Downloaded from hlayiso.com
GRAAD 12
NATIONAL
SENIOR CERTIFICATE
GRADE 12
CIVIL TECHNOLOGY: WOODWORKING
NOVEMBER 2019
MARKING GUIDELINES
MARKS: 200
These marking guidelines consist of 19 pages.
Copyright reserved Please turn over
Skip to contentAll 2019 papers %20Memo%20Afr_hlayiso.com_--13c03cd5-cfa4-42cf-9a7c-5d7b0e1069f0/v1-b52b9528a267b4d4a925/card.webp)
%20Memo%20Eng_hlayiso.com_--53bd979c-a0bb-411f-960b-1f8755cd4874/v1-6e2a9c2564a39a8c61d5/card.webp)
%20Eng_hlayiso.com_--b6e1822a-1416-45e5-97a8-13da0db177cd/v1-eeb0408976bd747bcb1f/card.webp)
%20Eng_hlayiso.com_--52c5e936-0c5c-4ea4-8929-a76fdaa48f02/v1-dee98d56b9368d5925f1/card.webp)
%20Afr_hlayiso.com_--560716c2-e3ed-412e-90e8-42d36162ee0d/v1-41dc402fc627c1a9afd9/card.webp)
%20Afr_hlayiso.com_--1a837a2b-2575-4096-939a-dd10f12a0bf9/v1-5a0c458a76489c046ea7/card.webp)
View all%20(English%20and%20Afrikaans)%20June%202025%20Question%20Paper--c8edd459-5237-48e0-8588-69d7ecd7f8e5/v1-be996aaed91bf782e098/card.webp)
%20Afr--591d6ffd-20b1-4748-a1ba-b055be0a14c3/v1-4d98a131fd37e013458a/card.webp)
%20Afr--05a95faf-5891-4d88-9e5e-7d13c1d21648/v1-f5ca67113376f7457b83/card.webp)


%20Afr--eefaae29-fe93-4b75-8223-87bf4f3fc14c/v1-3553acfa446acbaa2a45/card.webp)
Civil Technology Grade 12 NSC November 2019 Memo (English)
Grade 12 Civil Technology memorandum from the NSC November Exam 2019 (English), 19 pages. Read online or download the free PDF.
Civil Technology · Grade 12 · NSC November Exam · 2019. Memorandum, 19 pages. Read online or download the PDF.
- Subject
- Civil Technology
- Grade
- Grade 12
- Document type
- Memorandum
- Year
- 2019
- Exam period
- NSC November Exam
- Curriculum
- CAPS
- Pages
- 19
- File size
- 415.5 KB
Free to read online, no sign-up needed
Loading document…
Loading document…
1 of 19
This exam
Document textSearch extracted text and jump to a page.
Downloaded from hlayiso.com
Civil Technology: Woodworking 2 DBE/November 2019
NSC – Marking Guidelines
QUESTION 1: OHSA, SAFETY, MATERIALS, TOOLS, EQUIPMENT AND JOINING
(GENERIC)
1.1 1.1.1 B (1)
1.1.2 I (1)
1.1.3 A (1)
1.1.4 G/H (1)
1.1.5 C (1)
1.1.6 F (1)
1.1.7 J (1)
1.1.8 E (1)
1.2 Electroplating:
• protects metals against corrosion.
• improves the engineering- and mechanical properties of metal.
• may be used to increase the thickness of undersized parts.
• is decorative.
• will extend the life span.
ANY TWO OF THE ABOVE (2)
1.3 Curing (1)
1.4 The moisture:
• delays/prevents the rapid drying of fresh concrete.
• prevents concrete from cracking.
• ensures that fresh concrete hardens properly.
• allows adhesive bonding.
• increases strength of fresh concrete.
ANY ONE OF THE ABOVE (1)
1.5 • When material is transported in bulk, it must be secured firmly.
• When material is transported to higher levels, make sure that workers
maintain a safe distance from the material being moved overhead.
• When heavy material is transported with a lift/hoist/machine, a
qualified person must take charge of operations.
• Wear appropriate personal protective equipment (PPE).
• Material must be transported in a safe way.
• Transport should not be overloaded with material.
ANY TWO OF THE ABOVE (2)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 3 DBE/November 2019
NSC – Marking Guidelines
1.6 Scaffold planks should:
• be made of a solid wood at least 228 mm wide and 38 mm thick.
• be able to support the load.
• be free from defects.
• not be painted as it will hide defects/be slippery.
