SENIOR CERTIFICATE EXAMINATIONS/
NATIONAL SENIOR CERTIFICATE EXAMINATIONS
CIVIL TECHNOLOGY: CONSTRUCTION
2023
MARKING GUIDELINES
MARKS: 200
These marking guidelines consist of 20 pages.
Copyright reserved Please turn over
Skip to contentAll 2024 papers 




%20Memo%20Afr_hlayiso.com_--2a9b9e1b-37dc-48dc-9aa7-67dd5fa19a10/v1-8a03885eb99c8043e8b1/card.webp)
View all%20Afr--05a95faf-5891-4d88-9e5e-7d13c1d21648/v1-f5ca67113376f7457b83/card.webp)
%20Afr--eefaae29-fe93-4b75-8223-87bf4f3fc14c/v1-3553acfa446acbaa2a45/card.webp)
%20Afr--307147a5-3280-4a11-a82e-cf3e33388eb0/v1-e53e38093df191bfe243/card.webp)

%20Eng_hlayiso.com_--e6743728-8140-42ae-838d-282654a975a5/v1-dce3e047e0d7ad60a32b/card.webp)
%20Afr_hlayiso.com_--b820ac91-947c-4aed-821f-256aa13aabe1/v1-3be01795eace6f81b174/card.webp)
Civil Technology Grade 12 NSC June 2024 Memo (English)
Grade 12 Civil Technology memorandum from the NSC June Exam 2024 (English), 20 pages. Read online or download the free PDF.
Civil Technology · Grade 12 · NSC June Exam · 2024 · English. Memorandum, 20 pages. Read online or download the PDF.
- Subject
- Civil Technology
- Grade
- Grade 12
- Language
- English
- Document type
- Memorandum
- Year
- 2024
- Exam period
- NSC June Exam
- Curriculum
- CAPS
- Pages
- 20
- File size
- 576.7 KB
Free to read online, no sign-up needed
Loading document…
Loading document…
1 of 20
This exam
Document textSearch extracted text and jump to a page.
Civil Technology: Construction 2 DBE/2023
SC/NSC – Marking Guidelines
INSTRUCTIONS FOR THE MARKERS
1. Markers should:
Familiarise themselves with the question and answer before evaluating
responses from candidates.
Always interpret the responses of the candidates within the context of the
question.
Consider any relevant and acceptable answer during pre-marking but
should strictly adhere to the answers after finalisation of the marking
guideline.
There are TWO approaches to answering questions; these are (1) to
explain and (2) to describe.
1. If a candidate is required to explain a process in a specific number of
steps, only the first required number of responses should be considered.
2. However, if for example a candidate is required to explain or describe a
process, we need to consider that candidates may write a long
description, not necessarily well organised. In this case the marker needs
to evaluate the complete statement to judge if the candidate explained
the required outcome satisfactorily and allocate marks on merit.
Mark what the candidate wrote and do not interpret or predict responses.
Indicate the tick or cross right at the position where the mark needs to be
awarded or where the candidate made the error.
Accept the letter corresponding with the correct answer as well as the
answer written in full in multiple-choice or similar questions.
Accept incorrect spelling in answers unless the spelling changes the
meaning of the answer.
If a learner writes two or more answers separated by a slash (/) mark only
the first response, unless the additional answer/s are different names for the
same item e.g., Yale lock/Night latch. In this case, the answer for the
response should be awarded and the slash (/) should NOT be considered
as an additional answer.
2. For calculations:
A mark is only awarded if the correct unit is written next to the answer. If the
question states that the answer must be in a specific unit, a mark will ONLY
be awarded if the answer has the correct unit as indicated in the question.
Marks will only be allocated for the correct values if the candidates add are
instead of multiply. NO marks will be awarded for the calculations and the
answer.
Copyright reserved Please turn over
Civil Technology: Construction 3 DBE/2023
SC/NSC – Marking Guidelines
Where an incorrect answer is correctly carried over, the marker must
recalculate the values, using the incorrect answer from the first calculation.
If correctly used, the candidate should receive the full marks for subsequent
calculations.
