Downloaded from hlayiso.com
GRAAD 12
NATIONAL
SENIOR CERTIFICATE
GRADE 12
CIVIL TECHNOLOGY: WOODWORKING
NOVEMBER 2018
MARKING GUIDELINES
MARKS: 200
These marking guidelines consist of 19 pages.
Copyright reserved Please turn over
Skip to contentAll 2018 papers %20FINAL%20Memo%20Eng_hlayiso.com_--f4e1d2a3-db17-47d5-8ae8-6332d121a6d3/v1-87156080ef4999b64098/card.webp)
%20FINAL%20Memo%20Eng_hlayiso.com_--90041771-68e0-4915-bc37-7a4f246b369f/v1-168ac77af6e035b2eae3/card.webp)
%20Afr_hlayiso.com_--be54c81a-cc52-4da7-a74c-ec3f0bddf626/v1-ba62d57d54f2abc10142/card.webp)
%20Afr_hlayiso.com_--8a4b5aba-d78e-4505-aae9-e127ef45df85/v1-c293df39bff70a3d967c/card.webp)
_hlayiso.com_--b6d609b6-89a5-4b39-a9b7-0d878af45cd4/v1-9c90f1958077961e2845/card.webp)

View all
%20(English%20and%20Afrikaans)%20June%202025%20Question%20Paper--c8edd459-5237-48e0-8588-69d7ecd7f8e5/v1-be996aaed91bf782e098/card.webp)
%20Afr--591d6ffd-20b1-4748-a1ba-b055be0a14c3/v1-4d98a131fd37e013458a/card.webp)
%20Afr--05a95faf-5891-4d88-9e5e-7d13c1d21648/v1-f5ca67113376f7457b83/card.webp)


Civil Technology Grade 12 NSC November 2018 Memo (English)
Grade 12 Civil Technology memorandum from the NSC November Exam 2018 (English), 19 pages. Read online or download the free PDF.
Civil Technology · Grade 12 · NSC November Exam · 2018. Memorandum, 19 pages. Read online or download the PDF.
- Subject
- Civil Technology
- Grade
- Grade 12
- Document type
- Memorandum
- Year
- 2018
- Exam period
- NSC November Exam
- Curriculum
- CAPS
- Pages
- 19
- File size
- 444.6 KB
Free to read online, no sign-up needed
Loading document…
Loading document…
1 of 19
This exam
Document textSearch extracted text and jump to a page.
Downloaded from hlayiso.com
Civil Technology: Woodworking 2 DBE/November 2018
NSC – Marking Guidelines
QUESTION 1: OHSA, MATERIALS, TOOLS, EQUIPMENT AND JOINING
(GENERIC)
1.1
1.1.1 F (1)
1.1.2 A (1)
1.1.3 G (1)
1.1.4 E (1)
1.1.5 B (1)
1.2 • Do not throw any tools or materials from a scaffold.
• Never jump on to and off a scaffold.
• Never overload a scaffold.
• Remove or cover sharp edges or corners.
• Always attach free-standing scaffoldings to a building.
• Use a ladder to get on and off a scaffold.
• Keep free of waste or any other obstruction.
• Never jump on a scaffold while working on it.
• Responsible/qualified person must ensure that scaffolding is safe, rigid,
stable and firm or has no defects.
• Scaffold must be supplied with guard rails/toe boards.
• Scaffolds must be levelled on uneven ground.
• Do not work on a scaffold in bad weather.
• Wear a safety harness when working on scaffolding.
• Do not throw tools on/off a scaffold.
ANY TWO OF THE ABOVE (2)
1.3 • It prevents workers from falling off the scaffold.
• It is used as a handrail.
• It is used to strap on safety harnesses.
• To protect the worker working on the scaffold.
ANY TWO OF THE ABOVE (2)
1.4 • The primary purpose of painting is to protect metals, wood and other
material against corrosion and decay.
• Provides a decorative/aesthetic appearance/finishing.
• Protects surfaces from moisture penetration.
• Protects surfaces from rust/uv rays.
ANY TWO OF THE ABOVE (2)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 3 DBE/November 2018
NSC – Marking Guidelines
1.5 The curing of concrete:
• Increases the strength of concrete.
• Decreases the permeability of hardened concrete.
• Improves durability of concrete by reducing cracks.
• Makes concrete more watertight.
• Minimises shrinkage cracks in concrete.
• Provides volume stability.
• Cured concrete can carry more weight without breaking/crumbling
than uncured concrete.
• Prevents rapid drying of concrete.
• Curing ensures that the hydration process continues.