• be supported at distances not exceeding 1,25 m.
• not project less than 70 mm and not more than 230 mm beyond the
ends of the last prop.
• be firmly secured to prevent its displacement.
• be placed in such a way to prevent materials and tools from falling
through.
ANY ONE OF THE ABOVE (1)
1.7 1.7.1 Dumpy level (1)
1.7.2 If the dumpy level is not set up level:
• it will give inaccurate readings.
• wrong levels will be transferred.
• true levels will not be transferred.
ANY ONE OF THE ABOVE (1)
1.8 1.8.1 A – Plastic plug/Plug/Rawl plug/Fisher plug/Fibre plug (1)
1.8.2 A screw (1)
1.8.3 Plastic plugs are used to secure:
• cupboards against a wall.
• mirrors against a wall.
• portraits and similar objects against a wall.
• objects, limited to certain weight, against walls.
ANY ONE OF THE ABOVE (1)
[20]
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 4 DBE/November 2019
NSC – Marking Guidelines
QUESTION 2: GRAPHICS AS MEANS OF COMMUNICATION (GENERICS)
ANSWER SHEET 2
NO. QUESTIONS ANSWERS MARKS
1 Identify the elevation in FIGURE A. West Elevation 1
Identify the type of roof that is used
2 Hipped roof 1
on the building in FIGURE A.
Ridge Capping/Ridge plate/Ridge
3 Identify number 1. 1
tile/Hip cap
Balcony/Floor slab of
4 Identify number 4. 1
balcony/Cantilever/Concrete slab
External door/Entrance
5 Identify number 5. 1
door/Door/Outside door
6 Identify number 7. Gutter 1
Rainwater down pipe/RWDP/Down
7 Identify number 8. 1
pipe
8 Identify number 12. Wash trough/Wash tub 1
9 Identify number 13. Built-in cupboard/BIC 1
10 Identify number 15. Landing 1
Identify the company that printed
11 Dlamini printers 1
the building plan.
Name a suitable material that can
Fibre cement/Galvanised sheeting/
12 be used for the manufacturing of 1
Timber/Plastic/PVC/Polyvinylchloride
number 2.
Name the drawing symbol in the
Electricity meter/Electrical meter/Watt
13 column for the notes in FIGURE 2 1
meter/Prepaid meter
that must be installed in the kitchen.
Name the drawing symbol in the
column for the notes in FIGURE 2
14 Face brick 1
that indicates the type of bricks for
the building.
Name a material that should NOT Steel/Mild steel/Iron/Ferrous
15 be used to manufacture the frame 1
metals
of number 9 for coastal areas.
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 5 DBE/November 2019
NSC – Marking Guidelines
Name a material that can be used Stainless steel/Plastic/Ceramic/
16 to manufacture the sanitary fitting Granite/Acrylic/Fibre 1
indicated by number 11. Glass/Concrete
17 Who checked the building plan? P Carter 1
How many types of windows are
18 2 1
used in FIGURE B?
What does the abbreviation NGL at
19 Natural ground level 1
number 6 stand for?
Give the reference code for this
20 QP 2-2019 1
plan.
Which room will electrical symbol
21 Lounge 1
16 serve?
Prevent people from falling off/through.
22 Describe the purpose of number 3. 2
Electrical wiring/Wiring/Electrical
Explain what the curved lines
cable/Wiring from light switch to
23 between the electrical installations 2
light/Shows which switch operates
in FIGURE B indicate.
which electrical fitting.
Explain why the light switch is To prevent steam/moisture entering
24 mounted on the outside of the the switch/To prevent electrical shock 1
bathroom. due to moisture/For safety purposes
Identify in FIGURE 2 which
25 North elevation 1
elevation does NOT have windows.
Identify the thickness of the internal
26 110 mm 1
wall in FIGURE 2.
13 – Built-in cupboard: to store
items.
Differentiate between symbols 13
27 15 – Landing: to rest/safety 2
and 15 in terms of their purpose.
feature/change of direction of
stairs
Ground floorplan:
• does not indicate the roofline
• does not indicate the balcony
• indicate an entrance door to the
Justify why FIGURE B is a ground house
28 • indicate a step at the entrance 1
floor plan.
door
• the position of the windows and
door correlate with the positions
of the window and door on the
west elevation
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 6 DBE/November 2019
NSC – Marking Guidelines
Predict what will happen if number 10 Water/Damp will penetrate into the
29 1
is NOT installed. wall.
