SENIOR CERTIFICATE
GRADE 12
i CIVIL TECHNOLOGY: CONSTRUCTION cl
i NOVEMBER 2024 "
MN SOO ROO OO COO noe pococoecocoosoecugenncped
MARKS: 200
TIME: 3 hours
This question paper consists of 13 pages and 6 answer sheets.
Copyright reserved Please turn over
Skip to contentAll 2024 papers %20Afr--307147a5-3280-4a11-a82e-cf3e33388eb0/v1-e53e38093df191bfe243/card.webp)





View all%20(Afrikaans)%20June%202025%20Possible%20Answers--c0a65d19-28ca-4ac3-8c61-d4627d2a3133/v1-5f42c573694769cf80ce/card.webp)
%20MG%20Eng--0e265899-dc44-4809-aabf-8f374f1af392/v1-73a07814cfc9334618a1/card.webp)




Civil Technology Grade 12 November 2024 NSC QP (Eng)
Grade 12 Civil Technology question paper from the November 2024 NSC (English), 20 pages. Read online or get the free PDF download, memo linked when available.
Civil Technology · Grade 12 · November 2024 NSC · 2024. Question paper, 20 pages. Read online or download the PDF.
- Subject
- Civil Technology
- Grade
- Grade 12
- Document type
- Question paper
- Year
- 2024
- Exam period
- November 2024 NSC
- Curriculum
- CAPS
- Pages
- 20
- File size
- 912.2 KB
Free to read online, no sign-up needed
Loading document…
Loading document…
1 of 20
This exam
Document textSearch extracted text and jump to a page.
Civil Technology: Construction 2 DBE/November 2024
NSC Confidential
REQUIREMENTS:
1.
2.
3.
Drawing instruments
A non-programmable calculator
ANSWER BOOK
INSTRUCTIONS AND INFORMATION
1.
2
3.
4
a
o 2 N ®
11.
12.
13.
14.
15.
16.
17.
18.
This question paper consists of SIX questions.
Answer ALL the questions.
Read ALL the questions carefully.
Answer each question as a whole. Do NOT separate subsections of
questions.
Number the answers correctly according to the numbering system used in this
question paper.
Start the answer to EACH question on a NEW page.
Do NOT write in the margins of the ANSWER BOOK.
You may use sketches to illustrate your answers.
Write ALL calculations and answers in the ANSWER BOOK or on the
attached ANSWER SHEETS.
Use the mark allocation as a guide to the length of your answers.
Make drawings and sketches in pencil, fully dimensioned and neatly finished
off with descriptive titles and notes to conform to the SANS/SABS Code of
Practice for Building Drawings.
For the purpose of this question paper, the size of a brick should be taken as
220 mm x 110 mm x 75 mm.
Use your own discretion where dimensions and/or details have been omitted.
Answer QUESTIONS 2, 3.5, 3.6, 5.7, 5.8 and 6.5 on the attached ANSWER
SHEETS using drawing instruments, where necessary.
Write your CENTRE NUMBER and EXAMINATION NUMBER on every
ANSWER SHEET and hand them in with your ANSWER BOOK, whether you
have used them or not.
Drawings in the question paper are NOT to scale due to electronic transfer.
Google Images was used as the source of all photographs and pictures.
Write neatly and legibly.
Copyright reserved Please turn over
Civil Technology: Construction 3 DBE/November 2024
QUESTION 1:
NSC Confidential
OHSA, MATERIALS, TOOLS, EQUIPMENT AND JOINING
(GENERIC)
Start this question on a NEW page.
1.4 Choose the correct word(s) from those given in brackets. Write only the
word(s) next to the question numbers. (1.1.1 to 1.1.10) in the ANSWER
BOOK, e.g. 1.1.11 Concrete. .
1.1.4
1.1.2
1.1.3
1.1.4
1.1.10
Wooden scaffold standards should not be placed more than
(4 m/3 m/6 m) apart.
Trestle scaffolds must have a maximum height of (3 m/4 m/6 m).
The material safety data sheet that accompanies hazardous
chemical substances must contain (fire-fighting measures/
flame ratio/combustion rate).
When transporting long ladders with a vehicle, (ensure that the
ladder does not protrude excessively/mark the end of the ladder
with a green flag/place ladder in an upright position).
(Galvanising/Powder coating/Electrolysis) is the process of
applying a plastic coating to a metal.
Electroplating is the process in which (the thickness of undersized