ANY ONE OF THE ABOVE (1)
1.6
1.6.1 Multi detector (1)
1.6.2 Tool A is used:
• to detect materials found in/behind walls, ceilings and
underneath floors, including ferrous and non-ferrous metals,
electrical wiring, wood and metal studs.
• to locate steel bars and copper pipes.
• in carpentry, plumbing, and construction.
• to measure the distance to/from covered objects.
ANY TWO OF THE ABOVE (2)
1.6.3 The batteries must be removed from the tool:
• to prevent the battery from running flat/battery can die.
• to prevent acid leaks from batteries damaging the tool.
ANY ONE OF THE ABOVE (1)
1.7
1.7.1 A – Bolt and nut/Bolt
B – Rawl bolt (2)
1.7.2 Bolt and nut
• Bolts and nuts are used to secure pipe supports to metal
parts.
• To join components together.
Rawl bolt
• A Rawl bolt is used to fix a truss hanger to a wall.
• To fix brackets/structures/panels to a wall/concrete.
• For construction, renovation and industrial work
ANY TWO OF THE ABOVE (2)
[20]
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 4 DBE/November 2018
NSC – Marking Guidelines
QUESTION 2: GRAPHICS AS METHOD OF COMMUNICATION (GENERIC)
ANSWER SHEET 2
NO. QUESTIONS ANSWERS MARKS
1 Identify FIGURE A. South Elevation/Elevation 1
2 Identify FIGURE B. Ground floor plan/Floorplan 1
First floor level/Second floor
3 Identify number 4. level/Suspended floor/Floor level/ 1
Dash line/ FFL/Expansion joint
4 Identify number 5. Window Sill 1
Hand wash basin/Wash
5 Identify number 9. 1
basin/Washing basin/HWB/Basin
6 Identify number 10. Water closet/WC/Toilet pan 1
7 Identify number 11. Bath/B 1
8 On what date was the plan printed? 2018/10/02 1
9 Who drew the building plan? JP Maloi 1
Name the feature in the column for the
10 notes in FIGURE 2 that must be Ramp 1
installed in front of the sliding door.
Name the feature in the column for the
11 notes in FIGURE 2 that must give Staircase/Stairs/Stairway 1
access to the first floor.
Identify the type of roof that is used for
12 Gable roof 1
the building in FIGURE A.
To cover the opening/close the gap
between the two slopes of the roof.
13 Explain the purpose of number 1. Prevent water and other elements 1
from entering the roof.
ANY ONE OF THE ABOVE
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 5 DBE/November 2018
NSC – Marking Guidelines
• To prevent water from falling
onto the ground
• To collect rainwater
• To channel the rainwater into
the downpipe
14 Explain the purpose of number 2. • To protect the wall from water 1
• To hide the rafters/finish off the
roof
ANY ONE OF THE ABOVE
Explain the abbreviation FFL at
15 Finished floor level 1
number 6.
To channel the water from the gutter
16 Explain the purpose of number 7. 1
to the ground.
Explain the meaning of the arrow on
It indicates the direction of the slope
17 the feature that must be installed in 1
of the ramp/it indicates the slope.
front of the sliding door.
It indicates the slope or the gradient
Explain what is meant by 1:10 of the ramp/for every 10 metres
18 1
indicated on the symbol in the notes. horizontally rises 1 metre
vertically.
19 Which room will feature 15 serve? The bathroom. 1
• Indicates what direction the
window is opening/window
opening.
Explain the short dash lines on the • Indicates the location of the
20 hinges. 1
windows.
• Indicates the location of the
casement stay.
ANY ONE OF THE ABOVE
Deduce the height of window 2 from
21 1,2 m or 1 200 mm (Ignore units) 1
the window schedule.
Deduce the width of window 3 from
22 2 m or 2 000 mm (Ignore units) 1
the window schedule.
On what elevation of the building is
23 Western elevation/Western side 1
the bathroom window situated?
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 6 DBE/November 2018
NSC – Marking Guidelines
3 – window/window frame/reveal
Differentiate between component frame stile/casement stile
24 2
number 3 and component number 8. 8 – sliding door /door frame/
door/reveal /sliding door stile
The light in the lounge is a
fluorescent light/1 x 40W-/2x40-
Differentiate between the light in the
25 /3x40 fluorescent light and the 2
lounge and the light in the bathroom.
light in the bathroom is a normal
ceiling light
Tile/ Vinyl flooring(Novilon)/
Coloured screed/Polished or stained
Recommend a suitable floor covering concrete flooring/Water proof
26 1
for the bathroom. laminated floor/carpet.
