Confidential
€i
Z
I
y
ee
basic education
Department:
Basic Education
REPUBLIC OF SOUTH AFRICA
NATIONAL
SENIOR CERTIFICATE
?
ERS
sae
x Bees
GRADE 12
Peer eee rere eee ee rere ere ree ee =
t CIVIL TECHNOLOGY: CIVIL SERVICES :
iy u
ly a
" NOVEMBER 2024 5
Wtetatet tal alae erlatetart eta atete tetera vat atet at staat atatayatetatatetatetatatetatatetetetete
MARKS: 200
TIME: 3 hours
This question paper consists of 15 pages and 6 answer sheets.
Copyright reserved Please turn over
— a ——ooooo —— =
Skip to contentAll 2024 papers %20Afr--307147a5-3280-4a11-a82e-cf3e33388eb0/v1-e53e38093df191bfe243/card.webp)





View all%20(Afrikaans)%20June%202025%20Possible%20Answers--c0a65d19-28ca-4ac3-8c61-d4627d2a3133/v1-5f42c573694769cf80ce/card.webp)
%20MG%20Eng--0e265899-dc44-4809-aabf-8f374f1af392/v1-73a07814cfc9334618a1/card.webp)




Civil Technology Grade 12 November 2024 NSC QP (Eng)
Grade 12 Civil Technology question paper from the November 2024 NSC (English), 22 pages. Read online or get the free PDF download, memo linked when available.
Civil Technology · Grade 12 · November 2024 NSC · 2024. Question paper, 22 pages. Read online or download the PDF.
- Subject
- Civil Technology
- Grade
- Grade 12
- Document type
- Question paper
- Year
- 2024
- Exam period
- November 2024 NSC
- Curriculum
- CAPS
- Pages
- 22
- File size
- 930.2 KB
Free to read online, no sign-up needed
Loading document…
Loading document…
1 of 22
This exam
Document textSearch extracted text and jump to a page.
Civil Technology: Civil Services 2 DBE/November 2024
NSC Confidential
REQUIREMENTS:
1.
2.
3.
Drawing instruments
A non-programmable calculator
ANSWER BOOK
INSTRUCTIONS AND INFORMATION
1.
k wo ON
a
oe oa N OD
11,
12.
13.
14.
15.
16.
17.
18.
This question paper consists of SIX questions.
Answer ALL the questions.
Read ALL the questions carefully.
Answer each question as a whole. Do NOT separate subsections of
questions.
Number the answers correctly according to the numbering system used in this
question paper.
Start the answer to EACH question on a NEW page.
Do NOT write in the margins of the ANSWER BOOK.
You may use sketches to illustrate your answers.
Write ALL calculations and answers in the ANSWER BOOK or on the
attached ANSWER SHEETS.
Use the mark allocation as a guide to the length of your answers.
Make drawings and sketches in pencil, fully dimensioned and neatly finished
off with descriptive titles and notes to conform to the SANS/SABS Code of
Practice for Building Drawings.
For the purpose of this question paper, the size of a brick should be taken as
220 mm x 110 mm x 75 mm.
Use your own discretion where dimensions and/or details have been omitted.
Answer QUESTIONS 2, 3.3, 3.5, 5.4, 6.5 and 6.6 on the attached ANSWER
SHEETS using drawing instruments, where necessary.
Write your CENTRE NUMBER and EXAMINATION NUMBER on every
ANSWER SHEET and hand them in with your ANSWER BOOK, whether you
have used them or not.
Drawings in the question paper are NOT to scale due to electronic transfer.
Google Images was used as the source of all photographs and pictures.
Write neatly and legibly.
Copyright reserved Please turn over
Civil Technology: Civil Services 3 DBE/November 2024
QUESTION 1:
NSC Confidential
OHSA, MATERIALS, TOOLS, EQUIPMENT AND JOINING
(GENERIC)
Start this question on a NEW page.
11 Choose the correct word(s) from those given in brackets. Write only the
word(s) next to the question numbers. (1.1.1 to 1.1.10) in the ANSWER
BOOK, e.g. 1.1.11 Concrete. .
1.1.1 Wooden scaffold standards should not be placed more than
(4 m/3 m/6 m) apart.
1.1.2 Trestle scaffolds must have a maximum height of (3 m/4 m/6 m).
1.1.3 The material safety data sheet that accompanies hazardous
chemical substances must contain (fire-fighting measures/
flame ratio/combustion rate).
1.1.4 When transporting long ladders with a vehicle, (ensure that the
ladder does not protrude excessively/mark the end of the ladder
