC/SEPTEMBER 2021) CIVIL TECHNOLOGY: CIVIL SERVICES 5
QUESTION 2: GRAPHICS, JOINING AND EQUIPMENT (GENERIC)
2.1 FIGURE 2.1 on ANSWER SHEET A shows a floorplan of a storeroom on
scale 1 : 50. Draw the south elevation on scale 1 : 50 on ANSWER SHEET
A from the given ground level, by using the following information:
The floor level height is 200 mm above the ground level
Wall height is 2 600 mm from the floor level to the ceiling
Window 1 is 1 200 x 900 mm
Door 1 is 1 100 x 2 100 mm
Doorknob
Roof construction pitch is 30°
Show construction lines to determine the roof height
Gable end at the west elevation
Hippen end at the east elevation
Use the marks table on ANSWER SHEET A as reference. (29)
2.2 A – Nut with built-in washer like a flange (1)
B – Wing nut (1)
C – Domed top nut (1) (3)
2.3 Any TWO:
Resist pull-out failure
Excellent carrying capacity
Tolerance to a variance in the hole size (Any 2 x 1) (2)
2.4 Must be set-up that the telescope (1) is placed on a comfortable
sightline (1) to prevent a person from bending or stretching over the
telescope and tripod (1). (3)
2.5 Any THREE:
Wiring
Wood
Metal studs
Copper pipes
Plumbing work (Any 3 x 1) (3)
[40]
TOTAL SECTION A: 60
Copyright reserved Please turn over
Downloaded from hlayiso.com
6 CIVIL TECHNOLOGY: CIVIL SERVICES (EC/SEPTEMBER 2021)
QUESTION 3: SAFETY, MATERIAL AND CONSTRUCTION (SPECIFIC)
3.1 FIGURE 3.1 shows workers who must work in a manhole. Answer the following
questions regarding the safety measures which must be applied.
3.1.1 Similar answer:
Prevents material or persons falling in.
Identifies a danger zone. (Any 1 x 1) (1)
3.1.2 Similar answer:
Pipe for extractor fan or blower.
Provides manhole workers with fresh air. (Any 1 x 1) (1)
3.1.3 When (1) dangerous fumes / gases are (2) present in the manhole /
confined spaces. (2)
3.1.4 Respirator (1)
3.2 Similar answer:
Safety net
Catch platform
Rails / Barriers
Hard hat (Any 1 x 1) (1)
3.3 Any TWO:
Electrical tools
Battery tools
Fuel tools (Any 2 x 1) (2)
3.4 3.4.1 True (1)
3.4.2 False (1)
3.4.3 True (1)
3.4.4 True (1)
3.5 Scale or corrosion products (1) are removed (2) by subjecting it as an
electrode (3) to an electrical current (4) in an electrolytic bath. (4)
3.6 FIGURE 3.6 on ANSWER SHEET B shows layer 1 of a T-junction in a one-brick
wall in stretcher bond. Draw the alternate layer of the T-junction on scale 1 : 10
on ANSWER SHEET B. (7)
3.7 English bond (1)
Copyright reserved Please turn over
Downloaded from hlayiso.com
(EC/SEPTEMBER 2021) CIVIL TECHNOLOGY: CIVIL SERVICES 7
3.8 Give access to drain system / Cleaning of drain system (1)
3.9 Make a neat section sketch in good ratio to illustrate a manhole construction
with benching. Show the following parts and indicate it with labels:
Concrete base
Brick walls
Pipe channel
Benching
Cover frame and cover
COVER FRAME
PIPE CHANNEL
BENCHING
BRICK WALL
CONCRETE
BASE
(5)
[30]
Copyright reserved Please turn over
Downloaded from hlayiso.com
8 CIVIL TECHNOLOGY: CIVIL SERVICES (EC/SEPTEMBER 2021)
QUESTION 4: COLD-WATER SUPPLY, HOT-WATER SUPPLY AND
EQUIPMENT (SPECIFIC)
4.1 Any THREE properties of water
Colourless
Free from suspended matter
Free from harmful bacteria
Pleasant to taste
Moderately hard (Any 3 x 1) (3)
4.2 Prevents water from leaking from the spindle. (1)
4.3 It reduces splashing / water noise. (1)
4.4 Answer the following questions regarding the valve in FIGURE 4.4.
4.4.1 Non-return valve (1)
4.4.2 B (1)
4.4.3 Open (1)
4.4.4 Where water flows only in one direction. (1)
4.5 Answer the following questions regarding FIGURE 4.4.
4.5.1 S-trap (1)
4.5.2 (1) Keeps water back to (2) prevent odours passing to the inside. (2)
4.5.3 Inspection eye (1)
4.5.4 Cleaning of trap (1)
4.6 Wastewater – water contaminated by human waste / pollutants.
Soil water – water from the sink / basin / bath / shower. (2)
4.7 Describe TWO advantages of electronic taps.
It only allows water to flow through when the sensor is triggered / saves
water.
You do not need to touch the tap. (2 x 1) (2)
4.8 (1) Polluted water harms (2) mechanisms of valves and tap washers. (2)
4.9 4.9.1 Expansion-control vessel (1)
4.9.2 Mixer (1)
4.9.3 Non-return valve (1)
4.9.4 Float valve (1)
4.9.5 Pressure-control valve (1)
Copyright reserved Please turn over
Downloaded from hlayiso.com
(EC/SEPTEMBER 2021) CIVIL TECHNOLOGY: CIVIL SERVICES 9
4.10 Make neat sketches of the following symbols for hot water systems.
4.10.1 Pressure-reducing valve (2)
4.10.2 Vacuum-relieve valve (2)
4.11 (1) It occurs when a pipe bursts / faulty plumbing (2) traps air in a high point.
(3) The air blocks the (4) flow of water. (4)
4.12 4.12.1 True (1)
4.12.2 True (1)
4.12.3 True (1)
4.13 Loose clothing can get caught in the moving parts. (1)
4.14 Name TWO tools which are used for cleaning blockages in drains.
Drain-cleaning rods
Drain-cleaning or jetting machine (2 x 1) (2)
4.15 Water pressure testing pump (1)
[40]