Redraw the staircase in FIGURE B in OR
30 the adjacent column and indicate the 2
direction of the flight with arrows.
220 + 2 600 + 110 +
3 400 + 220
= 6 550 mm or 6,55 m
IF INCORRECT METHOD IS USED
TO CALCULATE THE ANSWER
USE THE FOLLOWING SLIDING
SCALE:
Calculate the total length of the wall
31 on the eastern side of the building. • 4 MARKS WILL BE 6
Show ALL calculations. AWARDED IF ALL FIVE
VALUES ARE CORRECT
• 3 MARKS FOR FOUR
VALUES CORRECT
• 2 MARKS FOR THREE
VALUES CORRECT
• 1 MARK FOR 2 VALUES
CORRECT
TOTAL: 40
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 7 DBE/November 2019
NSC – Marking Guidelines
QUESTION 3: CASEMENTS, CUPBOARDS, WALL-PANELLING AND
QUANTITIES (SPECIFIC)
3.1 3.1.1 16 mm (1)
3.1.2 Skirting (1)
3.1.3 7,5 m² (1)
3.1.4 Mullion (1)
3.2 3.2.1 • Transom
• Bottom rail of fanlight/ Bottom rail
• Top rail of casement/ Top rail
• Frame stile/Stile/Casement stile/Fanlight stile
ANY THREE OF THE ABOVE (3)
3.2.2 Drip groove/Throat/Groove (1)
3.3 A B C D
3.3.1 Area of roof sheeting needed:
Width of the roof = 150 mm + 8 000 mm + 150
mm
= 8 300 mm
Length of sheet =Length of rafter + overhang of
roof sheeting
2/ 8,3 = 2 900 mm + 50 mm = 2 950 mm
2,95 48,97 m2 NO UNIT IN FINAL ANSWER NO MARK (6)
3.3.2 Number of ridge plates needed:
Length of one ridge plate = 1 800 mm
Width of roof covering = 8 300 mm
Number of ridge Width of roof covering
=
plates Length of one ridge plate
8,3
=
1,8
= 4,61
= 5 ridge plates of 1,8 m long are needed (3)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 8 DBE/November 2019
NSC – Marking Guidelines
3.4
ASSESSMENT MARK
CRITERIA
Wall 1
Capping 1
Rough ground 1
Tongue and groove
1
board
Correctness of drawing 1
TOTAL: 5 (5)
Correctness
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 9 DBE/November 2019
NSC – Marking Guidelines
3.5
DRAWERS CAN BE THE FULL
WIDTH OR PLACED ON THE LEFT
SIDE.
TWO SHELVES CAN ALSO BE ON
THE LEFT SIDE
ASSESSMENT CRITERIA MARK
Top shelf (full width) 1
Intermediate side in middle 1
Hanging space on left side 1
Oval hanging rail 1
FOUR shelves 2
TWO drawer units below
1
shelving
Correctness of drawing 1
TOTAL: 8
Correctness
(8)
[30]
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 10 DBE/November 2019
NSC – Marking Guidelines
QUESTION 4: ROOFS, CEILINGS, TOOLS AND EQUIPMENT, AND MATERIALS
(SPECIFIC)
4.1 4.1.1 A Jigsaw
B Lathe (2)
4.1.2 •Clean the jigsaw blade after use.
•Store in such a way that the blade is protected.
•Use blade only for the intended purposes.
•Do not force the jigsaw blade to cut through material.
•Avoid the use of blunt saw blades.
•Keep the power cord away from the blade.
•Always plan your cuts carefully – make pre-cuts if necessary to
prevent blade from breaking.
• Use the correct blade for the specific work.
• Check if the blade is tightly/correctly secured and is not bent.
ANY TWO OF THE ABOVE (2)
4.1.3 •Always ensure that the work piece/stock is fastened tightly.
•Ensure that the work piece/stock moves freely.
•Ensure that the tool rest is locked as close as possible to the
work piece/stock.
ANY TWO OF THE ABOVE (2)
4.2 • Store the belt sander in a place where it cannot be damaged by dirt or
dust.
• Store in a wooden box away from moisture.
ANY ONE OF THE ABOVE (1)
4.3 • Strength
• Density (2)
4.4 • Sand the wood surface with different grades of sandpaper
• Sand until the surface is smooth and free from scratches.