with a green flag/place ladder in an upright position).
1.1.5 (Galvanising/Powder coating/Electrolysis) is the process of
applying a plastic coating to a metal.
1.1.6 Electroplating is the process in which (the thickness of undersized
parts can be increased/metal becomes extremely hot/metals are
coated with paint).
1.1.7 The (thread and shank/head and pin/runout and shank) do not form
part of the length of a bolt.
1.1.8 The purpose of the nylon insert on a hexagonal nut is for
(decorative purposes/easy removal from a bolt/preventing backing
off).
1.1.9 Wooden ladders may be treated with (oil-based paint/
wood _ preservatives/water-based paint) according to the
Occupational Health and Safety Act (OHSA).
1.1.10 | Workers carrying large equipment may not use (spiral/suspended/
fire escape) stairways that are a temporary part of a structure.
1.2 Which pictorial view below represents a nut with a built-in washer?
A B c D
1.3 The specifications for a Rawl bolt are R-RBL-M08/25. What does the M08
represent?
Copyright reserved
Please turn over
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
Civil Technology: Civil Services 4 DBE/November 2024
NSC Confidential
1.4 Cured concrete is exposed to elements.
1.4.1 Explain the effect of cured concrete on steel reinforcement. (1)
1.4.2 Explain the advantages of cured concrete in terms of the weight it
can carry. (1)
1.5 Differentiate between the mulfi-detecfor and the /aser level in terms of the use
thereof. (2)
1.6 Describe TWO uses of the dumpy level. (2)
1.7 Describe how you will take care of a telescopic staff. (2)
[20]
QUESTION 2: GRAPHICS AS MEANS OF COMMUNICATION (GENERIC)
Start this question on a NEW page.
FIGURE A and FIGURE B on the next page show drawings that appear on a building
plan. Analyse the drawings and complete the table on ANSWER SHEET 2.
Copyright reserved Please turn over
Civil Technology: Civil Services 5
NSC Confidential
DBE/November 2024
PLOT 27 0
eee 1 ae caeteetetentieeatiot
i i | t
1 1 i
! I 1
I i | 1
q ' rr | re
aya ie
————
igi} | 1)
PLOT25 16 i! H
1? 1 | f
H | |_| NEW DWELLING I
© 1 ' rf
1 i 1 Ww
1 I I aa
iH] | i || &
1 1 1 a
1 i I =
1 1 PLOT 23 ' 2
1 i i a
1 ' ! 3
----— 4d Li-------------- ~~~
—_ 25 000
S/S
HIBISCUS STREET _/
FIGURE A
©
NOTES:
Contractors must verify all
dimensions and levels on site
before commencing work.
Architects to be notified
of any discrepancies immediately.
Fencing: Clear-view fencing to be
used on the boundary
Architect's signature .................
Client's signature ..................0.
S REVISION | DATE; | DRAWING OF
1 1aoaizo24 | ELECTRICAL
= FITTINGS
©)
GARAGE PRINTED BY: DATE OF PRINT:
x FROG PRINTERS 16/04/2024
1x40W :
2 1:5
8 DRAWING TITLE:
© @) SITE PLAN AND FLOOR PLAN
_, | [WH NS U _. PROJECT:
= +—t PROPOSED DWELLING OF MS KOCK
Slt ROMA ON PLOT 23, CLIVIA STREET, MALUBU
]
2 | PROJECT NO.- DRAWING NO.-
8 = | KITCHEN GR 688-646 446P2
+
= DATE: DRAWN: | CHECKED:
©; —_J = 07/04/2024 SP JOB P BOT
=
oO Fo) 2
8 = L*| 8 SITE PLAN SCALE 1 : 500
N a) 3
N =
=— FLOOR PLAN SCALE 1: 100
2 LOUNGE h
o ~ REFERENCE CODE
b=} 5 | © ap 4 — 2024
ss
ROOM B M WINDOW SCHEDULE
=4 | S12
3 ~ 8 3
a — 4000 cf a am
| a
k ___ 12 000° — BOO wae
e—5000 >
FIGURE B wi [40]
Copyright reserved
Please turn over
Civil Technology: Civil Services 6 DBE/November 2024
QUESTION 3:
NSC Confidential
CONSTRUCTION ASSOCIATED WITH CIVIL SERVICES, OHSA
AND QUANTITIES (SPECIFIC)
Start this question on a NEW page.
3.1 Give ONE word/term for EACH of the following descriptions by choosing a
word/term from the list below. Write only the word/term next to the question
numbers (3.1.1. to 3.1.5) in the ANSWER BOOK, e.g. 3.1.6 Stretcher bond.
1:90; incidence board; strut; spirit level; queen closer; datum level;
wedge; stopped end; concrete lid; 1:40
3.1.1 A board with the correct fall on it (1)
3.1.2 An accessory used in concrete ring manholes (1)
3.1.3 Secures the strut in shoring used for trenches (1)
3.1.4 The gradient for a pipe with a diameter of 225 mm (1)