parts can be increased/metal becomes extremely hot/metals are
coated with paint).
The (thread and shank/head and pin/runout and shank) do not form
part of the length of a bolt.
The purpose of the nylon insert on a hexagonal nut is for
(decorative purposes/easy removal from a bolt/preventing backing
off).
Wooden ladders may be treated with (oil-based paint/
wood preservatives/water-based paint) according to the
Occupational Health and Safety Act (OHSA).
Workers carrying large equipment may not use (spiral/suspended/
fire escape) stairways that are a temporary part of a structure.
1.2 Which pictorial view below represents a nut with a built-in washer?
wv © 8
A
B c D
1.3 The specifications for a Raw bolt are R-RBL-M08/25. What does the M08
represent?
Copyright reserved
Please turn over
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
Civil Technology: Construction 4 DBE/November 2024
NSC Confidential
1.4 Cured concrete is exposed to elements.
1.44 Explain the effect of cured concrete on steel reinforcement. (1)
1.4.2 Explain the advantages of cured concrete in terms of the weight it
can carry. (1)
1.5 Differentiate between the multi-detector and the /aser level in terms of the use
thereof. (2)
1.6 Describe TWO uses of the dumpy level. (2)
1.7 Describe how you will take care of a telescopic staff. (2)
[20]
QUESTION 2: GRAPHICS AS MEANS OF COMMUNICATION (GENERIC)
Start this question on a NEW page.
FIGURE A and FIGURE B on the next page show drawings that appear on a building
plan. Analyse the drawings and complete the table on ANSWER SHEET 2.
Copyright reserved Please turn over
Civil Technology: Construction 5 DBE/November 2024
NSC Confidential
a PLOT 27 ? NOTES:
Contractors must verify all
eens Ol elie ~p- TFT TTT [- — dimensions and levels on site
sa 7 ry before commencing work.
i I i
1 4 U Architects to be notified
1 1 3S of any discrepancies immediately.
: | S| r-®
12 i | a ee
PLOT25 | s H | ! Fencing: Clear-view fencing to be
13 ! ' used on the boundary
t i c
i | || | NEW DWELLING ; —G)
1] i 1 b
® +——t-=d im
I 1 1 faa
I ' t Ee
H ! 1 ea}
<
1 1 PLOT 23 1 =
1 1 1 J
t 1 1 oO
i 1 1
a 4 Le J
Architect's signature .................
HIBISCUS STREET / Client's signature ...... 00.00.00...
FIGURE A ©
— mo
PROPOSED DWELLING OF MS KOCK
ON PLOT 23, CLIVIA STREET, MALUBU.
g REVISION | DATE: | DRAWING OF
1 saroaszo24 | ELECTRICAL
= FITTINGS
| iH
| GARAGE PRINTED BY: DATE OF PRINT:
Kx FROG PRINTERS 16/04/2024
a j1x 40 W 15
8S 7 DRAWING TITLE:
oS SITE PLAN AND FLOOR PLAN
WH ND U PROJECT:
ao)
NI
™ |} ROOMA PROJECT NO. DRAWING NO.
o < . .
+= = KITCHEN GR 688-646 446P2
“ DATE: DRAWN: | CHECKED:
©} =a 07/04/2024 SP JOB P BOT
= tL
SITE PLAN SCALE 1: 500
FLOOR PLAN SCALE 1: 100
2.200
|
M4
° LOUNGE
° a REFERENCE CODE
c=) — QP 4- 2024
oO
st WINDOW SCHEDULE
Fi a |sE4/]
s 7
a! )_4.000__ Sl], fom
12.000 - a p-800),
FIGURE B wi 2 [40]
Copyright reserved Please turn over
Civil Technology: Construction 6 DBE/November 2024
NSC Confidential
QUESTION 3: ROOFS, STAIRCASES AND JOINING (SPECIFIC)
Start this question on a NEW page.
3.1 Describe the following terminology related to staircases:
3.1.1 Pitch line (1)
3.1.2 Balustrade (2)
3.1.3 Run (1)
3.2 A roof truss on a completed building should be joined to a brick wall.
3.2.1 Recommend ONE method that can be used to anchor a roof truss
to a brick wall. (1)
3.2.2 Recommend ONE item that can be used to join a rafter to a
tie beam. (1)
3.3 When using concrete tiles as roof covering, what is the maximum distance
between the rafters? (1)
3.4 Name the type of roof covering that will be used when the spacing between
the roof trusses is 1400 mm. (1)
3.5 ANSWER SHEET 3.5 shows a drawing of a rafter that forms part of a
SA (Howe) roof truss. Use ANSWER SHEET 3.5 and complete the drawing to
scale 1:5 showing only the connection of the rafter, queen post and strut.
Print any ONE label.
Use the following specifications:
e All timber used for the roof truss is 114 mm x 38 mm.
