Downloaded from hlayiso.com
GRAAD 12
NATIONAL
SENIOR CERTIFICATE
GRADE 12
CIVIL TECHNOLOGY: WOODWORKING
NOVEMBER 2021
MARKING GUIDELINES
MARKS: 200
These marking guidelines consist of 21 pages.
Copyright reserved Please turn over
Skip to contentAll 2021 papers %20Eng_hlayiso.com_--dcb7f976-b3d6-42a9-b2b1-44ae9b2d8e3f/v1-323df2bd04b35e089240/card.webp)
%20Eng_hlayiso.com_--f39d7571-db9f-4ded-b5e7-27008235ca8b/v1-4efe03b2e24afe8e530e/card.webp)

%20%20MG%20Afr_hlayiso.com_--42b5315c-825c-40e3-b394-85e0253fc0fb/v1-6058b260e68654519cc3/card.webp)
%20Memo%20Eng_hlayiso.com_--f06cef7f-235e-45f7-9f9b-f8e6a2b0c0ca/v1-45ae92f9d9d194afe959/card.webp)
%20Memo%20Afr_hlayiso.com_--8cffc125-69c0-44e9-b0eb-88ae7e930363/v1-fca2156d2557644edb35/card.webp)
View all%20(English%20and%20Afrikaans)%20June%202025%20Question%20Paper--c8edd459-5237-48e0-8588-69d7ecd7f8e5/v1-be996aaed91bf782e098/card.webp)
%20Afr--591d6ffd-20b1-4748-a1ba-b055be0a14c3/v1-4d98a131fd37e013458a/card.webp)
%20Afr--05a95faf-5891-4d88-9e5e-7d13c1d21648/v1-f5ca67113376f7457b83/card.webp)


%20Afr--eefaae29-fe93-4b75-8223-87bf4f3fc14c/v1-3553acfa446acbaa2a45/card.webp)
Civil Technology Grade 12 NSC November 2021 Memo (English)
Grade 12 Civil Technology memorandum from the NSC November Exam 2021 (English), 21 pages. Read online or download the free PDF.
Civil Technology · Grade 12 · NSC November Exam · 2021. Memorandum. Read online or download the PDF.
- Subject
- Civil Technology
- Grade
- Grade 12
- Document type
- Memorandum
- Year
- 2021
- Exam period
- NSC November Exam
- Curriculum
- CAPS
- Pages
- 21
- File size
- 353.9 KB
Free to read online, no sign-up needed
Loading document…
Loading document…
1 of 21
This exam
Document textSearch extracted text and jump to a page.
Downloaded from hlayiso.com
Civil Technology: Woodworking 2 DBE/November 2021
NSC – Marking Guidelines
INSTRUCTIONS FOR THE MARKERS
1. Markers should:
Familiarise themselves with the question and answer before evaluating the
responses of candidates.
Always interpret the responses of the candidates within the context of the
question.
Consider any relevant and acceptable answer during pre-marking, but
should strictly adhere to the answers after finalisation of the marking
guidelines.
There are two approaches to answering questions, these are (1) to describe
and (2) to explain.
If a candidate is required to explain e.g. a process in 4 steps, only the first 4
responses should be considered.
If, however a candidate is required to e.g. explain or describe how to
transfer heights from one point to another using a transparent pipe level we
need to consider that candidates may write a long description not
necessarily well organised as an intellectual response may do. In this case
the marker needs to evaluate the complete statement to judge if the
candidate explained the required outcome satisfactorily and allocate marks
on merit. The marker should apply his/her professional judgement with
these types of questions.
Mark what the candidate wrote and do not award marks for answers that the
marker thinks the candidate meant with what was written.
Indicate the tick or cross right at the position where the mark needs to be
awarded or where the candidate made the error.
Accept the letter corresponding with the correct answer as well as the
answer written in full in multiple-choice questions.
Accept incorrect spelling in one-word answers unless the spelling changes
the meaning of the answer.
2. For calculations:
A mark is only awarded if the correct unit is written next to the answer.
