GRADE 12
SEPTEMBER 2018
CIVIL TECHNOLOGY: WOOD WORKING
MARKING GUIDELINE
MARKS: 200
This marking guideline consists of 12 pages.
Skip to contentAll 2018 papers _hlayiso.com_--b6d609b6-89a5-4b39-a9b7-0d878af45cd4/v1-9c90f1958077961e2845/card.webp)





View all
%20(English%20and%20Afrikaans)%20June%202025%20Question%20Paper--c8edd459-5237-48e0-8588-69d7ecd7f8e5/v1-be996aaed91bf782e098/card.webp)
%20Afr--591d6ffd-20b1-4748-a1ba-b055be0a14c3/v1-4d98a131fd37e013458a/card.webp)
%20Afr--05a95faf-5891-4d88-9e5e-7d13c1d21648/v1-f5ca67113376f7457b83/card.webp)


Civil Technology Grade 12 Eastern Cape Mock 2018 Memo (Eng)
Grade 12 Civil Technology memorandum from the Eastern Cape Mock Exam 2018 (English), 12 pages. Read online or download the free PDF.
Civil Technology · Grade 12 · Eastern Cape Mock Exam · 2018. Memorandum, 12 pages. Read online or download the PDF.
- Subject
- Civil Technology
- Grade
- Grade 12
- Document type
- Memorandum
- Year
- 2018
- Exam period
- Eastern Cape Mock Exam
- Curriculum
- CAPS
- Pages
- 12
- File size
- 521.7 KB
Free to read online, no sign-up needed
Loading document…
Loading document…
1 of 12
This exam
Eastern Cape Mock Exam 2018
- Other filesQuestion paper · EngQuestion paper · Eng (2)Question paper · Eng (3)Question paper · Eng (4)Question paper · Eng (5)Question paper · Eng (6)Question paper · AfrQuestion paper · Afr (2)Question paper · Afr (3)Question paper · Afr (4)Question paper · Afr (5)Question paper · Afr (6)Memo · EngMemo · Eng (2)Memo · Eng (3)Memo · Eng (4)Memo · Eng (5)Memo · Eng (6)Memo · Eng (7)Memo · Eng (8)Memo · Eng (9)Memo · AfrMemo · Afr (2)Memo · Afr (3)Memo · Afr (4)Memo · Afr (5)Memo · Afr (6)Memo · Afr (7)Memo · Afr (8)Memo · Afr (9)
Document textSearch extracted text and jump to a page.
Downloaded from hlayiso.com
2 CIVIL TECHNOLOGY: WOOD WORKING (EC/SEPTEMBER 2018)
QUESTION 1: SAFETY, MATERIAL AND EQUIPMENT (GENERIC)
1.1 1.1.1 True (1)
1.1.2 False (1)
1.1.3 False (1)
1.1.4 True (1)
1.2 Any THREE requirements to which a trestle scaffold must comply.
Soundly constructed with a solid material
Prevent spreading of supporting legs
Not higher than 3 m
Consists of not more than 2 tiers (3 x 1) (3)
1.3 Similar answer.
(1) Aluminium conducts (2) electricity / workers subjected to electrical shock (2)
1.4 Similar answer.
(1) Paint will cover (2) weaknesses (2)
1.5 1.5.2 Improves the durability of concrete. (1)
1.5.5 It improves the strength of concrete. (1)
1.5.7 It makes concrete more watertight. (1)
1.5.8 It improves the resistance to abrasion. (1)
1.6 (1) Plastic finish / coating (2) in powder form by (3) using a spray-gun (3)
1.7 Briefly describe any ONE use of the dumpy level.
(1) Determine (2) height differences
(1) Determine (2) levels and slopes
(1) Setting out (2) of buildings
(1) Transferring of (2) levels and heights
(1) Determine horizontal (2) distances (1 x 2) (2)
1.8 1.8.1 1.5 m (1)
1.8.2 1.535 – 1,47 x 100 = 6,5 m (4)
1.9 Any THREE materials which can be detected in walls by the multi-detector.
Ferrous metals
Non-ferrous metals
AC wiring
Wood
Metal studs
Steel bars
Copper pipes (3 x 1) (3)
1.10 1.10.1 Dry, soft cloth / Not cleaning agents or solvents (1)
1.10.2 Remove battery (1)
[30]
Copyright reserved Please turn over
Downloaded from hlayiso.com
(EC/SEPTEMBER 2018) CIVIL TECHNOLOGY: WOOD WORKING 3
QUESTION 2: GRAPHICS AND JOINING (GENERIC)
2.1 Use the information on ANSWER SHEET A and complete the site plan on
scale 1 : 200 according to the following requirements:
2.1.1 The site boundaries are measured from point A
The site boundaries in front and back are 23 m long
The site boundaries on the sides are 25 m long (2)
2.1.2 The front building line is 4 m from the site boundary