Alternative methods of calculations must be considered, provided that the
correct answer is obtained.
For the calculation of quantities marks will be awarded for the correct use of
the dimension paper.
3. When marking drawings:
The member for which the mark should be awarded must be drawn
correctly in the correct position to receive a mark.
A member incorrectly drawn but wrongfully repeated in another position will
be awarded the mark for the repeated incorrect member provided that the
marking guideline provide for TWO or more marks for that member (positive
marking).
Marks can only be awarded for a label if the label is correctly indicating the
correct member that was drawn. Do not consider labels for members that
were provided with labels on the answer sheet.
Scale drawings should always be marked using an appropriate mask.
If the incorrect/wrong drawing was drawn, the candidate can be awarded for
only what was provided for on the marking guideline.
If a two-dimensional drawing is required and a line
diagram/pictorial/isometric drawing is drawn, members will be marked
according to the assessment criteria and no marks will be awarded for the
correctness of the drawing.
If candidates draw/give more information than what is required, mark strictly
according to the assessment criteria.
The marks for the correctness of the drawing will only be awarded if the
entire drawing with all members/parts is correctly drawn.
4. Incorrect numbering of questions:
If a candidate numbered an answer incorrectly, but the answer is in the
correct position according to the sequence of the questions in the question
paper, circle the incorrect numbering and mark the response.
If questions were answered randomly not following the same sequence as
in the question paper and the learner numbered incorrectly, the response
should NOT be marked.
5. Duplication of responses and questions answered in the incorrect place:
If a question is answered twice, mark the first response.
If a question should be answered on an answer sheet and the candidate
answered it on both the answer sheet and in the answer book, mark the
response on the answer sheet and cancel the response in the answer book.
If the question was answered in the answer book instead of on the answer
sheet, mark the response in the answer book according to the assessment
criteria on the marking guideline.
Copyright reserved Please turn over
Civil Technology: Construction 4 DBE/2023
SC/NSC – Marking Guidelines
QUESTION 1: OHSA, MATERIALS, TOOLS, EQUIPMENT AND JOINING
(GENERIC)
1.1 1.1.1 Safety features omitted from the scaffold are:
Baseplate
Soleplate
Kickboard/Toe-board
Guardrails
ANY THREE OF THE ABOVE (3)
1.1.2 Platform used as displayed:
Vertical standards will sink into the ground
Can cause the scaffold/platform to tilt over
Can cause injuries to workers
Tools may fall from the scaffold on the workers below
Workers can fall from the scaffold
ANY TWO OF THE ABOVE (2)
1.2 1.2.1 Rust (1)
1.2.2 Zinc (1)
1.2.3 Keeping it moist (1)
1.2.4 Metal (1)
1.2.5 Plastic (1)
1.3 Height of guardrails (900 – 1 000 mm):
To keep workers safe on the platform
To prevent workers from falling over the guard rails
ANY ONE OF THE ABOVE (1)
1.4 Precautions when storing a ladder:
Store a ladder in a dry place after use
Never store material and equipment on a ladder
Hang the ladder vertically/horizontally on wall brackets
The ladder should be stored within easy reach
ANY ONE OF THE ABOVE (1)
Copyright reserved Please turn over
Civil Technology: Construction 5 DBE/2023
SC/NSC – Marking Guidelines
1.5 The operator must check if:
The builders hoist is not overloaded
The gates are shut when the device is being used
Overhead protection is provided
Material is stacked firmly and correctly
Emergency brakes are installed/operational
Safety measures are displayed inside the cage
ANY ONE OF THE ABOVE (1)
1.6 Any person/Fire fighters will be able to identify exactly what specific type of
fire extinguisher to use in case of a fire. (1)
1.7 A – Hexagonal nut
B – Square nut/Four sided nut
C – Wing nut/Butterfly nut
D – Domed top/Domed nut/Dome nut/Acorn nut/Cap nut (4)
1.8 1.8.1 Tool that can be used:
Laser level
Spirit level with straight edge
Transparent pipe level
Dumpy level
ANY ONE OF THE ABOVE (1)
1.8.2 Tool that can be used:
Dumpy level
Laser level
ANY ONE OF THE ABOVE (1)
[20]
Copyright reserved Please turn over
Civil Technology: Construction 6 DBE/2023
SC/NSC – Marking Guidelines
QUESTION 2: GRAPHICS AS MEANS OF COMMUNICATION (GENERIC)
ANSWER SHEET 2.