If TWO marks are awarded, ONE mark is awarded for the answer and ONE
mark for the correct unit.
Where the candidate made a principle error, e.g. use an incorrect method to
calculate the answer, marks will be awarded for the correct values used in
the calculation. No marks will be awarded for the answer of the incorrect
method that was followed.
Where an incorrect answer could be carried over to the next step, the first
answer will be deemed incorrect. However, should the incorrect answer be
carried over correctly, the marker has to recalculate the values, using the
incorrect answer from the first calculation. If correctly used, the candidate
should receive the full marks for subsequent calculations.
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 3 DBE/November 2021
NSC – Marking Guidelines
Markers should consider when and where a candidate has rounded off in
a calculation, as well as the subsequent effect it has on the final answer
obtained. The mark for calculations should therefore be awarded on
merit.
Alternative methods of calculations must be considered, provided that the
correct answer is obtained.
3. When marking drawings:
The member for which the mark should be awarded should be drawn
correctly in the correct position to receive a mark.
A member incorrectly drawn but wrongfully repeated in another position will
be awarded the mark for the repeated incorrect member, provided that the
marking guidelines provide for TWO or more marks for that member
(positive marking).
Marks can only be awarded for a label if the label is correctly indicating the
correct member.
Scale drawings should always be marked using an appropriate mask.
When a candidate drew the wrong drawing, e.g.:
A horizontal sectional view instead of a vertical sectional view, no marks will
be allocated to the drawing as the candidate did not respond to the
expected outcome.
An orthographic view instead of a sectional view, no marks will be allocated
to the drawing as the candidate did not respond to the expected outcome.
An orthographic view instead of an isometric view, no marks will be
allocated to the drawing as the candidate did not respond to the expected
outcome.
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 4 DBE/November 2021
NSC – Marking Guidelines
QUESTION 1: OHSA, SAFETY, MATERIALS, TOOLS, EQUIPMENT AND JOINING
(GENERIC)
1.1 1.1.1 Galvanising (1)
1.1.2 Paint (1)
1.1.3 Electroplating (1)
1.1.4 Curing (1)
1.1.5 Powder coating (1)
1.2 1.2.1 Scaffolding must be:
Properly propped against displacement.
Able to carry the mass or load.
Securely and effectively braced to ensure stability/Stable.
Secured at suitable vertical and horizontal distances to the
structure.
Free of defects/sharp edges.
Constructed so that it has a safety factor of at least two.
Levelled.
Inspected regularly.
ANY TWO OF THE ABOVE (2)
1.2.2 Toe-board/Kickboard (1)
1.2.3 When working on scaffolding:
Wear a safety harness/safety equipment/PPE.
Do not throw any materials from a scaffold.
Do not throw any tools from a scaffold.
Never jump from a scaffold.
Do not overload a scaffold.
Remove or cover sharp edges or corners of a scaffold.
Scaffolds should be kept free of waste/obstructions.
ANY TWO OF THE ABOVE (2)
1.3 To remove waste:
Use a chute/pipe chute
Use a conveyor belt/ramp
Use a bucket with a rope/pulley system
Use a forklift/mobi-lift/TLB/crane with a bucket/builders’ hoist
ANY TWO OF THE ABOVE (2)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 5 DBE/November 2021
NSC – Marking Guidelines
1.4 Safe use of trestle scaffolds:
Scaffolds should be soundly constructed of solid material.
All precautionary measures should be taken to prevent the unexpected
spreading of its supporting legs when in use.
Trestles should not exceed a height of 3 m.
Trestles scaffolds should not consist of more than two tiers.
ANY TWO OF THE ABOVE (2)
1.5 Hoisting materials and equipment in a builder’s hoist:
Materials and equipment should be firmly stacked.
Materials and equipment should be correctly stacked.
Materials and equipment should be properly secured.
Gates must be shut when in use.
Overhead protection must be provided.
Qualified person must operate the builders' hoist.
Emergency brake mechanism must be installed.
Not exceed the working capacity of the hoist/Not overload the hoist.
