Confidential
basic education
Department:
Basic Education
REPUBLIC OF SOUTH AFRICA
NATIONAL
SENIOR CERTIFICATE
GRADE 12
CIVIL TECHNOLOGY: CONSTRUCTION
NOVEMBER 2025
MARKS: 200
TIME: 3 hours
This question paper consists of 16 pages and 7 answer sheets.
Copyright reserved Please turn over
Skip to contentAll 2025 papers %20MG%20Eng--0e265899-dc44-4809-aabf-8f374f1af392/v1-73a07814cfc9334618a1/card.webp)
%20Eng_hlayiso.com_--e6743728-8140-42ae-838d-282654a975a5/v1-dce3e047e0d7ad60a32b/card.webp)
%20Afr_hlayiso.com_--b820ac91-947c-4aed-821f-256aa13aabe1/v1-3be01795eace6f81b174/card.webp)
%20Afr_hlayiso.com_--f6f7ac38-fb55-4d61-bc66-5441e4cbcee0/v1-b3313a875de5f3475dc0/card.webp)
%20Eng_hlayiso.com_--fdfc3cf4-1a3a-4817-a3e9-a2c7f9fe5c2e/v1-c9563485d35727af6c76/card.webp)
%20Eng_hlayiso.com_--fd47df8e-afbf-4ba2-8858-18deaf33c455/v1-d7b3c4a38228f498c17f/card.webp)
View all%20(Afrikaans)%20June%202025%20Possible%20Answers--c0a65d19-28ca-4ac3-8c61-d4627d2a3133/v1-5f42c573694769cf80ce/card.webp)




%20Afr--307147a5-3280-4a11-a82e-cf3e33388eb0/v1-e53e38093df191bfe243/card.webp)
Civil Technology Grade 12 NSC November 2025 QP (Eng)
Grade 12 Civil Technology question paper from the NSC November Exam 2025 (English), 24 pages. Read online or download the free PDF.
Civil Technology · Grade 12 · NSC November Exam · 2025. Question paper, 24 pages. Read online or download the PDF.
- Subject
- Civil Technology
- Grade
- Grade 12
- Document type
- Question paper
- Year
- 2025
- Exam period
- NSC November Exam
- Curriculum
- CAPS
- Pages
- 24
- File size
- 944.9 KB
Free to read online, no sign-up needed
Loading document…
Loading document…
1 of 24
This exam
Document textSearch extracted text and jump to a page.
Civil Technology: Construction 2 DBE/November 2025
NSC Confidential
REQUIREMENTS:
1. Drawing instruments
2. A non-programmable calculator
3. ANSWER BOOK
INSTRUCTIONS AND INFORMATION
1.
a fF Ye N
eo 2 N ®
11.
12.
13.
14.
15.
16.
17.
18.
This question paper consists of SIX questions.
Answer ALL the questions.
Read ALL the questions carefully.
Answer each question as a whole. Do NOT separate subsections of questions.
Number the answers correctly according to the numbering system used in this
question paper.
Start the answer to EACH question on a NEW page.
Do NOT write in the margins of the ANSWER BOOK.
You may use sketches to illustrate your answers.
Write ALL calculations and answers in the ANSWER BOOK or on the attached
ANSWER SHEETS.
Use the mark allocation as a guide to the length of your answers.
Make drawings and sketches in pencil, fully dimensioned and neatly finished
off with descriptive titles and notes to conform to the SANS/SABS Code of
Practice for Building Drawings.
For the purpose of this question paper, the size of a brick should be taken as
220 mm x 110 mm x 75 mm.
Use your own discretion where dimensions and/or details have been omitted.
Answer QUESTIONS 2, 3.6, 4.10, 5.4, 5.5, 6.6 and 6.7 on the attached
ANSWER SHEETS using drawing instruments, where necessary.