e The pitch of the roof is represented by the angle of the rafter. (8)
3.6 Use ANSWER SHEET 3.6 and draw to scale 1:20 a king post roof truss.
The walls are indicated on the ANSWER SHEET.
Use the following specifications:
e The overhang is 250 mm.
e The roof truss is constructed of 114 x 38 mm timber.
« 114x 38mm timber is used for the wall plates.
« The pitch of the roof is 30°. (14)
[30]
Copyright reserved Please turn over
Civil Technology: Construction 7 DBE/November 2024
NSC Confidential
QUESTION 4: EXCAVATIONS, FORMWORK, TOOLS, EQUIPMENT AND
MATERIALS (SPECIFIC)
Start this question on a NEW page.
4.1 Give ONE word/term for EACH of the following descriptions by choosing a
word/term from the list below. Write only the word/term next to the question
numbers (4.1.1. to 4.1.5) in the ANSWER BOOK, e.g. 4.1.6 Holes.
water; branch; ready-mix; hardness; hand mixed; workability;
15 MPa; boom; dust; 30 MPa; compressive strength
4.1.1 A type of pump that can pump concrete to high levels (1)
4.12 Concrete that has the same density throughout (1)
4.1.3 The slump test will determine this property of fresh concrete (1)
4.1.4 High-strength concrete that will have this compression strength at
28 days (1)
4.15 Used for curing flat surfaces, like floor slabs (1)
4.2 Various options are provided as possible answers to the following questions.
Choose the answer and write only the letter (A-D) next to the question
numbers (4.2.1 to 4.2.5) in the ANSWER BOOK, e.g. 4.2.6 D.
4.2.1
4.2.2
4.2.3
Copyright reserved
Excavated material should be kept away from the trenches at a
distance of at least ...
A
B
Cc
D
1,2 metres.
800 mm.
1 metre.
600 mm. (1)
Shuttering for shallow trenches has 152 x 50 mm...
A
B
Cc
D
backfilling.
folding wedges.
walling boards.
benching. (1)
The depth at which trenches should be tested for atmospheric
hazards is ...
A
B
Cc
D
1,2 metres.
900 mm.
600 mm.
1 metre. (1)
Please turn over
Civil Technology: Construction 8 DBE/November 2024
43
44
4.5
46
NSC Confidential
4.2.4 A suitable ... must be provided where excavations are deeper
than 2 m.
A catch net
B cover
C_ foundation
D barrier (1)
42.5 Trenches should be ... at the start of each shift.
A excavated
B_ inspected
C_ filled
D_ cleaned (1)
Predict the consequence of the vibration caused by heavy machinery in close
proximity to an excavation. (1)
Draw, in your ANSWER BOOK, a neat sketch of the vertical sectional view of
the shuttering for firm soil. Print any TWO labels. (8)
FIGURE 4.5 below shows a machine that is used on a construction site.
«
FIGURE 4.5
4.5.1 Why is it necessary to use this machine? (1)
4.5.2 Name this machine. (1)
Name the machine that you will use after the concrete has stopped bleeding
to get a smooth surface. (1)
Copyright reserved Please turn over
Civil Technology: Construction 9 DBE/November 2024
47
48
NSC Confidential
When constructing a building as in FIGURE 4.7, where large amounts of
concrete is required, there are a lot of rules and regulations that need to be
followed to prevent disastrous consequences, as witnessed recently. One of
these is that the cube test must be performed on each mixture/batch of fresh
concrete.
FIGURE 4.7
4.7.1 Describe the purpose of the cube test.
4.7.2 Name the apparatus that you will use to get rid of any air pockets in
the cube after it has been filled with concrete.
4.7.3 Explain the procedure to conduct a cube test after samples have
been taken and the moulds have been assembled.
Study FIGURE 4.8 below. Match the word(s) in the list below with the labels in
FIGURE 4.8. Write only the correct word(s) next to the label (A-J) in the
ANSWER BOOK, e.g. K baseplate. Words in the list may only be used
ONCE.
sole plate; shuttering board floor; prop; anchor bar; beam/joist;
bearer/head tree; cleat; wedge; soffit board/shutter board; fixing plate;
brace/strut; shuttering board side
>
ow
+-T OnmmoIO
FIGURE 4.8
Copyright reserved Please turn over
(2)
(1)