NO. QUESTIONS ANSWERS MARK
First floor: A/FIGURE A
Garage in FIGURE B
No arrows indicated in the staircase
in FIGURE A
Name the FIGURE that represents
No ramp in FIGURE A
1 the first floor. Give ONE reason for 2
your answer. Balcony in FIGURE A
Staircase
ANY ONE OF THE ABOVE ANSWER
AND REASON OR ANY OTHER
ACCEPTABLE ANSWER
2 Deduce from the building plan the 10 1
number of windows in the building.
3 Identify number 1. Balcony 1
4 Identify number 2. Shower 1
5 Identify number 6. One way switch – double pole 1
6 Identify number 8. Ramp 1
7 Identify number 9. Wall mounted light 1
8 Identify number 10. Wash tub 1
Identify the number that indicates the
9 7 1
garage door.
Deduce from the building plan the
10 110 mm/110 1
omitted dimension of number 11.
Deduce from the building plan the
11 material that must be used for Concrete 1
number 5.
Copyright reserved Please turn over
Civil Technology: Construction 7 DBE/2023
SC/NSC – Marking Guidelines
Give the abbreviations for the
following: Number 3: WC
12 2
Number 3 Number 4: WB/WHB
Number 4
Two-way switch:
Describe the purpose of a two-way Used to switch the same light on or
13 2
switch. off
From TWO different positions
Tiles/Novilon/Concrete/Vinyl/
Recommend an appropriate floor Painted floors/Laminated timber
14 1
covering for the kitchen. flooring/Timber floors
ANY ONE OF THE ABOVE
Who was responsible for the
15 P Kriel 1
checking of the drawing?
No switch/electrical
Deduce ONE fault in the bathroom in connection/wiring/light/door/door
16 1
FIGURE A. opening/bath/bidet
ANY ONE OF THE ABOVE
Rechargeable bulb/Candle/Paraffin
Name an alternative light source that
lamp/Gas lamp/Battery powered
17 can be used during load shedding for 1
lights/Torch/Solar/Cell phone
a dwelling.
ANY ONE OF THE ABOVE
State what was done during revision
Revision 1: Drawing of Staircase
18 1 and revision 2 of the house plan. 2
Revision 2: Drawing of light fittings
Name the finish for the ramp as
19 Paving 1
prescribed by the architect.
Draw the symbol for a damp-proof
20 2
membrane.
21 Draw the symbol for finished wood. 2
22 Draw the symbol for hardcore filling. 2
Copyright reserved Please turn over
Civil Technology: Construction 8 DBE/2023
SC/NSC – Marking Guidelines
Total horizontal dimensions
Control test top Control test bottom
220 220
4 110 4 820
3 510 3 020
220
= 8 060 = 8 060
Prove, by means of a control test, OR
that the total horizontal dimensions Top:
23 8
on the top and bottom of the plan in
220 + 4 110 + 3 510 + 220 mm
FIGURE A are the same.
= 8 060 mm
Bottom:
220 + 4 820 + 3 020
= 8 060 mm
Note: If the alternative method is
used, one mark should be
allocated if both totals are
the same.