Write your CENTRE NUMBER and EXAMINATION NUMBER on every
ANSWER SHEET and hand them in with your ANSWER BOOK, whether you
have used them or not.
Drawings in the question paper are NOT to scale due to electronic transfer.
Google Images was used as the source of all photographs and pictures.
Write neatly and legibly.
Copyright reserved Please turn over
Civil Technology: Construction 3 DBE/November 2025
QUESTION 1:
NSC Confidential
OHSA, MATERIALS, TOOLS, EQUIPMENT AND JOINING
(GENERIC).
Start this question on a NEW page.
1.1 Choose the correct word(s) from those given in brackets. Write only the word(s)
next to the question numbers (1.1.1 to 1.1.10) in the ANSWER BOOK,
e.g. 1.1.11 Plaster.
4.1.1 Every plank of a wooden scaffold platform must be at least
(28 mm/38 mm) thick.
1.4.2 Toe boards should be at least (150 mm/200 mm) high from the level
of the scaffold platform.
1.1.3 Steel scaffold standards with heavy platform loadings must not
exceed (320 kg per m?/160 kg per m’).
1.1.4 The framework of scaffolding must be constructed to have a safety
factor of at least (two/three).
1.1.5 Trestle scaffolds must not consist of more than (two/four) tiers.
1.1.6 When using a builder's hoist (overhead/hand) protection must be
provided to protect workers from falling objects.
1.1.7 Ladders must not be extended above (two thirds/three quarters) of
the extension length.
1.1.8 A construction site must be cordoned off to prevent (unauthorised
persons/building inspectors) from entering the site.
1.1.9 Stairways that will not be a permanent part of the building must have
landings of at least (760 x 560 mm/450 x 320 mm) for every 3,7 m
vertical rise.
1.1.10 The seller shall supply the user of any hazardous chemical
substance with sufficient information to enable the user to take
necessary measures regarding (safe stocktaking/health and safety).
1.2 Which pictorial view below represents a bolt that will resist rotation?
a Em (Sm | jo
A B c
Copyright reserved
Please turn over
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
Civil Technology: Construction 4 DBE/November 2025
NSC Confidential
1.3 Bolts are purchased according to different specifications. Name any TWO of
these specifications. (2)
1.4 Powder coating is a coating that is applied to metals.
1.4.1 Explain the process of powder coating by referring to the material
that is used and the method of application. (2)
1.4.2 Name ONE advantage of powder coating in terms of applying it to a
metal. (1)
1.5 What should NOT be used to clean a multidetector? (1)
1.6 Name TWO materials that can be detected in a brick wall using the
multidetector. (2)
1.7 What accessory of the dumpy level will be used to position a telescope on a
centre point when horizontal measurements are taken? (1)
[20]
QUESTION 2: GRAPHICS AS MEANS OF COMMUNICATION (GENERIC)
Start this question on a NEW page.
FIGURE A and FIGURE B on the next page show drawings that appear on a building
plan. Analyse the drawings and complete the table on ANSWER SHEET 2.
Copyright reserved Please turn over
Civil Technology: Construction 5 DBE/November 2025
NSC Confidential
NOTES:
Contractors must verify all
dimensions and levels on site
before commencing work.
Architects to be notified
of any discrepancies immediately.
!
LULU
Guard rails on patio to be made of
stainless steel.
Aluminium sliding door
G)
®
—s @) (2 400 x 2 000 mm)
(8) |__| a Aluminium side panel with
++ LI L 8 windows (600 x 2 000 mm)
@) Li Roof: Hipped roof
© Lintels must be installed above
every window.
Architect's signature ................