Safety measures must be displayed inside the cage.
ANY ONE OF THE ABOVE (1)
1.6 Drill a hole through the two metal plates.
Insert the bolt into the drilled holes.
Fasten the two plates with a bolt and nut. (3)
1.7 Used to locate:
Materials behind walls.
Materials in ceilings.
Materials under floors.
Steel bars
Copper pipes
Ferrous metals
Non-ferrous metals
Electrical wiring
Services
Wood/Wooden/metal studs behind walls.
The distance to and from an object.
ANY ONE OF THE ABOVE (1)
Care
Protect the multi-detector against:
Moisture/Water/Corrosion
Direct sunlight/heat
Extreme temperature changes
Bumps/Falling
Damage caused by the release of acid from the battery
ANY ONE OF THE ABOVE (1)
[20]
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 6 DBE/November 2021
NSC – Marking Guidelines
QUESTION 2: GRAPHICS AS MEANS OF COMMUNICATION (GENERIC)
ANSWER SHEET 2
NO. QUESTIONS ANSWERS MARKS
Identify the scale you will use for the 1 : 200
1. site plan and the floor plan 2
1 : 100
respectively.
Who is responsible to verify all
2. dimensions and levels on site before Contractors 1
commencing work?
What type of fencing does the
3. architect recommend for the new Palisade fencing/Palisade 1
dwelling?
State the colour that you would use to
4. indicate the new dwelling on the site Red 1
plan.
5. Identify number 1. Boundary line 1
6. Identify number 2. Building line 1
7. Identify number 3. Electricity meter/Watt meter 1
8. Identify number 4. Entrance/Exit/Driveway 1
9. Identify number 5. Water storage tank/Water tank 1
10. Identify number 6. Pavement/Walkway/Sidewalk 1
North point/North symbol/North
11. Identify number 7. 1
sign/North direction
Municipal connection/Municipal
12. Identify number 8. 1
manhole/Main sewer connection
13. Identify number 9. Manhole 1
Determine the distance between
14. number 2 and the new dwelling on the 4 000 mm/4 m 1
eastern side of the building.
Deduce the plot number of the new
15. Plot 31 1
dwelling from FIGURE A.
Which elevation is the closest to
16. South elevation/South 1
Loerie Street?
What is the plot number of the
17. property on the western side of the Plot 35 1
dwelling?
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 7 DBE/November 2021
NSC – Marking Guidelines
No window in the dining room
110 mm of outside wall is incorrect/
Internal wall thickness
Light switch in bathroom is in wrong
place
220 mm inside wall in room A is
incorrect/External wall thickness
No step at the kitchen door
No door in dining room/living
room/door opening
No arch indicated at dining 2
18. Deduce TWO faults on FIGURE B.
room/living room
Floor covering not indicated in
rooms
No socket outlets/plugs in rooms
No hatching of floor plan
No ceiling light in passage
No dashed/hidden detail lines
shown between living/dining/kitchen
to indicate the arch
ANY TWO OF THE ABOVE
Which natural feature is indicated on Trees/Shrubs 1
19.
the site plan?
What is wrong with the electrical The light switch is fitted on the
20. installation in the bathroom in inside of the bathroom/Switch is 1
FIGURE B? incorrectly placed.
21. Identify number 10. Ramp 1
Sink–double bowl/
22. Identify number 11. 1
Double bowl sink/Double sink
23. Identify number 12. Two-way switch 1
One-way switch single-pole/One-
24. Identify number 13. 1
way switch/Single-pole switch
25. Draw the symbol of a socket outlet. 2
26. Draw the symbol for a shower.
2
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 8 DBE/November 2021
NSC – Marking Guidelines
Draw the symbol for a wall-mounted 2
27.
light.