3.1.5 A specifically shaped brick used in an English bond (1)
3.2 FIGURE 3.2 below shows safety equipment being used in a confined space.
hints
FIGURE 3.2
3.2.1 Name the safety equipment that attaches the worker to the safety
rope. (1)
3.2.2 Name a method that is used to remove harmful gases from a
manhole. (1)
3.2.3 Name ONE safety item that a worker must wear in order to prevent
Copyright reserved
inhaling of dangerous gases. (1)
Please turn over
Civil Technology: Civil Services 7 DBE/November 2024
NSC Confidential
3.3 Draw on ANSWER SHEET 3.3 a horizontal sectional view of a manhole.
Indicate the direction the sewage will flow. Label the benching and any other
TWO labels. (8)
3.4 Use the information in FIGURE 3.4 below and take off the materials as
indicated in the table below. Write only the answer next to the question
numbers (3.4.1 to 3.4.7) in the ANSWER BOOK, e.g. 3.4.8 P-trap.
[32
14 000
FIGURE 3.4
ITEM NAMES OF MATERIAL | DIAMETER QUANTITY
PIPES/
SANITARY
FITTINGS
1 3.4.1 = = 3.4.2
2 Soil/Sewer pipe = 3.4.3 _
3 Y-junction 135° 3.4.4 ee 3.4.5
4 Main straight pipe wee a 3.4.6
(Indicate the
number of
6 m pipes needed)
5 3.4.7 tee wes 1
NOTE: Sewer pipes are available in 6 metre lengths. (7)
3.5 ANSWER SHEET 3.5 shows the top view of the first course of a corner
(quoin) with a T-junction half-brick wall. Project and draw the consecutive
layer to fit exactly on the given first course. (7)
[30]
Copyright reserved Please turn over
Civil Technology: Civil Services 8 DBE/November 2024
NSC Confidential
QUESTION 4: COLD- AND HOT-WATER SUPPLY, TOOLS, EQUIPMENT AND
MATERIALS (SPECIFIC)
Start this question on a NEW page.
4.1 FIGURE 4.1 below shows TWO valves.
FIGURE 4.1
4.11 Differentiate between fullway valves A and B in terms of the
mechanism to open the valves. (2)
4.1.2 Name the movable components inside the fullway valves that will
open or close the valves. (2)
4.2 FIGURE 4.2 below shows a machine.
FIGURE 4.2
4.2.1 Identify the machine. (1)
4.2.2 Name TWO uses of this machine. (2)
4.2.3 What type of lubricant should be applied to the cutting parts of the
machine to ensure a smooth cut? (1)
Copyright reserved Please turn over
Civil Technology: Civil Services 9 DBE/November 2024
NSC Confidential
4.3 FIGURE 4.3 below shows a pipe connected to cold- and hot-water taps, used
to solve a fault in the water pipes.
FIGURE 4.3
4.3.1 Identify the fault that is being rectified.
4.3.2 Explain how you would prevent the type of fault identified in
QUESTION 4.3.1.
44 FIGURE 4.4 below shows a component used inside a geyser to heat the
water.
FIGURE 4.4
4.41 Identify the component.
4.4.2 Name the component that protects the geyser inner casing against
corrosion.
4.4.3 Explain the function of the thermostat in a geyser.
45 Draw the following symbols that are used in hot-water systems:
4.5.1 Pressure switch
4.5.2 Expansion-control valve
4.5.3 Shower (fixed)
Copyright reserved Please turn over
(1)
(2)
(1)
(1)
(2)
(2)
(2)
(2)
Civil Technology: Civil Services 10 DBE/November 2024
NSC Confidential
4.6 FIGURE 4.6 below shows an electrical water-heating system.
[ Dp—~—C
A
D
TT i
q
FIGURE 4.6
4.6.1 Explain the function of pipes A and B, as used in the geyser
installation.
4.6.2 Name and explain ONE purpose of D.
4.6.3 Identify C.
4.6.4 Give ONE reason for using a drip tray in a geyser installation.
46.5 Name the component of the geyser that prevents siphoning.
Copyright reserved
Please turn over
(2)
(2)
(1)
(4)
Civil Technology: Civil Services
1
DBE/November 2024
NSC Confidential
4.7 Choose a description from COLUMN B that matches the item in COLUMN A.
Write only the letter (A-H) next to the question numbers (4.7.1 to 4.7.5) in the
ANSWER BOOK, e.g. 4.7.6 J.
COLUMN A COLUMN B
4.7.1 Heat pump to join galvanised pipes or fix a
leak
4.7.2 Flanges
is used to connect two steel pipes
4.7.3 Johnson pipe coupling and keep the components in place
4.7.4 Water meter allows unpleasant odours coming