FIGURE A Client's signature ...........6.0.026
DRAWING OF
DATE:
REVISION 1 a ELECTRICAL
24/05/2025 FITTINGS
PRINTED BY: DATE OF PRINT:
_ 4000 8 000 . 5 000 _1 500 BUZZ PRINTERS 26/05/2025
g 220), 110, owt wi 110) 2201) DRAWING TITLE:
Ny 5 a ———————— ELEVATION AND FLOOR PLAN
| I ) SERVING STATION —° | PROJECT:
o fT SE x PROPOSED BUILDING OF MR JD JONES
= 7 b] “ ON PLOT 54, PROTEA STREET, CALEDON
Ss E
1 SCULLERY COUNTER a
| “. REST ROOM PROJECT NO: | ORAWINGNO:
. \ 6-464 334P2
\ GENTS
+ 2x40W \ DATE: DRAWN: | CHECKED:
° A a | | || REST ROOM 20/04/2025 NCAR C BENN
ot \ (RESTAURANT | | LADIES
i=} a \ 9 ELEVATION SCALE 1: 100
3 $l pantry NN )
~~ FLOOR PLAN SCALE 1: 100
_s om! J 2 REFERENCE CODE
3 S W2 W2 PATIO oie 202
N
i
————
WINDOW SCHEDULE
NS o 2
° ely cE
FIGURE B ai ba ‘ 300
1800
wi We [40]
Copyright reserved Please turn over
Civil Technology: Construction 6 DBE/November 2025
NSC Confidential
QUESTION 3: ROOFS, STAIRCASES AND JOINING (SPECIFIC)
Start this question on a NEW page.
3.1
3.2
3.3
3.4
3.5
State the maximum spacing between roof trusses for EACH of the following
types of roof covering:
3.1.1 Fibre-cement tiles
3.1.2 Corrugated iron sheets
By means of two-dimensional drawings, differentiate between the two end
shapes and sizes of the purlins used for corrugated iron roof sheeting. Indicate
the dimensions on the drawings.
Complete the following sentences by filling in the missing word(s). Write only
the word(s) next to the question numbers (3.3.1 to 3.3.4) in the ANSWER
BOOK.
3.3.1 When designing staircases, the minimum allowed pitch must be 25°
and the maximum allowed pitch must be ...°.
3.3.2 The formwork on the underside of a concrete staircase may be
removed after ... days.
3.3.3 The minimum recommended striking time of the formwork for the
sides of stairs should be ... days.
3.3.4 The recommended dimension for a riser in a public building is
mm,
Name the fastener that you will use to anchor a wall plate to a concrete wall
when using galvanised straps.
FIGURE 3.5 below shows a partial roof construction.
a
500 DO >}
FIGURE 3.5
3.5.1 Identify parts A to D.
3.5.2 Predict the consequence if part A is NOT installed.
Copyright reserved Please turn over
(1)
(1)
(6)
(1)
(1)
(1)
(1)
(1)
(4)
(1)
Civil Technology: Construction 7 DBE/November 2025
NSC Confidential
3.6 Use ANSWER SHEET 3.6 and draw to scale 1: 20 just more than a half of
a close-coupled roof truss.
The wall is indicated on the ANSWER SHEET.
Use the following specifications:
e The pitch of the roof is 30°.
e The overhang is 250 mm.
e The span of the roof is 4 000 mm. (12)
[30]
Copyright reserved Please turn over
Civil Technology: Construction 8 DBE/November 2025
NSC Confidential
QUESTION 4: EXCAVATIONS, FORMWORK, TOOLS, EQUIPMENT AND
MATERIALS (SPECIFIC)
Start this question on a NEW page.
41 Give ONE word/term for each of the following descriptions by choosing a
word(s)/term(s) from the fist below. Write only the word/term next to the
question numbers (4.1.1. to 4.1.5) in the ANSWER BOOK, e.g. 4.1.6 Holes.
steel; galvanised sheet metal; lead; medium carbon steel; copper;
ductile cast iron; tin; brass; grey cast iron
4.1.1 A heavy and very soft metal
4.1.2 The elasticity of this material makes it ideal for casting
4.1.3 A material with a reduced welding ability
4.1.4 A material with a yellowish colour
4.1.5 A metal dipped in molten zinc
Copyright reserved Please turn over
(1)
(1)
(1)
(1)
(1)
Civil Technology: Construction 9 DBE/November 2025
4.2
4.3
44
4.5
4.6
NSC Confidential
Choose a description from COLUMN B that matches the item in COLUMN A.