Calculate the area of the floor plan in = 8,06 m x 6,05 m
FIGURE B. Show ALL the = 48,76 m²
24 calculations. Give your answer in m². 3
Round your answers to TWO decimal OR
places. = 8 060 mm x 6 050 mm
= 48,76 m²
TOTAL: 40
Copyright reserved Please turn over
Civil Technology: Construction 9 DBE/2023
SC/NSC – Marking Guidelines
QUESTION 3: ROOFS, STAIRCASES AND JOINING (SPECIFIC)
3.1
RISE/
RISER 2 1
TREAD
3
OR
RISE/RISER
TREAD
3
NOTE: ISOMETRIC/OBLIQUE DRAWINGS ALSO ACCEPTABLE
NO. ASSESSMENT CRITERIA MARK
1 Tread 1
2 Rise/Riser 1
3 Labels 2
TOTAL: 4 (4)
3.2 Collar-tie roof truss
Couple roof truss (2)
Copyright reserved Please turn over
Civil Technology: Construction 10 DBE/2023
SC/NSC – Marking Guidelines
3.3
RAFTER 4
CLOUT NAILS
3
3
TIE BEAM
2
2
WALL PLATE
2
HOOP-IRON STRAP
WALL
2
CORRECTNESS OF JOINING 1
NO. ASSESSMENT CRITERIA MARK
1 Correctness of joining 1
2 Hoop-iron strap 4
3 Clout nails 2
4 Any ONE label 1
TOTAL: 8 (8)
Copyright reserved Please turn over
Civil Technology: Construction 11 DBE/2023
SC/NSC – Marking Guidelines
3.4
2 2
3
2 RAFTER
3 2
KING POST
CORRECTNESS OF RIDGE OF ROOF TRUSS 1
APPLICATION OF SCALE 4
DRAWING NOT TO SCALE:
USE A MASK TO MARK THIS
NO. ASSESSMENT CRITERIA MARK
DRAWING
1 Correctness of ridge 1
2 Rafters 4
3 King post 2
4 Application of scale 1
TOTAL: 8
3
RIDGE BEAM
2 2 RAFTER
2 2
3
CORRECTNESS OF RIDGE OF ROOF TRUSS 1
APPLICATION OF SCALE 4
DRAWING NOT TO SCALE:
USE A MASK TO MARK THIS
NO. ASSESSMENT CRITERIA MARK DRAWING
1 Correctness of ridge 1
2 Rafters 4
3 Ridge beam 2
4 Application of scale 1
TOTAL: 8 (16)
[30]
Copyright reserved Please turn over
Civil Technology: Construction 12 DBE/2023
SC/NSC – Marking Guidelines
QUESTION 4: EXCAVATIONS, FORMWORK, TOOLS, EQUIPMENT AND
MATERIALS (SPECIFIC)
4.1 4.1.1 K (1)
4.1.2 C (1)
4.1.3 I (1)
4.1.4 G (1)
4.1.5 F (1)
4.1.6 A (1)
4.1.7 D (1)
4.1.8 B (1)
4.2.1 Properties of galvanised sheet metal:
Protects metal against corrosion
Shiny bluish-white in colour
Metal dipped in molten zinc
Low in corrosion but is prone to corrode when galvanised layer
is damaged
Acids found in pot-clay soil may also reduce galvanised
protection
ANY ONE OF THE ABOVE (1)
4.2.2 Properties of low carbon steel:
Fine smooth appearance
Can be bent
Ideally suited for forging
Can be rolled out or flattened
Fairly tough and strong
Easy to weld
Prone to rust if not treated
ANY ONE OF THE ABOVE (1)
Copyright reserved Please turn over
Civil Technology: Construction 13 DBE/2023
SC/NSC – Marking Guidelines
4.2.3 Properties of high carbon steel:
Reduced welding ability
Ductile
Impact toughness
Increased strength and hardness
Grey in colour
Malleable
Corrodes easy
Good conductor of heat and electricity
Durable
ANY ONE OF THE ABOVE (1)
4.3 Methods of fixing cladding to a wall:
Adhesive fixing
Face fixing
Proprietary fixing (3)
4.4 4.4.1 Slump test (1)
4.4.2 True slump (1)
4.4.3 True slump profile:
Correct amount of water was used
Correct mixing proportions was used (1)
4.5 Services that need to be located:
Electrical cables