from a sewerage system to
4.7.5 Demand pillar tap escape
uses the solar to heat water
to join PVC pipes or fix a leak
uses warm air to heat water
used by municipal workers to take
readings of water used
regulates water flow for a few
seconds at a hand wash-basin
(5 x 1)
4.8 Name the reaction between two metals when the following processes take
place:
4.8.1 The selective removal of the more active zinc from an alloy in an
aqueous solution takes place
4.8.2 The process is carried out in an electrolytic cell dipped in a solution
of positive and negative charged ions
4.8.3 One metal corrodes another when both metals are in electrical
contact in the presence of an electrolyte
49 Show, by means of a sketch, a T-junction 90° single reducing inspection eye.
Copyright reserved
Please turn over
(5)
(1)
(1)
(1)
(4)
[40]
Civil Technology: Civil Services 12 DBE/November 2024
NSC Confidential
QUESTION 5: GRAPHICS AS MEANS OF COMMUNICATION, ROOF WORK AND
STORM WATER (SPECIFIC)
Start this question on a NEW page.
5.1 FIGURE 5.1 shows the front and top view of a stopped end of a gutter. Draw,
in your ANSWER BOOK, the development of the stopped end with a closed
top.
130
co}
c
oO
|
FIGURE 5.1
5.2 Name ONE method of channelling storm water to catchment areas.
5.3 Show, by means of a neat pictorial freehand sketch, a precast open channel.
5.4 ANSWER SHEET 5.4 shows the front view and top view of a square-based
truncated pyramid, with the base not parallel with the axis, to be used as a
vent pipe.
Use the views and information given and draw the development of the
truncated pyramid. Start the development at A.
The pyramid has a 3 mm seam on both sides.
Show ALL construction and projection lines.
Copyright reserved Please turn over
(8)
(1)
(4)
(19)
[30]
Civil Technology: Civil Services 13
NSC Confidential
DBE/November 2024
QUESTION 6: SEWERAGE, SANITARY FITTINGS AND JOINING (SPECIFIC)
Start this question on a NEW page.
6.1 Various options are provided as possible answers to the following questions.
Choose the answer and write only the letter (A-D) next to the question
numbers (6.1.1 to 6.1.5) in the ANSWER BOOK, e.g. 6.1.6 D.
6.1.1
Copyright reserved
The slope/gradienit/fall of a drain pipe with a diameter of 150 mm
is...
A
B
Cc
D
1:40.
1:60.
1:90.
All the above-mentioned
. is used to join waste-water pipes of the same diameter at
corners.
A
B
Cc
D Awasie bend with inspection eye 90°
A coupling
A T-waste junction 135°
A 90° bend with @110 mm
A cistern forms part of a...
A
B
c
D
water closet.
bath.
sink.
None of the above-mentioned
The most suitable tool used to cut a copper pipe is a ...
DOWD
hacksaw.
bench saw.
pipe cutter.
side cutter.
S-traps must be installed at ...
VOwWDY
showers.
baths.
bidets.
None of the above-mentioned
Please turn over
(1)
(1)
(1)
(1)
(1)
Civil Technology: Civil Services 14
NSC Confidential
6.2 FIGURE 6.2 below illustrates a type of urinal.
6.2.1
6.2.2
6.2.3
6.2.4
Copyright reserved
ss
ee,
FIGURE 6.2
Identify the type of urinal.
Identify A and B.
Explain the function of A.
DBE/November 2024
Describe what can be placed on top of the metal grid to prevent
paper and other material from entering the outlet.
Please turn over
(1)
(2)
(1)
(1)
Civil Technology: Civil Services 15 DBE/November 2024
6.3 FIGURE 6.3 below illustrates the soldering process. Study the figure and answer
NSC Confidential
the questions that follow.
pcan A
FIGURE 6.3
6.3.1 Identify A.
6.3.2 Explain why A is made of copper.
6.3.3 Describe the composition of the soldering stick.
6.3.4 Discuss TWO reasons for coating the joint with flux prior to
soldering.
6.4 Describe the process of joining PVC pipes to a straight coupler using
solvent. .
6.5 ANSWER SHEET 6.5 shows an incomplete vertical sectional view of a septic
tank. Use ANSWER SHEET 6.5 and complete the drawing of the septic tank.
Label the water level and scum.
6.6 ANSWER SHEET 6.6 shows the floor plan of a workshop and the incomplete