Write only the letter (A-I) next to the question numbers (4.2.1 to 4.2.6) in the
ANSWER BOOK, e.g. 4.2.7 K.
COLUMN A COLUMN B
4.2.1 Fibreglass A __ stronger than solid timber and can be
easily cut to shape on site
4.2.2 Steel shuttering
B horizontal member carrying the load
4.2.3 Plywood of the casted concrete
4.2.4 Laminated board C _ is very light and easy to move where
concrete has set
4.2.5 Wedge
D used to secure the brace to the prop
4.2.6 Bearer/Head tree
E used to secure cleats into place
F _ will last longer than any other
material used for the same purpose
G has less carrying capacity and warps
when filled with concrete
H vertical member supporting the entire
formwork
l excellent release properties and
waterproofing due to the glue used
during manufacturing
(6 x 1)
You are contracted to excavate the foundation of a new storeroom next to the
principal's office. What specifications, that are prescribed in the working
drawings, wil! you have to consider before excavating any soil?
Smali foundations for houses are normally excavated by hand. State the other
method that can be used for excavations for multistorey buildings.
Name the type of shuttering in which poling boards are spaced further apart.
Name TWO methods that can be used to level a site that is on a mountainous
slope.
Copyright reserved Please turn over
(6)
(2)
(1)
(1)
(2)
Civil Technology: Construction 10 DBE/November 2025
NSC Confidential
47 FIGURE 4.7 below shows a picture of a structure filled with soil.
FIGURE 4.7
471 Name ONE machine that can be used to compact the soil. (1)
4.7.2 After compacting the soil in the picture above, you should ensure
that the machine is taken care of. Name TWO ways how you will do
this before storing the machine. (2)
4.7.3 Name the personal protective equipment you would use to protect
your ears when using the machine named in QUESTION 4.7.1 and
explain the possible consequences of ignoring such a safety
measure. (2)
48 FIGURE 4.8 shows the apparatus used on a construction site to conduct
a slump test.
FIGURE 4.8
4.8.1 Give TWO reasons why you would conduct the slump test on fresh
concrete before pouring it. (2)
4.8.2 By means of labelled sketches, show ANY TWO possible outcomes
of the test. (6)
Copyright reserved Please turn over
Civil Technology: Construction 11 DBE/November 2025
NSC Confidential
4.9 Sketch a line diagram in the ANSWER BOOK that shows the difference
between a wedge and folding wedges.
Print the correct title below EACH drawing. (4)
4.10 ANSWER SHEET 4.10 shows an incomplete drawing of the formwork for a
concrete beam.
Draw the supporting members of the formwork from the head tree down to the
sole plate. (6)
[40]
Copyright reserved Please turn over
Civil Technology: Construction 12 DBE/November 2025
NSC Confidential
QUESTION 5: PLASTER AND SCREED, BRICKWORK AND GRAPHICS AS
MEANS OF COMMUNICATION (SPECIFIC)
Start this question on a NEW page.
5.1 FIGURE 5.1 below shows a person finishing off a wall on the inside of a new
building.
ea
FIGURE 5.1
5.1.1 Name the process that the worker is busy with.
5.1.2 Identify the TWO tools that the worker is using.
5.1.3 Name ONE admixture that you will use to reduce cracking during the
process above.
5.2 The floor in the classroom is cracked. After repairing the floor, a screed must
be applied to create a smooth finish.
5.2.1 Name TWO types of screeds that can be used.
5.2.2 Explain how the absorptiveness (ability to absorb moisture) of the
concrete to receive screed can be tested.