(5)
(10)
[40]
Civil Technology: Construction 10 DBE/November 2024
QUESTION 5:
NSC Confidential
MEANS OF COMMUNICATION (SPECIFIC)
Start this question on a NEW page.
5.1
5.2
5.3
5.4
5.5
5.6
5.7
5.8
Copyright reserved
FIGURE 5.1 below indicates a splatter finished wall.
=
FIGURE 5.1
5.1.1 State the mixing ratio of a splatter finish.
6.1.2 What is the alternative description of a splatter finish/splatter-dash
finish?
§.1.3 State another method to obtain a splatter finish if a Tyrolean
machine is not available.
Skimming plaster is usually a two-coat application for walls.
5.2.1 Describe the purpose of skimming plaster.
5.2.2 Name ONE tool that can be used to float/polish skimmed plaster.
Define the term dry screed.
Name TWO materials that you will mix with water to obtain a dry screed.
State TWO advantages of beam filling.
Describe the shape of the bricks and the joints of a gauged arch.
ANSWER SHEET 5.7 shows an incomplete drawing of the construction of
paving blocks with a restrained edge. Complete the drawing and print any
TWO labels. Indicate the symbol for concrete.
ANSWER SHEET 5.8 shows the incomplete first and second courses of a
one-and-a-half brick pier attached to a one-brick wall in English bond. Use
ANSWER SHEET 5.8 and complete the drawing of the brick pier on EACH
course.
PLASTER AND SCREED, BRICKWORK AND GRAPHICS AS
Please turn over
(1)
(1)
(1)
(1)
(1)
(2)
(2)
(2)
(2)
(8)
(9)
[30]
Civil Technology: Construction 11 DBE/November 2024
NSC Confidential
QUESTION 6: REINFORCEMENT IN CONCRETE, FOUNDATIONS, CONCRETE
FLOORS AND QUANTITIES (SPECIFIC)
Start this question on a NEW page.
6.1 Choose a description from COLUMN B that matches the item in COLUMN A.
Write only the letter (A-H) next to the question numbers (6.1.1 to 6.1.5) in the
ANSWER BOOK, e.g. 6.1.6 J.
COLUMN A COLUMN B
6.1.1 Tensile force A _ is placed in compression areas
for strength
6.1.2 Stirrups
B _ is positioned where tensile
6.1.3 Anchor bar stresses take place
6.1.4 Shear force C forces pile foundation into the
ground
6.1.5 Main bar
D__ occurs where a beam is inclined
to stretch
E occurs where a beam is inclined
to shorten
F used to prepare holes for
short-bored piles
G _ placed around main bars to
counteract forces
H__ is inclined to cause a diagonal
stress fracture
(6x1)
Copyright reserved Please turn over
(5)
Civil Technology: Construction 12 DBE/November 2024
NSC Confidential
6.2 FIGURE 6.2 below illustrates two types of beams.
oD
o
oO
oD
>
>
dD
oe ee B oe
7
FIGURE 6.2
6.2.1 Identify the types of beams illustrated by A and B. (2)
6.2.2 State ONE advantage of reinforcing concrete beams. (1)
6.2.3 State TWO disadvantages of reinforcing concrete beams. (2)
6.2.4 Explain TWO purposes of using spacers in reinforcing. (2)
6.3 Piles are used for foundations under special circumstances.
6.3.1 In your ANSWER BOOK, sketch in good proportion, a steel tube
caisson pile that is being driven into the ground. Label any TWO
parts or accessories. (7)
6.3.2 Explain TWO circumstances that will NOT require the use of piles. (2)
6.4 FIGURE 6.4 below illustrates a rib and block floor.
FIGURE 6.4
6.4.1 How wide must the double layer DPC be underneath the ribs to
allow for movement? (1)
6.4.2 State TWO safety factors to consider after installing a rib and block
floor. (2)
Copyright reserved Please turn over
Civil Technology: Construction 13 DBE/November 2024
NSC Confidential
6.5 FIGURE 6.5 below shows the floor plan of a small store room.
7 000
n
10 500
FIGURE 6.5
Use the following specifications:
The superstructure is a one-brick wall, 220 mm wide and 2 700 mm high.
The door opening is 2 000 mm high x 900 mm wide.
Use 50 bricks per square metre for a half-brick wall.
The centre line for the superstructure is 34 120 mm.
Use the dimension paper on ANSWER SHEET 6.5 and calculate the
following. Round off your answer to TWO decimals.
6.5.4 The area of the walls of the superstructure before deductions (4)