The back and side building lines are 2 m from the site boundaries (2)
2.1.3 Show the site entrance, 3 m from the western site boundary (1)
2.1.4 Show the datum level in the north-eastern corner of the site
Complete the sewage lay-out and abbreviations of the sewage
appliances according to the following requirements: (1)
2.1.5 The main sewage from the bathroom to the municipal connection (2)
2.1.6 The branch sewage to the bathroom and kitchen (2)
2.1.7 Manhole on the site, before the municipal connection (2)
2.1.8 Rodding eyes (4)
2.1.9 Inspection eyes (4)
2.2 Length of shank
Diameter
Type of thread
Head size (4 x 1) (4)
2.3 (1) When square shoulder is driven in (2) it resists rotation (2)
2.4 2.4 A – Nut
2.4 B – Thread
2.4 C – Runout
2.4 D – Shank (4)
[30]
Copyright reserved Please turn over
Downloaded from hlayiso.com
4 CIVIL TECHNOLOGY: WOOD WORKING (EC/SEPTEMBER 2018)
QUESTION 3: CASEMENTS, DOORS AND WALL PANELLING (SPECIFIC)
3.1 FIGURE 3.1 illustrates the outside elevation of a window frame.
3.1.1 A – Mullion (1)
B – Frame stile / Jambs (1)
C – Moulding (1)
D – Glazing / Window pane (1)
E – Sill (1)
3.1.2 Helps water to run off / Drip groove prevents wall from getting wet. (2)
3.1.3 76 mm x 150 mm (2 x 1) (2)
3.2 3.2.1 1 200 mm (1)
3.2.2 1 768 mm (1)
3.2.3 1 768 mm (1)
3.2.4 1 768 mm (1)
3.2.5 1 200 mm (1)
3.2.6 900 mm (1)
3.3 3.3.1 Gypsum plaster / Clout nail / Silicone (1)
3.3.2 Steel nails / Silicone (1)
3.3.3 Clout nails / Dry wall screws (1)
3.4 3.4.1 Stile (1)
3.4.2 50 mm (1)
3.4.3 600 mm (1)
3.4.4 3 mm (1)
3.4.5 713 mm (1)
3.4.6 2 032 mm (1)
3.4.7 20 mm (1)
Copyright reserved Please turn over
Downloaded from hlayiso.com
(EC/SEPTEMBER 2018) CIVIL TECHNOLOGY: WOOD WORKING 5
3.5 ANSWER SHEET 3.5 (ANSWER SHEET B)
Three-panel door
ASSESSMENT CRITERIA MARKS LM
Placement of door 1
Top rail 2
Lock rail 2
Top raised fielded panel 3
Bottom raised fielded panel 2
Bottom rail 3
Measurements 2
TOTAL 15 (15)
[40]
Copyright reserved Please turn over
Downloaded from hlayiso.com
6 CIVIL TECHNOLOGY: WOOD WORKING (EC/SEPTEMBER 2018)
QUESTION 4: ROOFS AND CEILINGS (SPECIFIC)
4.1 4.1.1 Couple roof truss (1)
4.1.2 W or Fink roof truss (1)
4.1.3 Howe or South African roof truss (1)
4.1.4 Lean-to-roof truss (1)
4.2 4.2.1 F (1)
4.2.2 K (1)
4.2.3 G (1)
4.2.4 C (1)
4.2.5 J (1)
4.2.6 H (1)
4.2.7 I (1)
4.2.8 A (1)
4.2.9 D (1)
4.2.10 B (1)
4.3 4.3.1 Rafter (1)
4.3.2 Tie beam (1)
4..3.3 Cornice (1)
4.3.4 Plaster (1)
4.3.5 Brick wall (1)
4.3.6 Purlin (1)
4.3.7 Roof sheeting (1)
4.3.8 Wall plate (1)
Copyright reserved Please turn over
Downloaded from hlayiso.com
(EC/SEPTEMBER 2018) CIVIL TECHNOLOGY: WOOD WORKING 7
4.4 ANSWER SHEET FOR KING POST ROOF TRUSS (ANSWER SHEET C)
(15)
4.5 Cover the roof trusses / Finishing off the room / Dust / Temperature (1)
4.6 Any TWO below:
To allow access to the roof space
To attend to the geyser
For electrical wiring
To install cables for television (2 x 1) (2)
[40]
Copyright reserved Please turn over
Downloaded from hlayiso.com
8 CIVIL TECHNOLOGY: WOOD WORKING (EC/SEPTEMBER 2018)
QUESTION 5: CENTERING, FORMWORK, SHORING AND IRONMONGERY
(SPECIFIC)
5.1 5.1.1 Temporary support to stabilise walls (1) while cracks are being
repaired or when new or large openings are being made (1). (2)
5.1.2 Are used to provide temporary support to two parallel walls that are
located between 9 metres and 15 metres apart (1), where one or both
walls shows signs of failure (1). (2)
5.2 5.2.1 To carry the weight by transferring the forces to the keystones. (2)
5.2.2 Choose a suitable scale and draw a horizontal line (birth line) of
span and mark the middle point. (1)
Draw a perpendicular line through the middle of the mid-point (1) of