5.3 In the ANSWER BOOK, sketch the difference between a brick used for a
gauged arch and a brick used for a rough arch, as seen from the front view.
5.4 ANSWER SHEET 5.4 shows a horizontal sectional view of part of a one-brick
wall built with face brick that is plastered on the outside.
Complete the horizontal sectional view to illustrate how a steel door frame is
attached to the wall. Show the hatching on the wall and the symbol for plaster.
Copyright reserved Please turn over
(1)
(2)
(1)
(2)
(3)
(5)
(7)
Civil Technology: Construction 13 DBE/November 2025
NSC Confidential
5.5 ANSWER SHEET 5.5 shows the incomplete drawing of a part of a vertical
sectional view of a closed eave. Complete the drawing by adding the omitted
members of the closed eave.
Use the following specifications:
e Corrugated iron roof covering
e Fibre-cement ceiling board is used to cover the eave. (9)
[30]
Copyright reserved Please turn over
Civil Technology: Construction 14 DBE/November 2025
QUESTION 6:
NSC Confidential
REINFORCEMENT IN CONCRETE, FOUNDATIONS, CONCRETE
FLOORS AND QUANTITIES (SPECIFIC)
Start this question on a NEW page.
6.1 Various options are given as possible answers to the following questions.
Choose the answer and write only the letter (A-D) next to the question numbers
(6.1.1 to 6.1.5) in the ANSWER BOOK, e.g. 6.1.6 C.
6.1.1
6.1.2
6.1.3
Copyright reserved
The main purpose of reinforcement in concrete structures is to ...
A __ increase the weight of the structure.
B provide resistance against tensile forces.
C __ reduce the curing time.
D OnlyAandC
A force that acts on the top section of a loaded concrete beam:
A __ Tensile force
B Shear force
C Compressive force
D_ All the above-mentioned
In reinforced concrete beams, stirrups are mainly used to resist ...
A bending moments.
B _ shear forces.
C _ tensile forces.
D expansion forces.
Which type of steel is commonly used for reinforcement in concrete
structures?
A _ Mild steel
B Stainless steel
C High-tensile steel
D- OnlyAandC
Shear bars in a beam is also referred to as ... bars.
A secondary
B bent
C cranked
D_ All the above-mentioned
Please turn over
(1)
(1)
(1)
(1)
(1)
Civil Technology: Construction 16 DBE/November 2025
6.2
6.3
6.4
6.5
6.6
NSC Confidential
Name TWO types of pile foundations. (2)
You are required to install a beam on the second storey of a new building that
is supported only on one side and will be used as the new balcony.
Name the beam you will install to support the weight. (1)
By means of TWO horizontal sectional sketches in the ANSWER BOOK,
differentiate between a square column with FOUR main bars and a round
column with SLX main bars. Indicate the stirrups and the minimum concrete
cover of the columns that have already been casted. (6)
FIGURE 6.5 below shows a drawing of a rib and block floor.
Identify parts A to E.
\, A
I< E eo e <— oe B
¥ NE OAL —e
e e oe D
E
FIGURE 6.5 (5)
ANSWER SHEET 6.6 shows an incomplete reinforced concrete beam resting
ona wall.
Complete the reinforcing for the concrete beam by drawing the omitted
members. (8)
Copyright reserved Please turn over
Civil Technology: Construction
16
NSC Confidential
DBE/November 2025
6.7 FIGURE 6.7 below shows the floor plan of a small tool room with a gable roof.
So
So
Oo
foo)
12 500
FIGURE 6.7
Use the following specifications:
oe ee
The superstructure is a one-brick wall.
The centre-to-centre spacing between the roof trusses is 1 200 mm.
The length of the rafter is 4 920 mm.
The centre-to-centre spacing between the purlins is 1 130 mm.
Use the dimension paper on ANSWER SHEET 6.7 and calculate the following.
Round off your answers to TWO decimal places.