Copyright reserved Please turn over
Downloaded from hlayiso.com
10 CIVIL TECHNOLOGY: CIVIL SERVICES (EC/SEPTEMBER 2021)
QUESTION 5: DRAINAGE AND QUANTITIES (SPECIFIC)
5.1 Describe the following requirements for an efficient drainage system.
5.1.1 Smooth finishing (1)
5.1.2 100 mm (1)
5.1.3 Where 2 or more pipes meet
At the main pipeline junction
Every 25 metres (3)
5.2 (1) Where ground movement occur and (2) leakages must be prevented. (2)
5.3 Name TWO properties of earthenware drainpipes.
Brittle
Durable (2 x 1) (2)
5.4 Make a neat section sketch of a coupling socket joint for drainpipes.
(3)
5.5 Name TWO positions in a drainage system where gullies must be installed.
Wastewater connection at drain from the kitchen.
Wastewater connection at drain from the bathroom. (2 x 1) (2)
5.6 Choose the correct description regarding a septic tank.
5.6.1 Sewerage
Water closet (2)
5.6.2 Sink to the bottom of the chamber (1)
5.6.3 Bacteria
Liquid (2)
5.6.4 Sludge (1)
5.7 Give the colour coding for the following drainage fittings:
5.7.1 Brown (1)
5.7.2 Blue (1)
5.7.3 Black (1)
Copyright reserved Please turn over
Downloaded from hlayiso.com
(EC/SEPTEMBER 2021) CIVIL TECHNOLOGY: CIVIL SERVICES 11
5.8 Identify the following abbreviations for drainage fittings:
5.8.1 IR – Inspection room (1)
5.8.2 ST – Septic tank (1)
5.8.3 CE – Cleaning eye (1)
5.9 Test if drains are airtight / watertight. (1)
5.10 The side of a cubic water supply tank is 1 800 mm.
Determine the following of the tank.
(Show all calculations and formulas.)
5.10.1 Volume = S3
= 1,8 x 1,8 x 1,8
= 5,83 m3 (3)
5.10.2 Volume water = 5,83 m3 x 1 000 ℓ/ m3
= 5 830 ℓ (2)
5.11 FIGURE 5.11 shows the pictorial view of a part of the layout for a drainage
system. Answer the following questions regarding the system.
5.11.1 A – Stop end
B – 90° Single T-junction
C – Waste pipe
D – Waste bent (4)
5.11.2 Ø 110 mm (1)
5.11.3 Ø 50 mm (1)
5.11.4 PVC (1)
5.11.5 620 mm (10 mm tolerance) (1)
[40]
Copyright reserved Please turn over
Downloaded from hlayiso.com
12 CIVIL TECHNOLOGY: CIVIL SERVICES (EC/SEPTEMBER 2021)
QUESTION 6: GRAPHIC COMMUNICATION, ROOF WORK, STORMWATER AND
JOINING (SPECIFIC)
6.1 FIGURE 6.1 on ANSWER SHEET C shows the top and front view of a
cylindrical pipe.
Draw the development of the cylindrical pipe on ANSWER SHEET C. Show all
construction lines. (12)
6.2 Indicate if the following statements are TRUE or FALSE. Write only ‘true’ or
‘false’ next to the question number in the ANSWER BOOK.
6.2.1 True (1)
6.2.2 True (1)
6.2.3 False (1)
6.2.4 True (1)
6.3 Join gutters (1)
6.4 Bottom of a downpipe (1)
6.5 Discuss the following regulations which are applicable to stormwater disposal.
6.5.1 (1) It must be drained away from the building (2) to prevent damage to
property. (2)
6.5.2 (1) At least 5 m away from any building (2) to prevent any accumulation
of dampness. (2)
6.6 Name THREE negative consequences of storm water constructions which do
not comply to the requirements.
Any THREE:
Discomfort of occupants
Loss of life
Damage to property
Pollution of the environment
Negative environmental impact (Any 3 x 1) (3)
6.7 (1) Assists in cleaning the material / prevents oxidation (2) and promotes the
flow of solder. (2)
6.8 Resin (1)
6.9 1 – Pop rivet
2 – Lap joint with cover strip (2)
[30]
TOTAL: 200
Copyright reserved Please turn over
Downloaded from hlayiso.com
(EC/SEPTEMBER 2021) CIVIL TECHNOLOGY: CIVIL SERVICES 13
CIVIL TECHNOLOGY NAME:
ANSWER SHEET A GENERIC
2.1 FIGURE 2.1 shows the floor plan of a storeroom on scale 1 : 50.
Draw the south elevation on scale 1 : 50 on ANSWER SHEET A from the
given ground level. (29)
4 200
3 640
2 740 3 300
SCALE 1:50
Floor level 2
Wall 3
Pitch Window 3
Windowsill 1
Door 4
Height
Stairs 1
Ramp 1
Fascia board 2
Gutter 1
Down pipe 1
Gable ent 4
Hipped ent 3
Roof height 3
NGL TOTAL: 29
Copyright reserved Please turn over
Downloaded from hlayiso.com
14 CIVIL TECHNOLOGY: CIVIL SERVICES (EC/SEPTEMBER 2021)
CIVIL TECHNOLOGY NAME:
ANSWER SHEET B CIVIL SERVICES
3.6 FIGURE 3.6 on ANSWER SHEET B shows layer 1 of a T-junction in a one-
brick wall in stretcher bond. Draw the alternate layer of the T-junction on scale
1 : 10 on ANSWER SHEET B. (7)
SCALE:
Brickwork 6
Application of scale 1
TOTAL: 7
Copyright reserved Please turn over
Downloaded from hlayiso.com
(EC/SEPTEMBER 2021) CIVIL TECHNOLOGY: CIVIL SERVICES 15
CIVIL TECHNOLOGY NAME:
ANSWER SHEET C CIVIL SERVICES
6.1 FIGURE 6.1 on ANSWER SHEET C shows the top and front view of a
cylindrical pipe.
Draw the development of the cylindrical pipe on ANSWER SHEET C. Show
all construction lines. (12)
C D
0 1 2 3 4 5 6 7 8 9 10 11 12
A B
FRONT VIEW 1
2
3
4
5
3 6
4 2 7
8
5 1 9
10
11 E
0 12
6
12
7 11
Dividing lines 0–12 on top view 6
8 10
9 Base line A–B 1
Dividing lines AE 2
TOP VIEW Vertical construction lines 0–12 2
Seam lines A–C and B–D 1
TOTAL: 12
Copyright reserved Please turn over
Study this subject
Recommended for this subject