6.5.2 The area of the door (4)
6.5.3 The area of the walls of the superstructure of the building after
deductions (3)
6.5.4 The number of bricks needed to build the superstructure of the
building (4)
NOTE: Amark will be awarded for the correct use of dimension paper. (1)
[40]
TOTAL: 200
Copyright reserved
Civil Technology: Construction
NSC Confidential
[| CENTRE NUMBER: [TT TT 1
DBE/November 2024
[EXAMINATION NUMBER: | | | |
ANSWER SHEET 2
NO. QUESTIONS ANSWERS MARKS
1 What is the measurement of the 4
‘| dwelling facing Hibiscus Street?
2. | Identify number 1. 1
3 Identify the number indicating the 1
*__| building line.
4. | Identify number 2. 41
5. | Identify number 3. 1
6 Write down the abbreviation for 7
“| number 5.
7. | Explain the purpose of number 6. 1
8 How many fluorescent tubes are used 1
“| in number 7?
9 How many one-way switch single-pole 1
"| switches are in the dwelling?
40 How many built-in cupboards are in 4
* | the dwelling?
1 What is omitted in terms of electrical 1
* | installation in the bedrooms?
12 Name TWO access points into the
: - 2
dwelling.
13 How do you know in which direction 1
* | the door at number 8 will open?
Name ONE other fixture that can be
14. | installed in the bathroom indicated by 4
number 9.
15. | Identify number 10. 1
Copyright reserved
Civil Technology: Construction
NSC Confidential
| CENTRE NUMBER:
| | |
DBE/November 2024
[EXAMINATIONNUMBER: | | | |
16.
Which plot is on the eastern side of
plot number 23?
17.
How many inside doors are in the
building?
18.
How many 2 600 mm x 1 400 mm
windows are in the building?
19.
Who checked the drawing of the new
dwelling?
20.
Why will it be difficult to enter the
dwelling at number 8 if the NGL is
300 mm lower than the FFL?
21.
Who was responsible for the printing
of the building plan?
22.
Deduce from the notes column the
date that revision 1 took place.
23.
In which town will the new dwelling be
erected?
24,
Draw the symbol for a sink unit —
double.
25.
Draw the symbol for hardcore filling.
26.
Calculate the metres of clear-view
fencing that would be needed to fence
plot number 23, excluding the
driveway.
Give your answer in metres and show
ALL calculations.
27.
The internal area of the garage is
39,6 m?. Calculate the internal length
of number 11.
Give your answer in mm and show
ALL calculations.
TOTAL:
40
Copyright reserved
Civil Technology: Construction , DBE/November 2024
NSC Confidential
[CENTRE NUMBER: LT TT TTT 4)
[EXAMINATIONNUMBER: | | | | | [| | | [| | | | J |
ANSWER SHEET 3.5
ASSESSMENT CRITERIA
NO. | MARK CANDIDATE'S MARK
1 2
2 2
3 1
4 1
5 2
TOTAL:| 8
Copyright reserved
INN
vZ0¢ JequieAon/aga
pevasel }yBuAdog
pL | -1WLOL
Z 9
Z g
Z v
z €
z z
v L
WUVIN S.SLVGIGNVO | Mev] ON
Vidal LNSIWSSaSSV
A
i]
|
Za
9°¢ LISHS MSMSNV
LT [TT 7 7 [ TT J | 7MSSINNN NOILVNIWVXG |
7YASINNN SYLNFO |
lenuepyuod ISN
uoHonsjsuog :ABojouyse | IAD,
Civil Technology: Construction DBE/November 2024
NSC Confidential
| CENTRE NUMBER: LILtTfTT tT]
[EXAMINATIONNUMBER: | | | | | | [| [| | | | J[ [ |
ANSWER SHEET 5.7
WALL ee
Ga ——_,— SUBGRADE
ASSESSMENT CRITERIA
NO. MARK | CANDIDATE'S MARK
1 1
2 1
3 1
4 1
5 1
6 1
iZ 2
TOTAL 8
Copyright reserved
Civil Technology: Construction DBE/November 2024
NSC Confidential
[ CENTRE NUMBER: ET 7] tT 7 7 7
[EXAMINATIONNUMBER: | | [| | | | | | | | | | [J
ANSWER SHEET 5.8
FIRST COURSE
SECOND COURSE
ASSESSMENT CRITERIA
NR. MARK | CANDIDATE'S MARK
1 3
2 1
3 3
4 2
TOTAL: 9
Copyright reserved
Civil Technology: Construction DBE/November 2024
NSC Confidential
[ CENTRE NUMBER: LT TT TT [4
[EXAMINATIONNUMBER: | | | | | | [| | | | [| | J[ |
ANSWER SHEET 6.5
DIMENSION PAPER
6.5 Al B c D
6.5.1
(4)
6.5.2
(4)
6.5.3
(3)
6.5.4
(4)
Correct use of dimension paper (1)
[40]
Copyright reserved
Study this subject
Recommended for this subject
%20Afr--307147a5-3280-4a11-a82e-cf3e33388eb0/v1-e53e38093df191bfe243/card.webp)
Question paper
Civil Technology Grade 12 November 2024 NSC QP (Afr)