ANY ACCEPTABLE ANSWER
Recommend an appropriate scale to
27 which FIGURE A should be drawn, 1:50/100/200 1
according to SANS.
Recommend an alternative sanitary
28 fitment to replace number 11 that will Shower 1
serve a similar purpose.
Calculate the internal area of the office 4 m x 3 m = 12 m² OR 12
29 3
in m² Show ALL calculations. 4 000 X 3 000 = 12 000 000mm2
Positive marking
(220 + 3 000 + 110 + 2 800 + 220) x 2
= 6 350 x 2
=12 700 mm
Calculate the perimeter of the building. (220 + 4 000 + 110 + 2 000 + 220) x 2
30 = 6 550 x 2
7
Show ALL calculations.
= 13 100 mm
12 700 + 13 100 mm
= 25 800 mm OR
= 25,8 m
TOTAL 40
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 7 DBE/November 2018
NSC – Marking Guidelines
QUESTION 3: CASEMENTS, CUPBOARDS, WALL-PANELLING AND QUANTITIES
(SPECIFIC)
3.1
3.1.1 Tongue and groove boards (1)
3.1.2 520 mm - 570 mm (1)
3.1.3 Cornice (1)
3.1.4 Drip groove (1)
3.1.5 Fanlight (1)
3.2
3.2.1 • A – Wood/Timber (1)
• B – Glass/Perspex (1)
3.2.2 This part is holding the glass/pane in its place. (1)
3.3
3.3.1 • A Storage space/top unit
• B Hanging space
• C Shelves/storage space/shelf
• D Drawers (4)
3.3.2 Melamine:
• is waterproof.
• is easier to clean.
• is more durable.
• enhance inside appearance.
• has a smooth finish.
OR
Chipboard:
• Is not water proof
• Is not easy to clean
• Is less durable
• Does not enhance the inner appearance
• Is not as smooth (1)
ANY ONE OF THE ABOVE
3.3.3 • E – Front rail/Top rail
• F – Oval hanging rail/Hanging rail/Pipe rail
• G – Side
• H – Kick plate/base/Bottom rail/Plinth (4)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 8 DBE/November 2018
NSC – Marking Guidelines
3.4
3.4.1 • A – Cornice
• B – Horizontal rough grounds
• C – Quarter round/Quadrant (3)
3.4.2 • To enhance appearance.
• To give an aesthetic appearance.
• There is no need to plaster the wall where panelling is to
be done.
• It serves as insulation against sound and heat.
• For durability
ANY TWO OF THE ABOVE
(2)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 9 DBE/November 2018
NSC – Marking Guidelines
3.5
A B C D
3.5.1 Internal measurements of long walls:
= 9 000 – 2/220 = 8 560 mm
OR
= 9 000 - 440 = 8 560 mm
Length of wall plates needed:
2/ 8,56 17,12 17,12 m wall plate needed
3.5.2 (4)
Number of purlins needed
Number of purlins = Length of rafter +1
Distance between centres
= 3,6 + 1 OR 3 600 + 1
0,9 900
= (4 + 1) 2 OR (5x2)
= 10 purlins
(4)
[30]
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 10 DBE/November 2018
NSC – Marking Guidelines
QUESTION 4: ROOFS, CEILINGS, TOOLS AND EQUIPMENT, AND MATERIALS
(SPECIFIC)
4.1
4.1.1 C (1)
4.1.2 A (1)
4.1.3 D (1)
4.1.4 E (1)
4.1.5 F (1)
4.2
4.2.1 • A Hipped end
• B Purlin
• C Ridge/Ridge plate
• D Valley rafter/Valley
• E Overhang/Eaves overhang
• F Gable end/Gable wall/Wall/Side of building (6)
4.2.2 76 mm x 50 mm
76 mm x 76 mm
ANY ONE OF THE ABOVE (1)
4.3 • It allows rain water to be directed into the gutter.
• So that water does not damage the end of the rafters.
(1)
ANY TWO OF THE ABOVE
4.4 • A good roof covering must be able to resist weather conditions such as
rain and wind/resistance against corrosion.
• Should look durable and enhances the appearance of the building.
• Should be fire resistant.
• Should provide insulation against heat and cold.
ANY TWO OF THE ABOVE (2)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 11 DBE/November 2018
NSC – Marking Guidelines
4.5
IBR sheeting Corrugated iron sheeting (4)
4.6 • The installation of steel roofing is faster.
• The installation of steel roofing is more economical.
• The installation of steel roofing is simpler.
• Steel roof covering is cheaper than tiles.
• Steel roof covering is environment friendly.
ANY TWO OF THE ABOVE (2)
4.7 • If roof underlay is not installed there will be more dust inside the roof
space.