sewerage layout. Use ANSWER SHEET 6.6 to design and complete a
suitable sewerage layout with a gully for the workshop. Print the abbreviations
for the inspection eyes and the vent pipe.
Copyright reserved
TOTAL:
(1)
(1)
(1)
(2)
(4)
(10)
(11)
[40]
200
Civil Technology: Civil Services DBE/November 2024
NSC Confidential
| CENTRE NUMBER: LTT TI J
[EXAMINATIONNUMBER: | | | | | | LJ] ] [ J
ANSWER SHEET 2
NO. QUESTIONS ANSWERS MARKS
1 What is the measurement of the 1
“| dwelling facing Hibiscus Street?
2. | Identify number 1. 1
3 Identify the number indicating the
building line.
4. | Identify number 2. 4
5. | Identify number 3. 1
6 Write down the abbreviation for 1
‘| number 5.
7. | Explain the purpose of number 6. 1
8 How many fluorescent tubes are used 1
‘| in number 7?
9 How many one-way switch single-pole 1
"| switches are in the dwelling?
40 How many built-in cupboards are in 1
* | the dwelling?
4 What is omitted in terms of electrical 1
~ | installation in the bedrooms?
42 Name TWO access points into the
. : 2
dwelling.
13 How do you know in which direction 1
* | the door at number 8 will open?
Name ONE other fixture that can be
14. | installed in the bathroom indicated by 1
number 9.
15. | Identify number 10. 1
Copyright reserved
Civil Technology: Civil Services
NSC Confidential
| CENTRE NUMBER: [ | [ ft J
|
DBE/November 2024
[EXAMINATION NUMBER: | | |_|
[
Which plot is on the eastern side of
18. | slot number 237 1
47 How many inside doors are in the 1
| building?
18. | How many 2 600 mm x 71 400 mm 1
windows are in the building?
19 Who checked the drawing of the new 4
“| dwelling?
Why will it be difficult to enter the
20. | dwelling at number 8 if the NGL is 1
300 mm lower than the FFL?
21 Who was responsible for the printing 4
* | of the building plan?
22 Deduce from the notes column the 1
’ | date that revision 1 took place.
23 In which town will the new dwelling be 4
* | erected?
Draw the symbol for a sink unit —
24. double. 5
25. | Draw the symbol for hardcore filling. 2
Calculate the metres of clear-view
fencing that would be needed to fence
plot number 23, excluding the
26. driveway. 6
Give your answer in metres and show
ALL calculations.
The internal area of the garage is
39,6 m?. Calculate the internal length
27. | of number 11. 3
Give your answer in mm and show
ALL calculations.
TOTAL: 40
Copyright reserved
Civil Technology: Civil Services DBE/November 2024
NSC Confidential
[CENTRE NUMBER: [TT TT 7 T ]
[EXAMINATIONNUMBER: | | | | | [| [| | [| | | | J 4
ANSWER SHEET 3.3
ASSESSMENT CRITERIA
NO. | MARK | CANDIDATE'S
MARK
1 1
2 1
3 1
4 1
5 1
6 1
7 2
TOTAL: | 8
Copyright reserved
Civil Technology: Civil Services
NSC Confidential
DBE/November 2024
[CENTRE NUMBER: [| | | | | JT J
[EXAMINATIONNUMBER: | | | | | | | [| [ TT [ J
ANSWER SHEET 3.5
ASSESSMENT CRITERIA
NO. [MARK | CANDIDATE'S
MARK
1 4
2 2
3 1
TOTAL: | 7
Copyright reserved
Civil Technology: Civil Services DBE/November 2024
NSC Confidential
[| CENTRE NUMBER: LTT TT TT 4
[EXAMINATIONNUMBER: | | | | | | | | | | | | [J
ANSWER SHEET 5.4
ASSESSMENT CRITERIA
NO. | MARK | CANDIDATE'S : A
MARK
NO) on) B) oo) Do} a
=
O/NM/ A/a] ayo) Nh}
TOTAL:
Copyright reserved
Civil Technology: Civil Services DBE/November 2024
NSC Confidential
[ CENTRE NUMBER: LJ] TT 7 7 JT ]
[EXAMINATIONNUMBER: | | | | | | | | | | | | [4
ANSWER SHEET 6.5
ry Sw DASaen & DA pa
BER ODET ahah nh RS J ROR OS 4
a. 2 fo) fo}
ASSESSMENT CRITERIA
NO. MARK | CANDIDATE'S
MARK
1 1
2 1
3 2
4 2
5 1
6 1
7 2
TOTAL: 10
Copyright reserved
Civil Technology: Civil Services
NSC Confidential
[CENTRE NUMBER: Ll
DBE/November 2024
| EXAMINATION NUMBER: | |
ANSWER SHEET 6.6
ASSESSMENT CRITERIA
No.
MARK
CANDIDATE'S
MARK
M)on) BR) co} ho}
N]3}3)-] 09/00
TOTAL:
=
=
MUNICIPAL CONNECTION
Copyright reserved
Study this subject
Recommended for this subject
%20Afr--307147a5-3280-4a11-a82e-cf3e33388eb0/v1-e53e38093df191bfe243/card.webp)
Question paper
Civil Technology Grade 12 November 2024 NSC QP (Afr)