Water pipes
Gas lines
Communication lines
Storm water systems
Sewer lines
ANY THREE OF THE ABOVE (3)
4.6 Heavy rains during excavations can cause:
Excavation can collapse/Mudslides can occur
Excavation can fill up with water
Conditions inside the trench can become slippery
Delays may occur
ANY TWO OF THE ABOVE (2)
4.7 Workers may not work alone in an excavation because:
It is a safety risk
No one will be able to help the worker in case of an emergency
No one will be aware that the worker is in danger
ANY ONE OF THE ABOVE (1)
4.8 4.8.1 Plate compacter (1)
Copyright reserved Please turn over
Civil Technology: Construction 14 DBE/2023
SC/NSC – Marking Guidelines
4.8.2 Operating machine safely:
Operate with care
Wear appropriate personal protective equipment (PPE)
Do not place hands or feet near moving parts
Use both hands to operate this machine
Do not make any adjustments while the machine is in motion
Ensure a firm and well-balanced stance
ANY TWO OF THE ABOVE (2)
Copyright reserved Please turn over
Civil Technology: Construction 15 DBE/2023
SC/NSC – Marking Guidelines
4.9
5 CLEAT
BEAM/JOIST
3 3
FIXING PLATES
2
SHUTTER
4
BOARD SIDES
WEDGE 4
2
8 8
BRACES/STRUTS
6
7 7
BEARER/HEAD TREE
SOFFIT/SHUTTER BOARD
BRACES/STRUTS
PROPS/STRUTS
CORRECTNESS OF FORMWORK 1 1
NO. ASSESSMENT CRITERIA MARK
1 Correctness of formwork 2
2 Cleats 2
3 Beam/Joist (under floor) 2
4 Braces/Struts 2
5 Shutter board side (right) 1
6 Soffit board 1
7 Fixing plates 2
8 Wedges 2
TOTAL: 14
(14)
[40]
Copyright reserved Please turn over
Civil Technology: Construction 16 DBE/2023
SC/NSC – Marking Guidelines
QUESTION 5: PLASTER AND SCREED, BRICKWORK AND GRAPHICS AS
MEANS OF COMMUNICATION (SPECIFIC)
5.1 Ratio:
1 :3 /1:6/1:5
1 Bag cement:3 Wheelbarrows sand/
1 Bag cement:2½ Wheelbarrows sand
ANY ONE OF THE ABOVE (2)
5.2 Preparation of floors to receive screed:
Chip the surface
Remove all debris and dust
Test the absorption ability of the concrete (3)
5.3 A monolithic screed is a screed that is laid over fresh concrete. (1)
5.4 Plastering the stop-end of a wall, in chronological order:
Clamped straight edges to stop-end of the wall
Apply the plaster and allow to dry
Cut the access plaster to the level of the straight edges
Finish off the sharp edges after removing the straight-edges (4)
5.5 Advantages of a gauge arch:
Looks neat and aesthetic
Do not need plastering (2)
5.6
4
FORMWORK BOARD
2
3
LAGGINGS
CORRECTNESS OF TURNING PIECE 1
NO. ASSESSMENT CRITERIA MARK
1 Correctness of turning piece 1
2 Formwork board 1
3 Laggings 1
4 Space between laggings (open laggings) 1
TOTAL: 4 (4)
Copyright reserved Please turn over
Civil Technology: Construction 17 DBE/2023
SC/NSC – Marking Guidelines
5.7
3
3
3
3
3
3
CORRECTNESS OF SECOND COURSE: 1
2
2
2
2
2
2
CORRECTNESS OF FIRST COURSE: 1
NO. ASSESSMENT CRITERIA MARK
1 Correctness of courses 2
2 First course 6
3 Second course 6
TOTAL: 14 (14)
[30]
Copyright reserved Please turn over
Civil Technology: Construction 18 DBE/2023
SC/NSC – Marking Guidelines