• If roof underlay is not installed, the roof may not be fully
waterproof.
• The risk of wind lifting tiles becomes greater.
• Insulating would not be good.
ANY TWO OF THE ABOVE (2)
4.8 • A - Tie beam
• B - Brandering
• C - Trapdoor
• D - Cover strip (4)
4.9.1 • A – Router
• B – Combination belt and disc sander. (2)
4.9.2 Store in a safe, dry place.
Store it in a wooden or plastic box away from moisture. (2)
4.9.3 • Maintain like all machinery – lubricate and adjust according to
the manufacturer’s instructions.
• Clean the belt/disc sander after use.
• Repair or replace damaged electrical cords.
• Handle the sander so as not to damage or impair its accuracy.
• Use machinery only for the intended purpose.
• Do not force material onto the belt/disc of the sander.
• Avoid the use of worn out (clogged) belts and discs.
• Service the machine regularly.
ANY TWO OF THE ABOVE (2)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 12 DBE/November 2018
NSC – Marking Guidelines
4.9.4 • Table saw/Circular saw/Mitre saw
• Band saw
• Radial arm saw
• Jigsaw
• Scroll saw
ANY THREE OF THE ABOVE (3)
4.10.1 M – Mechanical grading
V – Visual grading (2)
4.10.2 6 - The number indicates the strength. (1)
4.10.3 The SABS symbol.
(1)
[40]
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 13 DBE/November 2018
NSC – Marking Guidelines
QUESTION 5: CENTERING, FORMWORK, SHORING AND GRAPHICS AS
MEANS OF COMMUNICATION (SPECIFIC)
5.1 A - Concrete beam/Concrete
B - Brace/Strut
C - Prop/Adjustable prop
D - Sole plate (4)
5.2 • Block board
• Laminated board
• Shutter board
• Plywood
• Timber
• Hard board/Masonite
ANY FOUR OF THE ABOVE (4)
5.3 • Wedges are inserted under the bearers and props to support the
formwork.
• Wedges keep the different formwork components sturdy and fixed.
• Wedges help with the lowering and raising of the formwork.
• Wedges are used for the levelling of the formwork.
• Wedges ease the striking of formwork.
ANY THREE OF THE ABOVE (3)
5.4 • It supports more weight.
• Support the weight of the fresh concrete.
ANY ONE OF THE ABOVE (1)
5.5 5.5.1 • A – Laggings
• B – Ribs
• C – Bearer (3)
5.5.2 Brick arches because they have a solid surface. (1)
5.5.3 Openly spaced laggings/Open laggings/Open
Laggings are not close to each other. (1)
There are spacing’s between the openings of the laggings.
ANY ONE OF THE ABOVE
5.6 5.6.1 • Dead shores are used to support structures.
• Dead shores carry dead weight above the dead shores, e.g.
walls, floors.
• Support existent walls if openings are made.
• Transfer the weight of the structure to firm ground during
structural renovations.
• Support a wall if alterations are made.
ANY ONE OF THE ABOVE (1)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 14 DBE/November 2018
NSC – Marking Guidelines
5.6.2 Double flying shores provide temporary support to TWO parallel
walls where one or two walls show signs of failure.
Double flying shores give temporary support to TWO parallel
defective walls.
Double flying shores can only be used with TWO parallel defective
walls between 9 and 15 meters.
ANY ONE OF THE ABOVE (1)
5.7 5.7.1 The steel dog is used to secure the joint between prop and
needle. (1)
5.7.2 Props are used to strengthen or brace the floors and ceiling. (1)
5.7.3 Sole plates spread the weight transferred by the props over a wider
area.
Prevent vertical props/pipes from sinking into the ground.
The soleplate create a level area where the props rest on. (1)
5.8 45° (1)
5.9
Slope of roof 45°
Span/3 000 mm
ASSESSMENT CRITERIA MARK CANDIDATE'S
MARK
Span 1
Wall plates 2
Rafters 2
Ridge beam 1
Slope of the roof 45° 1
TOTAL: 7
(7)
[30]
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 15 DBE/November 2018
NSC – Marking Guidelines
QUESTION 6: SUSPENDED FLOORS, STAIRCASES, IRONMONGERY, DOORS
AND JOINING (SPECIFIC)
6.1 6.1.1 D (1)
6.1.2 C (1)
6.1.3 B (1)
6.1.4 A (1)
6.1.5 A (1)
6.2
Joist built into wall
ASSESSMENT MARK CANDIDATE'S
CRITERIA MARK
Joist 1
Built into wall 1
TOTAL 2
Joist secured to wall with truss/joist hanger
ASSESSMENT MARK CANDIDATE'S
CRITERIA MARK
Joist 1
Truss/Joist hanger 1
TOTAL: 2
(4)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 16 DBE/November 2018
NSC – Marking Guidelines
6.3 Alternative drawing will also be acceptable
OR
(
ASSESSMENT MARK CANDIDATE'S
CRITERIA MARK
ONE one-brick pier 1
DPC/Proportion 1
Ant guard 1
Bearer 1
Joist 1
Floor boards 1
TOTAL 6
(6)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 17 DBE/November 2018
NSC – Marking Guidelines
6.4
HAND RAIL
NEWEL/NEWEL POST
LANDING
RISE
(5)
TREAD
2 OR 3 DIMENSIONAL DRAWINGS WILL BE ACCEPTED
6.5 • Serves as a place of rest.