Memorandum
Civil Technology Grade 12 Eastern Cape Prelim 2024 Memo

Memorandum
Civil Technology Grade 12 Eastern Cape Prelim 2024 Memo

Memorandum
Civil Technology Grade 12 Eastern Cape Prelim 2024 Memo

Memorandum
Civil Technology Grade 12 Eastern Cape Prelim 2024 Memo

Question paper
Civil Technology Grade 12 Eastern Cape Mock 2023 QP (Afr)
More from Grade 12 Civil Technology
%20(Afrikaans)%20June%202025%20Possible%20Answers--c0a65d19-28ca-4ac3-8c61-d4627d2a3133/v1-5f42c573694769cf80ce/card.webp)
Memorandum
Civil Technology Grade 12 Gauteng June 2025 Memo (Afrikaans)
%20MG%20Eng--0e265899-dc44-4809-aabf-8f374f1af392/v1-73a07814cfc9334618a1/card.webp)
Memorandum
Civil Technology Grade 12 NSC November 2025 Memo (English)

Memorandum
Civil Technology Grade 12 Eastern Cape Mock 2023 Memo (Eng)

Question paper
Civil Technology Grade 12 Eastern Cape Mock 2023 QP (Afr)

Question paper
Civil Technology Grade 12 Eastern Cape Mock 2023 QP (Afr)

Question paper