Memorandum
Civil Technology Grade 12 Eastern Cape Prelim 2024 Memo

Memorandum
Civil Technology Grade 12 Eastern Cape Prelim 2024 Memo

Memorandum
Civil Technology Grade 12 Eastern Cape Prelim 2024 Memo

Memorandum
Civil Technology Grade 12 Eastern Cape Prelim 2024 Memo

Question paper
Civil Technology Grade 12 Eastern Cape Mock 2023 QP (Afr)
More from Grade 12 Civil Technology
%20(Afrikaans)%20June%202025%20Possible%20Answers--c0a65d19-28ca-4ac3-8c61-d4627d2a3133/v1-5f42c573694769cf80ce/card.webp)
Memorandum
Civil Technology Grade 12 Gauteng June 2025 Memo (Afrikaans)
%20MG%20Eng--0e265899-dc44-4809-aabf-8f374f1af392/v1-73a07814cfc9334618a1/card.webp)
Memorandum
Civil Technology Grade 12 NSC November 2025 Memo (English)

Memorandum
Civil Technology Grade 12 Eastern Cape Mock 2023 Memo (Eng)

Question paper
Civil Technology Grade 12 Eastern Cape Mock 2023 QP (Afr)

Question paper
Civil Technology Grade 12 Eastern Cape Mock 2023 QP (Afr)

Question paper