the span line and mark the desired height (1). (2)
Connect the height mark diagonally with one of the bottom points of
the arc. (1)
Half the diagonal and draw a perpendicular line (spring line) from
were to cut the vertical line. (1)
This point (centre of percussion) is the radius of the segmental arch. (1)
5.2.3 Formal compound and full arch. (2)
5.3 5.3.1 A – Drawer or till lock (1)
B – Cut cupboard lock (1)
5.3.2 Drawer or till lock: Used in a horizontal position (1) and fitted into a
recess for drawers and tills (1). (2)
Cut cupboard: Fitted into a recess on the external surface of the door
(1) and gives a neater appearance (1). (2)
5.4 5.4.1 Vertical clamps (1)
5.4.2 Metal collar / Yoke (1)
5.4.3 Lining material (1)
5.4.4 Laggings (1)
5.4.5 Bolts / Nut (1)
5.5 5.5.1 Any FOUR below:
They are inserted under the bearers and props.
To support the formwork.
Wedges keep the different formwork components sturdy and
fixed.
Wedges facilitate the raising or lowering of the formwork to a
required height.
They are used for the levelling of formwork.
Wedges ease the striking of formwork after the concrete cured. (4)
5.6 Better bonding with concrete / Resist tensile forces better (1)
[30]
Copyright reserved Please turn over
Downloaded from hlayiso.com
(EC/SEPTEMBER 2018) CIVIL TECHNOLOGY: WOOD WORKING 9
QUESTION 6: SUSPENDED FLOOR AND STAIRCASE (SPECIFIC)
6.1 6.1.1 Handrail (1)
6.1.2 Newel post (1)
6.1.3 Riser (1)
6.1.4 Half-landing (1)
6.1.5 Tread (1)
6.1.6 Stringer (1)
6.2 6.2.1 750 mm (1)
6.2.2 150 mm (1)
6.2.3 240 mm (1)
6.3 6.3.1 C (1)
6.3.2 D (1)
6.3.3 A (1)
6.3.4 E (1)
6.3.5 B (1)
6.4 6.4.1 To ensure the circulation of fresh air to ventilate the interior area
below the floor. (2)
6.4.2 The floor joist rests on them. (2)
6.4.3 To prevent ants or termite infestations that could damage and
eventually destroy the timber. (2)
6.5 6.5.1 Floor boards (1)
6.5.2 Bearer (1)
6.5.3 Ant guard (1)
6.5.4 Damp proof coarse (DPC) (1)
6.5.5 Brick pier / Brick wall (1)
6.5.6 Foundation (1)
6.6 (1) Prevent the damp in the debris to spread to (2) the floor parts/members (2)
6.7 220 mm x 170 mm (2)
[30]
TOTAL: 200
Copyright reserved Please turn over
Downloaded from hlayiso.com
10 CIVIL TECHNOLOGY: WOOD WORKING (EC/SEPTEMBER 2018)
CIVIL TECHNOLOGY
ANSWER SHEET A GENERIC
NAME:
2.1 Use the information on ANSWER SHEET A and complete the site plan to
scale 1 : 200.
ERF 121 ERF 123 ERF 125
RE
IE IE RE
KITCHEN BATHROOM
A
MH
A
PARLEMENT STREET
Site boundaries 2
Building lines 2
Site entrance 1
Datum level 1
Main sewerage 2
Branch sewerage 2
Manhole 2
Rodding eyes 4
Inspection eyes 4
TOTAL 20
Copyright reserved Please turn over
Downloaded from hlayiso.com
(EC/SEPTEMBER 2018) CIVIL TECHNOLOGY: WOOD WORKING 11
CIVIL TECHNOLOGY
ANSWER SHEET B WOOD WORKING
NAME:
3.5 Draw on ANSWER SHEET B the completed front elevation of a three-panel
door with raised and fielded panels. (15)
16
16
Scale 1
Top rail 2
Lock rail 2
Panels 3
Bottom rail 2
Stiles 3
Measurements 2
TOTAL 15
X
Copyright reserved Please turn over
Downloaded from hlayiso.com
12 CIVIL TECHNOLOGY: WOOD WORKING (EC/SEPTEMBER 2018)
CIVIL TECHNOLOGY
ANSWER SHEET C WOOD WORKING
NAME:
4.4 Use ANSWER SHEET C and draw to scale1 : 20 the front view of a king
post roof truss. (15)
RAFTER
KING POST
APPLICATION OF SCALE
X
TIE BEAM
NEATNESS
KING POST ROOF TRUSS
SCALE 1 : 20
Rafter 2
King post 1
Tie beam 1
Title 1
Scale in print 1
Neatness 2
Scale 4
Labels 3
TOTAL 15
Copyright reserved Please turn over
Study this subject
Recommended for this subject
_hlayiso.com_--b6d609b6-89a5-4b39-a9b7-0d878af45cd4/v1-9c90f1958077961e2845/card.webp)
Memorandum
Civil Technology Grade 12 Eastern Cape Mock 2018 Memo (Eng)