Dressing room/Walk-in closet
En-suite/Bathroom
Gym/Gymnasium
Study/Office
28. Recommend TWO uses for ROOM A. 2
Store/Rest/Baby/Play/Games/
Guest/TV room
Laundry
ANY TWO OF THE ABOVE
24 500 – 5 000 – 9 000 –
3 000 – 5 000
Calculate the omitted horizontal = 2 500 mm
29. dimension on the site plan. Give your ANY OTHER CALCULATION 6
answer in mm. Show ALL calculations. METHOD TO ARRIVE AT THE
ANSWER
TOTAL: 40
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 9 DBE/November 2021
NSC – Marking Guidelines
QUESTION 3: CUPBOARDS, CASEMENTS, WALL-PANELING AND QUANTITIES
(SPECIFIC)
3.1 3.1.1 Bottom rail of fanlight (1)
3.1.2 Transom (1)
3.1.3 Wood/Wooden (glazing) bead/Quadrant/Quarter round (1)
3.1.4 Reason for moulding:
To enhance appearance/Decorative appearance
To provide a good finish
ANY ONE OF THE ABOVE (1)
3.1.5 Small window above door/window (1)
3.1.6 To prevent water/moist from entering:
The house through the casement
The casement
ANY ONE OF THE ABOVE (1)
3.2.1
Member Quantity Unit Length Width Thickness Material
Side 2 mm 2 400 550 16 Melamine
Bottom 1 mm 1 068 550 16 Melamine
Top 1 mm 1 068 550 16 Melamine
Base front
1 mm 1 068 80 16 Melamine
rail
Shelf board 4 mm 550 526 16 Melamine
Intermediate
1 mm 2 368 550 16 Melamine
side
Back 1 mm 2 400 1 100 16 Melamine
(7)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 10 DBE/November 2021
NSC – Marking Guidelines
3.2.2
SIDE RAIL FRONT RAIL
TOP
SHELF BOARD
BACK
INTERMEDIATE SIDE
BOTTOM
BASE BACK RAIL BASE FRONT RAIL
HATCHING
ASSESSMENT CRITERIA MARK
Correctness of drawing:
Side rail 1
Front rail 1
Top 1
Shelve boards 2
Intermediate side 1
Bottom 1
Back/Back rail 1
Base front rail 1
Base back rail 1
Hatching 1
TOTAL: 11 (11)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 11 DBE/November 2021
NSC – Marking Guidelines
3.3
PLYWOOD
BOARD
SKIRTING
ROUGH GROUND
QUADRANT MOULD
FLOOR COVERING
APPLICATION OF SCALE
ASSESSMENT CRITERIA MARK
Correctness of drawing:
Plywood board 1
Skirting 1
Rough ground 1
Quadrant mould 1
Floor covering 1
Application of scale 1
TOTAL: 6
DRAWING NOT TO SCALE
USE A MASK TO MARK THIS QUESTION (6)
[30]
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 12 DBE/November 2021
NSC – Marking Guidelines
QUESTION 4: ROOFS, CEILINGS, TOOLS, EQUIPMENT AND MATERIALS
(SPECIFIC)
4.1 4.1.1 F (1)
4.1.2 H/B (1)
4.1.3 I (1)
4.1.4 K (1)
4.1.5 B (1)
4.1.6 J (1)
4.1.7 A (1)
4.1.8 E (1)
4.2 Both machines must be:
Switched on before coming into contact with the work piece.
Switched off when lifting the machine from the work piece. (2)
4.3 Safe handling of the square chisel with its drill (mortising attachment):
The square chisel with its drill bit must be securely tightened.
Ensure a clearance of 1 mm between the tip of the bit and the cutting
edge of the chisel.
Never use a blunt chisel and drill bit.
ANY TWO OF THE ABOVE (2)
4.4 When working with a belt sander and router:
Place both hands on the handles when operating these machines.
Keep your hands away from moving parts.
ANY ONE OF THE ABOVE (1)
4.5 4.5.1 Metal T-strip (1)
4.5.2 Tie beam (1)
4.5.3 Materials for trapdoor:
Gypsum board/Rhino board
Timber/Plywood/Masonite/Hardboard
Block board
Metal
Fibre-cement/Nu-tech
PVC/Plastic
ISO board
ANY THREE OF THE ABOVE (3)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 13 DBE/November 2021
NSC – Marking Guidelines
4.5.4 Aluminium is popular because:
It is light in weight.