6.7.1 The length of the wall plate
6.7.2 The number of roof trusses
6.7.3 The number of purlins
NOTE: A mark will be awarded for the correct use of the dimension paper.
Copyright reserved
TOTAL:
(4)
(4)
(4)
(1)
[40]
200
Civil Technology: Construction
NSC Confidential
DBE/November 2025
| CENTRE NUMBER: [ [| | ]
[EXAMINATIONNUMBER: | | |_| L [|
ANSWER SHEET 2
NO. QUESTIONS ANSWERS MARKS
1 What elevation is indicated by 1
* | FIGURE A?
2 Deduce, from the notes column, what 1
* | type of roof is indicated by number 1.
What energy-generating components
3. | are installed on the roof, as indicated 1
by number 2?
4. | Identify number 3. 1
Identify number 4. 1
6 What material is recommended to be 1
* | used to manufacture number 5?
7. | Identify number 6. 1
8 Write down the abbreviation for 1
“| number 7.
9 Identify the end shape used to 1
* | manufacture number 8.
10 How many built-in cupboards are 1
* | there in the building?
11 What electrical installation has been 1
* | omitted in the building?
What type of material can be used to
12. | manufacture the fascia board in 1
FIGURE A?
How should the opening direction of
13. | the sliding door be indicated on the 1
floor plan?
14 Name ONE material that can be used 1
* | to manufacture number 9.
15 Deduce, from the notes column, what 1
* | must be installed above every window.
Copyright reserved
Civil Technology: Construction
NSC Confidential
| CENTRE NUMBER: | [| [ |
DBE/November 2025
[EXAMINATION NUMBER: | | | |
16.
How many external doors are visible
on the southern side of the building?
17.
How many water closets are installed
in the building?
18.
Identify number 10.
19.
Deduce the thickness of the internal
walls from FIGURE B.
20.
State the reference code of the
proposed building.
21.
How many 1 200 x 600 mm windows
are there in the building?
22.
Deduce, from the notes column, the
dimensions of the aluminium side
panel with windows.
23.
Draw the symbol for a grease trap.
24.
Draw the symbol for undisturbed
earth.
25.
What sanitary fitting is installed in the
scullery?
26.
Calculate the area of the scullery to be
covered with floor tiles.
The sink unit must be installed on top
of the tiles.
Give your answer in m?.
27.
Calculate the total length of the wall
on the northern side of the building.
Show ALL calculations. The length
must be indicated in metres.
TOTAL:
40
Copyright reserved
pauasal yyGisAdog
zt] = 1WLOL
Zz Zz
L 9
L g
Zz v
? €
L z
L L “Vy
WAV S.ALVGIGNVD MYVN| “ON
VIdaLlldd LNAWSSASSV
9°¢ LASHS YAMSNV
fy | | [| [ [| [| [ J J] J J J 2a38inn NOLLVNINV Xa |
LTT tT tT 7] T J 7MSGWNN SYLNAO |
fenuepyuod ISN
SZ0Z JequieAON/3gd uoONsuag :ABojouysa | AID)
Civil Technology: Construction DBE/November 2025
NSC Confidential
| CENTRE NUMBER: [TTT {Tf [4
[EXAMINATIONNUMBER: | | | | | | | | | [| | | J 4
ANSWER SHEET 4.10
TIE
CONCRETE
+. CLEAT