• Remove all dust. (3)
4.5 • A conventional trapdoor can be removed/consists of a panel that can be
pushed up
• Hinged trapdoor opens upwards/downwards by pivoting around the
hinges. (2)
4.6 Timber framework
Panel
Cover strip
ANY TWO OF THE ABOVE (2)
4.7 King post: 114 mm x 38 mm
Brandering: 38 mm x 38 mm/38 mm x 50 mm (2)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 11 DBE/November 2019
NSC – Marking Guidelines
4.8 Hurricane clips:
• Securing purlins to rafters (roof truss)
• Securing trusses to wall plates
• Ideally used at eaves overhangs
• Where truss cross each other or where truss members cross each
other or meet at 90°
• To fix opposite faces of roof members.
ANY ONE OF THE ABOVE
Storm clips:
• Securing roof tiles to the battens. (2)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 12 DBE/November 2019
NSC – Marking Guidelines
4.9 RIDGE BEAM
228 mm x 38 mm
RAFTER
114 mm x 38 mm
WALL PLATE
TIE BEAM
114 mm x 38 mm 114 mm x 38 mm
SPAN 3 m
WALL 220 mm
ASSESSMENT CRITERIA MARK
Walls drawn correctly 2
Wall plates drawn correctly 2
Tie beam drawn correctly 2
Rafters drawn correctly 2 Scale
Ridge beam drawn correctly 2
Overhang drawn correctly 2
Labels (any TWO) 2
Span 1
Dimensions of members (any 2
TWO)
Application of scale:
ONE or TWO incorrect =3
THREE or FOUR incorrect = 2 3
More than FIVE incorrect = 1
NO measurement correct = 0
TOTAL: 20
DRAWING NOT TO SCALE
A MASK MUST BE USED TO MARK THIS QUESTION (20)
TOTAL [40]
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 13 DBE/November 2019
NSC – Marking Guidelines
QUESTION 5: CENTRING, FORMWORK, SHORING AND GRAPHICS AS MEANS
OF COMMUNICATION (SPECIFIC)
5.1 5.1.1 Open laggings (1)
5.1.2 Closed laggings (1)
5.2
RIB
TIE/TIE BEAM
ASSESSMENT CRITERIA MARK
Tie beam 1
Ribs 2
Two labels 2
Correctness of drawing 1
Correctness
TOTAL: 6 (6)
5.3 Steel/Metal/Hard board/Plywood/Fibre glass/Plastic (1)
5.4 Releasing oil/Shuttering oil/Plastic (1)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 14 DBE/November 2019
NSC – Marking Guidelines
5.5 SHUTTERING
BOARD SIDE
CLEAT
STRUT/STAY
WEDGE
BEARER/HEAD TREE
KICKER/FIXING PLATE
FISHPLATE
STRUT/BRACE
PROP
ASSESSMENT CRITERIA MARK
Shuttering board side 1 Correctness
Cleat 1
Kicker/Fixing plate 1
Wedge 1
Stay/Strut 1
Any TWO labels 2
Correctness of drawing 1
TOTAL: 8
IF CANDIDATE DREW THE FULL DRAWING, MARK ONLY THE LEFT
HAND SIDE.
IF CANDIDATE DREW RIGHT SIDE ONLY, A MAXIMUM OF SEVEN
MARKS WILL BE AWARDED. (8)
5.6 A - Needle/Cleat
B - Straining sill
C - Inclined strut/Raking strut/Strut
D - Horizontal shore/Shore
E - Folding wedge
F - Wall (6)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 15 DBE/November 2019
NSC – Marking Guidelines
5.7
Scale
ASSESSMENT CRITERIA MARK
Stile 1
Top rail 1
Haunch 3
Application of scale 1
TOTAL: 6
IF THE EXPLODED VIEW IS DRAWN A MAXIMUM OF 5 MARKS WILL BE
(6)
AWARDED.