Question paper
Civil Technology Grade 12 Eastern Cape Mock 2021 QP (Eng)

Memorandum
Civil Technology Grade 12 Eastern Cape Mock 2022 Memo (Eng)

Memorandum
Civil Technology Grade 12 Eastern Cape Mock 2022 Memo (Eng)

Memorandum
Civil Technology Grade 12 Eastern Cape Mock 2017 Memo (Eng)

Question paper
Civil Technology Grade 12 Eastern Cape Mock 2023 QP (Eng)

Question paper
Civil Technology Grade 12 Eastern Cape Mock 2022 QP (Eng)
More from Grade 12 Civil Technology

Question paper
Civil Technology Grade 12 Eastern Cape Mock 2025 QP (Eng)
%20Afr--05a95faf-5891-4d88-9e5e-7d13c1d21648/v1-f5ca67113376f7457b83/card.webp)
Question paper
Civil Technology Grade 12 NSC November 2025 QP (Afr)

Question paper
Civil Technology Grade 12 Eastern Cape Prelim 2024 QP (Eng)
%20Afr--eefaae29-fe93-4b75-8223-87bf4f3fc14c/v1-3553acfa446acbaa2a45/card.webp)
Question paper
Civil Technology Grade 12 November 2024 NSC QP (Afr)
%20Afr--307147a5-3280-4a11-a82e-cf3e33388eb0/v1-e53e38093df191bfe243/card.webp)
Question paper
Civil Technology Grade 12 November 2024 NSC QP (Afr)
%20Eng_hlayiso.com_--e6743728-8140-42ae-838d-282654a975a5/v1-dce3e047e0d7ad60a32b/card.webp)
Question paper