It provides an aesthetic finish/No need to paint it.
It is durable/strong/corrosion free.
It is easy to fix against brandering.
ANY TWO OF THE ABOVE (2)
4.6 Lean-to roofs/Flat roofs
Couple roofs (2)
4.7 King post roof: Tie beam
Collar-tie roof: Collar beam (2)
4.8 Ridge beam (1)
4.9 To secure/fix the rafters to the ridge beam. (1)
4.10 The number of the queen posts will be determined by the:
Length of the tie-beam.
Span of the truss/building.
ANY ONE OF THE ABOVE (1)
4.11 Components used:
Soffit hanger
Bearer
Soffit board
Quarter-round moulding
Ceiling board/Slats
Fascia board
ANY TWO OF THE ABOVE (2)
4.12 2
4
6
3
5
1
MARK STRICTLY ACCORDING TO SEQUENCE (6)
4.13 Type of varnish finish:
Glossy
Matt
Satin/Sheen
ANY TWO OF THE ABOVE (2)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 14 DBE/November 2021
NSC – Marking Guidelines
4.14 Sanding sealer can be applied with a:
Spray gun
Brush
ANY ONE OF THE ABOVE
Wax can be applied with a:
Sponge
Shoe brush/Brush
Cloth
ANY ONE OF THE ABOVE (2)
4.15 Waxed surfaces tend to make:
White spots on the surface
White rings on the surface
ANY ONE OF THE ABOVE (1)
[40]
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 15 DBE/November 2021
NSC – Marking Guidelines
QUESTION 5: CENTERING, FORMWORK, SHORING AND GRAPHICS AS MEANS
OF COMMUNICATION (SPECIFIC)
5.1 5.1.1 C (1)
5.1.2 A (1)
5.1.3 D (1)
5.1.4 A (1)
5.1.5 B (1)
5.2 5.2.1 A: Segmental arch/Oval/Elliptical arch (1)
B: Semi-circular arch/Half round arch (1)
5.2.2 Closed laggings (1)
5.2.3 450 mm (1)
5.2.4 Ribs can be secured by:
Ties
Struts
ANY ONE OF THE ABOVE (1)
5.3
KING POST
QUEEN POST
TIE BEAM STRUT RAFTER
ASSESSMENT CRITERIA MARK
Correctness of drawing:
Rafters 2
King post 1
Queen posts 2
Struts 2
Tie beam 1
Label (Any ONE) 1
TOTAL: 9 (9)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 16 DBE/November 2021
NSC – Marking Guidelines
5.4 SHUTTERBOARD
BEARER JOIST
SIDE BEAM/SIDE
CLEAT/CLAMP
STRUT
WEDGE
KICKER/FIXING PLATE
SOFFIT BOARD
ASSESSMENT CRITERIA MARK
Correctness of drawing:
Bearer joists 2
Clamps/Cleats 2
Struts 2
Wedges 2
Kicker/Fixing plates 2
Label (Any ONE) 1
TOTAL: 11
(11)
[30]
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 17 DBE/November 2021
NSC – Marking Guidelines
QUESTION 6: SUSPENDED FLOORS, STAIRCASES, IRONMONGERY, DOORS
AND JOINING (SPECIFIC)
6.1 6.1.1 Night latch/lock (1)
6.1.2 Mortise lock (1)
6.1.3 Rim lock (1)
6.1.4 Straight cupboard lock (1)
6.2 6.2.1 Between the leg and the rail. (2)
6.2.2
ASSESSMENT CRITERIA MARK
Correctness of drawing:
Rail 1
Haunch 4
Tenon 3
TOTAL: 8 (8)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 18 DBE/November 2021
NSC – Marking Guidelines
6.3
WALL
FLOOR JOIST
TRUSS OR JOIST HANGER
(3)
6.4 STRAIGHT FLIGHT OF STAIRS WITH A LANDING
OR
(2)
AND
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 19 DBE/November 2021