TOTAL 30
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 16 DBE/November 2019
NSC – Marking Guidelines
QUESTION 6: SUSPENDED FLOORS, STAIRCASES, IRONMONGERY, DOORS
AND JOINING (SPECIFIC)
6.1 6.1.1 D (1)
6.1.2 D (1)
6.1.3 A (1)
6.1.4 A (1)
6.1.5 B (1)
6.2.1 Double bare face mortise and tenon joint (1)
6.2.2 Framed ledge braced batten door. (1)
6.3
(3)
Doorframe
OR
Jamb lining
ASSESSMENT CRITERIA MARK
Frame profile of door 2
Jamb lining profile 3
Any title 1
(3)
TOTAL: 6
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 17 DBE/November 2019
NSC – Marking Guidelines
6.4
Correctness
ASSESSMENT CRITERIA MARK
Muntin 1
Raised panels 2
Space for expansion and shrinkage 1
Hatching 1
Correctness of drawing 1
TOTAL: 6 (6)
6.5 • On a cupboard door
• On a drawer (2)
6.6 Night latch (NO BRAND NAMES ACCEPTED) (1)
6.7
Correctness
ASSESSMENT CRITERIA MARK
Treads on each flight of stairs 2
Half-landing 1
Newel post 1
Open well 1
Correctness of drawing 1
TOTAL: 6 (6)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 18 DBE/November 2019
NSC – Marking Guidelines
6.8
AIR BRICK
ANT GUARD
DPC/DAMP PROOF COURSE
Hatching
Correctness
ASSESSMENT CRITERIA MARK
Bearer 1
Joists 2
Wall plate 1
Tongue and groove floorboard 1
Skirting 1
Quadrant 1
Hatching 1
Labels for: Ant guard 1
Air brick 1
DPC 1
Correctness of drawing 1
TOTAL: 12
(12)
Copyright reserved
Downloaded from hlayiso.com
Civil Technology: Woodworking 19 DBE/November 2019
NSC – Marking Guidelines
AIR BRICK
ANT GUARD
DPC/DAMP PROOF
COURSE
ANT GUARD
DPC/DAMP PROOF
COURSE
Hatching
Correctness
ASSESSMENT CRITERIA MARK
Bearer 1
Joists 2
Wall plate 1
Tongue and groove floorboard 1
Skirting 1
Quadrant 1
Hatching 1
Labels for: Ant guard 1
Air brick 1
DPC 1
Correctness of drawing 1
TOTAL: 12
(12)
[40]
TOTAL: 200
Copyright reserved
Study this subject
Recommended for this subject
%20Memo%20Afr_hlayiso.com_--13c03cd5-cfa4-42cf-9a7c-5d7b0e1069f0/v1-b52b9528a267b4d4a925/card.webp)
Memorandum
Civil Technology Grade 12 NSC November 2019 Memo (Afrikaans)
%20Memo%20Eng_hlayiso.com_--53bd979c-a0bb-411f-960b-1f8755cd4874/v1-6e2a9c2564a39a8c61d5/card.webp)
Memorandum
Civil Technology Grade 12 NSC November 2019 Memo (English)
%20Eng_hlayiso.com_--b6e1822a-1416-45e5-97a8-13da0db177cd/v1-eeb0408976bd747bcb1f/card.webp)
Question paper
Civil Technology Grade 12 NSC November 2019 QP (Eng)
%20Eng_hlayiso.com_--52c5e936-0c5c-4ea4-8929-a76fdaa48f02/v1-dee98d56b9368d5925f1/card.webp)
Question paper
Civil Technology Grade 12 NSC November 2019 QP (Eng)
%20Afr_hlayiso.com_--560716c2-e3ed-412e-90e8-42d36162ee0d/v1-41dc402fc627c1a9afd9/card.webp)
Question paper
Civil Technology Grade 12 NSC November 2019 QP (Afr)
%20Afr_hlayiso.com_--1a837a2b-2575-4096-939a-dd10f12a0bf9/v1-5a0c458a76489c046ea7/card.webp)
Question paper
Civil Technology Grade 12 NSC November 2019 QP (Afr)
More from Grade 12 Civil Technology
%20(English%20and%20Afrikaans)%20June%202025%20Question%20Paper--c8edd459-5237-48e0-8588-69d7ecd7f8e5/v1-be996aaed91bf782e098/card.webp)
Question paper
Civil Technology Grade 12 Gauteng June 2025 QP (Afr)
%20Afr--591d6ffd-20b1-4748-a1ba-b055be0a14c3/v1-4d98a131fd37e013458a/card.webp)
Question paper
Civil Technology Grade 12 NSC June 2025 Question Paper (Afr)
%20Afr--05a95faf-5891-4d88-9e5e-7d13c1d21648/v1-f5ca67113376f7457b83/card.webp)
Question paper
Civil Technology Grade 12 NSC November 2025 QP (Afr)

Question paper
Civil Technology Grade 12 Eastern Cape Prelim 2024 QP (Afr)

Question paper
Civil Technology Grade 12 Eastern Cape Prelim 2024 QP (Eng)
%20Afr--eefaae29-fe93-4b75-8223-87bf4f3fc14c/v1-3553acfa446acbaa2a45/card.webp)
Question paper