QUESTION 6: REINFORCEMENT IN CONCRETE, FOUNDATIONS, CONCRETE
FLOORS AND QUANTITIES (SPECIFIC)
6.1 6.1.1 B (1)
6.1.2 D (1)
6.1.3 A (1)
6.1.4 C (1)
6.1.5 B (1)
6.2
2
3
4
5
CORRECTNESS OF ENLARGED BASE HAMMERED IN 1
NO. ASSESSMENT CRITERIA MARK
1 Correctness of enlarged concrete base 1
2 Drop hammer 1
3 Steel casing 1
4 Shape of enlarged base 1
5 Symbol for concrete in the base 1
TOTAL: 5 (5)
6.3 Components of a rib-and-block floor:
Hollow core blocks
Precast ribs/Pre-stressed ribs
Steel mat/Steel mesh/Wire/Reinforcing mesh/Reinforcing steel
Spacers
In-situ cast concrete/Concrete
ANY FOUR OF THE ABOVE (4)
6.4 The rib-and-block floor can collapse under the weight of the wet concrete. (1)
Copyright reserved Please turn over
Civil Technology: Construction 19 DBE/2023
SC/NSC – Marking Guidelines
6.5 6.5.1 Number of bars in the group (1)
6.5.2 Diameter of the bar (1)
6.5.3 Center-to-center spacing/Heart spacing (1)
6.6
3
4
2
STIRRUPS 6
4
5
MINIMUM CONCRETE COVER 6
4
2
3
MAIN BAR
CORRECTNESS OF L-SHAPED COLUMN 1 1
NO. ASSESSMENT CRITERIA MARK
1 Correctness of L-shaped column 2
2 Completed column 2
3 8 main bars
Correct number of bars 1
Correct placement of bars 1
4 Stirrups 3
5 Minimum concrete cover (indicated) 1
6 Any TWO labels 2
TOTAL: 12 (12)
Copyright reserved Please turn over
Civil Technology: Construction 20 DBE/2023
SC/NSC – Marking Guidelines
6.7 A B C D
Correct use of dimension paper (1)
Internal dimensions long walls:
7 000 – 2/220 = 6 560 mm
Internal dimensions of the short walls:
6 000 – 2/220 = 5 560 mm
(4)
Volume of blinding layer:
1/ 6,56
5,56
0,04 1,46 m³
(5)
[40]
TOTAL: 200
Copyright reserved
Study this subject
Recommended for this subject

Question paper
Civil Technology Grade 12 Eastern Cape Prelim 2024 QP (Eng)

Memorandum
Civil Technology Grade 12 Eastern Cape Mock 2022 Memo (Eng)

Memorandum
Civil Technology Grade 12 Eastern Cape Mock 2022 Memo (Eng)

Memorandum
Civil Technology Grade 12 Eastern Cape Mock 2021 Memo (Eng)

Memorandum
Civil Technology Grade 12 Eastern Cape Mock 2017 Memo (Eng)
%20Memo%20Afr_hlayiso.com_--2a9b9e1b-37dc-48dc-9aa7-67dd5fa19a10/v1-8a03885eb99c8043e8b1/card.webp)
Memorandum
Civil Technology Grade 12 NSC June 2019 Memo (Afrikaans)
More from Grade 12 Civil Technology
%20Afr--05a95faf-5891-4d88-9e5e-7d13c1d21648/v1-f5ca67113376f7457b83/card.webp)
Question paper
Civil Technology Grade 12 NSC November 2025 QP (Afr)
%20Afr--eefaae29-fe93-4b75-8223-87bf4f3fc14c/v1-3553acfa446acbaa2a45/card.webp)
Question paper
Civil Technology Grade 12 November 2024 NSC QP (Afr)
%20Afr--307147a5-3280-4a11-a82e-cf3e33388eb0/v1-e53e38093df191bfe243/card.webp)
Question paper
Civil Technology Grade 12 November 2024 NSC QP (Afr)

Question paper
Civil Technology Grade 12 Eastern Cape Mock 2023 QP (Eng)
%20Eng_hlayiso.com_--e6743728-8140-42ae-838d-282654a975a5/v1-dce3e047e0d7ad60a32b/card.webp)
Question paper
Civil Technology Grade 12 NSC November 2023 QP (Eng)
%20Afr_hlayiso.com_--b820ac91-947c-4aed-821f-256aa13aabe1/v1-3be01795eace6f81b174/card.webp)
Question paper