NSC – Marking Guidelines
STAIRWELL WITH A HALF-LANDING
OR
(3)
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 20 DBE/November 2021
NSC – Marking Guidelines
6.5
DIRECTION OF GRAIN
TONGUE AND GROOVE
FLOORBOARDS
SKIRTING
WALL QUADRANT
PLASTER
JOIST
AIRBRICK
BEARER
ANT GUARD
WALL PLATE
DPC
BRICK
NGL PIER
FOUNDATION
ASSESSMENT CRITERIA MARK
Correctness of drawing:
Closure of opening between wall and floorboards 2
Members supporting flooring boards:
Wall plate 1
Bearer 1
Joists 2
One-brick pier with foundation 2
Prevention of termites and moisture at the pier 2
TOTAL: 10
Copyright reserved Please turn over
Downloaded from hlayiso.com
Civil Technology: Woodworking 21 DBE/November 2021
NSC – Marking Guidelines
6.6 SIDELIGHT
STILE
FRAME STILE BOTTOM RAIL
WITH
REBATE RAISED AND
FIELDED PANEL
GROOVE
ASSESSMENT CRITERIA MARK
Correctness of drawing:
Frame stile with rebate 2
Sidelight stile 1
Groove/Clearance for expansion 1
Bottom rail 1
Raised and fielded panel 2
Hatching 1
TOTAL: 8 (8)
[40]
TOTAL: 200
Copyright reserved
Study this subject
Recommended for this subject
%20Eng_hlayiso.com_--dcb7f976-b3d6-42a9-b2b1-44ae9b2d8e3f/v1-323df2bd04b35e089240/card.webp)
Question paper
Civil Technology Grade 12 NSC November 2021 QP (Eng)
%20Eng_hlayiso.com_--f39d7571-db9f-4ded-b5e7-27008235ca8b/v1-4efe03b2e24afe8e530e/card.webp)
Question paper
Civil Technology Grade 12 NSC November 2021 QP (Eng)

Memorandum
Civil Technology Grade 12 Eastern Cape Mock 2021 Memo (Eng)
%20%20MG%20Afr_hlayiso.com_--42b5315c-825c-40e3-b394-85e0253fc0fb/v1-6058b260e68654519cc3/card.webp)
Memorandum
Civil Technology Grade 12 NSC November 2023 Memo (Afrikaans)
%20Memo%20Eng_hlayiso.com_--f06cef7f-235e-45f7-9f9b-f8e6a2b0c0ca/v1-45ae92f9d9d194afe959/card.webp)
Memorandum
Civil Technology Grade 12 NSC November 2020 Memo (English)
%20Memo%20Afr_hlayiso.com_--8cffc125-69c0-44e9-b0eb-88ae7e930363/v1-fca2156d2557644edb35/card.webp)
Memorandum
Civil Technology Grade 12 NSC November 2020 Memo (Afrikaans)
More from Grade 12 Civil Technology
%20(English%20and%20Afrikaans)%20June%202025%20Question%20Paper--c8edd459-5237-48e0-8588-69d7ecd7f8e5/v1-be996aaed91bf782e098/card.webp)
Question paper
Civil Technology Grade 12 Gauteng June 2025 QP (Afr)
%20Afr--591d6ffd-20b1-4748-a1ba-b055be0a14c3/v1-4d98a131fd37e013458a/card.webp)
Question paper
Civil Technology Grade 12 NSC June 2025 Question Paper (Afr)
%20Afr--05a95faf-5891-4d88-9e5e-7d13c1d21648/v1-f5ca67113376f7457b83/card.webp)
Question paper
Civil Technology Grade 12 NSC November 2025 QP (Afr)

Question paper
Civil Technology Grade 12 Eastern Cape Prelim 2024 QP (Afr)

Question paper
Civil Technology Grade 12 Eastern Cape Prelim 2024 QP (Eng)
%20Afr--eefaae29-fe93-4b75-8223-87bf4f3fc14c/v1-3553acfa446acbaa2a45/card.webp)
Question paper