Memorandum
Civil Technology Grade 12 Eastern Cape Mock 2018 Memo (Afr)

Memorandum
Civil Technology Grade 12 Eastern Cape Mock 2018 Memo (Eng)

Memorandum
Civil Technology Grade 12 Eastern Cape Mock 2018 Memo (Afr)

Memorandum
Civil Technology Grade 12 Eastern Cape Mock 2018 Memo (Eng)

Memorandum
Civil Technology Grade 12 Eastern Cape Mock 2018 Memo (Afr)
More from Grade 12 Civil Technology

Question paper
Civil Technology Grade 12 Eastern Cape Mock 2025 QP (Eng)
%20(English%20and%20Afrikaans)%20June%202025%20Question%20Paper--c8edd459-5237-48e0-8588-69d7ecd7f8e5/v1-be996aaed91bf782e098/card.webp)
Question paper
Civil Technology Grade 12 Gauteng June 2025 QP (Afr)
%20Afr--591d6ffd-20b1-4748-a1ba-b055be0a14c3/v1-4d98a131fd37e013458a/card.webp)
Question paper
Civil Technology Grade 12 NSC June 2025 Question Paper (Afr)
%20Afr--05a95faf-5891-4d88-9e5e-7d13c1d21648/v1-f5ca67113376f7457b83/card.webp)
Question paper
Civil Technology Grade 12 NSC November 2025 QP (Afr)

Question paper
Civil Technology Grade 12 Eastern Cape Prelim 2024 QP (Afr)

Question paper