• For safety in case of a falling accident.
• Facilitates a change in direction when moving up or down stairs.
ANY ONE OF THE ABOVE (1)
6.6
6.6.1 Door stile/Lock rail (1)
6.6.2 Frame stile/Door frame/Stile (1)
6.6.3 Frame stile/Door frame/Stile (1)
6.6.4 Door stile (1)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 18 DBE/November 2018
NSC – Marking Guidelines
6.7
OR
ASSESSMENT MARK CANDIDATE'S
CRITERIA MARK
Raised panel top view 2
Raised and fielded panel
2
top view
TOTAL 4
(4)
6.8 The opening allows shrinkage and expansion of the panel/wood. (1)
6.9 A – Brace/Strut
B – Tongue and groove battens/V- Tongue and groove battens
C – Stile (3)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 19 DBE/November 2018
NSC – Marking Guidelines
6.10
6.10.1 Hinge (Any hinge accepted) (1)
6.10.2 Clout nail/Chipboard screws/Drywall screw (1)
6.10.3 Nail/Skew nail/Perm fix nail (1)
6.10.4 Gang nail/Bolt and nut/Nails (1)
6.11 • Hinges
• Casement fasteners
• Casement stays
ANY TWO OF THE ABOVE (2)
[40]
TOTAL: 200
Copyright reserved
Study this subject
Recommended for this subject
%20FINAL%20Memo%20Eng_hlayiso.com_--f4e1d2a3-db17-47d5-8ae8-6332d121a6d3/v1-87156080ef4999b64098/card.webp)
Memorandum
Civil Technology Grade 12 NSC November 2018 Memo (English)
%20FINAL%20Memo%20Eng_hlayiso.com_--90041771-68e0-4915-bc37-7a4f246b369f/v1-168ac77af6e035b2eae3/card.webp)
Memorandum
Civil Technology Grade 12 NSC November 2018 Memo (English)
%20Afr_hlayiso.com_--be54c81a-cc52-4da7-a74c-ec3f0bddf626/v1-ba62d57d54f2abc10142/card.webp)
Question paper
Civil Technology Grade 12 NSC November 2018 QP (Afr)
%20Afr_hlayiso.com_--8a4b5aba-d78e-4505-aae9-e127ef45df85/v1-c293df39bff70a3d967c/card.webp)
Question paper
Civil Technology Grade 12 NSC November 2018 QP (Afr)
_hlayiso.com_--b6d609b6-89a5-4b39-a9b7-0d878af45cd4/v1-9c90f1958077961e2845/card.webp)
Memorandum
Civil Technology Grade 12 Eastern Cape Mock 2018 Memo (Eng)

Memorandum
Civil Technology Grade 12 Eastern Cape Mock 2018 Memo (Afr)
More from Grade 12 Civil Technology

Question paper
Civil Technology Grade 12 Eastern Cape Mock 2025 QP (Eng)
%20(English%20and%20Afrikaans)%20June%202025%20Question%20Paper--c8edd459-5237-48e0-8588-69d7ecd7f8e5/v1-be996aaed91bf782e098/card.webp)
Question paper
Civil Technology Grade 12 Gauteng June 2025 QP (Afr)
%20Afr--591d6ffd-20b1-4748-a1ba-b055be0a14c3/v1-4d98a131fd37e013458a/card.webp)
Question paper
Civil Technology Grade 12 NSC June 2025 Question Paper (Afr)
%20Afr--05a95faf-5891-4d88-9e5e-7d13c1d21648/v1-f5ca67113376f7457b83/card.webp)
Question paper
Civil Technology Grade 12 NSC November 2025 QP (Afr)

Question paper
Civil Technology Grade 12 Eastern Cape Prelim 2024 QP (Afr)

Question paper