|4+__—_——. SHUTTER BOARD
[1 [3 FIXING PLATE
ASSESSMENT CRITERIA
NO. | MARK | CANDIDATE'S MARK
1 1
2 2
3 1
4 1
5 1
TOTAL: 6
Copyright reserved
Civil Technology: Construction DBE/November 2025
NSC Confidential
| CENTRE NUMBER: LILIsIt[ I 4)
[EXAMINATIONNUMBER: | | | | | | | | | | [| | [J
ANSWER SHEET 5.4
ASSESSMENT CRITERIA
NO. | MARK | CANDIDATE'S MARK
1 2
2 1
3 3
4 1
TOTAL: 7
Copyright reserved
Civil Technology: Construction
NSC Confidential
| CENTRE NUMBER:
| | | | J J J
DBE/November 2025
| EXAMINATION NUMBER: |
| |] [| | | |} TT |
ANSWER SHEET 5.5
ASSESSMENT CRITERIA
NO. MARK _| CANDIDATE'S MARK
1 2
2 1
3 1
4 1
5 1
6 1
7 1
8 1
TOTAL: 9
Copyright reserved
Civil Technology: Construction DBE/November 2025
NSC Confidential
[| CENTRE NUMBER: LTT TT Ty fT 4
[EXAMINATIONNUMBER: | | | | | | [| | [| | | [ J{ 4
ANSWER SHEET 6.6
“Neg
24 gy. CONCRETE
vas BEAM
WALL
ASSESSMENT CRITERIA
NO. | MARK | CANDIDATE'S MARK
1 2
2 2
3 2
4 1
5 1
TOTAL:| 8
Copyright reserved
Civil Technology: Construction DBE/November 2025
NSC Confidential
[ CENTRE NUMBER: [TTT JT TT T 4
[EXAMINATION NUMBER: | | | | | | |
ANSWER SHEET 6.7
DIMENSION PAPER
A B Cc D
6.7.1
(4)
A B Cc D
6.7.2
(4)
A B c D
6.7.3
(4)
Correct use of dimension paper (1)
[40]
Copyright reserved
Study this subject
Recommended for this subject
%20MG%20Eng--0e265899-dc44-4809-aabf-8f374f1af392/v1-73a07814cfc9334618a1/card.webp)
Memorandum
Civil Technology Grade 12 NSC November 2025 Memo (English)
%20Eng_hlayiso.com_--e6743728-8140-42ae-838d-282654a975a5/v1-dce3e047e0d7ad60a32b/card.webp)
Question paper
Civil Technology Grade 12 NSC November 2023 QP (Eng)
%20Afr_hlayiso.com_--b820ac91-947c-4aed-821f-256aa13aabe1/v1-3be01795eace6f81b174/card.webp)
Question paper
Civil Technology Grade 12 NSC November 2023 QP (Afr)
%20Afr_hlayiso.com_--f6f7ac38-fb55-4d61-bc66-5441e4cbcee0/v1-b3313a875de5f3475dc0/card.webp)
Question paper
Civil Technology Grade 12 NSC November 2023 QP (Afr)
%20Eng_hlayiso.com_--fdfc3cf4-1a3a-4817-a3e9-a2c7f9fe5c2e/v1-c9563485d35727af6c76/card.webp)
Question paper
Civil Technology Grade 12 NSC November 2023 QP (Eng)
%20Eng_hlayiso.com_--fd47df8e-afbf-4ba2-8858-18deaf33c455/v1-d7b3c4a38228f498c17f/card.webp)
Question paper
Civil Technology Grade 12 NSC November 2023 QP (Eng)
More from Grade 12 Civil Technology
%20(Afrikaans)%20June%202025%20Possible%20Answers--c0a65d19-28ca-4ac3-8c61-d4627d2a3133/v1-5f42c573694769cf80ce/card.webp)
Memorandum
Civil Technology Grade 12 Gauteng June 2025 Memo (Afrikaans)

Memorandum
Civil Technology Grade 12 Eastern Cape Prelim 2024 Memo

Memorandum
Civil Technology Grade 12 Eastern Cape Prelim 2024 Memo

Memorandum
Civil Technology Grade 12 Eastern Cape Prelim 2024 Memo

Memorandum
Civil Technology Grade 12 Eastern Cape Prelim 2024 Memo
%20Afr--307147a5-3280-4a11-a82e-cf3e33388eb0/v1-e53e38093df191bfe243/card.webp)
Question paper